CII8I
Australian Blue Asbestos, Limited., who have spent ouch money for results which do not offer much encouragement for the further financing of the venture, which is obviously necessary. The position at the moment is serious for the Company and also for this State as a whole, as was indicated to m by the Under Secretary as well as yourself. The object of this
report is to outline a general method of mining, with particul ar attention to improvements in technique, and in reading it, you are ashed to remember that it is written more or leas from memory, without access to any of the mine records, so that many of the figures quoted are approximate only.
MIflIKG.
Ore can be won either by benching ftcm the gorge
faces or by underground mining methods. The total length of
all grades of fibre to be got by either method averages about
4 inches, and the mining width of any underground method
cannot be muoh less than 7 feet it modern appliances are to
be used, while the amount of overburden that can be economically
removed in benching is a direct function of underground mining
costs/ Rock can be broken from the free gorge faces at a
much smaller cost per ton than by any underground method.
This fact was realised at Wittenooa and in the early stages all
fibre was produced from benches. Overburden was shot from
the top of the fibre bearing rock and the waste rock shovelled
over the edge of the bench, while the fibre was broken separate
ly. The miners were inexperienced in large scale quarry methods
and bored and fired holes which were for the most part only
$ feet or so deep, a depth which sons of them had probably
used in stopes. Ho attempt was made to bore holes 20, 30 or
more feet in depth and to bull them before firing, and in
general to take advantage of the much higher tonnage of rock
to be broken per pound of explosive than with short holes.
Objections to large scale methods were offered on the spot, and
though they have some substance, no effort was mads to overcome
them, which should have been done before underground mining was
fcjtqfcimAT
a large part of the coats of underground methods
will be attributable to development openings, and since none
of these is necessary on the gorge faces, the coet of breaking
rock from them is relatively lose.
It wae said that the
gorge face was too broken,which would make boring difficult
and might dissipate the energy of the blast when firing, but
both of these reasons apply equally to shallow holes if not
placed correctly. It la worth noting that it ia now proposed
that blast hole drilling, which has gained popularity in the
United States and is now being used at Big Bell, be used
underground at Wittenoom. The only conditions under which
blast drilling can be used underground, are where there are
great mining widths (80 feet at Big Bell) and it will be
in the narrow 6 or 7 ft. atopes at wittenoom,
l
. '/. ..$/ '/K /-; ' r'/-
u^
'A
2
' *gygLO?ttENT.
Underground development was put in hand some three years ago and much work has been done on a bord and pillar basis. The economical exploitation of these deposits demands that the maximum extraction of ore be got from any developed area, which postulates that no matter what mining methods'are used, they must be carried to the limits of safe local subsid ence at the working faces. As mining is continued, large areas are opened up, causing caving of old workings, but the mining method 3hould be designed so that the caving occurs long after miners or utilities are required in the area.
General subsidence can extend to the surfaces of the deposit rendering them unstable and causing much damage.
The atope preparation that has so far been done starwithin about 200 feet of the portals of the main entries, whil the gorge face extends above the portals at an average angle
of some 70 for a height of about 300 feet. If any extensive area is completely stoped out close to the portal entries, subsidence will eventually extend to the vertical face of the
gorge and loose rock would then be periodically dislodged from
the faces endangering life and various mine installations. Thi theory of subsidence, which can be seen in any good coal miain. text book, indicates that in the present case the minimum dis tance from the portals at which ground could be completely
stoped without affecting the gorge face would be roughly 600 feet normal to the gorge face and should be considers*) ly
greater for preference.
It should be clear that a high percentage of extract at a distance of less than 600 feet from the portal will cause a dangerous set of conditions to ensue, or alternatively, if the danger is to be avoided, pillars must be left so that per centage of extraction ia lowered with relatively high costs. These considerations apply to the bulk of the ore which has been developed to date.
The principal factor in development in any mine is speed, which is particularly applicable in the Hamersley deposits in which the valuable content is only 4 inches wide. Most things must be sacrificed to this requirement except in cases where development is far ahead of mill throughput.
Some development ends at ffittenoom have been driven
20 feet wide, the argument being that contractors are paid lee
than double the price of a 10 foot drive, so that fibre is aor
cheaply won from the larger drive. This is true to some exter
but it slows down development tremendously, thereby postponing
the time that fibre ean be won from stoplag at much less cost
than from any development face. For speed drives should be
carried as
as la compatible with the use to which they
are to be put, which would be about 9x7 for main entries anc
perhaps somewhat smaller for cross entries. It should be remembered that in narrow drives, although more fracteur la usee
per ton of rock broken, this disadvantage ie partly offset by
the fact that the ground breaks smaller and ie therefore quiet
er to remove.
Removal of broken rock frcm development faces la quicker and cheaper if done by mechanical means. Portable scrapers have been tried, but have not proved a success. Scrapers are efficient and economical only when large tonn ages of rock are to be handled from a fixed location. Their performance figures when in actual operation are very attract ive, but it is almost invariably found that their use entails
much lost time due to trouble with ropes,
ipanish
holes, and wear and maintenance costs are high, map
7 1 b'3
3
.--oTrite mine figures recently given shoved that the actual work-
ins 5ioe *as at best 3 hours 35 minutes in an 8 hour shift, and
such a proportion of lost time cannot be borne when developing.
a further considerable disadvantage in using scrapers in the
asbestos deposits is that the ground breaks in flat slabs, which
are <iuite large in wide faces, and the light scraper continually
rides over them, whereas in an unbedded one, which breaks rough
ly spheroidal, the scraper has much more chance of picking up a
full load at every trip.
