SAFE file ETHYL CORPORATION
MANUFACTURING AND TRAFFIC DEPARTMENT
PLAINTIFFS EXHIBIT
ETCd-514
May 31,- 1946 JUN
Mr. K. E.nsterbusch Stone & Webster Engineering Corporation 90 Broad Street New York 4, New York
EXHIBIT
PLCASE AOORC3S REPLY TO CHRYSLER BUILDING
AOS LCXINOTON AVL.NCW YORK 17, N
. 3. i. VV.E.C-I
irile No*
ooc. No;
Dear.Mr. Hnsterbusch:
The Ethyl Corporation hereby requests the services of Stone & Webster Engineering Corporation in connection with the installation of additional oooling water facilities for process equipment in the Ho. 3 Ethyl Chloride Plant at Baton Rouge, Louisiana. The work to be performed by you will comprise essentially the installa tion of an 8* water line from our No. 2 well to our collecting basin, including the necessary tie-in connections. We understand that this work has already been discussed in detail with your Held supervisor at Baton Rouge. This work is estimated as costing in the neighborhood of $1,200.
We propose that the work be carried out in accordance with Part II - Design and Construction, of Term Contraot between us dated May 29, 1945. In view of the fact that your services will con sist essentially of construction, we propose that this work be consider ed a Class "CB project. Ary insurance recommendations other than Work men's Compensation insurance covering your employees are to be submitted to us for approval. In view of the size of this project, we reconmend that all clerical work and reports be reduced to a minimum.
so advise.
If the foregoing is acceptable to you will you kindly
Very truly yours.
ccs NIB BB
*)
Pro. Div.: NY, Bos., Houston) 6/6/46
Contract File: NY, Bos.
)
SAFE FILE
tx n uuoiuu UiiuiiXliUiUiXU ViUlti'UiliVA1UJ>
y$rt Kr
SAFE FILE
Oob&cMjs'Xl j sf. i W.E.C.
jr lit No.;
\39SS
-':c. No. /^r
J 5, 194&
Mr. J. B. Schaefer, Ties Ethyl Corporation K&suf&oturing and Traffl Chrysler Building 405 Lexington Avenue Her loric 17f Boa Iork
CX)Lw riJ
ulUTiSg
BO. 3 EXH > CHL H m PLAIT
BATtW a
A OiaiiBA _
Dear Mr. Schaefers
This is to eeknoeledge lottor of Hay 31 authorising os th Installation of additional too Bo* 3 Ethyl Chlorlda
thank you for your s la connection idth **ter facilities for
This uwrk sill bo fart IX - Design and Construction, May 29, 1945 and will bo considered
out in aeoordasoo dth ra Contreat dated Class *C".yrejeot
foxy truly yours.
Karl Plasterbusch Tice President
f/f7j.o.
QTtAAR ociMXB BB
Pro. Div.s NX, Boo., Houston Contract Piles HX, Boa.
SAFE file
0 7f (?
>. *
SAFE FILE BTHYJL CORPORATION
D |VL Manufacturing and Traffic Department
#B * <9
May 31, 1946
t-.n.7rn
ii" 1Qh &
4 cW "C
FLEASC ADDRESS REPLY TO CHRYSLER BUILDING
Mr. K. Hnsterbusoh Stone & Webster Engineering Corporation 90 Broad Street New York 4, New York
Dear Mr. ELnsterbusch:
The Ethyl Corporation requests the services of Stone & Webster Engineering Corporation in connection with a construction project covering the erection of 2. - 5,000 barrel hortonspheres at onr Baton Rouge, Louisiana, Plant. These hortonspheres were recently purchased from Alabama Ordnance Works. They have been dismantled and will be erected at Baton Rouge by the Chicago Bridge and Iron Company. Under our contract with Chicago Bridge and Iron Company we are to provide suitable foundations for the spheres and neces sary connecting piping and services.
We wish Stone & Webster Engineering Corporation to do the follow ing work for us in connection with the re-erection of these spheres: (1) Ex cavations, form and concrete work for foundations and fire-walls, (2) Installa tion of a 3" firing line from Ethyl Chloride Storage, including the construction and installation of the necessary pipe supports and road bridges, (3) Re-location of plant fence and fence lighting facilities,(4) Installation of a 6" fire line end fire hydrant near the hortonspheres, (5) Installation of a 1-1/2* air line to the hortonspheres, (6) Installation of concrete ducts and 6* cestiron drain lines to drain the fire-wall enclosures, (7) Installation of No. 6 TJB.W.P. control wires to the pump at the hortonspheres and 110-220440 volt service, together with necessary wire and poles,' (8) Construction of ooncrete pump sump and installation of a 4* castiron drain line from the pump sump, (9) Installa tion of necessary wiring, transformers and electrical facilities for temporary 440-volt service for welding equipment. We understand that this work has already been discussed in detail with your field supervisor at Baton Rouge.
We propose that the foregoing work be carried out in accordance with Part II - Design and Construction, of Term Contract between us dated May 29, 1945. In view of the fact that your servioes will consist essentially of oonstruotion, we propose that the work be considered a Class *C* project. Any engineering and drafting services required for this work will be supplied under Article X (d) at cost plus an equal amount to cover overhead expense. Any insurance recommendations other then Workmans Compensation insurance covering your employees engaged in this work are to be submitted to us for approval. In view of the site of this project, we recommend that all eletloal work and reports, eto., be reduced to a minimum.
.SAFE FILE
.2
Mr. K. linsterbusch Stone k Webster Engineering Corporation
May 31, 1946
advise.
If the foregoing is acceptable to you, to.11 you kindly so Very truly yours.
8-3
cc: NZB BB
)
Pro. Div.: NY, Bos., Houston)
Contract File: NY, Bos.
