Document VKELYwXgdv7zaD7E1yVy14wjo

(P ; EMPIRE BOILE PLAINTIFF'S EXHIBIT by American - <$\andaxd INSTALLATION - OPERATION AND Maintenance Manual FOR TYPE 2-GA GAS FIRED BOILERS APPROVED BY AMERICAN GAS ASSOCIATION Notice to Installer and Operator This Booklet Must Be Affixed to or Placed in Suitable Pocket on the inside of the Access Panel AMERiCAN-$taitdaitf Pint in linating ... first in plwmbing 18993 EMPIRE AND STANDARD Amhhcam TYPE 2-c GENERAL DIMENSIONS FOR EMPIRE BOILEI BOILER NUMBER CNO. OF NO. OF SECTIONS BURNERS 2-GA-4-E 4 2 6% 2-GA-5-E 5 2 Q'/q 2-GA-6-E 6 2 9% 2-GA-7-E 7 2 life D BL 5 5434 194 5 5434 224 6 55 Vz 254 6 56% 284 ERECTING Caution On open hot water systems, expansion tank should not be installed in cold or exposed place. No valves of any type should be installed in piping between boiler and expansion tank. Sealing system at any time during operation may cause breakage of boiler or radiators. Location If water condition is encountered in basement, or if it has been neces sary to water-proof the basement floor, boiler should be mounted on concrete or tile base at least 3" above floor level. 18994 BOILER NO. OF NO. OF NUMBER SECTIONS BURNERS #2-GA-4 4 2 2-GA-5 5 2 2-GA-6 6 2 2-GA-7 7 2 DLB 5 13% 47 k2 5 16 % 47% 6 19% 48 k 6 22% 5 1 li Testing Before connecting boiler, plug openings, fill boiler with water and subject to not less than 10 lbs. nor more than 30 lbs. pressure. When boiler is used for direct hot water supply, test pressure should be in creased up to 120 lbs. Inspect boiler inside and outside for leakage to insure against breakage from handling and shipping. To safeguard ac curacy of gage supplied with boiler, do not install gage until after test of boiler. This precaution of testing the boiler will simplify handling of any necessary replacements or adjustments and assist in treating with claims against transportation companies. After test, drain and remove plugs where required. 18995 AMERICAN TYPE 2-GA f Assembly of Fittings 1. Position boiler section assem blage so that sides with removable cleanout plates are accessible for pe riodic cleaning. Loosen tie rod nuts so that they are finger tight only. 2. Screw bushing and/or other return fittings into 2V" lower tap ping on back section. Provide a drain connection in the return pip ing at the lowest point in the system. 3. Screw flow fittings into back section. 4. Burner access door frames are alike. Attach one to front sec tion using 1V" flat head screws at top. If boiler is Standard model, place front jacket panel in position before attaching door frame. (Fig. 1 shows frame in position for Em pire model) 5. Fill putty groove at top of sec tions with boiler putty and place canopy in position with ribs firmly imbedded in putty to make gas seal. Smooth off excess putty. 1. Burner Access Door Frame 2. Canopy 3. Tapping for Limit Control Front Section 4. Tapping for Reverse Acting Low Limit Control Fic. 1--Section Assemblage Installing Burners and Control Sub-Assemblies 1. Fit left burner assembly (Fig. 2) including burner, bracket, pilot burner, thermocouple lead, and vent tube tip to tapered end of mixer with forked lugs engaging lug on mixer. (See Fig. 3.) For Electric Ignition, the pilot lighter assembly is furnished in sepa rate container. It should be installed before the burner assembly is placed in the boiler. To install the lighter assembly, place it in position with the end of the thermocouple through the hole and push downward until the spring clip engages the bottom of the pilot body. See Figs. 2 and 3. See that air shutter is assembled on mixer. Install burner assembly and mixer in combustion chamber. Place mixer firmly on burner sup port which should rest on lugs provided on section (See Fig. 4; Empire model shown). Place right burner and mixer alongside resting on right side of burner support. 18996 American TYPE 2-GA 3 Electric Ignition Manual Ignition Fic. 2--Left Burner Sub-Assembly Fic. 3--Cross Section Through Combustion Chamber 2. Attach the control piping assembly at the union on the manifold. Be sure that arrows on automatic gas valve, automatic pilot valve and gas pressure regulator point in direction of the gas flow. Check spuds in end of spud holders to see that they are screwed in tightly and that orifices are drilled to size specified on tag attached to manifold. Assemble manifold, controls and manifold brackets to front burner ac cess frame. Use 3i" round head screws in upper holes and l'/s" round head screws in lower holes to hold frame to front section. (See Fig. 5 ) Be sure spud holders are fitted firmly into mixer tubes. 