Document VJXRvykar580Beg4VrdG72RDK
PATRICK R. ATKINS PITTSBURGH OFFICE
OMR. JOHN WIJNGAARDE MR. PIM GEERDINK
RE: PERIODIC ENVIRONMENTAL REPORTS
As we discussed during my recent visit to Suralco, periodic reports on environ mental activities are of benefit to us in Pittsburgh. I suggest that a monthly report be considered describing your activities, progress and problem areas. If you prefer, the reporting process could be initiated on a semi-monthly basis or even a quarterly basis and expanded at a later date to monthly if you find that your time schedule allows for this additional paperwork. The typical format which I recommend is as follows:
I. Environmental Contacts
1. Government regulatory agency contacts and visits.
2. Other government agency contacts or visits related to planning, resource conservation, etc.
3. Complaints received from all sources.
II. Sampling information
1. Emission Sampling Results.
Source
Measured Emissions
Kg/hour
Kg/ton
Allowable or Target Emissions
Kg/hour
Plume Opacity
2. Ambient data.
Site Number
Particulate Concentration Minimum Average Maximum
Sulfur Dioxide
Fluoride
Min. Avq. Max. Min. Avg. Max,
(Specify sampling time. Note whether fluoride is gaseous, particulate or total.)
3. Vegetation results. - See attached reporting form
4. Discharge water sample results - See attached U. S. Environmental Protection Agency reporting form. Complete one form for each discharge sampled.
III. Environmental Program Status
1. Approved R/A's - status of construction program. Describe program,
project status, anticipated completion date and any expected problems.
0 ALCOA
468415 0072
March 3, 1977 Page 2
2. R/A's anticipated or submitted for approval. Describe need for the project and the proposed solution.
IV. Areas Which Need Attention
1. Air pollution.
2. Water pollution.
3. Solid waste management.
4. Land reclamation - list problem areas which you or others feel should be studied and approved. Examples include: leaks in mud lake area, leaching from landfills, high fluoride concen trations at some downwind point, dust problems in the power house, etc.
V. Environmental Personnel Activities
1. Schools or short courses attended by environmental personnel.
2. Environmental manpower changes, actual or anticipated.
3. New equipment acquired or ordered.
4. Participation in seminars.
5. Presentations given or anticipated by environmental personnel to in-company groups or outside groups.
I realize that a number of these items will be blank for Suralco at the present time. However, in case that situation changes, I decided that the format should be provided you so that if activities occur in these areas you could report them in the standard format. I anticipate that vegetation sampling will be eliminated at least for the present time. I would hope that in the future some ambient air monitoring and water sampling programs will be under taken.
I have attached a copy of a recent environmental report from Point Comfort Operations since their activities are similar to many of yours. After you have reviewed this suggested program, I would appreciate your comments concerning how you feel it would be best to keep the Pittsburgh Office informed of environmental needs, programs and activities at Suralco.
Patrick R. Atkins
PRA:mh
Attachments
I
468415 0073
468415 0074
N A TIO N A L P O L L U T A N T DISCHARG E E LIM IN A TIO N SYSTEM DISCHARGE MONITORING REPORT
' " i<ppn>y i OMB NO. IM KO073
v. - * V'
*tY ) k
,~y-
: *:
; .-vW
-1 x'S.O
*!
i
.i 468415 0075
, GWI v-u^-,
, iw-e"
7
*fROM TOM FLORES
ENVIRONMENTAL CONTROL POINT COMFORT OPERATIONS
n:Cc!`/ED
/''/_ am -
10 MR. A. A. RAMBIKUR
ENVIRONMENTAL CONTROL SUPV.
POINT COMFORT OPERATIONS
'
/3~) _ _.
December 14, 1976 CONFIDENTIAL
-ib j t> 1976 cc: PAIS-ICK R. ATK!N3
Mr. S. A. Jones - Pittsburgh
.
Mr. A. B. Kaltwasser - Pittsburgh IV*
Mr. V. W. Rieke - Pittsburgh Dr. P. R. Atkins - Pittsburgh
eLt
/ *<*
Mr. E. B. Parker - Rockdale
'
Mr. C. L. Green - Rockdale Mr. R. C. Hinkle - Badin
Mr. G. B. Scott - Point Comfort
Mr. F. A. Sharkey - Point Comfort Mr. F. J. Mabry - Point Comfort Mr. J. K. McClain - Point Comfort Mr. W. W. Browne - Point Comfort Mr. C. E. Steele/Mr. J. L. Tew/
Mr. D. D. Hinds/Mr. W. L. Pou/ Mr. A. A. Dohmann/Mr. J. Sampson/
Mr. L. D. Rafalski Mr. J. Lemezis/Mr. H. G. Keller/
Mr. J.'C. Lanier/Mr. T. S. Lewis/ Mr. C. P. Kouba
Mr. W. H. Floyd/Mr. D. A. Kallock/
Mr. J. H. Hutchins/Mr. D. W. Gann/ Mr. C. A. Phillips - Point Comfort
RE; MONTHLY REPORT -- ENVIRONMENTAL CONTROL -- NOVEMBER 1976
I. NPDES PERMIT
A pH excursion occurred at 005 outfall on November 30. It was caused when
a watered cut-out pot was left on a railroad siding next to a ditch that
empties into 005 outfall. Water dripped from the pot shell all night and
drained into the ditch causing a pH of 9."5Ts'^
>.f`
II. VISITS AND REPORTS OF GOVERNMENT AGENCIES
11-1 Received letter from TACB granting permission for excursions from certain sections of Regulation I during start-up of Line 4 - but only for 60 days
11-10 Dr. P. R. Atkins and Mr. C. L. Green met with TWQB in Austin to propose a less expensive outfall revision plan.
