Document VJkD33yq90d92JjbgLGkDDdLg

T. H. Huffman * umrovnn Communication From: Date: Subject: D. C. Skokna September 23, 1992 AimnwM MONTHLY PROGRESS REPORT August, 1992 There were four first aid cases reported during August. At month end, the plant's employees had worked 4806 days (6,446,863 employee hours) since the last lost time injury. PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime. Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EU1, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M 39.5 91.7 98.7 1.0225 7.2 97.2 1.5 97.4 1.8 88.2 < 4.9> 192.0 < 45.6> 407.8 86.7 97.2 1.0341 61.0 96.7 21.2 97.5 16.4 81.6 < 12.6> <404.9> <622.6> Costs Variable costs were above budget in the resin unit with near budget performance in the other units. Fixed costs were favorable primarily due to correcting accrual errors that were made in July. Operations Annual inspections and rupture disk changeouts were done on reactors D744 and D745. Production was very good in the flexible compound unit. Inventories increased during the month. Rigid compound pro duction was low. Plans are set to shut down the dry blend unit near the end of September. / VAB.0001189139 T. H. Huffman 09/23/92 Aberdeen Monthly Progress Report - August, 1992 Page 2 OMP Cerro Wire and Cable (a resin and compound customer) visited and toured the plant. Discussions focused on ways they could Improve their compound production. h The Vinyl nAM Shift Natural Team presented a project to improve access to blend tank valves during the winter. Environmental We met with MDEQ to discuss our work plan to collect data for the James Creek flow modelling project. MDEQ made some comments and they will be incorporated Into the data collection plan. Data collection began in early September. Plant Superintendent rah VAB.0001189140 SAFETY - B. L. Trego First Aid OSHA Recordable Total Injuries Number of Restricted Workday Cases Number of Lost Workday Cases Injuries bv Department Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office Totals Injuries by Type Cuts and Abrasions Eye Injuries Bums Bruises Strains/Sprains Stings Other Totals Fiscal Y.T.D. 1992 Fiscal Y.T.D. 1991 4 0 4 0 0 0 1 3 0 0 0 4 39 01 04 03 03 00 4 Lost Workday Cases Days Lost 08 3 ~ 49 6 127 Contractor First Aid Cases Medical Treatment Cases Lost Workday Cases 0 44 0 01 0 01 Safety Record Last lost time injury - 7/5/79 Days since - 4,806 Employee hours since - 6,446,865 On August 31, 1992, the employees of the Aberdeen plant completed 4,806 days with no lost time injury. VAB.0001189141 4 4 SAFETY - Continued Topics for the plant safety meetings during the month included "Lockout/ Tagout Training" and "Safe Work Permit Training". Routine dosimetry results for the month were: Chemical VCM Lead Total Particulates Number 74 6 1 Percent 100.0 100.0 100.0 Ntimhor 0 0 0 0 0 0 FA Compound Abrasion of right thumb. FA Maintenance Abrasion of left elbow and contusion of left hip. FA Maintenance Puncture of left palm. FA Maintenance Irritation of right forearm (contacted AMS). There were no emergency drills conducted during August. m , U _ !_________ VAB.0001189142 OUAT.TTY E. E. Smith All natural teams continue to meet. Most are preparing team project presentations to management. The Plant Manager's Natural Team and the Synergy Team brainstormed solutions to previously identified QMP barriers. The Vinyl "A" Shift Natural Team recommended electric tracing on some transfer lines to improve safe access to blend tank valves during the winter. In the past, winterization shelters have made valve access difficult. Cerro Wire and Gable visited the Aberdeen Plant on August 19. They received a resin and compound tour. They were looking at ways to improve their compounding operation. A VAB.0001189143 COST VARIANCES - D. C. Variable Costs Product Aug*. 