Document VKKebY41xOZ0GxVkb4NKm3yjZ
PROGRESS REPORT
..
^ TECHNICAL SERVICES DEPT.-W. Q. KRUHMRICH PLANT
I job no.
| report no.
[ 9^370:3690________ |
1 (Final )
idate
| J , 17/68
0 0
W.O. KRUMMRICH PLANT
OENERAL OFFICE
OTHERS
0.D.Dressel
J. M. CONNAUGHTON
T. W. DALTON
>9 P.J. Verna J.G.Bright
J.E.Smith
*0 D.C.Armstrong 0W.R. Richard EkJd. DANNA (4 )
H
0C p
.E.AnagnostopUUXUo
*QD. E.Cayard QP. . EDWARDS
0J R: Ravage NITRO
*0 W. R. KANENLILSTOOGNG taJ.C .Landwehr * So. 2nd St.
.0J,W,Molloy
'SW.A. Kuhn
0R.E.Howard 0 P.0. DeGarmo
{ J. R. McCLAIN
.
s. A. HEININOER
J.F. Ouinn
0 H. B. PATRICK
.
*0 D. B. HOSMER
*0T.M. Patrick
SJD.W. Jackson
H.C.Carder
1H.P. Ray
0N.L. SAMPLE
*60 V. Brawley^^Sptl
.
EJR. J. StratmeyeiIO
TO RECEIVE DETAIL SECTION
INCREASE AROCLOR CAPACITY
personnel? R. M. McCutchan (T. E. Greenman)
PROBLEM:
The Aroclor capacity is inadequate to meet 1968 sales forecast 0
SUMMARY
By mid-1967 it became apparent that the Aroclor department capacity had to be increased by at least 10$ in order to meet the 1968 sales forecast of 32.75 jyf ibs/yr. The rated and actual
capacity was 29*5 M lbs/yr.
The following capacity improvements haye been completed:
Item
Date
Cost
OSR & Capacity Increase
1. Furnace improvement
9/67
Minor Work
2.0#
2. Six-inch Cla line
2/23/68
$32,480
2.5#
3- Still Preheater & Alterations Total
4/18/68
$9300(est) $41,780
7-0# 11.5#
When the chlorination step is run at 195C for quality reasons instead of the normal 150C, the off-gas vapor losses increase
with a resulting 2.5# decrease in OSR and capacity. May 1968 was run at 195C and yet production was 3,166,383 lbs, breaking the old record by 9*6#.
The 1968 sales forecast will be met (15, 796, 967.lbs. thru June) The expanded Aroclor facilities are scheduled to start up on 10/14/68. The above capacity improvements result in estimated savings of $52,000 and new earnings of $158,000 before taxes.
DSW 311656 COMPANY CONFIDENTIAL INFORMATION This document Is tbs property of Monsanto Company sad tbe recipient is responsible for Its safekeeping and disposition. It contains confide, tlal Information of Monsanto Company which moat not be reproduced, revealed to unauthorised persons or sent outside tbe company withov proper authorisation. Either retain in secure files or destroy.
FORM wok too rtEV-2/66
STLCOPCB4071642
91570:5690 (1)
-2- July 17, 1968
Future Work:
EDC
1. Check preheater operation after alteration.
8/15/68
2. Monitor preheater operations for possible plugging.
10/15/68
5. Close Job.
.
8/15/68
Acknowledgements
The capacity improvements summarized in this report are the efforts of the Production department itself, the TSD Mechanical Design Group and the TSD Process Group. Particular thanks goes to H. F. Ray and
V. Brawley.
' R. M. McCutchan Technical Services Department
/tm
DSW 311657
STLCOPCB4071643
SUMMARY DETAILS:
I.
REPORT OUTLINE
BACKGROUND
t'
A. Capacity vs. Sales Forecast B. Production Limitations
II. CAPACITY IMPROVEMENTS
A. Furnaces B. Six-inch Chlorine Line C. Still Preheater D. Summary of Capacity Improvements
III.CONCLUSIONS
IV. FUTURE WORK
APPENDIX
A. B. C.
Aroclor Production Timetable of Preheater Project Preheater Drawing
dSVM 3AA658 STLCOPCB4071644
91370:5690 (1-Pinal)
-4-
July 17, 1968
DETAILS:
I. BACKGROUND
A. Production Capacity vs. Sales Forecast
By mid-1967 it became apparent that the Aroclor production capacity was inadequate to meet the 1968 sales forecast. The rated capacity was 2.462 M lbs/mo., or 29.5 M lbs/yr. Through June 1967* the department was operating a 103.6$ of rated capacity. The sales forecast was 32.75 M lbs. of Aroclors for 1968. Department capacity had to be increased by at least 10$.
B. Production Limitations
1_. Low chlorine pressure caused considerable production loss. This was being corrected by the installation of a new 6" chlorine feed line to replace the existing 4" line (Project 3824, Mechanical Design Group).
