Document V3LjbJVMgMzngwQ53eNJ1oVVK

STREAMLINING, OF 85 BLDG. LABOR FORCE THE FOLLOWING PROPOSAL OUTLINES A PLAN POR REDUCING THE LABOR STAFF IN 85 BLDG. BY 31 PEOPLE. THIS REPRESENTS A NUMBER WHICH IS TIGHT, BUT WHICH WILL STILL PERMIT SATISFACTORY OPERATION OF THE DEPARTMENT. IT IS NOT PELT THAT ANY UNREASONABLE DEMANDS WILL BE PLACED UPON THOSE PEOPLE IN THE DEPARTMENT FOLLOWING IMPLEMTATION OP THE PLAN. / RSV0025093 t i '' L-_` SUMMARY POSITION CURRENT SAMPLE DISPATCHER: 1 SALES COLOR MATCHER: 1 DAY' JANITOR: 1. REELER PACKAGER: ! GENERAL HELPER: 20 20 MILL ROLL OPERATOR: 16 COMPOUND ROLL OPERATOR: 8 PREMIX OPERATOR: 12 ASST. CAL. OPERATOR: 8 LEAD OPERATOR: 0 NEW 0 0 0 16 16 8 4 8 0 4 * 3 $>.S7^ r^L / 4 #4^~? ft/ / 4&/* REDUCTION 1 1 1 4 48 {' a} 4 8 +4 ?:;-: ';. &.;j"` &4=l .6 c,s>. ,p Jt RSV0025094 1.) SAMPLE DISPATCHER: (DAYS) LEVEL 8 REDUCTION 1 LEAD INSPECTOR: (DAYS) LEVEL 14 PICKUP a.) Reduction of work for the Lead Operator, 1.) Gauge profiles from 2 to 1 a week, 2.) R.P.T. Report no longer required, 3.) Rewind stand inspection no longer'inquired. b.) Reduction in the amount of samples needed to he processed for mailing by the Sample Dispatcher, -P*ssAifLe--rel o eati^rrT^f"th^sami?le--roum--'te--&5--31 d.g-, 2.) SALES COLOR MATCHER: (DAYS) LEVEL 14 REDUCTION PRODUCTION COLOR MATCHER: (DAYS) LEVEL 13 PICKUP A.) Both Have work for only 50$ of the time, b.) Production will take priority. 1 3.)JANITOR: (DAYS) LEVEL 3 REDUCTION 1 a. ) Work willbe absorbed by the shift Janitors at a reduced frequency. b. ) Shift work now required will be reduced. 4.) PREMIX OPERATOR: (6-2) LEVEL 10 REDUCTION 4 a.) Anytwo lines on bag resin will require an extra man. b. ) A new plasticizer metering system has been installed. c. ) A new drum heater has been installed. d. ) A new G-62 charge facility has been installed. RSV0025095 5.) PARREL REELER PACKAGER: (6-2) LEVEL 7 REDUCTION 4 CHANGE TO RESLSR OPERATOR: a.) No longer lceep a record of roll numbers and weights. b.) No longer has to cut end of run rolls or scrap while running. c.) Procedure on box runs will "be the same as on the Adamson Cal. d.) Will take care of trim. 6. ) ASST. CAL. OPERATOR: (6-2) LEVEL 13 REDUCTION 8 a.) Create a Lead Operators position. +4 b.) Automatic speed indicators installed on both Cals. c.) Recording of operating conditions will he reduced from 4 times to once a shift. 4.) Heeler Operators will assist. 7. ) GENERAL HELPER: (6-2) LEVEL 6 REDUCTION CHANG TO UTILITY OPERATOR: a.) Re-arrange work - more work on mill rolls. 4 8. ) MILL ROLL OPERATORS: (6-2) LEVEL 10 REDUCTION 8 a.) Assistance of a utility operator. b.) Batches will be dropped on the north mill of Parrel Cal. , except for a few heavy1, .gauge runs. RSV0025096 9. ) COMPOUND ROLL OPERATOR: . (6-2) LEVEL 11 REDUCTION a.) Assistance of a utility operator. b.) Fewer product changes. c.) Install an automatic knife on the north mill so it can "be moved by the operator at the south roll. 4 10. ) Total REDUCTION IS (31) 11. ) MISCELLANEOUS: a.) Consider setting up smoking areas in certain selected operating areas. b.) Consider making a substantial reduction'in the noise level at the dicers. c.) Re-evaluate affected jobs for possible level changes. RSV0025097