1992 Variance. $M Efficiency Erlfeft X&&1 PVC Flexible Compound Rigid Compound Plasticizer Total <$44.2> < 11.2> 1*0 8.8 <$45.6> <$506.0> < 69.7> < 18.1> < 37.8> <$631.6> <$550.2> < 80.9> < 17.1> < 29.0> <$677.2> PVC 4 Raw material use for all PVC (prime and non-prime) was slightly above budget for the month. These units operated close to budget. Malor Price Variances: Yfyj&ngf.. - $M VCM Natural Gas Aleoho1R Alcohols Plasticizers Resin to Flexible Compound Off-Grade Resin Credit Resin to Flexible Compound Micral 932 Electricity Other Price Variances Total <$478.6> < 52.8> < A6 * < 34.9> < 34.1> < 11.6> < 11.0> 12.6 24.1 0.8 <$631.62l. Fixed Cost Variances Payroll and Benefits MM&C m Miscellaneous TI&D m Clearances Payroll & Benefits Variance - $M Total $ 25.8 84.7 55.5 4.8 21.2 $192.0 Hourly payroll and benefits were both favorable; salaried payroll was above budge t. MM&C The favorable variance is due to correcting an $85M accrual error made in July. VAB.0001189144 L 1 cost mTAwas . Continued Miscellaneous m Assigned Vehicles: $68.1M - This corrects a July accrual error. $12.6M $16.2M ShlPP&Pg<$22.8M> - Delayed processing of a prior period invoice overstated the actual August costs. This favorable variance is due to a credit for the Pond 2 cleanout project. k VAB.0001189145 y t VINYL - J. D. Olson, D. E. Knittig The Vinyl Department had no injuries in August. The monthly safety meetings were held on shift. A meeting with all supervisors was held to review revisions to the lockout/tagout procedure implemented last month. General 1. Annual inspections and rupture disk changeouts were completed on reactors D>745 and D-744. The New Module inspections were completed in August. .2 D-400's recovery line was replaced from the valve to the condenser. The line developed a leak due to corrosion, All other recovery lines were inspected and reactors needing recovery line replacement were scheduled down. Reactors D-500 and D-600 were completed in August and D-742 was completed in early September. August YTD - Production, MM lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), % Fluid Bed Dryer Stream Factor, % Resin Quality, % Prime 39.5 1274.1 96.2 947.0 30.5 91.7 93.0 97.2 98.7 Reactor Downtime 407.8 1213.7 91.6 9741.0 29.0 86.7 91.3 91.0 97.2 Hours Operational downtime (recovery scheduling conflicts, charge/rinse water conflicts, Q.C. data delays, dump conflicts, and no blend tank space). 385.0 Maintenance downtime (D-745 annual inspection and condenser cleaning, D-400 recovery line, D-744 annual inspection, D-745 VCM charge valves, incinerator work, fluid bed dryer for cleaning, D-743 agitator gearbox and motor, D-600 recovery line, D-500 agitator PM, D-500 recovery line, D-300 evacuation valve, D-741 steam valve, D-500 suspending agent ram valve, D-300 catalyst pot disks, and RVCM charge meter New Module). 233.0 wmmmmmm VAB.0001189146 VINYL - Continued Dryer Tine m Operational downtime (centrifuge plugs, dryer cleaning, flameouts). m Maintenance downtime (activator problems, centrifuge repair). m Reactor limited production. 