To: M. G. Hayes
Interoffice Communication
Subject:
P. L. Fetzer February 16, 1990
Sludge Samples - Analytical Cost Evaluation
VISTA
The Louisiana Department of Environmental Quality (DEQ) requested the sludge material in each of the seven basins for which Vista wants to secure closure be tested for hazardous waste characteristics, EP toxicity and TCLP parameters. Furthermore, DEQ requested that all sampling and analyses be conducted in accordance with the protocol as stated in the EPA Methods for Evaluating Solid Wastes (SW-846). Based on the sampling criteria requested by the DEQ, it was estimated that one thousand (1000) samples would be taken and analyzed.
It was requested that comparative analytical cost be developed between commercial laboratories completing the analysis and Vista buying the necessary equipment to complete the analysis for the one thousand (1000) samples.
The commercial laboratories analytical costs ranged from
$1.7 MM to $2.30 MM for the normal 30 day sample
turnaround time.
This analytical cost can double if
priority treatment is required, i.e., sample turnaround
time of less than two weeks. Vista's cost to complete
the testing was estimated to be $0.52 MM. Breakdown of
these costs are shown in the attached report.
For 275 samples or less, it is more economical to utilize a commercial laboratory. If more than 275 samples are generated from this study or are expected from future studies, it would be advantageous to secure the capital funding to establish the capability within Vista at the VCM Plant to analyze the hazardous characteristics, EP toxicity and TCLP parameters. Based on the experience in the VCM laboratory showing an increased utilization of the GC/MS for volatile component analyses, the work/sample load to utilize the new instrumentation would undoubtedly increase.
Equipment delivery schedules, four to eight weeks, requires the decision as to who will do the testing, Vista or a commercial laboratory, to be made quickly if a June 15 project starting date is to be met.
CUH 000010305
Another important fact which must be considered is coordinating basin sampling with the analysis schedule of the laboratory selected so the maximum allowable holding time for the samples will not be exceeded.
The detailed cost evaluation report is attached.
Paul Fetzer Chief Chemist
lk cc:
RAC, SAR, DRB - LCVCM JF, - LCCP TGG - Houston JRR - Austin
SLUDGE SAMPLES ANALYTICAL COST EVALUATION-
This report summarizes the economical evaluation requested by Mike Hayes for cost comparisons between commercial laboratories completing the analytical testing for 1000 sludge samples and the cost required for Vista to do this testing.
I. Testing Requirements
At the request of the Louisiana Department of
Environmental Quality (DEQ), sludge material in the
seven basins selected for closure is to be sampled
in accordance with the protocol as stated in the SW-
846 Manuals. DEQ requested the analytical testing
be conducted per the methods listed in SW-846 for the
identification of the hazardous wastes, EP toxicity
and TCLP parameters. DEQ requested sludge samples
be taken on a 50 ft. by 50 ft. grid over each basin
and be analyzed individually.
However, current
sampling protocol requires only a 100 ft. by 100 ft.
grid which, if agreed to by DEQ, will reduce the
sample load by 75%.
The identification of hazardous wastes include;
corrosivity,
ignitability,
reactivity and EP
toxicity. The EP toxicity parameters fall into three groups; metals (8), pesticides (4), and herbicides
(2) . The TCLP is a modified leaching procedure whose
parameters fall into the following groups; metals (8), pesticides (6), herbicides (2), volatile
organics (19) and semi-volatiles - acid fraction (8)
and base neutral fraction (9).
II. Comparative Analytical Cost
A. Commercial Laboratories
Comparative analytical costs have been developed
between four commercial laboratories and the cost
for Vista to purchase the necessary equipment to
complete the testing. One thousand (1000) samples
were used as the basis for the economic
evaluation. Sampling and testing were scheduled
to begin June 15.
Care must be taken in
coordinating basin sampling with the schedule of
the laboratory selected so that the maximum
holding time allowed by the protocol will not be
exceeded.
Cost estimates to complete the required analytical testing were secured from American Laboratories,
CUH 00U>3O7
Hattiesburgh, MS; ENSR, Houston, TX; Gulf South Environmental Laboratories, New Orleans; and Radian, Austin, TX, (R & D secured the cost estimate from Radian). Costs not addressed in this evaluation include transportation cost, sampling and shipping containers and ice to keep the sample refrigerated.
Comparative analytical costs are listed in Table I. From this data, selected costs were used to show the costs graphically as indicated in Figure I.
The analytical cost for normal sample turnaround, generally 4 weeks, ranged from $1.71 to $2.3 MM dollars for 1000 samples. If priority treatment is required, one week to two weeks sample turnaround, the price can double depending on the laboratory used. This would increase the analysis cost to $4.6 MM dollars.
