Document Vj9BE5RDmNNmx6O7rq8xpzxXN

INDUSTRIAL HYGIENE AND TOXICOLOGY* MUB8-000669 1=3 =3 M GULF OIL CORPORATIONMEDICAL DEPARTMENT PITTSBURGH. PA. JUNE 1974 BULLETIN INDUSTRIAL HYGIENE STANDARD NO. 25A OCCUPATIONAL SAFETY AND HEALTH ACT STANDARD FOR EXPOSURE TO ASBESTOS DUST Attached is a copy of the OSHA Standard 1910.93a for Exposure to Asbestos Dust as printed in the Federal Register on October 18, 1972. Some of the most important aspects of this regulation are highlighted below: 1. AIR SAMPLING (a) Employee exposures (see Table I) must have been monitored at all locations where asbestos fibers are released to the atmosphere to determine whether exposures are within limits. (b) At intervals no greater than 6 months, employees whose exposure to asbestos may reasonably be foreseen to exceed the criteria, must be re monitored . (c) The following types of air samples should be collected: (1) Personnel monitoring - 15 to 30 minute samples to determine peak concentrations (not to exceed 10 fibers/cc). (2) Long-term samples from 90 to 480 minutes to determine the 8-hour time weighted average (TWA) (not to exceed 5 fibers/cc) concentrations. (3) Environmental monitoring in the general work area to determine the 8-hour TWA concentrations. GULP 6209 Replacement for Industrial Hygiene Standard No December 1972 25A, dated 03114727 PIAINTIFF'S 1 ; EXHIBIT I urn-gift | HUBB-B8Q6693 4 Page 3 5. ASBESTOS SUBSTITUTES No asbestos-bearing insulation materials (except mastic or asphalt base materials) should be used in new installations or as replacement material in existing plants. Please see the attached list of substitute materials (Table II) and asbestos-free products in use by Gulf (Table III). 6. ATTACHMENTS (a) Table I -- Typical Asbestos Handling Practices (b) Table II -- Asbestos-Free Substitutes (c) Table III -- Asbestos-Free Products Currently In Use By Gulf (d) Table IV -- OSHA Standard for Exposure to Asbestos Dust 1910.S3a i = 001147^3 t INDUSTRIAL HYGIENE AND TOXICOLOGY^ aUBB-flO066 GULF OIL CORPORATION MEDICAL DEPARTMENT PITTSBURGH. PA. June, 1974 INDUSTRIAL HYGIENE STANDARD NO. 25 BULLETIN THERMAL INSULATING MATERIALS PRODUCTS CONTAINING ASB2ST05------ INTRODUCTION The modern mass production of hundreds of natural and synthetic materials, such as asbestos, has brought the need to protect workers from certain health risks, known or suspected. Manufacturers of Thermal Insulation Products containing asbestos have for years been taking protective measures to eliminate excess ive exposures to inhalation of dusts that may be injurious. The OSHA Asbestos Exposure Standard now in effect states that the 8-hour time-weighted average (TV/A) airborne concentrations of asbestos fibers to which any employee may be exposed shall not exceed 5 fibers longer than ^m per cc of air. In addition, the ceiling concentration above which no employee shall be exposed at any time is 10 fibers longer than 5^m per cc of air. Note that effective July 1, 1976, the TWA concentration is reduced to 2 fibers from the current 5 fibers longer than ^im per cc of air. (See OSHA 9310.93a, section (a) Definitions, (b) Permissible Expo sure to Airborne Concentrations of Asbestos Fibers). Based on the fact that all materials can be handled safely, the National Insulation Manufacturers Association recommends the follow ing practices for handling and applying Thermal Insulation Products containing asbestos and/or other potentially injurious materials to protect the worker. A section on demolition has been added, taken from Environment Protection Agency Asbestos Emission Standard 40 CFR 61, dated May 1974. CONTRACTORS Insulation contractors and applicators are urged to study these recommended practices carefully and to see that they are observed by all workers handling insulation materials. As with Safety Regu lations, it is in the interest of both contract employer and contract employee to see that health protection practices are strictly observed. Replacement for Industrial Hygiene Standard No. 25, dated 6209 February 1969 03114731 M U BB-aaaifi95 Page 3 debris off cartons. Repack odd lot pieces. Close cartons. Fabrication in Warehouse and Job Site Shops (See OSHA 1910.93a, Section (c) Methods of Compliance, (2) Mark Practices, i) Wet Methods. v=3 1. Open and remove the material from cartons with care. & 2. Handle and stack pieces of material in a manner that will avoid generating dust and breakage. 