1 of Total Downtime 35,5 2.8 61.7 Kev Maintenance Items J. B. Antrey/S. A. Truitt m Reactor 744 was prepared for annual rupture disc and die check. Relief valves were sent out for reconditioning. m The Old Unit cooling tower, 4B gearbox seal on the input shaft, coupling, and grommets were all replaced. The tower has been experiencing some vibration due to the deck sagging. i Recovery compressor "BK was pulled out of service and rebuilt for a spare. m Emission recovery system compressor 706 was pulled out of service and rebuilt. Reactor gearbox 743 coupling was changed and the unit realigned after rough vibration was detected on bi-weekly vibration checks. The demister pads on the fluid bed dryer were changed, and a temporary patch put on the ductwork. m Reactor 745 was prepared for hydroblasting. The .gearbox was pmrd while the reactor was down. m Five major valves were changed in the Vinyl area. Recovery lines that showed severe corrosion on reactors 400, 500, 600 and 742 were replaced. Critical instrumentation P.M. was completed on the west and east incin erators, and reactors 744 and 500. Boiler blowdown piping was completed. m Air compressor #6 was rebuilt and is now on line. m Boiler feedwater pump #5 had severe vibration in pump and motor. Both were rebuilt, aligned and placed back Into service. A VAB.0001189147 Cfflfponup - S. C. Hillman, J. B. Hegwood The Compound Department had one first aid injury during the month. A Compounder received an abrasion to his thumb. General Orders were down slightly on Line X and Line III during the month. Production for the month was up 300M pounds from last month. This increase can be attributed to a continued decrease in downtime and more efficient scheduling. Efforts are still being made to move two products to Line V to relieve congestion on Lines X and XXX. At this time, we have received approval to move one product to Line V. The second product has been shipped and we are awaiting approval from the customer. CoMPOund Operating Manggi Line X 31 Line III 31 Line V 15 Total % Prime Capacity Utilization Factor 2202 4400 552 7154 97.20 96.12 71 142 37 250 18413 37711 4899 61023 96.68 72.22 Downtime Hours - Product Changes - One Dicer Offline - Miscellaneous Maintenance - Quality Line III - Product Changes - Miscellaneous Maintenance - Quality Line V - Product Changes - Quality - Miscellaneous Maintenance - Coverage for Other Lines 91 17 29 15 43 55 5 46 3 5 60 i VAB.0001189148 --r k. 1 COMPOUND - Continued Operating Days Rigid Compound 18 % Prime Capacity Utilization Factor Production (H U.) Month Ayg./Day Fiscal T.T.D 1456 97.40 28.96 81 21171 97.54 37.19 Hours - Product Changes - Miscellaneous Maintenance - Quality 38 24 32 Operating Para Plasticizer 31 % Prime Capacity Utilization Factor 1845 88.20 95.16 16391 81.63 63.89 Key Malntenime* - J. B. Autrey/S. A. Truitt Line I "AM blender gearbox was replaced. The old gearbox was rebuilt for a spare. Line III auger for the bulk lead system was replaced. The old auger will be repaired for a spare. Line V Welex starter had bad contacts and was replaced. Line III bearings. totors were repaired. Both motors had worn A f mmmf mmm r VAB.0001189149 ENGINEERTNG - J. E. Nickerson, T. R. Mackey, R. H. Sneed, M. L. Carter PROJECTS IN DEVELOPMENT - GENERAL Equipment checkout is nearly complete and operator training is continuing. Filter media installation is also complete. A DOE jar test to determine water plant chemical addition levels is in progress. Startup is scheduled for the third week in September. New Boiler m An unallocated AFE for $45011 was submitted to