.,
Air operated mine car loaders, or mechanical boggers, as they are called, are in almost universal use in drives of
this nature. They are rugged and will bog out a 30 ton drive
cut in about 2 hours in the hands of a skilled operator, if trucks can be kept up-to them.
In boring time is lost in rigging up and pulling down machines, so that modern rock drill carriages or "Jumbos" should be used, mounting two automatic machines on two bars one foot apart, held up to the face by air operated telescopes. This apparatus will increase the boring time of each machine by about | of an hour per shift.
The present practice is to carry the fibre seams at
the bottom of entries, but if the over riding importance<f speed be admitted,the fibre must be carried at the top of the drive. >Yith a bottom seam, the face must be fired in two sec tions, the top worthless portion first, and after it has been cleaned up, the fibre bearing rock is shot out. The removal of the first part of the round is made slow and costly by the fibre shelf, and-the two firings create two periods of lost time while fumes clear from the face. If all holes were blasted at the same time, the fibre would be mixed with and covered by the waste rock. There would be too large a volume of rock for effective hand sorting before milling, which, incidentally, always entails soss loss of the valuable content of an ore, and the alternative would be to mill all development dirt which is very abrasive and would cause very high mill costs.
If, however, the fibre were carried at the top of the drive, all of the above disabilities oould be overcome at the expense of a small amount of fibre. The round would be shot out in one tiring in which the back holes would be deton ated last. By a little experimentation in the placing and charging of all holes, particularly the back holes, no scatter
ing will occur and the fibre can be picked off the top of the pile with very little loss of both product and time, and the rest of the dirt rapidly bogged out with a mechanical bogger. It is Imperative that attention be given to this matter and
the small fibre loss accepted for the sake of speed*
Briefly, development ends should be driven about 9 ft. by 7 ft. with tbe fibre seam at the top, using two machines mounted on a jumbo, and a mechanical bogger to which trucks are brought up by a mule or locomotive. Ail holes are fired at the same time, fibre rock removed, and waste bogged out. It has been found best to complete a round of these oper tions every shift, that is to bora, fire and bog out, and the length of the round bored is adjusted so that this complete cycle can be worked. Three men are employed on each shift, tw miners and a bogger driver. Three shifts per day are worked and faces are driven double ended, that is, while the bogger is cleaning out one face, the miners are boring in another
, nearby.
Under these conditions, but without the use of a jumbo, the writer had a party of nine men in Wiluna, who took out 168 feet of 8 ft. x 8 ft. drive in a fortnight working
nincOa ended only. Their average was about ih5 rorsimnee noulrt not be expected at Wittenoom since
s
C 1184
if
rock is harder than in most gold mines, and some time must t in fibre sorting. First class men should get about
120 feet and average men 100 feet.
Many re&aona have been advanced for the wide drives and other practices of the past, and the chief one is that seme fibre had to be produced quickly for war purposes, which is undeniable. It is contended that development by the technioue suggested would have produced more fibre at lower cost than" has been dene, and that advancement would have been many times greater, so that the mine would now have a substantial output.
STOPING.
The evolution of a successful method of stoping the fibre bearing deposits after development is the key to the
economic future of the deposits. The essential factors involved are
1. A flat bedded deposit.
2. The fibre is in a number of seams whose total length is only about 4 inches.
3. These seams are enclosed in rocks which are appreciably harder than those found in most metal mines.
i
Nowhere, as far as can be ascertained, has a deposit been mined under conditions which have conformed precisely to those enumerated.
It is axiomatic in any industry that coats must be as low as poedile, and this is especially applicable to the present case and particularly if calculations are based on pre war vorld prices for asbestos. Clearly the major part of production costs will be incurred in underground workings, and it follows that
both efficiency and output must be much higher than anything attained in the past andthat the percentage of developed ore
extracted must be as high as possible.
V-
r
\
One proposed method was that after development, stoping should be done over a width just adequate to encompass the fibre seams, which, would be about 2 feet, and which would do away with the mining of waste rock. The chief objection is that the rock is so very h&rd that the heavy firing so close to the fibre seams nec essary to mine them over such a narrow width, would entirely pulverise much of the fibre. More development would be necessary than by any other method.
It seems to be generally accepted that seme sort of coal mining system will have to be applied, but this is true in name only, in this respect much loose thinking is in evid ence, which may lead to further fruitless expenditure. The points which follow should be considered carefully and are based on an output of 6,000 tons of ore per month, a scale which will have to be approached as soon as possible.
It has been remarked that a greater width than the 2 feet of fibre bearing rock must be broken to preserve the length and quality of the product and therefore the moat economical mining width will probably be just sufficient to give head room for men and modern labour saving appliances, but not so wide as to make necessary the removal of any of the waste rock from the workings, or even any further hmdllng of it after tiring. This width will be about 7 feet. Soring and blasting
ra.wo
k
V-
C 1185
a
0* arranged in such a manner that the waste rock is shot
jr of the fibre bearing rock. If the mining width is 7
reet, and the fibre rock width 2 feet, a total of 21,000 tons
of rock broken per month gives 15,000 tons of waste rock, which
is left in the workings and 6,000 tons of ore which is milled
for the production of 896 short tone of fibre. These figures are
dealt with further later on.