)
6/6/46
Diuiiu cc
iMMxli\isiiKUN(i UittPOKAIlOW
SAFE FILE
|S.1W.E.C. File No.sSS? Cv>c. No.Z^-|
i _____ .'
1 ~S>tA^L
RWC
\
June S| 1946
itr. J. H. Schaefer, Tie*
Ethyl Corporation
lieunfacturiag and Traffic
Chrytler Building
405 Lexington Arena*
.
Me* lark 17, B Toric 1
aafiKsiiSiEii
BAJCW
i&mm
Dear Mr. Schaetferi
>1
Thank you for your letterof Hay 31 authorising
ns to undertake rsrious Tsork in doaueatlaa with th* re-ereetien
of tee 5,000 b&rral borton,pfoereSs^tt your Baton Kongo,
<
Plant. Thia letter will eonatitutfcsohr acceptance end coaflra
the understanding that the work wllineWrrled out in accordance
with Part ZZ < Design end Construetiaa^of tb Tern Contract
between as dated Say 29, 1945, enid will be considered a Claes *C*
undertaking.
Tory truly yours.
Karl Piasterbuach Tie* President
181$
KFiAAB cet HZB BB
Pro. Sir.t BT, Boa., Houston Contract Pilot MX, Bos.
SAFE FILE
> ORDER
tiflLXi, UUKFOKATION SAFE FILE
Tn Stone & Webster Engineering Corporation? o. No.
Z'lks.tp^.....................................
ZIZZZZIIZIIZIIIZIIIII.IIIZZZZIZZZZII REQ. No.
T-27164T-3266
SHIP TO.. Ethyl Corporation................ ... TEL Plant...................................
... Bato.n...RQttge.r.ZLD.hl.aiaoa.......
INVOICE TO ( 4- COPIES) .. Ethyl.....C.Qrp.Qr.atlon................
...P.*....Q*....Box..34i............................
.. Baton^.RQUg.e.JL.,....J^.ulfllaiia.
.................
ORDER DATE May 30, 1946
.................
DELIVERY DATE -
.................
VIA Cheapest Way
................ ....... ... TERMS Net 30 DaysF.O.B. -
ri--?
PACKING SLIPS showing the order number must be placed in each package. 'URCHASE ORDER NUMBER MUST BE SHOWN ON VLL DOCUMENTS AND PACKAGES.
B1
RATION
PURCHASING AOKNT
1
ORDER C` 0
isJLttXL CORPORATION
safe file
to___SDBe...&..Wfibter....Ei^jLiie.ering...C..Qrp....
....~Bjos.tm,....Mas*.._.................................. ...........
P.O.No. E-33626
REQ. No. ELA-46-9282
SHIP TO.... Ethyl...C.orporalion............/ORDER DATE Dec. 10, 194-6
....ELA.JP.lant..............................
.... Ba.ton..Ro.uge.,....La................ !... ......DELIVERY DATE -
INVOICE TO ( 4 COPIES)
.... Ethyl...Corpor.ation.............. VIA -
.... P.*O...BoX..341............................
.... Baton-Rouge.,....La*................. ....... .............
TERMS Net 30 DaysF.O.B.-
QUANTITY
-- MATERIAL
Furnish Necessary Lab or & Material To Install A New
150' High Flare Stack With! Ladder & Guys, A New Seal Drum With Necessary Piping And All Foundation Work. On The Above Items.,/
PRICE
f12,560,
THIS IS IN ACCORDANCE WITH BATON ROUCS FORCES *
___________ ESTIMATE #17
..
V.
"CONDITIONS GOVERNING WORK BY: INDEPENDENT CONTRACTORS" IS A BART OF THIS ORDER.
I'
'SAFE'FILS'1
CCl'iDiLFOofi VHD i-'Z,
The seller or contractor, by accepting this purchase order, agrees to comply with the terms and conditions on the reverse side hereof.
PACKING SLIPS showing the order number must be placed in each package.
PURCHASE ORDER NUMBER MUST BE SHOWN ON
ALL DOCUMENTS AND PACKAGES.
~bt:
ETHYL CORPORATION
jr/-- /
PURCHASING AGCHT
1
ORDER ii
ceimniuL CUUKK/^'HPUURRAATTIIOON
\m&a
Doc. N<
TO_.?.?.P.&^..-&_Webs.t;.er...ngineering...Corpcratlon p- O. No. T-33255" .Bost.(3.n.,..,,itaJs.a^.................................................
........................... -... -..................... An''"Ft'f"'='......
REQ* No. T-6S03
SHIP TO.Etfcyl....C.arparatlon........................................... _ .TEL...P.lant...............................................................
.Mi.O.a RQ.uge.,....Lo.uislana................................ INVOICE TO ( 4- COPIES)
.Eth3r.l....G.o.rp.o.r.atlaii................... .......................
...........................................................
.B&t.Q.rj...iIo.uge...l.,....Lo.'uls.iaiia...........................
ORDER DATE December 2 1946 *
DELIVERY DATE _
_
VIA
F.O.B. -
TERMSflet 30Day
:m NO. I QUANTITY
MATERIAL
PRICE
Please Alter Existing Bldg. Location on The East End
of the Engineering and Maintenance Buildings to Provide For Office Space for Contractors in Prefdrming Work on
Projects BR-7S0 and BR-795
6,020
THIS IS IN ACCORDANCE WITH YOUR BATON ROUGE FORCES' _______________________ ESTIMATE #lg
r the attached "conditions governing work by / independent contractors11 is a part of this order
PLEASE M FURSISH COPIES T1 INVOICE
1
I ...SAFE PILE
rhe seller or contractor, by accepting this purchase order, agrees to :ompIy with the terms and conditions appearing on the face and jn the reverse side hereof.