Houston. These funds will allow fabrication of a new boiler to begin immediately. An 80,000 lb./hr. boiler was recommended as the size that would give the plant the best flexibility and efficiency. Flame Arrestor Lid A new lid, with a higher pressure rating, was Installed on the incinerator flame arrestor. A pressure transmitter and a feed block valve were also installed to protect the arrestor from over pressure. Startup is complete and the system was turned over to Operations. Plasticizer Efrlltflift-ion An estimate of the Stripper Class "A" design is expected within the week. Equipment relocation issues have been resolved. A Class "A" design of storage and transfer facilities for the stripper will be issued in early September. The Class "A" design will cover the capacity of the existing facilities and additional capacity gained by adding the steam stripping column. A model of our plasticizer production was developed to gredict how VRP and RAE handling affect final annual capacity. Operations ended the wastewater test run July 28 after having a truck of 610P rejected for cloudiness. Loadings to ponds 3 and 4 have increased over the test run, but remained below expected levels. COD samples were taken around P-1 and downstream of the API to evaluate the contribution of the dribble tank, T-470, to overall loadings. Sampling will continue through mid-September to evaluate loadings as operating conditions return to normal. Centrate Pool Depth Tests Sample ports are being installed on all centrate basins to deter mine if considerably higher concentrations of resin in centrate water will occur with lower pool depth. A test run on all cen trifuges will be done once the sample ports are in place. ENGINEERING - Continued VCM Compressor Upgrade Construction for upgrading the compressors and installation of safety equipment are in progress. Construction completion is targeted for the end of September. Operating procedures have been completed and training will begin as soon as possible. OSHA Process Safety The following policies have been approved by plant management: Management of Change Procedure, Operating Procedure Development and Control Plan, Pre-Startup Safety Review and Process Safety Informa tion Development Plan. Management of Change and Pre-Startup Safety Review training for all supervisors and engineers was completed. Management of Change and Pre-Startup Safety Review were implemented plant-wide on August 26. The new system is proceeding smoothly so far. Bids were received for P&ID development. BA1HSE A plant water balance was completed and issued this month. Currently, we are still identifying ways to reduce water use. The Class design for a new diffused air aeration system to pond 3 is complete and is in review. The regulatory relief work has led to a meeting with the State and a stream survey for James Creek is being conducted. The oxidation test results were not positive and this has been dropped. Pond 6 water is being tested for characteristics to determine if it can be recycled. A VAB.0001189151 ABERDEEN CHEMICAL PLANT MONTHLY PROGRESS REPORT CAPITAL EXPENDITURE STATUS M.L. CARTER AUGUST REPORT 1992 F.Y. July-August Month 4th Qtr. YTD 251.5 251.5 3106.1 287.0 479.0 3841.0 - 55.6 - 227.5 - 734.9 -12.3% -47.4% -19.1% Actual Expenditures - The General Ledger for August indicates a large negative actual expenditure for the month. The General Ledger was overstated in July due to the VMS not accepting actual expenditures for July and