A 10% discount is obtainable on a per sample basis
for complete TCLP analysis.
In addition, a
discount can be obtained for the large number of
samples to be analyzed.
The largest discount
quoted was 20% provided all testing was completed.
This lowered the cost to $1,276 MM dollars.
Dependent on the conditions imposed on the
contract laboratory, i.e., turnaround time, number
of samples, the sample load where Vista's
anticipated costs match the contract laboratory
analysis cost ranged from 50 to 275.
The 275
sample load may be nearer the actual number of
samples that will be obtained from the seven
basins. The maximum sampling/testing that can be
completed by Vista would be 8 samples daily. This
means the 275 samples would require 35 days to
complete. As there is a 14 day holding time on
the sludge samples, a maximum of 112 samples could
be collected at one time, unless only a five day
work week is observed then only 80 samples can be
collected.
The cost to analyze the samples as required by
the DEQ is shown in Figure II. This represents
the cost for a single sample and totals $1,710
dollars - the minimum cost without a discount.
Analytical testing discount for a complete TCLP
analysis lowers the cost to $1,595.
A volume
discount for 1000 samples lowers the cost another
20%. This variance is shown graphically in Figure
CWH 000010308
I. Figure III shows various options should the DEQ allow Vista to forego the indicated analysis.
B. Vista VCM Laboratory
1. Equipment Requirements
For Vista to complete the analysis, several pieces of laboratory instrumentation will be required. The equipment needed are shown on Table II. Capital required for this equipment is estimated to be $0,309 MM dollars.
Analyses which require the instrumentation are discussed briefly:
Hazardous Waste Characterization:
Minor equipment will be required for the testing associated with the corrosivity, ignitability and reactivity parameters.
Semi-Volatiles:
A second GC/MS will be required
to complete the semi-volatile
fraction analysis. It would not
be feasible to be changing
columns in the GC to be able to
analyze volatiles and semi
volatiles on our current GC/MS.
This would lead to less
instrument run time due to
changing
calibration
requirements,
increased
contamination on the source,
etc. There is a new accessory
for a GC/MS permitting the
direct analysis of volatile and
semi-volatiles from solids,
possibly sludge samples. The
capital cost includes this
equipment.
Metals:
A new fully automated atonic
adsorption
(AA)
spectro
photometer
designed
for
optimized
flame,
graphite
furnace and mercury/hydride
analyses would be required to
complete the testing.
One
automated instrument would be
able to keep up with the
extracted samples.
CWH 000010309
Pesticides & Herbicides:
A gas chromatograph specifically
equipped for the pesticide and
herbicide analyses along with associated integration equipment
will be required.
No gas
chromatograph in the VCM
laboratory is equipment with the
specific detectors required.
Extraction Equipment:
Additional extraction apparatus
and tumblers, would be required
to run the 1000 samples. With
the purchase of an additional
12 place unit we would be
capable of analyzing 8 volatile
and 8 semi-volatile samples
daily. The maximum one person
can extract and properly clean
the equipment would be 8
samples.
This will be the
limiting factor for the analysis
as it requires 24 hours to
complete the testing. It may
be wise to double the number of
extractors to maximize through
put on each tumbler. This would
allow container cleaning while
other
samples
are
being
extracted.
2. Manpower Requirements
Training requirements for the new instruments, operational supplies, and manpower needs total about $0,211 MM dollars. It was estimated that four additional people would be required to do all the work associated with the testing. The first would work with the new GC/MS, the second would work the herbicide/pesticide extraction, sample preparation and analysis, the third would work with zero headspace extractions and the fourth would run the AA instrument and help with extractions. Another individual may be required to keep the reports current, but is not counted at this time. In all likelihood, once the current sample load is completed the manpower requirements can be reduced by cross training the analysts on the AA and the gas chromatograph used for the pesticide and herbicide analyses.
CWH 000010310
With an estimated capital cost of $0,304 MM and anticipated operating cost of $0,211 MM dollars, the total investment for Vista would
be $0,520 MM dollars. The date to be obtaining valid data would be June 15 provided the equipment can be ordered by March 15. This would allow the equipment to be received by May 15 with installation completed by May 30. Training and method development could be completed by June 15. Meeting this date means ordering the equipment by March 15 or earlier.
If it is likely that fewer than 275 samples
will be taken, then the commercial laboratory
is the most logical choice. However, if it is
anticipated the sample load from the current
project or future projects would exceed the 275
number, serious consideration should be given
to setting up our own laboratory. In the event
regulatory
requirements
impose
tighter
restrictions
for
some
specific
toxic
parameters, i.e., low levels of trace metals
(copper, nickel) and semi-volatile trace
organics, this same equipment would be required
on an ongoing basis.