MEORTANT--Render invoices in triplicate. ' 3ACKING SLIPS showing the order number must be placed in each package. 'URCHASE ORDER NUMBER MUST BE SHOWN ON \LL DOCUMENTS AND PACKAGES.
ORM 144-10M.3B30I-A-A6
CORPORATION
PURCHASING AGENT
SAl*b. rii-c.
CC: Mr. C. W. Bond Mr. W. J. Henry
^ ^
ETHYL CORPORATION
Hr. P. L. Griffiths Mr. P. B. Monahan
Manufacturing and Traffic Department
Mr. R. H. Cowlishaw Mr. J. S. Southwick
September 16,
1946
PL. CASE AODPC3S RfPtVTO CHRYSLER OUILOIHG
OS LCXINOTON AVL,MIW YORK 17, N.Y.
S. 1 W.E.C.
rile No
K01H) SEP 17 13^6
m SEP
Mr. K. Finsterbusch Stone & Webster Engineering Corporation 90 Broad Street New York 4, Hew York
Dear Mr. Finsterbusch:
The Ethyl Corporation requests the service of Stone & Webster Engineering Corporation in connection with the design and construction of new Ethyl fluid drumming facilities, including building, to be erected at the site of its Baton Rouge, Louisiana, Plant.
We wish Stone & Webster Engineering Corporation to do the following work in connection with this project:
(a) Design building and equipment for Ethyl fluid drumming, including reconditioning of drums, etc.
(b) Construct building and building extension with necessary plumbing, drainage, fire protection, lighting, heating, ventilation, and provide power for same; install equip ment for drum loading and reconditioning, and perform all necessary yard work and pro vide yard facilities including grading, con struction of retaining walls and railroad siding, relocating of roadways and parking areas, laying of service, process and power lines, etc.
We propose that the foregoing work be carried out in accord ance with Part II, Design and Construction of Term Contract between us, dated May 29, 1945. In view of the fact that your work will involve a relatively large amount of engineering, considering the project as a whole, and a relatively large amount of services from the Construction, Purchasing and other Departments of your Company, we are agreeable that this work be considered a Class A project and as such the fee for your services to be at the rate />f 8-3/4 percent of the cost of the work (estimated at $700,000).
safe file
Mr. K. Finster- jch 2 -ptember 16, 1946
113111 you please submit to us your insurance recommendations, other than Workmen's Compensation Insurance covering Stone t Webster employees engaged in this work, for approval. We understand that your representatives have discussed vdth our Finance Department the account ing procedure to be employed and a detailed outline of the practice will be submitted to us for approval at an early date.
We have discussed with the New Orleans office of CPA the ques tion of ordering long term delivery materials not on the restricted list prior to their approval of our CPA application and they have raised no objections. In accordance herewith, we hereby authorize you, as soon as practical, to issue purchase orders covering any long term delivery materials not on the CPA restricted list.
By this letter. Stone & Webster is authorized to charge to the Ethyl. Corporation any costs incurred by you in connection with this work prior to the date hereof.
If the foregoing proposal is acceptable to you, will you kindly so signify by signing this letter in duplicate in the space provided for therein and return one copy to us for our files.
Very truly yours.
ACCEPTED: STONE & WEBSTER ENGINEERING CORPORATION
By
"WLce President
cc:NYB BB FAS (2) Pro. Div.rNY, Bos) 9/20/46 Contract File: NT)
\\ M, A
STONE & WKRSTER ENGINEERING CORPORATION
SAFE FILE
OOtZZhtZ^^fijl^NNno-iSSTlJV k>oc- No^fL.........
September 20, 1946
Mr. John B* Schaefer, Tiee Ethyl Corporation Chrysler Building 405 Lexington inont lev Xork 17, Bov Xork
Dear Mr. Schaefers
Inclosed ii a-cogy ,of- jpu r letter of September 16
authorising as to proceed vith ticj del
and construction of the
nev Ethyl Fluid Brassing Fadlit; .<
B^trn Rouge, Louisiana,
Fe have signed the acceptance to thanlc you for this tart.
of this letter and wish
truly yours.
^closure
EFlAJLE
ocimCB BB FAS(2) Pro. RIt. l HI, Bos Cantraet Files SI, Bos
Earl Finstexboseh Tioe President
SAFE FILE
A
Mr. P. L. Griffith* E A. Yatger
SAFE FILE
--~h% i~G
OOl Hr* X* Rnstarbuaoh'^ Mr* C. W* Bond Mr* W* J* Bonry
Mr. ? B. Monohon -t Mr* B. H. Cowliahs*
ptOTED
SEP ^0 1946
S.4.W.E.O.
,-ileNoSS-P5s
low York^^r
^>oc. NoJs
Bow York
4_ _ _ _ _ /! -
Contract with Stono & Wsbeter Englnaeiing rporation
Saptonbar 11, 1946
HOTHJ SEP Is 1946 J.W.V.
Undor data of May SI, 1946, we anther! sad Stono & Webstar EngLnoerlng Corporation to praparo preliminary plans and a ooat eetimate for dnmrdng fact li tie* at Baton Bongo* YHa work was undertakan undor Part I of our fen Contrast with 8tono 4 Webster. This study iu assigned J.O. 7610 by Stono & Webster and is now complete
We aro today authorising 8tono 4 Wobator to proceed -oith tho design and construction of tho drunning foollities for Baton Bouge. TJndar our Torn Contract, Stono 4 Wobator is authorised to invoice ua under Fart I at thair regular expert or pr dies rata, axeapt in auoh cases where tho project is subsequently authorised undor Part II of our Tom Contract, in which ease tho charge ie to bo adjusted to 2/S thoir regular expert or par dLam rate.