posted accruals. Houston has indicated that the problem has been rectified in the August General Ledger. The plant has therefore added expenditures in July to those in August to report an actual expenditure of $251.5M for the JulyAugust months (shown above). Expenditures for July-August were $ 55.6M less than the plant's budgeted expenditure forecast approved in the Fourth Quarter Budget submitted in June FY92. July-August FY92 capital expenditures were 12.3% less than the plant's budgeted expenditure forecast. It should be noted that the capital expenditures associated with project H612 Pond 2 Resin Drying are not accounted for in the reported actual above due to the accounting procedures and contract agreement with Conoco. Quarter Budget - Current Quarter Expenditure Forecast as submitted and approved for the current quarter capital budget. YTD Budget - Total of current and previous quarter approved budgets. Forecasted Expenditures - The submitted 4th Quarter Capital Budget calls for expenditures of $479.OM and September expenditures of $192.OM. VAB.0001189152 s 1 K. G. Akins Water All wastewater discharge parameters were met for the month of Augus t. We met with the KDEQ in August to discuss the work plan for data collection for James Greek flow modelling. Comments by MDEQ were incorporated into the work plan. Data collection will begin in early September. Air Permit The MDEQ air division informed us that little or no activity is taking place on air permit renewals. They are working on new source reviews only. They are allowing companies to run on expired per mits. We believe the MDEQ will not take any action on our permit application that was submitted September/ 1990. a&s Waste shipments during the month included: m A bulk shipment of waste oil to Fisher Industrial Service in Gadsden, AL. A VAB.0001189153 I "mmmmmmmmmmmmrnmmmmmp ENERGY CONSERVATION - J. A. Bodron I. Energy Conservation Data A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU II. Boiler Operation Aqftt. 1992 < 4.8%> < 4.9*> 2694.0 134.8 Fiscal T.T.P. < 13.5%> < 12.6%> 2915.0 1476.4 No. 1 No. 2 No. 3 83.3% 84.6% 85.0% 83.4% 83.5% 83.3% VAB.0001189154 HOMAN RESOURCE REPORT AUGUST* 1992 personnel - j. E. Beall + EMPLOYMENT Keith Bailey - Engineering Department - New hire Co-op Student. Thaer Abudiab - Engineering Department - Rehired Co-op Student. Allen Bodron - Engineering Department - New hire Chemical Engineer (removed from Educational Leave of Absence). PROMOTIONS/TRANSFERS None. RRTTPRMBHTO None. Berlin Genetti - Engineering returning to school. Dwight McComb - Engineering returning to school. Holli Harris - Engineering returning to school. Department - Co-op Student Department - Co-op Student Department - Co-op Student TO/PROM LEAVE OF ABSENCE R. Danny Flippo - Vinyl Department - Vinyl Lead Operator Union Leave of Absence. Holli Harris - Engineering Department - Co-op Student placed on Educational Leave of Absence. A VAB.0001189155 UJ (A UJ O S UJ UJ cc a U3Jt C\I g0' co L (h SO 8 8 SQ 8 8 SO8 m tn rn tn 8 JO a 8 8 rn o tn O CM s s in ' in 1C O CM CM in * *a CM Kl in 1O e 5 'O CM & to A II o> II c Ofto CO II II UaJ. II 8oUJ to V) XUJ <0 Q o a: i/t UJ I UJ INI c<0 *8 oo ooftl. a ua 3UJ Of c/ o. CO s CJ VAB.0001189156 *' i DEPARTMENTAL SUMMARY HOURS REPORT ................ YEAR TO DATE .................. 