Document V3y9mm0EOnOzo1KG8JVwB8exg
variation. . "'00-
actw- can
Mr with
'"tat '
am
.. Si-
Sxiliaries net outHg back1,500 kw. ,uble-ftow u buckets. :ed steam action lothe leadthrow the he casing. ie turbine This re
g ies of corcrossover. store and mg steam
to 6.6%. n pressure
used, the very large, isure there face. Four ie seem to keup water demineral earn is not
: es. >tcd 00-kw ine total of n per kw.
for lightlion, which . the initial d by about .vould drop cost figures el elements lost of the it been in-
ng present ;y, it is felt tor concept bilities. Unand cost of and cost of ss the fuel
could pro ng in atomic ference with under con i. Fuel ele* v than some on reactors,
in existing ns 9 feas\d ating
POWER
DATA SHEET
Generating Stations
No. 253
Service
GENERATOR LEADS, BUS TIES, ETC'
Max 3-ph voltoge
Insulation
' 2,000 Heot-resistanf rubber (RH)
15.000
Ozone-resistant rubber0
17.000
Vornished-cambrie
AUXILIARY MOTORS
17,000 2.000
Impregnated paper Heat-resistant rubber (RH)
15,009 Ozone-resistont rubber0
17.000
600 5.000
Varnished-cambric
Vinyl resin Asbestos-vornished-cambric
CONTROL CABLES
600 Heat-resistant rubber 600 Ozone-resistant rubber 600 Vinyl resin, polyethylene
Installation
Conduit2 Insuiotors Ducts* Conduit, ducts
Condaif* Ducts0 Conduit, ducts
Conduit2 insulators Ducts*
Any
Conduit2 Conduit, ducts Ducts*
Conduit, duets Conduit1 Ducts*
Conduit2 Duets*
Conduit
Conduit2 Conduit* Ducts*
Conduit2 Conduit, ducts* Ducts*
Conduit2 Conduit, ducts* Duets*
Conduit, ducts
Covering
Cotton braid Cotton braid Neoprene jacket Lead sheath
Cotton braid Neoprene jacket Lead sheath
Cotton braid7 Cotton broid Lead sheath7
Lead sheath
Cotton broid9 Neoprene jacket Leod sheath"
Neoprene jacket Cotton braid" Leod sheath7, 10
Cotton braid Lead sheath
None
Cotton braid" Asbestos braid" Lead sheath10
Cotton broid Lead sheoth12 Neoprene jacket
Cotton braid Lead sheath12 Neoprene jocket
Vinyl resin
Finish
Note 3 Note 3 None Note 5
Note 3 None Note 5
Note 8 Note 8 Note 5
Note 5
Note 3 None Note 5
None Note 3 Note 5
Note 8 Note 5
None
Note 8 HFV: Note 5
Note 3 Note 5 None
Note 3 Note 5 None
None
EXCITER AND FIELD LEADS1
15,000
Ozone-resistont rubber
17,000
Varnished-cambric
Conduit, ducts Conduit, duets Conduit, ducts
Conduit, duets
Leod sheath12 Neoprene jacket Cotton braid
Lead sheath12
Note 5 None Note 3
Note 5
RHEOSTATS
300 All asbestos
Focepiete to resistors
Asbestos braid
HF
BOILER ROOMS, ASHPITS
5,.000
Asbestos-vornished-eombnc
5,000 2,000
Conduit2 Conduit Ducts*
Conduit2 Duets*
Conduit2 Ducts* Conduit, ducts
Cotton broid" Asbestos braid9 Lead sheoth
Cotton broid* Leod sheath
Cotton broid* Lead sheath Neoprene jacket
Note 8 HF11 Note 5
Note 8 Note 5
Note 8 Note 5 None
POWER TRANSFORMERS Primary and secondary services
2,000
Heat-resistant rubber (RH)
Conduit
Ducts* Conduit, ducts
Asbestos broid
Lead sheath Neoprene jacket
Paint - filled
Note 5 None
8,000
Ozone-resistont rubber0
17,000
Vornished cambric
Conduit
Ducts* Conduit, ducts
Conduit Ducts*
Asbestos braid
Leod sheath Neoprene jacket Cotton braid Lead sheath
Poinffilied Note 5 None
Note 8 Note 5
132,000
Impregnated paper
Conduit, duets Leod sheath
Note 5
Notes:1--usually overinsulated.2--essentiotly dry; if moist consider ducts. 3--smooth block. 4--moistlocations.5--Neoprene hose-type jacket overall tor protection ogoinst corrosion and electrolysis. 6--preferably shielded above 2 kv. 7--look up shielding recommendations. 8--smooth black or tlow-buming point-filled ond finished far indoor work. 9--Interlocked steel
armor overall for metallic pan construction; alternate of bronze for single conductor or for corrosive conditions. 10--alternate of lead sheath, fibrous covering ond intoriocked .armor for pan construction. 11--heat-, flame- and moisture-resistant. 12---in hotter locations. 13--for more reliability.
Courtesy F Aime, Electrical Engineer, Anaconda Wire & Cable Co
TJ~r~ C POWER
JULY 1953
105