/ \/
Referring back to the suggested coal mining methods, it is generally recognised that the techniques of coal breaking
and rock breaking underground differ greatly since coal is com paratively soft and is usually associated with very soft rock.
The main difference is that the breaking of the coal is nearly always assisted by the controlled subsidence of the soft roof. At times no blasting at all is necessary, and if shots are fired they are very few and light by hard rock standards. The use of
roof pressure as an aid to ore breaking is likely to be danger ous and quite impossible at Wittenoom, and all ground can only be broken by heavy firing. At the working faces it would be
uesless to have semi permanent installations such as conveyors, as they would be shot to pieces, whereas in a coal mine they are
easily used and not subject to great damage from this cause.
In coalfields most boring is done by some form of auger, light rock drills being used occasionally in headings. The heavy rock drill of the hard rock miner is seldom seen. Coal is fired with black powder or other low grade explosive as against high grades of nitro glycerine and kindred explosives in hard rock. Coal must be handled gently to retain a reasonable size, while the object of metal raining is to break the ore small and save work in the milling plant.
Hand building of pack walls and gobs and the pumping of water can be done without at wittenoom and the amount of develop ment for ventilation only will be much less.
It has been noted that the mining width will be about 7 feet, and experience.teaches that the maximum depth at which
holes can be economically fired in a mining width of 7 feet is about 6 feet. A length along the face of 8 feet could be com fortably bored out, fired and cleaned up by a party in a shift. At 12 c. ft. of both rock and fibre per ton, the firing would
give 20 tons of waste and 8 tons of ore.
If 150 tons of ore per shift is to be mined, working
2 shifts per day at faces, 8 feet wide, it is clear that there
will need to be 19 working faces, and In general that,as would
be expected In a mine with an ore streak only 2 feet wide,
production is made up of small amounts frcm many faces. Naturally
it would be better to have fewer faces each producing a higher
tonnage. In the present instance this can be accomplished
either by increasing the depth to which holes are bored or carry
ing wider faces. If hole depth is increased, the amount of
fracteur per ton broken in narrow lodes rises rapidly and the
heavier firing would be prone to damage the fibre.
Greater
face widths will mean that if * high percentage of ore extrac
tion is aimsd at, when large areas become open, the miners are
subjected to greater riak&om subsidence, and from this point
of view, faces must be kept narrow. Another reason in support of narrow faces is that waste rock can probably be removed from
them without any further handling after firing, and this will
be referred to later. Generally speaking tl**, face* 1c"
b#
much wider than 8 feet, 19 of which would supply 6,000 tons of
ore per month, but in practice about 15 stop fac?87,
s 5K.Kr.K
C U 86
ba:
more space when broken than when in situ. 77ith a mining ridth of about 7 feet, and. allowing for the removal of all develoo aent dirt, as well as stoped ore, sufficient space becomes avail-* able to make the removal of waste unnecessary. Small local varia tions of the mining width will allow of some flexibility in the ratio of waste produced and space to be occupied, and will also assist in making unnecessary the further handling of dirt after firing. In this connection two other conditions will have to be fulfilled. Firstly, the waste will have to be shot in the dire ction of the maximum dip of the beds, which requires that work ing faces be roughly parallel to the strike, and secondly holes in waste rock will have to be electrically fired. In a face parallel to the strike, and with 5 feet of mullock and 2 feet of ore, if 2 holes are bored, one near the top and one near the bottom of the mullock seam, and fired separately, the dirt from the first is shot at right angles to the face, but when the second hole is fired, a large part of the dirt from it is shot either up or down in a vertical plane and remains at the face. If both holes are fired simultaneously, the broken rock can only travel at right angles to the face which is left fairly clean. All holes in the stooe face should be fired at the same time with those in mullock fired electrically in pairs, after which the fibre is shot and very roughly sorted during bogging to reject with the waste large lumps of valueless rock.
Consider now the handling underground and transport to the mill of the 6,000 tons of ore as against similar opera tions in a coal mine, bearingTtnind that profit margins in'both types of mines are likely to oe similarly low. It is well Imown that a 6,000 ton a month coal mine is only a small show, but this figure for asbestos in Australia is much larger than anything yet attempted. It is proposed that full scale mechanisation of handl ing and transport be installed as in coal mines and conveyors at the face, Joy loaders and other such expensive machines of high capacity are freely mentioned. It will be generally found that mines employing this equipment have an output considerably in excess of 6,000 tons per month, produced from seams several times thicker than the 2 feet asbestos seams. The point Is that the capital outlay for these heavy machines cannot be justified unless they can be employed full time, which can only take place when large tonnages are to be handled without much time lost in moving equipment from face to face.
It has been shown that comparatively large quantities of coal are quickly broken from any particular face because the coal is usually broken over the full height of the face, which is 7 feet for comparative purposes, and being soft can be undercut and broken down often with no boring or firing. In contradistinction, at Vlttenoon in the same time a much smaller amount of rock can be broken owing to the close boring and heavy firing necessary, calling for many more separated working faces, and from which only one third of the total rock broken has to be transported to the mill. At 15 stope faces heavy firing cannot be done indis criminately, but must be confined to crib time and knock off time, and therefore loading of ore will have to be done simultaneously at not less than seven faces twice per shift, and the quantity from each face will be of the order of 8 tons.