0CM 8: (T 0 I o ca iOu oc 4g1 o' Ui UI N g 8oOe (A V s o UI u 41 8oQ. u o IU g UI I 3 (A OUi O in CO M o epw PPi M* VAB.0001189157 P rinted 9/01/92 r EMPLOYMENT Salaried Hourly Temporary SUB TOTAL L.O.A. TOTAL 81 156 2 239 2 241 DEPARTMENTS #EKPLOYEES WAREHOUSE GENERAL PLANT MAINTENANCE LABORATORY COMPOUND VINYL PLASTICIZER SUB TOTAL SALARIED 15 10 36 22 36 32 5 156 81 ABERDEEN PLANT MONTHLY PERSONNEL REPORT AUGUST. 1992 NEW HIRES Salaried/Transfer Hourly Temporary TOTAL HO 1 0 0 1 FY 13 0 4 17 MF 90 50 80 41 24 1 11 2 20 63 4 6 19 %M %F 60% 50% 22.2% 18.2% 66.7% 34.4% 40% 40.4% 7.4% 0 0 0 4.5% 2.8% 6.3% 0 4 "2.6% 23.5% DEPARTMENT TURNOVER MO. FYD 00 02 03 01 02 02 00 ANN. % 0 21.8% 6.1% 5.0% 6.1% 6 8% . 0 APPLICATIONS Month FYD Minority Female No. i 00 00 00 00 PLANT TURNOVER. Hourly Month FYD Salaried Month FYD No I 00 6 4.2% 00 5 6.7% VAB.0001189158 I 4 ADMINISTRATIVE SERVICES - D. A. Barclay There were no reportable safety Instances this month. All teams met during August to review progress on their projects. Futures YTD Natural Gas <$34,092.64> Statistics Month Processed Invoices ly010 Working Fund Checks Written 9 Cost Savings Through Bid Process $2,666.11 Raw Material Purchase Orders Issued 83 MR0/AFE Purchase Orders Issued 178 Spare Parts Purchase Orders Issued 196 Packaged Finished Goods FY92 Y.T.P. 11,723 174 $33,557.11 1078 2079 2113 h July. p? Compound "A" Grade PLENEX Compound Off-Grade (BC) Compound Off-Grade (H) Millscrap Dry Blend "A" Grade Dry Blend Offgrade Resin Type I Resin Type "BC" Vacuum Dust Total Packaged W/house 3,757,133 139,263 402,946 107,117 155,418 607,206 278,130 950,750 100 . 19?i,058 6,590,121 Bulk Finished Goods Ending Inventory Compound "A" Grade Compound Offgrade Rigid "A" Grade Rigid Offgrade Resin Type I Resin Offgrade Total 448,765 0 1,321,300 269,870 9,605,310 1.400.551 13,045,796 3,995,394 144,706 312,000 63,607 84,469 632,625 261,850 1,222,700 100 242.701 6,960,152 (Decrease) /Increase % Change 238,261 5,443 < 90,946> < 43,510> < 70,949> 25,419 < 16,280> 271,950 0 50.643 370,031 6.34 3.91 <22.57> <40.62> <45.65> 4.19 < 5.85> 28.60 0 26.37 5.61 Aug..*92 (Decrease) /Increase % Change 858,815 0 876,709 56,050 8,280,950 924.750 10,997,274 410,050 0 < 444,591> < 213,820> <1,324,360> < 475.801> <2,048,522> 91.37 0.00 <33.65> <79.23> <13.79> <33.97> <15.70> VAB.0001189159 m m mm w i A 1800-rl 1600 1 s 1200 S 1000 08/91 10/91 12/91 02/92 04/92 08/92 08/92 09/91 11/91 01/92 03/92 05/92 07/92 PKG'D PRODUCTS INVENTORY VAB.0001189160 ABERDEEN CHEMICAL PLANT SHIPPING ANALYSIS AUGUST 1992 -SHIPMENTS BY PROOUCTS- PUBLIC MONTH IPT/ITC EXCH/TOLL PUBLIC YTD IPT/ITC 09:33 AM 09-Sep-92 EXCH/TOLL RESIN-BULK RESIN-PACKAGED 14,206,180 675,741 FLEXIBLE COMPOUND-BULK FLEXIBLE COMPOUND-PACKAGED 656,000 2,967,524 20,665,250 308,200 3,068,330 99,761 0 0 0 0 194,937,209 196,984,760 5,805,246 3,556,900 5,341,920 23,509,490 33,333,743 434,342 0 0 0 0 NEW BUSINESS 26,091 1,981 0 181,880 1,981 0 RIGID COMPOUND-BULK RIGID COMPOUND-PACKAGED RIGID COMPOUND-PELLETS TOLLING - BULK TOLLING - PACKAGED 921,750 296,605 0 0 0 426,600 495,874 0 0 0 0 0 0 0 0 12,120,610 4,621,962 0 0 0 5,959,650 677,724 0 0 0 0 0 0 0 PLASTICIZER 0 1,050,720 0 165,060 6,657,380 917,400 TOTAL -SHIPMENTS BY MOOEBULK: AUGUST* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER 19,749,891 26,116,716 0 256,507,630 237,782,227 917,400 ISBiaWtlVBS SBBBBBBISBSBBBSSSSSXBtBSCGSBKSBBESGBGBaBBBVtDBSBmmxmwmmnmMmmm* 8SS8BSBSSS RAILCAR 177 16 6 5 CUSTOMER PICKUP COMMON CARRIER 19 42 0 18 0 14 05 TOTAL 238 34 20 10 TOTAL AUGUST 204 19 79 302 YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER 1,841 134 76 39 145 381 0 132 