11-15 Received a call from Mr. Loren Marsten of TWQB setting up an appointment for a semi-annual inspection and grab sampling of our outfalls. The sampling was made on November 23, 1976 by Mr. Marsten and Mr. Bob Lewis.
III. OTHER ENVIRONMENTAL ACTIVITIES
11-11 Mr. C. L. Green visited Point Comfort Operations to discuss effluent parameters for proposed less expensive outfall revision.
11-12 Messrs. A. A. Rambikur and Joe Surovik discussed status of Blue Crab Study.
ALCOA
466415 0076
<ncv n-4fl)
Mr. A. A. Rambikur Re: Monthly Report -- Environmental Control -- November 1976 December 14, 1976 Page Two
III. OTHER ENVIRONMENTAL ACTIVITIES (Cont*d)
11-13 Mr. A. A. Rambikur attended an American Chemical Society Meeting and Symposium on Coastal Living Resources in Corpus Christi.
11-16 Mr. A. A. Rambikur attended Texas Chemical Council annual meeting in Houston.
11-18 Mr. A. A. Rambikur attended APCA meeting in Corpus Christi; Mr. Oscar Cabra, Chief of Air Programs for EPA Region VI, was the speaker.
11-19 Messrs. A. A. Rambikur and M. A. Kassing met with Mr. Jim Butcher of Nalco to discuss algae control in 006 lagoon.
11-30 Mr. A. A. Rambikur visited Rockdale to discuss proposed NPDES revision with Dr. P. R. Atkins and Mr. C. L. Green.
IV, TEST DATA ON INSTALLED EQUIPMENT
Bldg. Date No.
Emission Source
#/Hour #/Hour Actual Allowable
11-2 R-50 R-50
11-3 R-50 R-50
11-11 R60A
EP-1 East Stack EP-1 West Stack EP-2 South Stack EP-2 North Stack Lime Kiln Venturi
6.0 9.2 4.1 1.2 3.5
59.5 57.7 35.9 37.1 29.3
11-9
R300 R300 R300 R300
Hydrogen Line after Carbon Beds Mercury Fume Stack* Mercury Fume Stack* Mercury Fume Stack*
* Three individual ten minute tests.
Hg - #/Day Actual
/ .02
( 13 \ 13
\^,11
M/^,
/> .^
.i '
'
Visual inspections at emission sources disclosed five (5) sources with opacities in excess of allowable 307. one or more times during the month.
Bldg. No,
Emission Source
R-7 R-50 R-73 R-73 R-82
Lime Storage Norblo Kiln Vent Stacks Fine Cryolite Storage Norblo Pellet Norblo Spar Storage Top Norblo
A
i,
^ if i fi, fV iV. r
'n
i
n
l
468415 0077
. ,*
Mr. A. A. Rambik.ur Re: Monthly Report -- Environmentai Control -- November 1976
Dec embe r 14,` 1976 Page Three
V. CONDITIONS NEEDING ATTENTION
A. Air
(Alumina and Chemicals Area)
1. Control of gaseous fluoride losses to the atmosphere from the Aluminum Fluoride Plant.
The new type combination Carpenter 20 and steel HF user box has had all the steel plate replaced with Carpenter 20 due to excessive wear. An old type Carpenter 20 HF user box is being fabricated in the Machine Shop as a spare and for the next conversion.
j
? i
' ;V
Ho. 3 HF Kiln has the new type drain installed in the gyp box cone. With this installation, three of the six kilns are now equipped with the new drains, sprays and chlorobutyl coated fans in the HF gas scrubbers.
i
2, Contain dust created by unloading and storing bauxite and reduce AV L building emissions from R-15, R-16 and R-21,
The Nalco people have completed the drawings for the test installation
to be installed in Building 16. Drawings have been mailed to the Nalco
field representative and he and our Project Engineer will field check
the drawings prior to the test installation. The 55 gallon drum of dust ,jrl
suppressant chemical has arrived.
^j
3. Reduce dusting during railroad car alumina loading.
i
A RFA has been written and should begin local routing in the next few days.
j
4. Reduce dusting during spar unloading and transporting operations. R-82.
i;
A requisition has been written and is presently being routed for the
purchase of the collector, screw conveyor, and rotary air lock. Pittsburgh
Engineering is sizing the blower for the collector. Drafting is continuing
on the duct layout.