A small model Joy Loader, if procurable, would probably cost about 3,000 and have a capacity of 15 tona per hour, includ ing time for loading and switching trucks. If faces are to be loaded together, eight Joy Loaders would be required and would operate for an hour per shift in two half-hour periods. Going to the other extreme, allowing for shifting time, two Joy Loaders would be capable of bogging out the whole fifteen faces in a shift, but all faces would be idle part of the time varying from half an hour up to 6* hours. To counteract this, other working
h e >eraie two d r
ook
capital outlay Sd from which returns would be long delayed.
It should be plain that any mechanisation must be on the basis of* a large number of small units rather than a few big ones and this will apply no matter or. what scale operations are carried out because high output from a very narrow*seam of 2 feet effective width can never be attained unless a large number of separated faces is producing.
Similarly semi portable conveyors for talcing ore from the stopes are impracticable on account of the high overhead ex pense that would attach to them, and because they would be dam aged by firing. The only feasible alternative is mine trucks and they will have to be taken right to the working faces. The small est model mechanical bcgger will be the most efficient device for loading .trucks. They are very compact, which will be found to be a big advantage in both stope and drive faces.
The small tonnage to be milled has a bearing on develop ment. Small trucks can be used and locomotives do not need to be large, so that the entries themselves are email. If locomotives do not need to be heavy, tracks can be light. The diesel loco motive already on the job should be ideal, and trucks should not be bigger than about 30 cwt. and should be self dumping.
After it is loaded into the trucks at the face, the ore will be hauled through the cross entries to the main entries by small hoists of about h H.P. either air or electrically driven, the latter for preference. Since waste is to be shot in the direc tion of maximum dip, ore must be hauled against it, that is, against a grade of about 1 in 6, or 10 at which normal traction is very inefficient. Pull cars will be left at sidings on the main en tries and picked up from them by the loco and hauled to the mill bins* The use of hoists in the cross entries conforms to the idea of mechanisation in small units. Sven if traction were efficient, iong distances for a small number of trucks would have to be travelled in many entries, requiring several locos at a high capital cost.
SUBSIDENCE.
This question has been dealt with here in general terms In several places and it is the most vital single factor to be taken into account when designing stoping methods, conflicting theories have been advanced, but it is generally agreed that the precise nature of subsidence to be expected in a new area is unpredictable. The subsidence of soft strata in coal mines is quite well understood and can be controlled to a nicety. This understanding is, however, usually baaed on past experience of similar beds in the same or similar districts. All written observations on the subject appear to be unanimous in the view that the subsidence of very hard brittle strata is virtually uncontrollable to anything like the extent of soft strata usually associated with coal measures. Coal strata start to bend almost immediately that the coal is taken from under them, but hard brittle rocks stand over very large areas until the limiting load is reached, when they crack down suddenly rather than subside, rhis is certain to occur in the Hamersley deposits, but the chief factor to which nobody can yet supply an answer is whether they Till suddenly break off short right up to the working face or only to within 2, 7, 12 or what distance of it. The information Till only be gained by careful experimentation and the proposed initial stoping method is flexible to allow ror changes which
night be necessary.
,./-r
3
Although, the stoped areas will be full of -.Taste rock, ."blear that this cannot prevent subsidence. It is general*'/
that even if the stopes be refilled hydraulically after _**, some subsidence will still take olace if very'large areas opened up. Hydraulic fill would be too expensive in any case, and it follows that if packing of the waste rock cannot prevent subsidence, any handling of it at all after firing is a waste c-e money, which is the reason that special methods and directions'" of firing of the waste are proposed here. It must be remembered' that the quantity of waste to be broken is 2? times the amount of ore to be removed.
It.will probably be found that subsidence will be greatly influenced by vertical joint planes, which can be easily seen in the weathered rock at the gorge faces, but not so plain ly underground, and that when considerable areas are opened, conditions at any working-face will bear a direct relation to the vertical joint planes.
Plat dipping deposits in hard rock have been success fully mined in other countries, notably America, and on the Rand in South Africa. In a few of the lead and zinc deposits in the State of Missouri, mining widths, dip, and hardness of country rock are comparable with the Hamersley deposits. Generally speaking, however, widths are greater and"rocks softer. Stoping widths in the gold mines on the Rand are usually about 5 feet, dips are mostly steeper and rocks are fairly hard. It is inter esting to record that low grade deposits are mined by these means in both countries. The tenor of lead ores has been as low as 5% and ainc ores 2%, while vast tonnages of 4 dwt. gold ore have been mined and to.depths now approaching 10,000 feet.