18 126 0 21 2,367 266 220 60 TOTAL YTD 2,090 163 660 a 2,913 PACKAGED: AUGUST* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER CUSTOMER PICKUP 5 19 4 0 COMMON CARRIER 24 78 19 0 TOFC AIR/UPS 00 00 00 00 AIR/UPS f 2 0 0 0 TOTAL 31 97 23 0 TOTAL AUGUST 28 121 0 0 2 151 *YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER 34 265 0 0 211 914 0 0 23 139 0 0 0 000 7 23 1 0 306 1,148 163 0 TOTAL YTD 268 1,318 0 0 31 1,617 CC: DAB,TLC,MAS,AEV,JRF * VAB.0001189161 A 888888 oc a. ec CL oc 0. OC a. 19 o o a u a 888 Crt s s s 8 S i w 5888888 UJ oo QUl Ul Ul s S3 sUJ Ul Ul Ul a Ul Ul Ul Ul Ul UJ Ul Ml o aLi! Ual Uol U5l 5 88 1 I8 *fc Ul u I 3 M 52g 5"Z U Ul CCRCRR 0 3 5? 5 3 S 82i8 t 8 (A N o K o ko fo: ko 03 o o o o o 5 S 5 SJ JI rJ oooooo 95 5 2 3 <A (A 3 M (VI Ul 1 M ss R R8 i 5 i i i i K ku. N- IMi IM*0 CM A fM j fM* fM a4 in in on C cUl NK K K O Is. fM 3583 O' 8 8 ooo 8 0o0 a sOC OC Ul UJ Ul 3 8 8 S 8 o o Ul u uui UJ LJ Ul u ui u zu a. a. CL oc a. oc t i*1 CO CO (A m oo go IM O' N N N (M IM (M O' O' O- O' O' o> M O g S8SSS oc 8L 0 to Ul =1 1(A <A o S 3 Ij 19 tA UJ g UMl to 8- - O 8 "u s a SX X J 3 iii S Ul a. 2s CA 8 8</i 3 fM 8 S8 O 3 8 (NM 888 8 8 | 8IM (M O' O % O5 8m 8 888 333 8 ooo 5 388 CM fM rvi O 3S S N. NO g i O%A 8 8 5fil M r- N N - M 1" MW Ul i N NK SS 8M du8 S5 g in in 5 V> (A y Ul i IM 8in X (A u CM u o IA M X 3 Ul 5 4A 4A (A A A Ul IM R 8 IM N N N 33 M isi s E5E rS m S 8 g 9 Irt IA rJ N I 5(A <A to o 8 ww II 8 N (A r* s Ss ^So iMn 3 S 5 8 8 8S2 S3 -o SS (A Ul U> 111 Si Si u o (A U r* w+ 5 !0w (A 8 co CO 33 8 CA Ui 3 * 5o a u (A (A & XXX 19 (A X O* Ul <_> X 2u Uul uUl a o o UJ 3Ul Ul oc Ul $OC 5UJ XXX Ul Ul X Ui m 3 (A 8 o g IL X s ft!oIM IoM ru o> CM O fM O' (M O' fM fM O' O' O' fM O' MM OOO fM 88 8 S I 00 00 0o0 CO 00 CO CO J VAB.0001189162 LABORATORY - J. M. Edwards, J. R. Williams A. Safety There were no safety incidents in the Laboratory during Augus t. B. Customer Contacts Jim Edwards, Amy Bagwell and Terry Edwards went to Intex in Corinth, MS to offer training in resin testing. C. Customer O.C. Problem Reports and CHR's 8/Q3 Abitlbl. Mlddleburv. IH The customer complained that the wrong sample being shipped to them for evaluation. 8/04 Kappua Plastics Hampton. HJ The customer complained of 5465 con tamination in 5265 bagged resin. The problem was caught during blown film testing of the 5265. The contamina tion occurred in the bagging process. 8/08 AT&T. Omaha. HE The customer complained of abnormal screen change frequencies using 34862 Gray 546 compound. Analytical tests showed the yellow and black contami nation to be aluminum trihydrate, lead stabilizer and calcium carbo nate . "" 8/10 Thermal Industries. Pittsburg. PA The customer complained of poor finish and poor surface results with RP-159 Beige 347. R&D Technical Service is investigating. 8/10 Armor Bond. Sardis. MS The customer complained of a 5385 resin car arriving with one unload ing spout missing and taped with duct tape. LABORATORY - Continued C. Customer O.C. Problem Reports and CHR's - continued 8/11 Simbeam- The customer complained of a 27251 compound color shift at the end of a lot. The product was a little too yellow. 8/11 Inter The customer complained of having problems unloading a 5305 resin car. We suspect that the resin was too dry and too high in static. 8/18 Centrallft. Clearnore. OK The customer complained of two collapsed boxes of 34431 compound. The pallet design is presently being reviewed as the main cause of stacked box failures. 