3. Mechanical dust collecting systems adequately designed to remove dust at the source should be installed on power- a operated, fixed and portable equipment in the warehouse shop and/or in the job site shop. 4. All machines should be furnished with suitable waste contain & ing equipment for the collection of scrap and waste to pre vent the material from falling on the floor and generating dust. 5. Shop-fabricated pieces of Thermal Insulation such as fittings, segments, etc., should be placed in containers. Care should be taken when handling these pieces during piling, stacking, and packing. 6. Containers should be closed after packing and remain closed until the material is used. Application Procedures 1. Unpacking and application of the material should be done in a manner that will minimize airborne dust. 2. Avoid dropping, throwing, or unnecessary rough handling of insulation materials. ' 3. Keep floors and surfaces clean of scrap, shavings, and debris. Put unusable material into waste containers immediately. 4. Hand sawing, cutting, jacket stripping, etc., should be done in a manner that will create minimal airborne dust. Use of proper methods and tools will help considerably towards dust abatement. 5. When working in confined spaces, portable dust collectors or exhaust blowers should be provided to remove dust from the source. 6. If conditions prevent collecting or exhausting dust from the source, use exhaust blowers to provide general air changes in the room. 7. Avoid exhausting into other working areas. 03114733 NUBB**0006696 Page 5 7. Wet the material and mix into a slurry as quickly as possible. 8. When mixing cement in a confined space where proper ventila tion is inadequate, respirators should be worn. Cleaning 1. Bag breakage, cleaning up dry cement and discarding bags at the mixing area should be done in the same manner as recom mended under Warehousing, Storage, and Handling* 2. Wet down tools, mortar boxes, wheelbarrows, mixing containers, and any spillage before scraping and cleaning. 3. Cements should be handled wet whenever possible. Wet material will create no dust problem. SPRAYING OF THERMAL INSULATION (See OSHA 9310.93a Section (c) Methods of Compliance, (2) Work Practices ii) Spraying Demolition or Removal. Spraying Areas Spraying of Thermal Insulation Products containing asbestos re quires special precautionary measures. Refer to the Sprayed Mineral Fiber Manufacturers Association for Sprayed Fiber Appli cation Practices. 1. The equipment and machinery to be sprayed should be shielded by adequate wind breaks and, where practicable, drop cloths to prevent excessive dust and contamination in adjacent areas. 2. Workers not engaged in the spraying operations should wear respirators when entering an area within 15 feet of the spray ing machine, nozzle or equipment. - 3. Where Sprayed Fiber Application Practices cannot be followed and excessive airborne dust is generated, it is recommended that portable mechanical exhaUst ventilation be used to remove airborne dust. Exhaust must be located to avoid con tamination of other occupied areas. ^ CN Application 1. All. personnel in the immediate area engaged in the machine feeding and spraying operation should wear respirators, whether in confined or open areas, ventilated or not venti lated . 