South African deposits resemble our asbestos mines in that the raining width is often double the reef width, so that waste rock is produced in these cases. Pack walls are hand built from waste, while some of it may be hoisted to the surface. It would appear that 5 feet is the raoet economical width in which human beings can work a 2* ft. reef in a flat deposit. The basis of all mining in South Africa is the use of native labour, which is usually plentiful and cheap, but inefficient. ITo such reservoir of labour is ever likely to be available here, and the class of white labour offering in any isolated area has always been infer-ior and will continue to be so in the future. Hence the need for mechanisation, postulating a sufficient mining width to accommo date various machines, which can not be done under about 7 feet in most cases,
* The American mines are worked advancing which calls for a Tim,,) outlay on development before returns are made, and in them faces are turned and firing takes place in all directions. Only ore is broken and is all removed from the face, support for the backs being provided by the leaving of pillars or artificial means. The necessity here for the disposal of waste with little or no handling calls for all firing to be done in the direction of dip and the unknown factor of subsidence make it desirable that initially at leas'; a retreating method be used. Our deposits are large and regular and do not have to be explored as do the lead and zinc, causing semi unsystematic workings. Clearly we are faced with features which call for the use of a stoping method not precisely duplicated anywhere else, but em bodying portions of different systems. The scheme now to be outlined to conform with the many points that have been made calls for systematic development followed by retreating stops faces until experience of subsidence is gained. The general outline resembles coal mining practice, but the technique is everywhere in line with hard rock mining practice.
C 1139
"1
The general outline is covered, in Sketch No. i. Employing nard rock techniques as outlined, main entries A A are simultaneous ly driven and as soon as the position of the first cross entry is reached, it is turned off frcm both main entries. Driving is then continued double ended and each cross entry face is opened up as soon as possible, the object being to have a number of faces in which both boring and bogging is continuous. One face is bored while another is being bogged, and a mechanical oogger in the hands cf a skilled operator will clean out three faces per shift, orovided that they are not^far apart. As more faces become open, the number of working parties is increased to keep all faces and equipment in continuous operation as far as is possible. Cross entries in the same panel are driven up and down the dip and work must be concen trated on the one panel, in the first instance, rather than using the potential development of adjacent panels to get the required number of faces for full time working. Adjacent panel entries, however, should be started and carried 20 feet or so to avoid interfering at a later date with ore transport in the main entries.
After the cut off line 600 feet from the gorge face is reached, the panels bantering it require some 7,000 feet of total development. 200 feet per month has been allowed for each party, which should be easily attained with complete mechanisation and working multiple ended, and the number of parties will vary from two in the early stages to at least six and perhaps eight in the later stages, so that the first panel should be completely develop ed in about twelve months. This first panel will call for some 8,000 feet of development. The amount of fibre won from develop ment only will range from about 75 to 300 tons per month near the end of opening up, and the fibre immediately recoverable from each panel after development is about thirteen months supply at the rate of 896 short tons per month. If subsequent panels call for 7,000 feet of development in thirteen months, at the rate of 200 feet per month per party, it is plain that three parties can comfortably cope with this work, although it would be desirable to have four or five until such time as developed ore got well ahead of mill requirements.
There would be no need to wait for the panel to be completely teveloped before stoping started, as cross entries between main entries are connected faces can be stoped progressively after about three months* work until the sixteen faces are worked in eight pairs. Each face is advanced every shift, boring with two machines mounted on a jumbo and firing one at crib time and ohe at knock off, one face being bored while the other is bogged as in driving. As the stoue face retreats, pillars 30 ft, x 20 ft. are left on 125 ft. centres along the strike and 50 ft. centres up the dip. Waste is left in the stopes and the ratio of space to waste produced is controllable within narrow limits by slight variations of stoping width. Ho attempt is made to maintain the cross entries through the waste as stope faces retreat, so that the fibre in stope pillars is not retrievable.
The position of pillars on the sketch is very regular, but in practice the msthod is flexible and pillar intervals are easily varied, especially in the direction of dip. The strike interval of 95 feet between pillar boundaries appears large. Reckoning on 300 feet of rock above the back of the stope to the surface above, and allowing 12 c. ft. per ton, the total weight of rock above the whole panel is 12,500,000 tons. The ultimate str9ngth in compression of very hard homogeneous rock is 15,000 lbs. per square inch, and 10,000 for not so hard rock.
C ? I 90
l
S \
iag the latter figure, it can be shown that the 63 pillars the size indicated theoretically will support a ?/eight of 2i,500,000 tons. No account is taken of shear streee because no information even of an approximate character is available. C-enerally speaking these theories are not to be relied cn to any great extent, and experience, which, has to be won care fully in the early stages, is the only guide. The backs of the drives that have already been ooened uo 20 feet wide ^cr long lengths are perfectly flat and'as sound as a bell after the area of weathering near the gorge faces has been left be hind.
The proposed system is not designed to test mining methods or technique, for they are well understood. Cre ex traction should take a secondary role until the subsidence characteristics of the rock are determined, and they can not be predicted precisely by anyone. The object of leaving the pill ars is not to support the roof over large areas, but to oroteet working faces in their immediate vicinity. Actually we want the roof to subside, and until it dees a potentially dangerous condition cai exist. The hard rock is certain to stand over very large areas, and will probably approach its limiting load without many signs of stress, and then break suddenly. After the sudden break its characteristics can be studied and altera tions made accordingly. It may be advisable to bore out the first two or three lines of pillars and leave paths to them through the waste, so that they can be fired after the stope has retreated, with the object of forcing subeidenoe.
Ventilation of each panel should be supplied by an exhaust fan of 20,000 c. ft. per minute and c ontrolled by doors in such a way that the current can be passed along the stope faces after firing. Secondary ventilation by the usual means should be provided in all dead ends.