CUH 00l03i}
TABLE I COMPARATIVE ANALYTICAL COST
COMMERCIAL LABORATORIES
PARAMETER EP Toxicitv
AMERICAN LABS
ENSR
RADIAN
GULF SOUTH
Corrosivity
5
10 15
11
NACE
75
60 125
--
Ignitability Reactivity Extraction
30
35 35
30
70
70 60
100
50
75 75
--
Metals
150
200
200
200
Pesticides & Herbicides TCLP
175 555
330 780
300 810
325 736
Extraction Metals
200 140
100 200
-- --
135 200
Pesticides & Herbicides
150
400
--
325
ZHE Extraction
Incl. Above
150
--
125
Volatile Organics
200
250
--
250
Acid Fraction
465
425
--
475
Base Neutral
--
--
--
--
+10 Components per Fractions (3)
$100/Fr NC 1155
N/I 1525
N/I 1340-1500
$30/Fr 1600
Total $ Cost/Sample
1710
2305 2150-2310
2246
TCLP Discount
10%
N/I
N/I
N/I
Priority Treatment
N/I
4wk-Norm 2wk-100%
N/I
4wk-Norm lwk-100%
Volume Discount (1000 Samples)
20%
--
--
10%
Transportation
NC
Neg.
N/I
Neg.
Sample Disposal
Ret.
N/I
N/I
Ret.
NC Fr Neg. N/I Ret.
= No Charge = Fraction = Negotiable = Not Indicated = Returned to Client
CWH 000010312
TABLE II VISTA - COST ESTIMATE
Eauinment Finnigan GC/MS INCOS 50*
Therm Ex.
Cost $125,000
26,000
Estimated Deliverv
60 Days
90 Days
P & E Automated AA System for Metal Analysis Varian Gas Chromatograph FID and EC Integration Equipment ZHE Extraction Apparatus
Extraction Vessels Tumblers
Tax Transportation
Lab Modification Cost Total Set-Up Cost
96,800
16,700 4,000
60 Days
9,800
3.000 284,300
18,300
4.000 294,600
9.250 308,850
4 Weeks 4 Weeks
Capital
Estimated Omeratina Costs Training Manpower Operating Supplies Maintenance Contracts
10,000
141,000
30,000
30,000 $211,000
* = Ordered after March 9 the cost increases to $140,000.
CWH 0000J.031
FIGURE I
COST COMPARISON
CONTRACT LAB - VISTA
$MM Analysis Cost
Total Cost (VISTA) Equip. Cost (VISTA) Volume Discount (CL) S Anticipated Low (CL) 44- Anticipated Hlgh(CL) + 10 Components (CL) -r Priority Treat. (CL) S- TCLP Discount (CL)
Number of Samples
CWH 0 0 0 0 1 0 3 1 -4
Pi
o
o
3
)--<
H
IQ
>
H co
LU o
CC o
WO
oO
Q
c6 O
4 r--I
+->
CO r--H Ctf
<1
CWH 000010315
$2 $1.5
$1.71
FIGURE III
SLUDGE TESTING
Base Case Analytical Cost Evaluation
$i
$0.5
CWH 0 0 0 0 1 0 3 1 6
$o Base
Option. 1
Cost vs Option based on 1000 samples
Option 2
Option 3
Option 4
Option 5
Options
Base Case - Testing required by DEQ. TCLP & Haz. Option 1 - Assume DEQ permit elimination of Pest. & Herb.
Option 2 -- Ign., Corr., React., &i TCLP Option 3 -- Assume DEQ permit elimination of EP metals Option 4 - VCM to do Ign., Corr., &c React. Option 5 - VCM to do Volatiles 6i Option 4
TABLE II VISTA - COST ESTIMATE
EguiDment Finnigan GC/MS INCOS 50*
Therm Ex.
Cost $125,000
26,000
Estimated Delivery
60 Days
90 Days
P & E Automated AA System for Metal Analysis Varian Gas Chromatograph FID and EC Integration Equipment ZHE Extraction Apparatus
Extraction Vessels Tumblers
Tax Transportation
Lab Modification Cost Total Set-Up Cost
96,800
16,700 4,000
60 Days
9,800
3,000 284,300
18,300
4,000 294,600
9.250 308,850
4 Weeks 4 Weeks
Capital
Estimated Operating Costs Training Manpower Operating Supplies Maintenance Contracts
10,000
141,000
30,000
30.000 $211,000
-- Ordered after March 9 the cost increases to $140,000.
CUH 000l03l?