Attached are the results of an air monitoring survey conducted during turnaround activities in the Sulfolane Unit at Southwestern Refinery on February 18-24, 1988.
Your response to items 88-01 through 88-03 is required by May 16, 1988.
Should you have any questions concerning this report, please call me on
extension 2909.
RECEIVED
ERG/lh
MAY 13
attachment
T.W Ssr^;
xcs: C. DeYong W. Litton J. Warn
SWRfIAsbestos 1151 1H 000648
INTERNAL CORRESPONDENCE
EHMD-MS (UNIT)
TO R. Goltra, M.D.
from Janet Smith CP
Caroline DeYong
date April 22, 1988
subject Southwestern Refinery Turnaround Monitoring
On February 18-24, 1988, air monitoring was conducted during turnaround activities in the Sulfolane Unit at Southwestern Refinery to determine employee benzene exposure during non routine activities. Asbestos air monitoring was also conducted during removal of pipe insulation inside the unit. This report summarizes the findings and recommendations for the survey.
Benzene
A total of 46 samples were obtained during six days of monitoring. The personnel monitoring results have been forwarded, in writing, to each employee monitored. A graphic summary of the personnel monitoring results is found in Table I and graphic area monitoring results are found in Table II. Table III A lists numerical values for employee exposures and area time weighted averages are found in Table III B.
During the initial shut down of the Sulfolane Unit, designated safety employees monitored the unit with benzene detector tubes. In areas where airborne benzene levels equaled or exceeded 1.0 ppm, employees were required to wear full facepiece respirators with organic vapor cartridges.
The data indicated benzene levels varied over a wide range with the highest levels recorded during steaming operations. The peak exposure "ceiling" value was measured on February 19, at approximately 12:30 a.m. when there was a sudden release of benzene to the atmosphere. At this time, area monitoring results inside the control room reflected a rapid rise in airborne benzene concentration.
Prior to the release, samples obtained on employees working in the area outside the control room were about three times the OSHA Permissible Exposure Limit of 1.0 ppm. Excursions during the monitoring period exceeded ACGIH recommended guidelines and the OSHA "ceiling" value. (Table I - Slashed Graph).
Based on this information, the following comments and recommendations are submitted:
88-01 Comment:
The nature of the turnaround activities are such that fluctuations in benzene levels routinely occur and sudden releases resulting in high levels are likely to occur. Since every area cannot be measured during the activities for determining potential exposure, employees may encounter exposure situations without having adequate respiratory protection, if wearing of protection is based only on detector tube readings for various areas.
SWRf/Asbestos 1152
1H 000649
G>*srr
s Pvt
/X fJ/OlT St+C'TboOS'*j ft0 C 7& CP E- 7&sf7^
77" /h)>e 55^:5
Recommendation: .;
PcispiSLArToP'-/ fi'ZQ <J/3
tPMftTS
Until the system has stabilized, i.e., after initial bleeding and steaming activities have been completed, wearing of respiratory protection by employees is recommended. Guidelines regarding the use of respirators should be incorporated into the sulfolane shut down procedure plan.
88-02 Comment
Full facepiece respirators with organic vapor cartridges are approved for airborne concentrations of benzene less than or equal to 50 ppm.
- --:------------ ---/ -S 0^c.-=r TV?-*- /t/aJ /37 cJ 7
v^Recommendation: cz//c-7tpc '/C y'7~/?(P_ fty/X.
fftyt-t-
& //ftr
~<yc% > //c nS "?Pa. "Y /^PEZ UP
pyu'p /rftPo-'T/y
Given the excursion values observed during this turnaround, the facility
should consider upgrading respiratory protection to full facepiece,
powered air-purifying respirators with organic vapor canisters. =-V~-- -
.
_____
r cr.
. / , . .. ' 1...*, .n . .. y_. X-'7P yj<\!
88-03 'Corffmen't:I z, / ` , , .
i
.
The benzene revels varied significantly during the activities and
included the sudden release that resulted in elevated levels in the
control room. Engineering controls to prevent such occurrences may be
possible and W. Litton has contacted,the engineering department about
methods and changes that may be indicated.
e: <OC"z S ~//ftS
/Peep/?
/ ,,Recommendtion: cy/u7 3/-v? 7~ P sSz.z~/ si7 <y jci'si/i
7J
The development of engineering controls to prevent introduction of benzene into the control room from the air intake located on top of the building should be followed up. Another means of reducing benzene entering the control room consists of procedures that limit access to doorways designated with consideration of wind direction.
To!uene/Xylene
Employee monitoring results for toluene and xylene were well below OSHA Permissible Exposure Levels. It should be noted that not all samples were analyzed for toluene and xylene. A summary of this monitoring is found in Table IV.
. Asbestos
Two employees were monitored on February 22nd while removing insulation from piping in the Sulfolane Unit. One sample was deleted due to moisture interference with the filter media. The second sample, (#2673; 8. Terrel) indicated asbestos levels of 0.45 f/cc for the 273 minute monitoring period. The 8-hour time-weighted average for this sample is 0.25 f/cc. This value exceeds the OSHA 0.2 f/cc Permissible Exposure Level and is somewhat higher than past samples, obtained during glove bagging operations. The employee was
-2-
SWRf/Asbestos 1153
1H 000650
wearing appropriate respiratory protection and the area was barricaded. It is possible that moisture in the air during the sample period interfered with the filter media resulting in a higher than expected value.
Questions concerning this memo should be directed to J. Smith, extension 2534 or C. DeYong (KMNET: 8-323-2375).