/ "to -4^0
5. Reduce dusting from bulk loading and handling activities, R-52 and R-53.
Because of difficulty in locating a supplier for the telescoping chute
and related fabrication problems, we will be unable to make the January,
1977 installation date of the chute assembly and monorail. The installation
date of these items will slip back to the same date as the installation of.
the dust collectors and duct work, March 1977.
, i^
A 'f
(Jj A* r
6. Reduce dusting during cryolite bulk loading. R-73.
r/> A / ?
RFA is complete and being prepared for routing.
468415 0078
Mr. A. A. Rambikur Re: Monthly Report -- Environmental Control -- November 1976 December 14, 1976 Page Four
7. Eliminate high opacity readings AlFq Area.
One of the venturis, which was received last month, has been installed. Some problems were experienced using filtrate water so the piping was switched over to scrubber water. This venturi takes care of the nuisance dust.
The other venturi will be installed on the No. 2 hydrate dryer. Installation is scheduled for the week of December 6, 1976.
8. Replacement of R-7 Norblo.
Maintenance required to keep this collector operating properly is being done until such time that it can be replaced. A RFA is being worked on for the replacement of this collector and should be ready by January 1977.
B. Water
(Alumina and Chemicals Area)
1. Reduce number of high level alarms at 003 intercept.
Construction is essentially complete. Alarm system will have a manual switch with which to check out the electrical components for proper operation. Concrete kickers for the header assembly to be completed the first week in December.
2. Chlor-Alkali waste water disposal.
The two pumps for the onshore lagoon have been shipped and should arrive the second week of December 1976. Installation of the fiberglass pipeline has been hampered by bad weather and the completion date will probably slip back about a week. The painting and installation of the prefabricated supports have also suffered due to the weather. Target completion date is still December 31, 1976.
3. Maintenance Dredging.
A booster pump station has been installed about half way on the fill line to the dredge lake. The equipment and dredge arrived during the month and dredging started on December 4, 1276.
4. Control pullovers from evaporators at R-42.
Two more tests were run the first and second weeks of November. A final report will be forthcoming shortly which will include notes on the analytical capability and the maintainability of the instrument, calibration techniques, and EPA and TWQB limits for normal operation.
I
468415 0079
Re: Monthly Report -- Environmental Control -- November 1976 December 14; 1976 Page Five
5. Blue Crab Project,
Crab traps have been set out at all the locations to be monitored except in the No. 2 dredge lagoon. The first shipment of crabs should be in College Station by December 15, 1976 for analysis.
6. Waste water from Anderson County Works.
.^TventyNtruckloads of waste water were received during November. To date,
( 54 truckloads have been received to add to the loading of our solar
V^vgpdration system.
^
A
.7 Onshore Gyp Line.
It seems that sliplining with polyethene pipe is the most economical way of repairing the badly eroded gyp line. Efforts are being made to repair this line as soon as possible.
8. Safeguarding the bay from PCB's at R-10.
A Shop Order is out to build some curbing around the transformer to contain any spillage that may occur.
.9 Tank protection of sulfuric acid, hydrochloric acid and caustic tanks.
Cost estimates are being worked on by the respective engineers on methods of containing any accidental spill from any one of these tanks. Estimates should be completed by December 17, 1976.
C. Smelting
1. Reroute waste water to chemicals plant offshore lagoon.
The contract for construction of the concrete sumps at all the Smelting outfalls and pipe supports was awarded on November 29, 1976. Site
visitations for bid on pipe and pump installation have been rescheduled for the week of December 18, 1976. Electrical field installations began the week of November 13, 1976. Painting of material will begin the week of December 11, 1976.
The contract to enlarge the Smelting onshore lagoon was awarded on November 29, 1976. Equipment has been moved on site and construction should begin by mid-December.
Current negotiations between Dr. P. R. Atkins and Mr. Clois Green with TWQB have indicated a possibility of a revised permit. Mr. A. A. Rambikur is preparing a formal request to allow a discharge out of 006 lagoon. Indications are that the State and EPA may accept the modified plan. This would eliminate the cost of pumping and piping the Smelting water to the Aluminum Fluoride Plant and the offshore lagoon.
468415 0080
Mr. A. A. Rambikur
Re: Monthly Report -- Environmental Control -- November 1976 December 14, 1976 Page Six
J .ytfr
; 2. 006 Lagoon. ' V^ *jJ" 1
No discharge from this lagoon during the month. Samples were taken^ J* 4>"
for Nalco representative, Mr. Jim Butcher, to have analyzed and reconraend a program for algae control.
^ 4t/ li
VII. NEW LEGISLATION AND REGULATIONS
r i'
9
None.
VI. CONTACTS IN THE COMMUNITY
None.
TFrmdm
X- >-' . TOM FLORES
468415 0081
I