Since tho work oenpletod under J .0 . T810 io being authorised by ua undor Part II of the Tern Oontraot, the inroioo oorerLng saaio
should ba at 2/s of Stona 4 Webster's regular export or per Aon rate,
in imraLoe in eoeordanee therewith will bo aoooptoblo. The inroioo should show on ite face that tho ohorgo la adjusted to 2/S thoir regu lar export or per diem rate by virtue of subsequent onthorlaaticn un dor part II of our fans Contract.
6toj
E. A* Yaegsr
SAFE FILE
J.O. 7889
7810
SAFE FILE
407139
September 20, 1946
Mr. F. a. Stevens Stone A Webster Engineering Corp. 90 bread 8treat Kow York 4, U York
ETHYL CORPORATION ETHYL FLUID DRUMMING FACILITIES
BATON ROUGE, LOUISIANA
J.O. 7810 - RKPCBI J._0. .7889 .* J>EIfiE .AH3-C0H61BU5T10M
Dear Hr. Stevens i
Attached Is copy of Ethyl Corporation's letter of September 16 authorising as to proceed with the design and construction of the subject facilities under the conditions of Fart 11 of our Tern Contract. The original of this letter is being sent to Eosten for the Contract File.
You will note that the next tc the last paragraph on Page 2 of Ethyl's letter refers to work dene prior to the date thereof which is intended to cover work we have done since we received their verLal authorisation to proceed with the design and construction, which was about August 9 when Ethyl asked that Mr. Casselsan go to baton Rouge to finalise the basis of design for this Job. I believe kr. Casselsan arrived in baton Rouge. Monday, august 12. so that any charges froa the date of their verbal authorisation would come under the design and construction work.
This same paragraph of their letter of Septenber 16 does not refer to the report we made on this Job under J. 0. 7810, which was done on the basis of Part 1 of our Tera Contract at per alea rates and will now be billed with the rates adjusted to two*thirds per diem in accordance with the Term Contract. Also attached is copy of Mr. Yaeger'a aemorandua of Septenber 11 to their Mr. Griffiths explaining that the work under J. 0. 7810 has now been coupleted and will be billed on the tvo-thlrda basis. Please note the refer* ence, in the last paragraph of this memorandum, to how they would desire the charges to be shown on our invoice.
Very truly yours,
Earl Finsterbusch Enclosures EPlAAB ccsKYb Lb Contract FlletEY
Pro.Dlv.i NY, Bos
SAFE FiLE
SAFE FILE ETHYL CORPORATION
Manufacturing and Traffic Department
November 12, 1946
PLEASE AOORES3 REPLY TO CHRYSLER BUILDING'
AOS LCXINOTON AVE.NCW YORK !7, N.V.
Mr. K. linsterbusch Stone & Webster Engineering Corporation 90 Broad Street New York 4, New York
Dear Mr. "Einsterbusch:
The Ethyl Corporation requests the services of Stone & Webster Engineering Corporation in connection with the erection of new ethylene dichlori.de manufacturing facilities at its Baton Eouge, Louisiana, Plant. We wish Stone & Webster to perform the construction work only for this expansion.
We propose that the foregoing work be oarried out in accordanoe with Part II - Design and Construction - of Term Contract between us, dated May 29, 1945. Since your Company is to perform the construction work only, this will be a Class nCn Project and will carry a fee of six and one-quarter per cent (estimated completed cost one hundred and twenty-five thousand dollars) of the "Cost of the Work" as same is de fined in the Term Contract.
Will you kindly see that insurance coverage for the work is in accordance with the terms and conditions stipulated by Mr. Southwick for insurance coverage on work to be performed by Stone & Webster for Ethyl18 account.
By this letter Stone & Webster is authorised to charge to the Ethyl Corporation any expenses incurred by your organization in connec tion with this work prior to the date hereof.
If the foregoing proposal is acoeptable to you, will you kindly so signify by signing this letter in duplicate in the space provided for herein and return one copy to us for our files.
Very truly yours.
3-3 ACCEPTED STONE & WEBSTER ENGINEERING CORPORATION
SAFE FILE
SAFE file
ETHYL CORPORATION
Manufacturing and Traffic Department
December 18, 191*6
Kaife!
___ <U
PUCASC AOORCSS REPLY TO CHRYSLER UILOING
406 LEXlNOTON AVE.NEW YORK 17, H.Y.
Mr. K. Finsterbusch Stone & Webster Engineering Corporation 90 Broad Street New York U, New York
Dear Mr. Finsterbusch.j
The Ethyl Corporation requests the services of Stone & Webster Engineering Corporation in connection with proposed plant expansion program now under consideration by the Ethyl Corporation at its Baton Rouge, Louisi ana, Plant.
We wish Stone & Webster Engineering Corporation to make a prelimin ary investigation of expansion facilities, including an ethane cracking plant, fractionating facilities, a chlorination plant and an ethylene dichloride plant, all in accordance with arrangements between Ethyl Corporation and Stone & Webster representatives.
We propose that the foregoing work be carried out under Part I, Consulting Engineering, of the Term Contract between us dated May 29, 19it. Your compensation for this work will be at your regular expert or per diem rates of the members of your organization for the term during which they are engaged in the work, plus travelling and incidental expenses. Should the work subsequently be authorized under Bart II of the Term Contract, an adjustment to two-thirds of your regular expert or per diem rates will be made when the projects are released for construction.
By this letter Stone & Webster is hereby authorized to charge to the Ethyl Corporation any costs incurred by you in connection with the work prior to the date hereof.
If the foregoing proposal is acceptable to you, will you kindly so signify by signing this letter in duplicate in the space provided below and return one copy to us for our files.
Very truly yours.
8-3
ACCEPTED: STONE &, WEBSTER ENGINEERING CORPORATION
ETHYL CORPORATION
Manufacturing and Traffic Department
so'iiir
September $, 19U7
PLEASE AOORESS REPLY TO>BOX 3*1 BATON ROUGE I.LA.
