I. ret) Level In Sewers
Aroclor sewer loss control data are attached. Averape monthly daily PCB losses from the plant and the treatment plaht influent and effluent values are plotted to note trend as we approach our Eoal of 2///day daily loss.
A. Aroclor Department- Excellent control within the the department in July. The average dally loss from
the department was <0.2#/day.
B. Total Plant - July daily losses through the 25th varied
from 2 to 76#/day with a monthly averape of 22#/day.
This compares with an 180/day average influent to the
treatment plant. No known major losses occurred
during the month.
.
C. Treatment Plant Effluent - July (thru 25th) average at 8#/day. Lowest monthly daily averape experienced.
In one four day period the PCB loss was down to 2#/day which is the Business Group's objective.
11. Project Status
All therminol units in the plant have been changed to non-PCB fluids.
Estimate No.
.
2095
"Aroclor Scrap Rework" - 90+X complete. EDC changed from 7/1/71 to 9/1/71. To permit proper rework of returned material to Dept. 246.
HONS 099010
Mr. J. R. Savage - 0.0. Status - PCB Pollution
Control Program
Pace 2 August 2, 1971
WOK
Estimate No. 2922
2982
Paving and Curbing" - EDC changed from 8/1/71 to 9/1/71. To contain losses In tank car and storage area In Dept. 296.
"Contaminant Collection at Rip Track" EDC 9/1/71. To permit recovery of T/C washings and draining.
2675
"Air Pollution Control" - Design package to be Issued In August. Nitrogen blanket on mix tanks to eliminate atmospheric pollution in Dept. 296.
"Pave Under Therminol Unit" - EDC changed from' 8/1/71 to 9/1/71. Contain material In Dept. 296.
"Enlarge Aroclor Settling Basin" - Design package Issued in July.
III. Program Status
Continue to take routine sewer samples. Obtain additional samples as needed to check validity of results.
/br Att.
HONS 099011
H, /j aJaJ( stp*J ^-<no''p'
Current level -- Aroclor losses during July 1971 sveraged
2.14 lbs./day (240 ppb). Breakdown of numbers are:
^<^wf ojt^y
Normal level/
Ruptured MifaC Tank
140 ppb 45
1.24 lbs./day 0.40
Exceaslve Rain
55
0.50
Total
240 ppb
2.14 lbs./day
The (nonth of July had an unusual amount of Intermittent rain which may have caused the normal level to go above 1*0 lbs./day. Since our flow measurement is one per day It would not pick up the occassional cloudburst.
Spiljls with
Less than 10 gallons ickes Montar drawout line unplugged. No evidence of getting past the department sump pit.
MONS 099013 I