Re Bendix Automotive
ccmsesssesseensseenn
Argyle Plant
P.O. Box 2400
Walkerville Ont
Date of Visit August 11 1976
Accompanied by G.S. Rajhans
_
Company Contact
Kieth Neligan Safety and Personnel Department
A visit was made to the mentioned company to assess the asbestos dust exposure and ventilation conditions
in the brake shoe department which consist of two McDougall drilling machines four grinders and six rivetting machines At the time of the visit one drilling machine was in opera-
tion One grinder was also in operation but no rivetters were A personnel sample was taken on the person working on . grinder 3 The personnel sampling results are
Number and Location |
Time
.
Asbestos Fibres>
5 micrometers
in length of
air
1 Grinder 3
45 min
0.25
FH
+ Oy Lees
Lue
.
+
" oye
ptt
a
e t
ter
ae
o
'
Vent
eS
ne
N.W.
70-
l
_
_
2
McDougall
Machines
|
2
2
Drilling
-
4 1
Rivetting Machines ' Rivetting 6
Va
GRINDERS GRINDERS
GRINDERS
3 '4
a,
S.W.
tae
tye
wes
~
7
t J
30
i '
'
a,
-1/1 Internal
LwYVIV
Memorandum
May 4 1977
Letter No.
GITTE
GITTE
GITTE
Executive Offices
Michigan
Sout-hsfield
.
T. Schaefer
GITTE ; 40 awh
From J. R. Weber
ves
DEPAMBER na
*
vO, DEPAMBER iDme } DEPAMBER UR .
DEPAMBER DEPAMBER DEPAMBER
-
owe Nts.
.
_f ~~
\"\-
st ~
>--
Subject Annual Asbestos Monitoring ;
SA EAT Yee ean ae
pee
The laboratory results for the annual asbestos monitoring samples
collected at the Argyle Road plant on March 22 1977 have been re-
level ceived
cc
The results show no concentrations in excess of a 2.0 fiber -
The sample results are as follows
Excello Automatic Drill
Brian Beaunne
0.77 fibers
Grinder 3
Diane Jacques
0.14 fibers
Riveting 5 Susan Dobsky
.
0.49 fibers
Bag Collector Cleaning Gary Knuckle
0.09 fibers
The results from the Bag Collector Cleaning operation indicate an em-
ployee exposure well below the 2.0 fiber level However this re-
experienced sult does not accurately assess the problems being
with .
asbestos waste disposal or environmental protection
A continuing effort must be made to implement controls which will assure emissions to the atmosphere are at the lowest possible level
If I can be of assistance in this matter please contact me
solvent Finally
samples were collected at
the results are as follows
Prince Road plant
The
Vapor Degreaser TLV = 100 PPM
0.17 PPM Trichloroethylene
Spray Painting Backing Plates
.
Trichloroethylene
TLV = 100 Concentration =
2.42 PPM
Toluene
TLV = 100 Concentration
5.70 PPM
Xylene
TLV == 100 Concentration = 20.81 PPM
The results indicate employee posures well within established limits
I suspect the trichloroethylen at the spray painting operation is
carry minture of
from the degreaser toluene and xylene
The paint solvent
is most probably a
.
Internal Memorandum
Date
May 4 1977
T. Schaefer Page Two
Letter No.
Since these samples were taken subsequent to Ministry of Labor in-
available .
spection they should be kept readily
as documentation for
one of the items cited
-.
The next annual asbestos monitoring will be scheduled for September
.
1977 Should you have any questions or if I can be of assistance prior
to that time please feel free to contact me
glz
cc J. W. Armstrong
G. L. Detenbeck
weter
weter
J weter
roy
t
a
15 Uverlea no
.,:.
Toronto Ontario
:
M4H 1A9
~~
-_.
416 965-4066
July 5 1977
...
Mr. G. Detenbeck Industrial Relations
Administrator
Bendix Company 1473 Argyle Avenue Windsor Ontario
Dear Mr. Detenbeck
Enclosed is a copy of the Air Quality Assessment Report
preparebdy Mr. C. Rhodes O.H. Technician following a
visit to your plant on June 9 1977
Yours truly
HMN L
Encl
.
oO
Ontario
Ministry of
Labour
Occupational Health Branch 15 Overlea Blvd. 5th floor
Toronto Ontario M4H 1A9
Tel 965-4066
JP
July 21 1977
Mr. John D. McCann
Safety Representative
Local 195
Bendix Company
.