Stone i Y/ebster Engineering Corporation 90 Broad Street New York h, Mew York
PLANT EXPANSION - BATON ROUC-B, LOUISIANA
Dear Sirs:
FilE
The Ethyl Corporation requests the services of Stone <1 Tfebster Engineering Corporation in connection v/ith the design and construction of facilities for the expansion of its plants at Baton Rouge, Louisiana, the work to be performed under the terms and con ditions of the Term Contract between us dated Lay 29, 19U5
The new facilities to be included in the expansion program are briefly as follows:
Sodium Area
Salt evaporation, sodium handling, chlorine handling, additional rectifying units, and revisions to electrical system together vdth additional general facilities.
Tetraethyl Lead Area
Lead pot and furnace, lead-sodium alloy, steam jet refrigeration, nitrogen, TEL building and wash house, and fluid blending building, together with necessary storage, purification and general facilities.
Ethyl Chloride Area
No. U ethyl chloride, ethylene dichloride, ethylene production and purification, and vinyl chloride pilot plant together with necessary general facilities.
Since it is at this time impossible to estimate the extent of your services in connection with each of the specific items of work to be undertaken hereunder, including engineering, purchasing, expediting and accounting, it is suggested that we hold in abeyance the determination of the fee percentage of the "Cost of the Y;ork" on which your
Stone & Webster
-2-
9-S-hl
compensation is based until we can more clearly define the specific work to be undertaken by you. As in the past it is our desire to fix the total amount of your compensation for this work on the basis of a mutually approved definitive estimate of the Cost of the Work. At the time this estimate is available, we can also establish the fee percentage.
3y the terms of this letter, you are authorized to charge us any expenses incurred by your organization in connection with this work prior to the date hereof.
If the foregoing is acceptable, will you kindly so signify by signing this letter in duplicate in the space provided below and return one copy to us for our files.
Very truly yours.
Accented: STOES WEBSTER ENGINEERING CORPORATION
ay r\OsJL
Karl'Finsterbusch Vice President
/a > 19U7
SAFE FILE
f: ,
*V
ETHYL CORPORATION
Manufacturing and Traffic Department
February lii, 19U8
\~\\* Nodes*
TO -BOX 3*1 BATON POUOC1.UA.
File EMS Problem No. 1257-3B S & U J.O. No. S027-C
Stone L T/ebster Engineering Corporation
U9 Federal Street Boston 7, Massachusetts
ATTENTION: Mr. Karri' S. Houghton
Gentlemen:
HYDROCARBON GAS DRYER NO. U ETHYL CHLORIDE PLANT - ETHYL CHLORIDE AREA
PLANT EXPANSION - BATON ROUGE
In your letter of February 5, 19U8 you advised that the cost estimate and design of the component part's of the drying unit would be completed in the next few weeks. In order to save you needless work, we would advise your stopping activity on this job for the time being. The feed stream has been changed and as a consequence a new material balance will have to be made and the drying unit re-evaluated on the basis of new stream specifications. This information will be forwarded to you as soon as it can be developed.
Very truly yours
E. B. Turner Assistant Resident Manager
Engineering Superintendent
EP3:hm
CC: Mr. Yf. J. Henry Dr. H. E. O'Connell SAFE FILE Mr. B. B. Turner Mr. F. J. Maslyk (2) S & W, Baton Rouge
ETHYL CORPORATION
Manufacturing and Traffic Department
J.O. 8027-C
/J>
Stone & Webster Engineering Corporation 49 Federal Street Boston 7, Massachusetts
Gentlemen *
PROCESS REVISION #4 ETHYL CHLORIDE PLANT - ETHYL CHLORIDE AREA
PLANT EXPANSION - BATON ROUGE
Please refer to the letter of May 5, 1948, from your Mr, W, F, Ryan which transmitted an estimate of $6,700, exclusive of the services of Constructing Engineers, for wort to rearrange the flow of vapors between the reactors and the residual towers and the purchase and installation of a new separator drum, C-D-37, all of which was verbally authorized by our Mr* H, H. Wall, April 9, 1948.
We wish to approve your adding this estimate to the definitive estimate*
Very truly yours.
B* B. Turner Assistant Resident Manager
GSRjobs
Per*
XT c. Burl
2ft J
Engineering Sup erintendent
CCj
Dr. H* E. 01Connell Mr. W. J* Henry Mr. B* B. Turner Mr. F. J. Maslyk (2)-S k W, Baton Rouge
SAFE FILE
SAFE FILE
THYL C O RP O RAT > ''
MANUFACTURING AND TRAFFIC DEPARTMENT
April 19, 1948
0o*1X
. &&
in76^r
PLCASC ADDRC8S REPLY
TO 'BOX 34.1
^
BATON QOUOC I CA .
File EMS Problem 1421-3F
Stone & Webster Engineering Corporation 49 Federal Street Boston 7, Massachusetts
S 4 IT
J . 0 - No
8147
Gentlemens
REVISIONS TO NO. 3 ETHYL CHLORIDE PLANT ETHYL CHLORIDE AREA
PLANT EXPANSION - BATON ROUGE
In the conferences held in New York during December, 1947, it was arbitrarily decided that Ethyl would handle the engineering and construction required to make the No. 3 Ethyl Chloride Plant suitable for operation on Esso Standard's new "light ends* ethylene stream. Now that the job has been more thoroughly studied, we have decided that it would be more ad vantageous for Stone and Webster to handle all phases of this work (engineering, purchasing, and construction) in view of the similarity of this job with certain phases of the No. 4 Ethyl Chloride plant. In particular, most of the pressure vessels required for the No. 3 plant revision are exact dupli cates (with possible exception of nozzle orientation) of vessels required for the No. 4 Plant.