Sketch No. 2, showing the details of the junctions of the main entries and cross entries? features some rather elaborate track work designed so that ixnnediate switching is possible of full and empty trucks to and from both the panel being s toped and the one under development. The greater necessity for effic iency of mechanical loading, apart1from skilled operation, is to be able to keep a continuous supply of trucks up to the machine. Trucks are hauled from the stopes to the main lines by the winch, while they are pushed up the dip by the loco to the development faces# but run down by gravity when full and are fitted with light brakes for control.
Conventional mining steel is in use today, but the economics of changing over to-jack bits should be gone into particularly from the transport angle. Detachable bits would cost ouch leas to freight to Wittenoom and also in the mine itself, where long distances will eventually have to be trav elled. In view of the hardness of ths rock, an efficient steel shop is of cardinal importance. The use of diamond drilling instead of boring with steel has been proposed, but it has not yet been developed to the stage where it can be economically used in very hard rocks.
Survey plana of the workings are kept, but there has >een no effort to record on them the amount of fibre in the Leveloped workings. It has been taken for granted, and with some justification, that vast quantities are^a sight, but in 1 carefully costed mine, one must know as near/as soon as possble the amount of mineral to be won and marketed from any riven amount of expenditure. Fibre widths can be determined risually and plotted on the survey plan every 5 feet and the relative amounts of each grade should be recorded. It may sound laborious, but with experience appraisals can be rapidly
aade.
p
e
i
.r:
-11
rr.e underground plan teat has oeen put forward here 5>ould be fitted into the work that has already been done as far ss can be done, and no slackening of oroducticn is called ^or* by its adoption, but rather the reverse.
ill LUNG.
When the ore is crushed, the gangue which is hard and brittle breaks down, maintaining at all times a granular form, while the fibre splits along two perfect cleavage oianes, but retains its original unbroken length if not subjected to too rough a treatment. Thus the fibre eventually assumes a
fluffy form and can be sucked off the screen by an air current,
while the granular gangue passes through or over the screens, in other words, the milling process increases the ratio of sur
face area to weight to a much greater extent in the case of the fibre than of the gangue, which allows a current of air of the right velocity to pick up the fibre and leave the gangue behind.
3y comparison with smelting, roasting, or cyanidation,
as used for gold or base metal cres, the extraction of the fibre
is a simple matter. These former processes all involve chemical
reactions which cannot be observed, so that the actual results
of any changes made are not determinable until some later time.
The passage of asbestos ore through the mill is observable at
all stages and the efficacy or otherwise of any alteration is
immediately apparent. The separation is entirely mechanical \
from start to finish, requiring neither chemicals, water nor
'
crushing finer than about 6 mesh, which means that fine grind- \
ing, the costliest operation in particle si2e reduction, is
eliminated. For these reasons an asbestos mill should operate
cheaper than almost any other treatment plant if soundly de
signed and constructed.
Basically the problem of milling was solved about five years ago by Hancock, using a home-made plant built from scrap iron. Since then many improvements have been made and no doubt
many more will be made in the future.
The mill at Wittenoom is quite well designed and its construction in the face of many war time difficulties was well
done. One of its chief faults has been that insufficient atten tion has been given to the eradication of dust, which has been
.treated as an after-thought. When there is no flow of air in the gorge, which does not occur very often, dust conditions in
the vicinity of the plant have been terrific. Appreciable Hy and money have been spent lately on the problem, but efforts were based on wrong principles. A slow current of air distributed
over a large area is the principle on which collection of dust from all machines must be based. When this is carried out, and it can be done easily and cheaply, the dust nuisance will dis appear. In any dry crushing plant the dust menace must be accept
ed as a major principle of design, and not as an after-thought.
In the mining method proposed, there are no ore chutes underground, so that it is difficult to arrange for any undergroun storage of broken ore on which expenses of double handling are not incurred. Mill bins therefore provide the only storage which complies with this requirement. If the mill is to be run over the week end, the bins should have enough capacity to hold six shifts and preferably seven shifts dirt, taking into account the fact tha the five day week underground will probably shortly become law.
This calls for a capacity of U.65 tons based, on a 30 day month
milling seven days per week and three shifts per day. fraction of this capacity is now available and the mall nas a coarse ore bin only with no fine ere bin a_ter the primary
| C 1 1 92
cracicers, which besides furnishing storage, would ^ive a nuch steadier flow of feed to the machines to assist in*high per centage recovery.
Most metal mine mills of any size ooerate on a seven day week and three shifts per day. 7/eek end work is costly and the reason for accepting this expense is that the nrocesses are disturbed by shut downs, causing losses that outweigh the ' extra outlay. This does not, however, apply to the milling of asbestos, which can be stopped and started at any time without any serious disturbances. Whether a plant works at the week end or not depends entirely on whether the extra capital outlay is justified to build a larger mill capable of the same throughput in j.ive days a week, as a smaller mill operating seven days oer* >v@ ek
The fibre bearing rock is hard, brittle, and very abrasive, causing much wear in machines, particularly the rolls. Much of the rock in mill feed contains no fibre whatever, so that when milling costs are established, the question of the capital expenditure and operation costs on a hand nicking system will have to be examined inrelation to milling costs. Only a rough sorting can be done underground if stoning is not to be seriously delayed.