18997 American TYPE 2-i 3. Tighten the set screws in manifold brackets. (See Fig. 5). - 4- 4. For Empire model place front insulation panel in position and hold till temperature bulb is attached. Insert the temperature bulb element of the automatic gas valve in the upper center tapping on the front using the split nut and gland fittings provided. For more sensitive operation, discard well before installing. Attach number and series plate to front insulation panel, also terminal block and pilot ignition transformer for boilers having electric ignition. Two 34" control tappings are provided on the right side of the Front Section (See Fig. 1). No. 3 indicates tapping for limit con trol. No. 4 indicates tapping for reverse acting low limit control. Fic. 4--Burner Installation Fig. 5--Control Sub-Assembly Installed-- Standard Model Shown 18998 BtruO'"' CA5 LINE Fig. 6--Wiring Diagrams U*JN CAS LNC OLOCJ* AT LX AST fTwtCA TO _L s_ort - *llO* roe o*>e bemqval ruaoeuNe' AL.V. SHOWN BELOW SHUTOrr al>C hot supplied ev * as s CO*p Electric Ignition Fic. 7--Supply Piping Manual Ignition 18999 6 EMPIRE AND STANDARD American TYPE 2-G t. Manual Shutoff Valve 5. Vent Tube 2. Pilot Cock 6. Pilot Line 3. Push Button Lighter Switch 7. BASO Automatic Pilot Valve 4 Gas Pressure Regulator 8. Pilot Ignition Transformer 9. Automatic Gas Valve Fig. 8--Jacket Assembly and Control Connections for Empire Model with Electric Ignition 19000 American TYPE 2-GA 7 5 Empire Model--Install combination thermometer and altitude ae piping in tapping on right side of face of front section and install ,ge. See Fig. 8. In Case of Standard Model install H" x W bushing and gauge in ns tapping. See Fig. 5. Assembly of Jacket of Empire Model 1. Place rear jacket panel in position. Hold in place and attach rear burner access door frame with lVa" flat head screws at top and lVi" round head screws at bottom. 2. Place side jacket panels in position with grooved edges engaging flanges of rear panel. Attach side panels to rear panel at top and bottom with screws and nuts. '(>nnecting Controls 1. Connect thermocouple element from pilot burner to BASO auto matic pilot valve. (See Fig. 8). Discard protective cap covering threads on BASO valve. 2. Connect pilot line to manual shutoff valve (Fig. 7 for Mfd., Nat. and Mixed Gases) and to BASO automatic pilot valve for LP and Butane-air gases. (See Figs. 15 and 16). For electric ignition, connect pilot line from burner assembly ( Fig. 2) to Manual Valve ( Fig. 7) as shown in Fig. 8. 3. Connect vent tube from pilot burner bracket to gas pressure regu lator. Be sure stainless steel tip is screwed in securely; and that flame check is in place in vent tube connection on regulator. (See Fig. 10) 19001 8 EMPIRE AND STANDARD American TYPE 2-GA ------------- -! 1. Pilot Cock 2. Manual Shutoff Valve 3 Gas Pressure Regulator 4 Automatic Gas Valve 5. Pilot Line 6. Vent Tube 7. BASO Automatic Pilot Valve Fig. 9--Jacket Assembly and Control Connections for Standard Model with Manual Ignition 19002 STANDARD American TYfc'L 6-un ,\Iake wiring connections according to wiring diagram applying trols used. (See Fig. 6). Install thermostat and connect as indi- Install front and rear burner access doors. COMPRESSION MALE ELBOW FITTING MATERIAL 40 MESH MONEL OR BRASS SCREENING HERE IN REGULATOR FLAME CHECK Fig. 10--Flame Check 19003 10 EMPIRE AND STANDARD Amiricaw TYPE 2-Ga Completing Jacket Assembly for Empire Mode; 1. Place front jacket panel in position so that f. zs.ges engage grooves of side panels. Fasten at top and bottom with strews and nuts. ( See Fig. 11). Install Lighting Instructions Plate by ;..acing it on "Z" clips located inside the control access door and bend.r.g down six tabs to secure. Attach control access door. 2. Place top jacket panel over flue outlet wit.', perforations to front over controls. 3. Place draft hood in position with bottom through top jacket panel and on flue outlet of canopy. Front Fig. 11--Empire Boiler Assembly 19004 ^STANDARD American TYPE 2-GA 1. 