In order to expedite this project to take advantage of the early availability of the light ends stream, approval is being given to place duplicate orders wi th the successful bidder on the corresponding vessel in the No. 4 plant. The placement of orders should not be held up pending the study of nozzle orientation.
We are attaching to- this letter specifications for the major items of equipment (towers, drums, exchangers, and pumps) which are now known to be required. Subsequent investi gation may indicate that additional items are required, so the list should not be considered as fixed. Specifications on piping, instruments, etc, have not been handled at the time of this writing, but will be forwarded later. It is possible that the piping revisions could be made in the field to dispense with piping detail drawings.
SAFE FILE
S> ' * feTHvJ- CORPORATION
MANumtrruRiNa Department
Stone & Webster Engr* Corp.
Page 2
April 19, 1948
We should appreciate your accepting this added project and proceeding with its construction*
Tours very truly.
B. B* Turner Assistant Resident Manager
\
EPBt ebs
Engineering Superintendent
CCs
Mr* W. J. Henry Dr* H. E. 0`Connell Mr* J. B. Rhorer Mr* J. H* Schaeffer Mr. B. B* Turner Mr* p. J. Maslyk (2)-S & W, Baton Rouge
I
SAFE FiLE
Stone 8 Webster Engineering Corporation
90 Broad Street, New York 4
NSW YORK BOSTON CHICAGO HOUSTON NTTMURW LOS AMQCLES SAN FRANCISCO
April 26, VMS.
Mr. J. H. Scheffer, Tie* President Ethyl Corporation Baton Rouge, Louisiana.
J.O. 7660 and 8027^ ^ 7&J 1 F StSIL AMD TIHYL CHLORIDE PACTT.TTIE3
Dear Mr. Schaefers
An discussed In our meeting at Baton Eopge on April 9th, ve are outlining herein our-suggested arrangement for terminating our activities on the Ethylene Plant, our J.O. 60271 and Vinyl Pilot Plant, our J. 0. 8027T, since you hare deferred their conetruetion and removed them from the acope of the work under the Expansion Program.
Our eervlcee for engineering, drafting, inspection and ex pediting have been segregated for each of the jobs in the Expansion Pro gram and the amount expended at salary rates for the Ethylene Plant vill be determined. Ve propose that an equal amount to cover our administrative and incidental costs be paid us in addition to a Class "C" fee v&dch, in view of the fact that the total work now contemplated under the Program is in ex cess of $15,000,000, would be 3Jt of the Cost of the Vork which would include direct pay rolls, the 100^ overhead allowance on these and any ether eosts and expenses applicable to J.O. 8Q27E.
Similarly, ve propose that the Vinyl Pilot Plant be treated in the same manner except that in this case the Cost of the Work to which the Class *C* fee would apply would also Include any equipment and materials pur chased for this plant on which delivery has been taken end such cancellation charges as there may be.
You will, of course, realise that the fee will be a relatively small amount in either ease.
Prior to your authorisation to proceed with, the work under the Expansion Program, ve had made a design report and economic studies on the facilities for the Ethyl Chloride Area, Including the Ethylene Plant, Ethyl Chloride and Ethylene Bichloride.Plants under our J.O. 7880. This
SAFE FiLE
Mr. X. H. fick ..
2*
April 28, 1948
work vu performed under Port A of the Ten Contract and vac hilled at per die* rates for the engineering services. As provided in the Ten Contract, these services, upon your authorisation for constraction, were to he reduced to tao-thirds per din whleh would now be applicable to that part of the services pertaining to the Ethyl Chloride and Ethylene Pichloride Units which are still a part of the Expansion Program. However, since our record of the actual time spent on this work vas not segregated between the three individual phases of the study, ve cannot determine specifically what part of'the*'ser vices applied to the Ethylene Plant which is no longer included in the program and although ve estimate that approximately half of the time vas devoted to this plant, ve propose to reduce all of the per din charges to the two-thirds heals which will resalt in a credit to you of approximately $3,300.
If the foregoing meets with your approval, will you kindly so signify as provided below and return one copy for. our files.
Tours Very truly.
Karl Finsterbusch Vice President.
ST''TE STWSjz&rEB. EnGINEERING C IPORATIOii
J.O. 8027-K
November 22, 1948
Mr. John H. Schaefer, Vice President Ethyl Corporation P.0, Box 341 Eaton Rouge 1, Louisiana
___ -------------
SECOND EXPANSION PROGRAM
Dear Mr. Schaefer:
This will acknowledge your letter of November 3.1th regarding the purchasing of equipment and materials for the seventh Tetraethyl Lead Manufacturing Building and related facilities. We understood that 3-0'u desire to avoid delay by having us proceed with the purcheses until such time as de cision is reached on the selection of a contractor to perform the necessary engineering, procurement and construction work, which decision, at the time of the discussions, you knew would not be reached prior to November l6th
Your tinderstanding of the agreements reached between Mr. B. B. Turner ana Mr. Harry Houghton is essentially correct except as indicated in the following which refers to the corresponding3.y designated subparagraphs of your letter:
(a) Corrects However, the following should be added, which was part of the understanding:
"until the contractor to perform the necessary engineering, procurement and con struction work las been selected but not later than December 10, 1948."
(b) Corrects
(c) Correct,
(d) Correct, except that we have changed the designa tion for this work from J. 0. 8027-1 to J. 0oo027-K
Mr,, John H. Schaefer
2
November 22,19^8
(e) One of the purposes of giving the main job order number 8027 a designating letter (now K) was to be able to segregate time of personnel devoted to this work and any expenses from those to be charged to the
. job order number suffixes A to H. Therefore, we suggest that this subparagraph read as follows;
"(e) Inasmuch as purchases for the Second Expansion Program will be made over a limited period and will be accomplished by using the available local personnel of Stone ic Webster Engineering Corporation, the time spent on such purchasing and any expenses incurred will be charged to J.Oo 802/-K. However, Stone & Webster Engineering Corporation will not charge any fee for such purchasing work*"
(f) This is no longer required since the fact that wo v?ill not make any fee charge is covered in the suggested new subparagraph (e)c
You will note that ths above does not change the prin ciple of the understandings but primarily concerns the proper de signation of the purchasing work 'which is under way. If you are in accord with these suggested changes, we shall be glad to re ceive an amended letter for our acceptance.