2. Respirators should be worn after the spraying operation has been concluded and until the generated dust concentration has cleared. 03114735 HWBB-0006697 Page 7 3. Where applicable, portable mechanical exhaust ventilation should be used to remove airborne dust. 4. Avoid unnecassary rehandling of scrap. 5. Locate truck, dumpster bucket or final disposal equipment as close to stripping site as possible. ' 6. Wet down scrap material before shoveling, hauling, or dumping. 7. Do not permit accumulation of scrap and debris on floor and other surfaces. " 8. Vacuum equipment is recommended for cleaning up during and after stripping. Other Workmen 1. Personnel not involved in the stripping and tearing off operation should not be permitted in the stripping area. 2. If it is essential for other workmen to be in the work area, respirators should be worn by them. DEMOLITION The following is quoted from the EPA Asbestos Emission Standard 40 CFR 61 as revised May 1974. 61.21j "Demolition" means the wrecking or removal of any load supporting structural member. 61.22c 2 i ' Friable asbestos materials, used to insulate or fire proof any boiler, pipe, or load-supporting structural member, shall be wetted and removed from any building, structure, facility, or installation subject to this paragraph before wrecking of load-supporting struc tural members is commenced. Boilers, pipe, or load supporting structural members that are insulated or fireproofed with friable asbestos materials may be removed as units or in sections without stripping or wetting, except that where the boiler, pipe, or load supporting structural member is cut or disjointed, the exposed friable asbestos materials shall be wetted. Friable asbestos debris shall be wetted adequately to insure that such debris remains wet during all stages of demolition and related handling operations. 61.22c 2 ii No pipe or load-supporting structural member that is covered with friable asbestos insulating or fire proofing material shall be dropped or thrown to the ground from any building, structure, facility, or installation subject to this paragraph, but shall be carefully lowered or taken to ground level. 03114737 table: i NO Produce S Manufacturer ASBESTOS-FREE SUBSTITUTES Thermal Conducti'-it Btu/hr/fc2/F/ in. Composition ea C3Q Price Limits F 4/Board A.F. Uniblock, Holmes Insulations, Ltd. 0.50 ? 400 F 0.84 g 1 000 F Mineral Wool and 1,900 Glass Fibers _ > 37 CL Carey Temp 2000 0.70 500 F 0.76 0 7 50 F 0.84 0 1,000 F Calcined ' ^ Diatomaceous Silica with Glass Fibers as Binders 2 000 39.3 LCI 34.8 CL H.T. Block - 48 0.42 g 400 F Forty Eight Insulations, Inc. 0.90 | 1,200 F Mineral Fibers 1,900 36 LCI 28 CL MF Pipe - 48 0.30 g 300 F Forty Eight Insulations, Inc. 0.50 g 700 F Mineral Fibers 1,200 884/lin ft-6" p Hew Carey Temp 1S00 0.42 g 300 F 0.64 700 F Expanded Perlite 1, 500 40.2 LC 35.7 CL 1200 Block - 48 0.30 @ 300 F Forty Eight Insulations, Inc. 0.52 | 700 F Mineral Fibers 1,200 20 LC 15 C' Super Cal Temp. HA (rabco Industrial Products) 0.40 ? 300 F 0.67 C SCO F Uncalcined 1 200 Diatomaceous Earth 6 Mineral Fibers 28 CL Unibest Pittsburgh Corning Corp. 0.41 3 300 F 0.65 g 700 F Mineral Fibers 1 500 40 LC 32 CL LCL - Less tran Car Load Lrs. CL - Car Load Lora GR&DC ESD(WFK) 11/2/71 -1- sstra Material Designation TABLE II ASBESTOS-FREE PRODUCTS Manufacturer Max. Temp. F c* Os sq a ea 00 Composition J-M Microlite Johns Manville J-M Microtex Johns Manville J-M Microlok Johns Manville J-M 1000 Spin-Glas Johns Manville J-M Cerafelt Johns Manville J-M Zelie LW Johns Manville Aerotube (Armstrong Cork) Johns Manville 57 Adhesive (Armstrong Cork) Johns Manville . Banroc (Keene) Monobloc (Keene) Fiberglas Aerocor Fiberglas Boards AF-530 Fiberglas Pipe Covering Fiberglas Blanket Fiberglas AF-530 Johns Manville Johns Manville Fiberglas Canada, Ltd. Fiberglas