In an expansion of operations, expenditure on the dis posal of mill waste must be envisaged. Present facilities are inadequate and a conveyor will have to be erected to dump 'waste in the creek below the plant, from where it will be washed away when the annual rains come, which is usually between January and March. Contamination of the present water supply will probably arise from large ecale disposal of mill refuse in the area, and domestic water will need to be drawn from further up the gorge.
POWER HOUSE.
The existing plant was built up during war time from any material that became available. Recently one of the prime
movers, a secondhand machine, waa out of action for five months. Such delays are crippling and could not be countenanced in any
attempt to put the mine on a profit making basis. Consideration must be given to the almost complete re-equipment of the power house as soon as engines become available.
You will recall that it waa shown in connection with Blue Spec that power costs were extremely high due mainly to the high first cost of crude oil and the heavy transport charges thafr accrued in getting the oil to the mine. Similar conditions are. associated with power production at Wlttenooo. The oil is brought by boat to point Samson , whence it must be freighted by road to the mine, a distance of 200 milea. To combat high prices brought about by handling oil in small lots, it was suggested that Blue Spec, Comet, and Wodgina combine either their own re sources or in an approach to one of the major oil companies with the object of erecting a tank at Port Hedlandof a capacity equal to that of the smallest oil tanker, or about 2,000 tons, which would supply each minefor twelve months or more and cut costs appreciably. The idea would be equally beneficial to Wittenoom since It appears that their oil consumption may later be of. the order of 3,000 tons per annum. If a tank of this size could be erected at Point Samson a 5,000 ton tanker could fill both tanks. A very large road tanker or two smaller ones would then be employed full time in transferring oil to the mine.
Surface workshops will need extension since the mine must be self sufficient, so far as is economically possible, in
the matter of maintenance ar.d heavy repairs.
^
J
C 11 93
aI
13 TRANSPORT.
As in ail isolated areas, this item will figure orominently on any cost sheet. At present freights are handled by
Barrett and Radley or Tsakalos of Roebourne. They have modern and efficient trucks and their price, which frcm memory is sh per ton, is reasonable.
In the propounded expansion 896 tons of fibre would go into Point Samson, while perhaps 500 tons of oil and general merchandise may come out as back loading, representing an ex
penditure of roughly 5,000 per month, though the contractors would probably reduce their price. It is reasonable to assume that they operate at a profit, and the economic position is such that if there is any profit in 8ny phase of the operation, it should be sought by the producing company. The question 0f com pany operated trucks must be gone into if the scale approaches that comtemplated here. Considerable saving may be possible by the use of trucks of hO tons capacity, as are quite common over seas. Since the round trip would not be done in less than three days, it is clear that at least three such vehicles would be kept fairly busy. The purchase of these vehicles would imply
appreciable capital outlay, which may be beyond the means of private contractors, but within the reach of the company. The alternative is a fleet of smaller trucks with probably higher operating costs.
Mttch money has been spent on the road between the mine and Roebourne and it was in very good order 2? months ago. It traverses some very rough country, which causes it to deviate some kO miles to make the descent from the Tableland to the Roebourne coastal plain, which is dose down a hill four miles long* The negotiation of the hill on the outward journey from Roebourne is a severe strain on a loaded truck, and two of them have been destroyed on it to my knowledge, por seme time it has been proposed to cut both this hill and the extra 1+0 miles out of the journey to Point Samaon by the construction of a new road. The proposed route is through very rough country and the job would
be a costly one.
If Australian Blue Asbestos Limited are to spend further large sums in an attempt to expand to the point where freights of
the magnitude indicated are to be handled, they would be entitled to press the Government for the completion of the new road, and for continuous maintenance between the mine and the port. The use of large trucks on a short route well maintained or possibly bitumenised would bring costa down to a minimum. The Government, however, would need substantial assurances of the. continuity of any operation which calls for heavy expenditure on their part.
! '
The indifferent performance to date must be attributed to the war, iihlch brought shortages and high costs of labour, shipping and road transport, equipment, and applies, and some of these handicaps would still have been insuperable even if administration had been more experienced. The position can be retrieved, but it should be apparent that much capital expenditure mast be incurred, and it should also be remembered that all of the above difficulties still exist in some measure, though they
are gradually being alleviated.
( ` ' 1 1 1 <
!
Delivery dates for heavy machinery aa would be required for the power plant seem to be very indefinite. The labour posi tion is much better than it was, but even when labour is plenti ful, good men are always scarce in out of the way places, and companies operating in such districts must be prepared to spend money on social amenities. Between 200 and 250 men would be .on
the payroll, but a new mining conrcunity takes a long time .0
1
i
C 1 1 94
i
9
14
|J^5ume a settled, character, which is brought about only through ' tAe family unit. The sooner a townsite with school and the usual /acilities of everyday life is established, the better will be the chance of steady progress. The welfare side of the undertaldng has been entirely in the hands of the compa^Ttheir per formance in this respect compares more than favourably with that of other raining communities which were brought together in the North '.Vest during war time, but further recreation fac- / ilities must be afforded to single men.
It is certain that more capital must be provided if the profit making stage is to be approached. Taking into account the unsettled conditions at the moment, any estimate of the money required would be at this distance mostly in the nature of a guess, and the guess is 250,000. The question of what ultimate costs can be expected, is also subject to the same in stability, but significant points of comparison with other mines are worth recording.