Yours very truly.
Karl Finsterbusch Vice President
KF:AAR
cc:NYB BosB Pro.Div.:NY. Bos FAS(2) HSH lx
Stone 6 Webster Engineering Corporation
90 Broad Street, New York 4
jli&332
NEW YORK BOGTON CHICAGO HOUSTON PITTSBURGH LOS ANGELES SAN PRANCISCO
February 11, 1949
mb fee i4 ms iafiduif
Mr. E. LaCrosse
Stone & Webster Engineering Corporation 49 Federal Street Boston 7, Massachusetts
ETHYL CORPORATION J. 0. S027A.B.C.D & H AMD J. 0. 8147
Dear Mr. LaCrosse:
Attached is the signed and accepted original of Mr. Schaefer*s letter of February 4th as well as a copy of my transmittal letter returning to him the accepted copy of his letter for the Boston contract file. Mr. Schaefer's letter establishes the fixed fee for the subject jobs on the basis of the present scope of the work as represented by the Status Report as of January 1, 1949. Copies of this letter have been
made here for the New York files as well as two for F. A. Stevens.
Very truly yours.
Enclosures
Karl Finsterbusch
.*
!C'~/ '
SAFE FILE
/ ii ) / -:
ETHYL CORPORATION
Baton Rouge Plant,
February 4, 1949
PLCASC AOOPCSS OCPLV TO-BOX 34.1 BATON ROUGE I.LA.
Mr. Earl Finsterbusch Vice President Stone & Webster Engineering Corporation 90 Broad Street New York 4, Hew York
m eeb 14
Dear Mr. Finsterbusch:
Beference is made to the engineering and construction vork vhich Stone & Webster Engineering Corporation is performing for Ethyl Corporation at Baton Bouge, Louisiana, assigned your J. 0. Nos. 8027 A, B, C, L & H and 8147* In accordance vith our Letter of Authorization, dated September 5> 1947, and the Term Contract, dated May 29, 1945, we now propose to establish the fee percentage applicable thereto and determine your compensation for the work authorized. We submit for your consideration the fol lowing principles to be used in arriving at your compensation for this work.
The column of the "Status Beport as of January 1, 194-9" entitled "Total Authorized" shall be accepted as the starting point for the fee confutation. The total of this column represents the April and July, 1948 Estimate adjusted by Construction Change Orders covering increases and decreases resulting from further definitive engineering of the work authorized. From this total there shall be subtracted the following costs or credits, which, by Agreement or under the Term Contract, will not be included in the amount on which fee is to be based:
(a) Allowances for material escalation.
(b) Increases in material prices.
(c) Increases in wage rates.
(d) Taxes and contributions.
ethyl corporation BATON ROUSE PLANT
Mr. Earl Finsterbusch Page -2February h, 19^9
(e) Bebates, discounts, etc. (Since the Total Authorized column does not Include any such charges to Ethyl this item vill not be reflected in the fee calculation).
.From this total there shall also be subtracted the following estimated item of cost:
(f) Normal contingency.
To the total obtained after subtracting the amounts covered by (a) to (f) inclusive, above, there shall be added the following estimated item of cost:
(g) Normal contingency actually used in the fee base items of the work completed to date and a contingency allowance on the fee base items for the work remaining to be done, said contingency determined to be $750,000 total.
The "Cost of the Work" resulting after these deductions and addition shall be designated hereinafter as the "Fee Base Estimate".
The Fee Base Estimate shall be used for the fee computation. In accordance with the Term Contract, the vork covered by our authorize tion shall be Class "A" and Inasmuch as the Fee Base Estimate is in excess of $15,000,000, your compensation shall be based on a fee of five and three-fourths (5-3A$) percent. Tour compensation subject to change resulting only from (1), (2) and (3) below shall be the Fee Base Estimate times five and three-fourths (5~3A$) percent less an amount equal to that which Stone & Webster Engineering Corporation would have been required to spend for rental of office space had the Baton Bouge engineering vork been carried out at your home office, determined as $27,500
The fee as determined above shall be adjusted for the following reasons only:
(l) In the event of a material change in scope of the work as represented by the January 1, 19^9 Status Eeport, the Fee Base Estimate shall be increased or decreased in accordance with a mutually acceptable estimate of the cost of vork of such changes in scope and the fee determined herein shall be adjusted either up or down in accordance with the Term Contract and the principles herein established.
etmyl corporation / ' BATON ROUSE PLANT
Mr. Earl Finsterbusch Page -3Februaxy 4, 194-9
(2) Any mutually acceptable changes in the piping costs of J. 0. No. 8027 C, 1) & E as a result of the Definitive Estimate from take-off now being prepared shall be added to or subtracted from the Fee Base Estimate and the fee determined hereunder shall be adjusted up or down in accordance with the Term Contract and the principles herein established, except that such changes shall not Include costs of the type identified as items (a) to (f) inclusive, above.
(3) Any mutually acceptable changes in the costs of J. 0. No. 8027 A & B not originally in cluded in the January 1, 194-9 Status Beport under "Total Authorized" shall be added to or subtracted from the Fee Base Estimate and the fee determined hereunder shall be adjusted up or down in accordance with the Term Contract and the principles herein established, except that such changes shall not include costs of the type identified as items (a) to (f) inclusive., above.
