Document VaNN15NO4pb9jeDvgB5yg8Og
\
K3
WORK REQUEST FORM ANNISTON TECHNICAL SERVICES DEPART^NT
INITIATED BY
D* B. Hosmer
COMPLETED BY
DEPT.
826.08
J. G. Bryant
PRODUCT
AROCLOR
MINUS 30 POUR POINT AROCLOR
DATE ------10-8-64
DAT?-
10-8-64
JOB NO.
370: 22L
ORIOINAL TO T.S.D. FILES
J.R, McClain R. 6. Moody L. C. Fuhrmeister
P. H Sturman W. F. Taffe'e 0. E. Dpiin W. B. Dunlap
W. Molloy J. G. Bryant D. B. Hosmer - G. 0. V. R. Haupt R. Ww. BBuucckt:cneli - So. 2nd J. A. Mullendore - G. 0. P. G. BenignuS - G. 0.
STATEMENT OF PROBLEM AND OBJECTIVE (USE REVERSE SIDE IF NECESSARY)
Westinghouse desires an Askarel fluid with a pour point of -30C. To achieve it, they are experimentally blending Aroclors 1242, 1248 and 1254, T.C.B. and T.T.C.B. Although the experimental blends are an improvement over present blends, they still contain 20-30% TCB or TTCB.aS a diluent. We believe if a 100% Aroclor (or closer to 100%) were developed, the electrical industry may go to it rather than continue these exotic blends. A 100% Aroclor, if acceptable, would certainly be favorable to Monsanto by increased Aroclor sales*
ESTIMATED SAVING ON OTHER BENEFITS
No direct savings will result from this work. However, the work is necessary to evaluate a material which could promote $50,000 @ year in increased Aroclor sales. .
SUGGESTED APPROACH, REFERENCES, ETC.
Blend Aroclor 1221 and 1242 in appropriate weight percentage to obtain I23O, 1232, 1234, 1236/ I238, and 1240. The pour point should be checked as a function of the mix. Directly chlorinate tp the desired chlorine range under present conditions and try to find some additive to dissolve the crystals or inhibit their formation. Also, tests will be conducted to shift the isomer formation by additives and by different catalyst during the chlorination.
MANPOWER REQUIREMENTS
EVALUATION
MAN HOURS .
CH. E. DES.
MAN HOURS
M. E. DES.
MAN HOURS
E. E. DES.
MAN HOURS
INSTR.
MAN HOURS
DRAFTING
MAN HOURS
START-UP______
MAN HOURS
Proc.Res. 240
NO. MEN
1
T.S.D. COST
1920
ESTIMATED SAVINGS OR PROFITS
To be determined
NEW FIXED CAPITAL
To be determined
COMMENTS
Our research contract with Westinghouse expires in November and they will most likely go to blends of Aroclor 1242, 1248, 1254, TCB or TTCB In o^der to increase Aroclor sales, we must come up with a material giving the properties of these blends at a comparable price* We believe a suitable material to meet this need can be made*
TOTAL TOTAL
240 MAN HOURS _2Q_ MAN DAYS
ASSIONED TO
-______ J* Go Bryant
APPROVALS
PLANT MANAGER
S/ J. R. McClain by L.C.F.
Technical Serviced Supt. S/ L.C. Fuhrmeister
PCB-ARCH-EXT0377236