The cost of breaking ore underground is a function cf the raining width, the hardness of the rock and the scale of operation. At Wittenoom the proposed scale is in our favour,
a figure of 2/6d. to 3/6d. per ton%re mined is commonly allowed. No exploration of any kind is likely to be needed in the Eamersleys.
All other mines of similar size encounter water in the workings and pumping costs are continuous, involving appreciable capital outlay and often much overtime work in the week ends. The asbestos can be worked for many years without ever meeting with any water in the workings.
A metal or gold mine in which 21,000 tons of rock per month were broken would need, a large set of poppet legs, a mancage winder and a skip winder, the capital cost of which would be
of the order of 30,000. A shaft about 20' x 7* would also be necessary, which to sink, timber and equip with ladders, stages and ore pockets, would cost some 30 per foot. None of this out
lay is to be met with at wittenoom.
*
-| /I
!
In asbestos milling, no water is used, but this is off-
set to a small extent by the need for efficient dust collection apparatus, which, however, if properly installed, calls for less power than would be required to pump water to a wet milling plant. Tbs mill uses no chemicals, which are expensive and scarce, and are
required by most modem extraction processes for gold or metallic ores. Fine grinding, the chief cause of high milling coats, is not
needed.
Beallsatlon charges will be, higher on the fibre than on any gold, or most metals, with the possible exception of those requiring smelting.
Referring to sketch No. 1, it can be shown that by the time that the panel has been stoped and not accounting for any
ore in any of the pillars, about 270,000 long tons of ore will have been won containing 13300 long tone, or 14,900 short tons of fibre, indications are that total fibre losses in the mine and the mill will be 20, so that 11,900 short tons of fibre
will become available for marketing.
The total cost under normal conditions of breaking ore underground and hoisting it to the surface of our larger gold
mines has been about 9/- per ton. Allthings considered, at Wittenoom. 21,000 tons of rock should be able to be broken, and 6,000 toni taken to the mill for 15/- per ton, when conditions
!
r 1 1 <35
become normal, and the o,000 tons should be capable of
billed for 15/- per ton.
Costs would then be as follow
Sock broken - 21,000 long tons Ore milled - c,000 long tons
Cost oer ton 15/- long ten 15/- long ten
Per long ton of rock
broken
15/-
4.28
Freight Fremantle - 896 short tons fibre
137.6 short ton
5.87
Fremantle to Sydney - 096 short tons 63.6 short ton
2.71
Total
27.86/-
Thus fibre could be landed in Sydney at a total cost of some 28/- per ton of rock mined, which on 270,000 tons per panel for 11,900 tons fibre works out at 31.6 per ton cf fibre, not taldng into account fibre to be won from barrier pillars.
The freight figures are taken from the Yampire invest igation and show clearly the necessity for trying to cut down on realisation charges brought about by high freight costs.
The scale of operations contemplated by the company is not known, so that the one envisaged here is somewhat arbitrary, but it is certain that the larger the output, the lower the costs. Up to a point this company is not affected by the difficult question of marketing, which will probably frighten off other powerful groups not heretofore interested, but who were recent ly toying with the idea of asbestos production. My own opinion is that if a scale of the order of 3,000 tons per month could be approached, the undertaking would stand any competition on a world market. The contention is that full mechanisation in the hands of relatively few average white men, and carefully supervised by even fewer men of above average intelligence, will prove less costly than the use of large numbers of natives employed at a wage of a few pence per day to do inferior work by archaic methods* The latter is apparently the systeoin the Cape Blue deposits, which seem to be the chief competitors in the blue asbestos field* It seems that the relative magnitudes and values of the 3outh African and West Australian deposits are similar. The strong competition from white fibre, in the field in which both white and blue can be used for the ssme purpose, is based on Canadian mechanisation of particularly large deposits, and not on native labour.
The financing of a production of 3,000 tons per month Is well within the resources of the Colonial Sugar Refining Company and would of itself give rise to cheaper fibre, part icularly when produced by the one company. Clearly, very large outputs will be up against the marketing problem in part at least, and if rock bottom costs are to be attained, a monopoly of production i3 necessary. Many people, including the writer, do1 not favour monopolies, but there are exceptions which prove every rule. In the event of very large expansion, apart from savings on mining and milling costs, freight charges would be reduced by the chartering, or even purchase, of shipping for delivery, and the possibility of damming of one of the narrow gorges for the supply of water power would be worth investiga tion. However, much water must flow under the bridge before a drop rune over a well in the Hamersley Ranges, but we are dealing with one of the world's m&3or mineral deposits, for which long range ideas, even if only tentative, must be on a commensur
ate scale.
I
-1, check up on advisability of further benching from the gorge faces.
Institute systematic methods of ore breaking based on experience of large scale mining. This is the key to the problem*
Uechanise as far and as soon as possible, but be care ful in ohake of equipment.
4. Expansion of output to the highest desirable degree.
5. sxtend power, workshop, milling, general facilities, in line with expansion of production.
6. Bulk, handling of fuel oil should be gone into to save freight.
7. Efficient and continuous operation will justify the claim for a shorter and better road which will cut realisation charges.
8. tVhen production is ahead of demand, fibre may be able to be stored and a boat chartered for freight direct to Eastern Ports.
17th September, 1946. CPA/PT
DISTRICT INSPECTOR OF MINES.