Based upon the foregoing your fee has been determined in the attached Fee Calculation. If the foregoing principles for determining the fee due Stone & Webster Engineering Corporation for work authorized under J. 0. No. 8027 A, B, C, D&H and No. 814-7 and the attached Fee Calculation dated January 28, 194-9 are acceptable to you, will you please so indicate by signing this letter in duplicate in the space herein provided and return one copy to us.
ACCEPTED:
STONE & WEBSTER ENGINEERING CORPORATION
8
VO
00
CVJ
<P
O
trvs,
Bi CVJ
ea-
-a-
H
CO o o
o' o co
. VO
-te
o*v
oo
VO CD
o CVJ
cu
ffr
8 co
trv irv virov
VO CM
00 CcOn
V
Ov
V v
trv irv
t
cn
oirv
ccon
-l irv
-t=rf\
IA cn H
OJ
-e-
rn, in
CO H Ov O VO* VO*
H Jt
-e-
o VO
trv
con
VO CM
CVJ CVJ
1 tir\
Ov CM co
CM
5] ON
H
CO 05
CM Q o PQ
< H
CM
6
1-5
Ov CO CO
v
m OJ rH
V
IA C\J
-ee-
88
CM O CM
ctrov|
3
CO irv CO
CO
o
rn| o
CO Ov
on CM
w-
,88!
f- H
v
Vr^OCJO-
CO H
IiTrvV
VOV
ITV CO
trv
V
irv H
ITV
-iod-i-vtiro-v
v .
CM CO
oOn -HSi
e-
8
rl
a l CM
o
to -op
I su e I
p cto
I IfaH! $
oIDJ
w I--I
a]
8
CO
a
ao
n o
a
8-Op
*
J
euo
a
u
.8
n
s
Eh
tfl
^9 U01SSI
ws FEB l4
8
(
aop ao
m
8
e rH
l
BH
&
H
e Ph
I 3
P
te
* WiHiSIJKK KN6INEEBING COT"'ORATION
0-?,1-s k.P -.jeft-iozf
oS
Fstamary 11, 1949
J 0. So*. SQ271, B, 0, P & I
C 4 T. Attsohsd is * copy
of ttia lsttor Aidi has
jesopfsp ty as*
T*iy truly.
Diill oetXZB
XT
7A(2)
Boss
ZL&C
^ '> f iui 1":
safe file
Si
Stone & Webster Engineering Corporation
90 Broad Street. New York 4
4^ /C/t,.% -
NEW YORK BOSTON CHICAGO
HOUSTON PITTSBURGH LOS ANGELES
SAN FRANCISCO
IOTED SEP 1 11350 *
August 28, 1950.
Mr. J. H. Schaefer, Vice President Ethyl Corporation 100 Park Avenue New Toik, H. 7.
' f At. 0.
Dear Mr. Schaefer*
In your letter of February 4, 1949, which was accepted by ns Febroary 11, 1949* the amount of fee payable to ns vae determined for the work contemplated under yonr expansion program at Baton Bonge, Louisiana, as covered by onr Job Order Nos. 8027A, B, C, D and E and 8147. Ibis letter provided that changes in the piping casts of J.0. Bos. 8027C, D and H wold eanse an upward or downward adjustment in the fee as a result of definitive estimates which were then being prepared, and also provided for fee adjustment as might be warranted by change in scope of work or changes in the cost of J.0. Nos. 80274 and B as might be mutually acceptable.
The purpose of this letter is to summarise, as outlined be low, final fee adjustments in line with onr recent discussions:
1. The mntnally agreed fee base increase in the piping costs of J.0. Bos. 8027C, D and H is $173,270.
2. The scope of the work was increased wader J.0. Bo. 8027L and tile mntnally agreed fee base A?stin&te for the *LH accounts is $164,105*
3. Construction Change Orders affecting" varlorusaecounts under J.0. Mb^'8027 totaled $660,228 for fee..base items. However, since certain of this work could not be dassdd as increase in scope, it was mntnally agreed that one-half of this amount would be Included is the fee base estimate, i.e., an increase of $330,114*
4* Memo *xk Orders, which covered direct instructions to onr construction forces, totaled $134*480 for fee base accounts. However, it was agreed that no fee would bf charged on these Memo Hoik Orders*
5. Standby Operations covered services end node during the pro- limlnaxy operation of the new facilities and totaled $41,195
v
safe file
Mr. J. H. Schaefer
2.
kagvat 2d, 1950
for the fee base accounts, Although no amount had been indnded in osr definitive estimates or in the January 1,
1949 States Report to cover preliminary operation, it vas agreed that no fee would be charged for Standby Operations.
6. Certain miscellaneous voik is the various areas remained to be completed in December, 1949 ''hen by agreement our construction activities at the job site were brought to a dose. Die subsequent labor performed and material sup plied by Caldwell & McCann were estimated at $287,400. It was mutually agreed that this amount would be deducted from the fee base estimate.
If the foregoing and the attached Calculation of Additional Fee, dated August 4, 1950, are acceptable to yon, will you please so indi cate by signing this letter in duplicate in the space provided herein and return one copy to ns.
Tours very truly.
Enclosure
Karl Flnsterbosch Tice President.
Accepted*
i*l 11 . 1950
ran, CORPORATION
CALCULATION OF ADDITIONAL FEE AUGUST 4, 1950
J.O. BPS, 8027A. B. C, D. H & L
1. Increase in J.O. Son. 8027C, D & H, Piping 2* Additional for J.O. Bo. 8027L 3. Construction Change Orders -- 4* Hess ork Orders -- 5. Standby Operations -
TOTAL 6. Less Caldwell & McCann, Later -
let increase in FEE BASE ESTIMATE Additional Fee at 5~3/4
$173,270. 164,105. 330,114.
$667,4&9. 237.400.
$380,089. $ 21,855.