2. Distillation was a bottleneck when producing Aroclor 1242, which is about 50$ of the total Aroclor production. The distillation on stream rate (OSR) for 1242 was about 3900 lb/hr. while the chlorination OSR for 1242 was about 4300 lbs/hr. This assumes a total chlorination batch cycle of 7.5 hrs. For Aroclors 1254 and 1260, the distillation rate was not limiting. The two stills are fed continuously by vacuum.
II. CAPACITY IMPROVEMENTS
A. Furnaces
In September 1967* the production department increased the heat supplied to the stills by decreasing the size of the furnace burner orifices and increasing the gas pressure. An overall OSR increase of about 2$ resulted. (See summary paragraph of this section of this report for actual rates.)
B. Six-inch Chlorine Line
A new 6" chlorine feed line (Project 3824) was activated on 2/23/68. Periods of low chlorine pressure (below 18 psl) were eliminated. Normal pressure increased from 20 psi to 25 psi. Other changes were made in the department a short time later, but it is estimated that a 2.5$ OSR increase resulted from this project.
DSW 311659
STLCOPCB4071645
91570:5690 (1-Final)
-5-
July 17, 1968
C. Still Preheater
1. Original Project
Since about 40# of the heat supplied by the furnaces to the stills was used in raising the temperature of the crude Aroclor to its boiling point, a sizeable distillation capacity increase could be achieved by preheating the still feed.
A still preheater estimate for $8000 was approved, package submitted, and equipment installed under Project No. 5554 as per drawing TS-D-8555* The 150 sq. ft. spiral preheater cost $2980. The following considerations determined the project design:
a. Temperature Still Feed temperature before project
110C
Still Feed temperature after project (temp, of 200 # steam)
195C
Boiling Pointoof Aroclor 1142 at 40 mm Hg 220C
b. Flow Rate to Stills
Normal Maximum
7 gpm 12 gpm
c. Flow Velocity
Because the still feed contains approximately 0.02$
undissolved FeCl3 catalyst, the flow velocity had to be sufficient to prevent excessive settling out. The need to avoid very low flow velocities, the need for low flow rate and a high^T, determined that a spiral heat exchanger was best suited for this purpose. The curved channel through which the Aroclor flows minimizes settling out.
d. Pressure Drop
Pressure drop through the heat exchanger was estimated to be 10 psi. Actually it is 12-14 psl. Before the
installation of the preheater, the still feed was pulled by vacuum to the stills from the blow tanks. The Increased pre ssure drop made a pump necessary in
addition to the still vacuum. A 1-1/2 x 1 x 6 Durco Mark II was chosen.
qS^ STLCOPCB4071646
91570:3690 (1-Pinal)
-6-
July 17, 1968
2. Alterations
After start-up the need for the following alterations was apparent.
a. Discharge Line
The spiral heat exchanger is protected against high pressures by a 100 psi carbon rupture disc. The discharge line went to sewer. If the disc ruptured while the pump was in operation, it would have been possible to lose an entire blow tank of crude Aroclor. The piping has been altered to tie the rupture di3c discharge line back into the top of the blow tank.
b. Pump Impeller
The 5" impeller was replaced by a 6" one.
An overall demonstrated OSR increase of about 7# resulted from the installation of the still preheater. Start-up of the preheater was on 4/18/68.
D. Summary of Capacity Improvements
1. Capacity Variables
In order to evaluate the actions taken to increase capacity, the effect of two process variables had to be established.
a. Percent Chlorination
When chlorinating biphenyl to the 42-60# chlorine range,
the OSR decreases approximately 8 lbs/hr for every 1%
increase in final chlorine content. In other words, the OSR for Aroclor 1142 is about 50 lbs/lir greater than the OSR for Aroclor 1148. This data is based on production records for 10/1/67 to 4/17/68.
b. Chlorination Temperature
During most of the second quarter 1968, the chlorination temperature was 195C instead of the normal 150C. This was done to improve Aroclor stability. When operating at the higher temperature, off-gas condensate losses increase to reduce the OSR by about 100 lb/hr, or 2.5#*
STLCOPCB4071647
91370:5690 (1-Pinal)
-7-
July 17, 1968
2. Aroclor on-stream-rates
The graph on the following page relates# chlorination to OSR as it increased with -the improvements discussed in this report. The rates shown assume a chlorination temperature of 150C. If 195C is used, OSR decreases by 100 Ib/lir as noted above.
3 Aroclor Capacity
Assuming full use of the preheater, 48# average chlori nation at a temperature of 150C, and a standard on-streamtime of 91#, the_predicted OSR is 4580 #/hr with a pro duction of 2.87 M lbs/mo. or 34.4 M lbs/yr. This meets the goal of 10# increase in Aroclor capacity.
! The best month to date was May, 1968 when the preheater was used all month, average chlorination was 47*55# at 195C, OST was 99*4#, resulting in an OSR of 4279 lb/hr and a production of 3,166,383 lbs. See Appendix A for 1967-8 production data.