8/21 Tandy Wire, Ft. Worth. TX The customer complained of rough surface on wire insulated with 34711 compound. The lumps were unpigmented and slightly harder compound. 93/21 Marlev Moulding. Marion. VA The customer complained several compartment samples from a 5305 railcar were above the 3.0% on the pan speci fication. The plant is working at coarsening the 5305. P8/21 Triangle. Sikeston. MD The customer complained of contamina tion on their screen pak using 35852 compound. The contamination analyzed to be mostly lead with smaller amount of calcium and titanium. D. Product Waivers Issued Customer Product Reason Stylecrest RP-27 WHT 113 40 Mesh Mfr Ml up mrnmmmm m LABORATORY - Continued E. RVCM of In-Pro<*g Mmoles The following is a summary of residual VCM results on in- process samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of August, 1992. Reactor Slurries Number of Samples Average RVCM, ppm 33 0.090 79 0.137 F. RVCM of Shipment Sammies The following is a summary of the residual VCM analysis of shipment samples for the month of August, 1992. Product 5225 5265 5305 5325 5385 5395 5415 5416 5465 Debox Pond Dry Blend Humber of Samples 0 60 98 2 53 9 77 0 6 4 0 0 Average RVCM. ppm 0.038 0.077 0.049 0.080 0.015 0.040 0.007 0.019 G. Flexible Compound Quailtv Summary Hardness Color Hard Particles Contamination Dicing Cross-Contamination Mischarge Metal METS-IR Totals Adjustments" M Lbs. J_ 20.0 <0.28> 30.0 <0.42> 5.0 <0.07> 55.0 <0.76> Rejections M Lbs. (X'i ------13.7 5.2 1.3 13.6 11.2 17.2 15.5 9.0 86.7 ----------<0.19> <0.07> <0.02> <0.19> <0.16> <0.24> <0.21> <0.12> <1.20> k * VAB.0001189165 LABORATORY - Continued H. Rigid Compound Owht Torque Rheometry & Color Color Contamination Total Rejections M Lbs. <%> 3.9 11.7 15.6 <0.27> <0.80> <1.07> 4 VAB.0001189166 r* K 138 144 148 163 140 174 h(D CD (O oi to o qo co co 10 cm jq csi ^ 00 a> d 8 IO CM r,<>t cf-o f4S) O <l & C 2 CL E h- X Average Particle Size, Microns VAB.0001189167 * SAMPLE SHIPMENTS AUGUST 1992 RESIN Ship Date 8/04/02 8/05/92 8/12/92 8/18/92 8/21/92 8/20/92 8/24/92 8/25/92 8/25/92 8/25/92 8/26/92 Product 5385 5385 5305 5265 5385 5415 5325 5305 Pond Pond 5225 5305 5225 5305 5415 5325 Amount 50 lbs. Customer Vista R&D - Austin Ship Mode UP8 50 lbs. Alcan Building Products UPS 500 lbs. GRUPOIMPORTADOR JALISCO Burlington Northern Air 10 lbs. 10 lbs. 10 lbs. REHAU AG + CO Airborne 50 lbs. 2 lbs. Ferro Chemical Shawnee UPS Airborne 50 lbs. H. Heller J. Stark Pick-up 5 lbs. Carton Airborne 5 lbs. 5 lbs. Teknor Apex Airborne 1 lb. Osterman 1 lb. 1 lb. Airborne 50 lbs. O'Sullivan UPS 1 COMPOUND 8/14/92 8/19/92 8/19/92 8/21/92 8/27/92 58961 NAT 48451 BLK 419-128A NAT 48562 BLK 48451 BLK 462-121B1 BLK 35852 BLK 100 Ibe. 100 lbs. 2 lbs. 1500 lbs 1500 lbs 1500 lbs 200 lbs. Customer Winders and Geist Inc. Excel of Kentucky Furon - Macromeric Div. LOF Tech. Modified Tubular Products Mode UPS Airborne Airborne CC Airborne VAB.0001189168 f ''SAMPLE SHIPMENTS AUGUST 1892 DRYBLEND Ship Date 08/08/92 Product 489-188A NAT 489-188B NAT 489-188C NAT 489-188D NAT Amount 335 lbs. 348 lbs. 354 lbs. 349 lbs. Customer Abitibi-Price Corp. MISC. Ship Date Product 8/12/92 Penn Color 83B1479 Amount 5 lbs. Customer Vista R&D - Austin Page 2 Ship Mode CC Ship Mode UPS i1-. VAB.0001189169 NUMBER OF INJURIES /""Ns ABERDEEN CHEMICAL PLANT INJURIES (Twelve Month Running Totals) 30 MONTH TOTAL INJURIES --*- OSHA RECORDABLE VAB.0001189170 Mi h VO O OQ vo CO co <Si c-4 aT/nxa mmmm mmm MMpmppvpmimHHi P VAB.0001189171