0f Jacket for Standard Model ri-ear jacket panel in position. Hold in place and attach rear 1L.cess door frame with IVs" flat head screws at top and l'-i" ..cad screws at bottom. See Fig. 12. p:ace side jacket panels in position with ends overlapping front ,,.al panels. Attach to front and rear panels near bottom with . .crews. Attach number and series plate and lighting instrucpiate to front jacket panel. : place top jacket panel in position with flanges down tight over ivnr and side jacket panels. lace draft hood firmly on flue outlet of canopy. Front Rear Fig. 12--Standard Boiler Assembly 19005 12 EMPIRE AND STANDARD American Filling System Caution: Never start boiler unless it is properly filled. (After boiler is in operation, makeup water should be added slowly,) Fill open system to % height of expansion tank, remove rim and glass from gage and set movable pointer under automatic pointer. Re place rim and glass. Fill closed system until relief valve relieves. This must be less than 30 lbs. pressure. If necessary, adjust relief valve setting. Remove rim and glass from gage and set movable pointer under automatic pointer. Replace rim and glass. Keep systems filled. Pointers on gage should be even. If pressure exceeds 30 lbs., relieve at once by opening relief valve or drain cock. P" Pilot Adjustment Light boiler as directed in operating instructions and check for gas leaks. Adjust pilot flame to extend just over top of burner. Pilot rate can be adjusted with screw underneath cap on pilot cock or by adjusting throttling cock in pilot line if provided. Normal Pilot Input for BASO Pilot Burners | Mfd. Input per Burner Btu/Hr. 1000 Nat. Mixed LP | LP-Airi 1400 1200 | 1000 | iooo ! 19006 ^5'ANDARD American TYPE 2-GA 13 Biir,,er Input Adjustment jf Doi]er is warmed up, shut off all other gas appliances connected and time gas consumption. Adjust gas pressure regulator . rated input indicated on nameplate. ,. - . . _ . Input Rating (Btu Per Hr.) Consumption (Cubic Feet Per Hr-> ~H(:ating Value q{ Gas (Bw per Cu Ft ) _! j0 inCrease consumption, turn adjustment screw (beneath cap on : .,<ure regulator) clockwise; to decrease, turn screw counterclock- n> 3in Burner Primary Air Adjustment Adjust burner flame by opening or closing primary air shutter, fAirne should burn quietly, show no yellow and should have a noticeable aner blue cone. After adjustment, tighten screw to lock shutter in rxisition. !/ OPERATING Shutting Off (For All Gases) 1. Close manual shutoff valve and pilot cock. 2. Turn off switch in electric line to appliance. 19007 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric line to appliance. 4. Wait 5 minutes. 5. Turn on switch in electric line to appliance. 6. Open pilot cock. 7. Press button on lighter switch until pilot burner lights. 1. Manual Shutoff Valve 2. Pilot Cock 3. Push Button Lighter Switch 4. BASO Automatic Pilot Valve 5. Pilot Burner Fig. 13--Controls for Electric Ignition 8. Wait 2 minutes. 9. Press plunger on automatic pilot valve. 10. Open manual shutoff valve. 11. Set thermostat at desired temperature. i yt* 19008 "Tnd standard American TYPE 2-GA 15 I,,T|iting (Manual Ignition; Mfd., Nat. & Mixed Gases) . 5et thermostat at lowest temperature. Close manual shutoff valve and pilot cock. Turn off switch in electric line to appliance. 4 Wait 5 minutes. .) Open burner access door. ti. Light taper and hold to pi lot burner. 7. Open pilot cock. (Pilot should light). 3 Close burner access door. 1. Manual Shutoff Valve 2. Pilot Cock 3. 8AS0 Automatic Pilot Valve 4. Pilot Burner 9. Wait 2 minutes. Fig. 14--Controls for Manual Ignition Mfd., Nat- an<t Mixed Gases 10. Press plunger on automatic pilot valve. 11. Open manual shutoff valve. 12. Turn on switch in electric line to appliance. 13. Set thermostat at desired temperature. 19009 16 EMPIRE AND STANDARD American type 2-ga Re-Lighting (Manual Ignition; Liquefied Petroleum and LP--Air Gases) 1. Set thermostat at lowest temperature. 2. Close manual shutoff valve and pilot cock. 3. Turn off switch in electric 1 3 line to appliance. 4. Wait 5 minutes. 5. Open burner access door. 6. Open pilot cock. 7. Light taper and hold to pi lot burner. 8. Press plunger on auto matic pilot valve (Pilot should light). Hold 2 minutes. 1. BASO Automatic Pilot Valve 2. Pilot Cock 3. Manual Shutoff Valve 4. Pilot Burner Fic, 15--Controls for LP Gases (See Fig. 16 for LP-Air) 9. Close burner access door. 10. Open manual shutoff valve. 11. Turn on switch in electric line to appliance. 12. Set thermostat at desired temperature. 19010 STANDAW) V? Ameeican 1. 