Canada, Ltd. Fiberglas Canada, Ltd. Fiberglas Canada, Ltd. Fiberglas Canada, Ltd. 350 350 500 1,000 2,300 2,000 220 1,000 1,700 450 450 600 950 450 Fibrous Glass Fibrous Glass Fibrous Glass Fibrous Glass Fibrous Glass Kaolin - 70% Expanded rubber Synthetic rubber, phenolic resin, toluene, naphtha Mineral wool and metal Mineral wool and clay Glass fibers with phenol formaldehy binder ^arey Temp Carey Temp 2,000 Thermoglas Pipe Covering Careytemp Adhesive Philip Carey Philip Carey Philip Carey Philip Carey 1,500 2,000 350 Expanded perliteglass Fibers, clay and' phenolic Binders Fibrous adhesive Foamglas Foamthane Tab-lok Pittsburgh Corning Pittsburgh Corning Eagle Picher 800 (- 300 to 200) 1,400 Cellular Glass Rigid Polyurethar Mineral wool witt phenolic binder Sauereisen No. 31 Sauereisen Cements 2,000, Silica base and sodium silicate Lumnite r.2> Universal Atlas 2,600 Alumina, titania silica and calci oxide Resco AA-22 Resco RS-5A Resco RS-7 Resco RS-17-A Resco Products Resco Products Resco Products Resco Products 3,400 2,700 2,100 3,400 Alumina and P0e; Alumina, silica and CaO Alumina, silica and CaO Alumina and CaO_ -2- 03114740 Material Designation Plicast XL Mix L.W.I. - 20 L.W.I. - 24 Super Air Bond Super "F" Narcospar Narcocrete Narcocast ES Anti Erode TIW Insulation Type 1 Fiberglas IS-Board Aircor 75P Kast-O-Lite 2,500 F Castable 20 2,000 F Fireclay - Mortar Greencote Greencast 12 KS-4V SK-7 Gj.*sc--Therm 70 Style 4301 Blanket Super 44 Cement No. 1C Insulation Super Powerhouse Cement Perlite Purolite 22 Duracrete G-ES K 50wo 1 Kaocrotc - B Kaocrote 2600 LI TABLE II ASBESTOS-FREE PRODUCTS (cont'd) Manufacturer Max. Temp F Plibrico Canada, Plibrico Canada, Plibrico Canada, Plibrico Canada, Plibrico Canada, Ltd. Lea. Ltd. Ltd. Ltd. 2,9G0 2,000 2, *50 3,200 2,800 North American Refractories North American Refractories North American Refractories North American Refractories 3,100 2,450 2,400 2, 500 Owens Corning Osrens Corning Owens Corning 1,000 850 250 A. P. Green 2, 500 A.P. Green A. P. Green A. P. Green A. P. Green A. P. Green A. P. Green American Gilson:te 2,000 1.000 3,000 2,200 2,600 1,800 460 Forty-Eight Insulation Forty-Eight Insulation Forty-Eight Insulation Keene Corporation 1, 600 1,900 1,200 1,200 Perlite Industries Canadian Refractories 2, 350 2,200 Canadian Refractories 2, 600 Babcock c* Wilcox Babcock 5 V.ilco> Babcock >. Wilcox 2, 300 . "T Composition Alumina Silica, CaO, Ti02, Na~0 FejOj and MgO Si02, AI2O3, CaO Fe203, Ti02, MgO, in varying amounts Fiberglas Fiberglas Fiberglas Si02, AI2O, Fe2^*3> CaO . T1O2, MgO Si02> AloO-i Si02, AI2O3, CaO Si02>, AI2O3, CaO Powdered bituminous coal Fiberglas Mineral Fibers and binders Mineral fibers and binders Mineral wool and Portland cement Expanded perlite Fireclay, perlite and calcium aiuminate Fireclay, calcium and aiuminate Alumina-s ilica cerami< riber calcined alumina-s 1 Li ca Aggregate and calcium Aiuminate- JMIfiB-0006700 -3- 03114741 TABLE II ASBESTOS-FREE PRODUCTS ar-N Material Designation Speed Crete, Blue Line Light Weight Castable - 22 Harchrome G Harwaco Bond Superplastic Firebrick Thermolith Moldit 45 Moldit 58 Moldit 80 RSI 1199 Foster Lagtone Coatings Ccont'd) Manufacturer Max. Temp F CO 5 Composition s Cement Materials Corporation 85 Cement based silic Harbison-Walker Refractories Harbison-Walker Refractories Harbison-Walker Refractories Harbison-Walker Refractories Harbison-Walker Refractories 2,200 2,600 2,900 3,000 3,000 Si02, A1203, CaO ' Fe2C>3, Cr203 Ti02 and MgO RSI Ramtite Canada, Ltd. RSI Ramtite Canada, Ltd. RSI Ramtite Canada, Ltd. RSI Ramtite Canada, Ltd. 2,200 2,200 2,500 1,800 Si02, A1203, CaO, Fe23 Cr23> Ti02 and MgO Benjamin Foster Company ISO Polyvinyl acetate and plasticizer and ethylene glycc glycol ether acetate, water Thermo-12 Johns Manville Corp. 1, 500 asbestos free calcium silicate -- 11/4/71 -4- 03114742