III. CONCLUSIONS
Production of WGK Aroclor will be sufficient to meet the sales
forecast. Preheater downtime must be kept to a minimum. At
this writing the new Aroclor expansion is scheduled to start-up
on 10/14/68.
.
IV. FUTURE WORK
A. Check preheater operation after alteration. B. Monitor preheater operation for possible plugging. C. Close Job.
EDC
B7I5 10/15 8/15
DSW 311662
STLCOPCB4071648
* M * tk
aA
n ..
-o
5>OMw
STLCOPCB4071649
Month July 1967 August September October November December Jan. 1968 February;
4
March April May ! June 196|8
#12 51.1 48.3 49.3 48.8 46.9 50.1 49.2 47.0 46.6 48.7 47.6 48.5
OST, %
83.4 88.9 86.1 97.3 97.2 69.I 79.7 81.6 90.6 96.5 99-4 86.8
APPENDIX A
OSR,lb/hr 3917 3855 3800 3866 4127 4119 3985 3942 4ll6 4063 4279 3893
Production 2,446,613 2,550,544 2,355,684 2,798,453 2,887,372 2,118,204 2,363,279 2,235,888 2,773,669 2,824,184 3,166,383 2,433,564
Comments
Furnace improvements
Turn-around
6"C12 line on 2/23 195C on 4/11 Preheater on 4/18
DSW 311664
STLCOPCB4071650
APPENDIX B
TIMETABLE
TSD Job No. 91570:5690 opened Evaluation begun Estimate 5554 ($644o) submitted Verbal approval received Equipment ordered (spiral preheater) Project package transmitted to P & S Formal approval received Revised Estimate 5554 submitted (+$1560) Equipment arrived at plant Formal approval of revision received Project installation completed Project Start-up Estimate 6621 for alterations submitted
($1500) Formal approval received Alterations completed Progress Report written Job Closed
10/7/66 7/1/67 8/1/67 8/2/67 8/11/67 8/29/67 9/29/67 10/51/67 11/7/67 11/29/67 1/15/68 4/18/68 5/6/68 5/6/68 7/1/68 7/17/68
--_
DSW 311665
STLCOPCB4071651
Appzdpn c
AMERICAN HEAT RECLAIMING CORPORATION
r-
SPIRAL HEAT EXCHANGER
SPECIFICATION SHEET
customer Monsanto Co*
address
Kruaniich Plant
PLANT LOCATION
.
.
.
YOUF JOB No youfi REFERENCE No.
our inquiry no.
1-9438
DATE July 25. 1967
service of unit
type i-v TOTAL SURFACE
Ardor Heater
No. OF exch. req'd.
150 8q. ft.
One
item no.
connected in
SURFACE PER EXCH.
'
GUARANTEED PERFORMANCE
~
FLUID CIRCULATED
TOTAL FLUID ENTERING
VAPOR
LIQUID
r STEAM
NON-CONDENSABLES
FLUID VAPORIZED OR CONDENSED
STEAM CONDENSED
SPECIFIC HEAT
B.T.U./#
SPECIFIC GRAVITY
THERMAL CONDUCTIVITY
VISCOSITY
LATENT HEAT - VAPORS
B.T.U./#
TEMPERATURE IN
- F
TEMPERATURE OUT OPERATING PRESSURE PRESSURE DROP
F /SQ. IN. # /SQ. IN.
3
HEAT EXCHANGED - B.T.U./HR. 370*000
HOT SIDE
Steam 440 /HR
440 #/HR
440 #/HR
837 338 388
200
COLD SIDE
Arelor 7500 #/HR
12 GPM
....
.34____________________
1.25 .07 15 CD
232
380
LOG. M.T.D.
10
DESIGN PRESSURE
/SQ. IN.
TEST PRESSURE
# /SQ. IN.
DESIGN TEMPERATURE
F
SPACING
IN.
CHANNEL SEAL
MATERIAL eflr^nr, ntP.fil
gaskets connressed asbestos
3500SHIPPING WEIGHT fsnpvox.
#
dimensions see attached sketch
REMARKS
CONSTRUCTION
220
330
220
330
400
3/16"
400
3/16"
Alternate Channel* Welded
THICKNESS 1/4" 5/16" OUtfli.da tUCHS
`
WEIGHT FULL OF WATER
DSW 311666
STLCOPCB4071652
a bCd e f gh J knP rs
35" 12" 6" 24" 5" 23" 12" 49" 7".... . 1" ... -l"-- 1" 1" ?"
150SQ. FT SPIRAL HEAT EXCHANGER For . Monsanto Co.
Cust. No.:
Inq, No.:t,,9438 Date7/?5/67
AMERICAN HEAT RECLAIMING CORP
1270 Sixth Avenue New York 20, N.Y.
STLCOPCB4071653