1473 Argyle Avenue
Windsor Ontario
Dear Mr. McCann
I am sorry for the delay in my reply to your letter concerning
asbestos dust
As a result of your letter air sampling was carried out and
oe
~
the results reported June 27 1977 were sent to Mr. G. Detenbeck
Industrial Relations Administrator Of the six personnel and
two area samples taken all were below the Ontario standard of
2 fibres greater than 5 micrometers in length per cc of air
The results ranged from 0.3 to 1.5 fibres with a mean value
of 0.6 fibres
I trust this action is satisfactory to you If you have further
questions please feel free to contact this branch
HMN ds
. Yours truly
. :
Poe
GS GS Baithana b ! JUL 25
H.M. Nelson P. Eng PERSONNEL
Chief Occupational
DEPARTMENT
o Health Engineering ~*~)
a,
.
.
.
<
Bg
.
sto
/
:
Ontario
_
Ministry
Ministry of
eteaAKEX LABOUR
1.S.B. File No. : Q.H.P.B. File No. 88-24
A.Q.A. No 457
OCCUPATIONAL HEALTH RARTECRK BRANCH
AIR QUALITY ASSESSMENT REPORT
Date
From
June 27 1977
C. Rhodes
Plant
Bendix Company
Address
1473 Argyle Avenue Windsor Ontario
Contacts
Mr. G. Detenbeck - Industrial Relations Administrator
Hazard = Asbestos
Requested by I.H.S.B.
Accompanied Mr. F. Gamble I.S.O. _-
Date of Visit
June 9 1977
Copies to
1 Dr. V. Tidey Mr. G. Rajhans Dr. J. Vingilis 2
Mr. B. Hendrickson
Mr. J. Greenlaw 3
Mr. S. Morton
2
Mr. G. Detenbeck
above plant following Abstract Area and Personnel air samples were taken in the
and the
table lists their locations and results
as
a
Company Windsor
:
wy
aan
Sample Number
Employees Name
1 Ms. Mary Bennett .
_
2 Mr. R. Stan
'
3 Mr. Reaume
4 Mr. G. Marra
:
y
5 Mr. B. Zakala
6 Mr. V. Iich
Job Description
Personnel Samples .
No. 4 Grinder operator day shift
No 4 Grinder operator afternoon shift
;
No 4 Production Checker afternoon shift _~
No 3 Grinder operator afternoon shift
No3 Production Checker afternoon shift
com
Changing Dust collector waste box-
|
-
~
-
:
.
Sample Number
Location
Area Samples So
ve
1 On Pillar between # and 3 Grinders near end of day shift
a
2 On Pillar between 2 and 3 Grinders over shift change into afternoon shift
,
minutes *& This operation takes place over a duration of from 5 to 10
oe, mat
a
depending on the amount of spillage in the enclosure and could
;
occur twice a shift dependant on the amount of production
, .
ey
Asbestos fibres .|:
greater than
Sample
Sample 5 micrometers
Time in Volume in length per
Minutes Litres
cc of Air
.
,
27633
64
0.3
27633
0.5
27633
72
27633
74
27633
74
0.
0.9 0.6
*
Sample
Time in Minutes
14
Sample
Volume
Litres
1.5
. _
Asbestos fibres
greater than 5 micrometers
in length per
cc of Air
.
.
35
68
1.2
35
154
0.3
1
The present Ontario standard than 5 micrometers in length
the eight samples were above
for asbestos fibres is 2 per cubic centimeter cc
this limit
fibres greater of air None of
Observations
Housekeeping at the time of my visit was fair
The dust collector is outside adjacent to the grinding room
The doors to the enclosure of the dust collector containing the waste box appeared to be in need of repairs
At the time of sampling the waste box was only half full Normally
it is from three quarters full to full before it is changed
Wind direction was out of the west at approximately 5 to 10 knots with .
no precipitation
=