8AS0 Automatic Pilot Valve 2. Pilot Cock II 3. Manual Shutoff Valve 4. Pilot Burner Fic. 16--Control Arrangement for Liquefied Petroleum-Air Gases Pilot Goes Out If the pilot flame is extinguished, the automatic pilot will shut off the automatic gas valve, rendering the boiler inoperative. Relight ac cording to applicable instructions. If boiler is not operating correctly, call Heating Contractor or Gas Company Service man. Operation During Failure of Electric Power Supply In case of failure of supply of electric current, boiler will automat ically shut off. Boiler will not operate automatically while electric power is off; however, boilers equipped with Detroit V-575-FW auto matic gas valve may be operated manually as follows: 19011 18 EMPIRE AND STANDARD Amtbican TYPE 2-GA^f %~ 1. If pilot is out, relight as directed for manual ignition. 2. Remove rectangular housing from top of valve. 3. Pull up knob located on top. (Burners should light). 4. Caution--Shut off boiler by pressing reset lever, located next to knob, before water temperature becomes excessive. Bear in mind that operating the boiler manually is an emergency condition and that constant supervision is required to prevent the pos sibility of damage due to overheating. Never allow the boiler to oper ate under this emergency condition if it is to be left unsupervised for any length of time. 5. Valve is fully recycling and will return to automatic operation when electric power returns. MAINTENANCE In Fall Before Starting Boiler Drain system sufficiently to remove sludge in bottom of boiler. Do not drain more water than necessary to remove sludge. Then refill to proper level as directed above. Care of Boiler While in Operation 1. Check water level regularly and add water slowly when needed. 2. This boiler is fired automatically. AND standard Amikican TYPE 2-GA 19 I H'inter While Not in Operation Drain entire system to prevent damage from freezing. Drain ,rough drain cock, located at lowest point in system. Be sure boiler . completely drained. jn Summer While Not in Operation Fill system as during heating season. Have boiler inspected by service man before the start of the heating season. If necessary, re move jacket front and side panels so that cleanout cover plates are ac cessible. These may be removed from either side of the boiler for cleaning between the sections. General Care of Heating System 1. Keep radiators and convectors clean. 2. Keep system in good repair. It is advisable to have it inspected by your heating contractor at least once a year. 3. If a hot water radiator is hot at the bottom, but not at the top, it indicates that air has accumulated inside and should be vented. To vent radiator: Hold small cup under air vent (located near top of radiator), open vent until water escapes and then close. 4. Fill hot water systems as follows: Open all radiator valves, but keep vents at top of radiator closed. Fill open systems till hands on altitude gage are even. If it is a closed system the water filling will stop automatically when proper pressure is reached. (Pressure should not exceed 30 pounds.) Then, beginning with ground floor, vent each radiator as directed above. It may be necessary to add water during this operation to expel air from higher radiators. 19013 M uu^ oi/vnUARD AMrRtCAV TYPE 2-ga 5. If much water is added to system, it is advisable to heat system to a high temperature and vent again. This will make less venting necessary during the winter. 6. Where an expansion tank is used, make sure that neither the tank nor its drain pipe is exposed to freezing temperatures. Never place valves in piping leading to or from expansion tank. Note: All parts of this boiler have beep carefully inspected and packed. See Packing and Parts List sheet for details. In case of shortage, make sure that all parts have been re moved from shipping container and examine packing material thoroughly. If part cannot be found, report shortage to your dealer, giving boiler size, series number, date, inspector's num ber and packer's number. GIVE BOILER SIZE AND SERIES NUMBER WHEN ORDERING REPAIR PARTS Boiler Size ................................................ Series No. (See Series Plate on Boiler) Date ........................................................... 19014 Plumbing and Heating Division AMERICAN RADIATOR & STANDARD SANITARY CORPORATION AO WEST 40tm STREET. NEW YORK t 0. N.Y. ARSS 486* REV (12.3*1 19015