STREAMLINING, OF 85 BLDG. LABOR FORCE
THE FOLLOWING PROPOSAL OUTLINES A PLAN POR REDUCING THE LABOR
STAFF IN 85 BLDG. BY 31 PEOPLE. THIS REPRESENTS A NUMBER WHICH
IS TIGHT, BUT WHICH WILL STILL PERMIT SATISFACTORY OPERATION
OF THE DEPARTMENT. IT IS NOT PELT THAT ANY UNREASONABLE DEMANDS
WILL BE PLACED UPON THOSE PEOPLE IN THE DEPARTMENT FOLLOWING
IMPLEMTATION OP THE PLAN.
/
RSV0025093
t
i ''
L-_`
SUMMARY
POSITION
CURRENT
SAMPLE DISPATCHER:
1
SALES COLOR MATCHER:
1
DAY' JANITOR:
1.
REELER PACKAGER: !
GENERAL HELPER:
20 20
MILL ROLL OPERATOR:
16
COMPOUND ROLL OPERATOR: 8
PREMIX OPERATOR:
12
ASST. CAL. OPERATOR:
8
LEAD OPERATOR:
0
NEW
0 0 0 16 16 8
4
8 0
4
*
3
$>.S7^
r^L
/ 4 #4^~?
ft/ /
4&/*
REDUCTION
1 1 1
4
48 {'
a}
4
8
+4
?:;-:
';. &.;j"`
&4=l
.6 c,s>.
,p
Jt RSV0025094
1.) SAMPLE DISPATCHER: (DAYS)
LEVEL 8
REDUCTION 1
LEAD INSPECTOR:
(DAYS) LEVEL 14
PICKUP
a.) Reduction of work for the Lead Operator,
1.) Gauge profiles from 2 to 1 a week,
2.) R.P.T. Report no longer required,
3.) Rewind stand inspection no longer'inquired.
b.) Reduction in the amount of samples needed to he
processed for mailing by the Sample Dispatcher,
-P*ssAifLe--rel o eati^rrT^f"th^sami?le--roum--'te--&5--31 d.g-,
2.) SALES COLOR MATCHER: (DAYS) LEVEL 14
REDUCTION
PRODUCTION COLOR MATCHER: (DAYS) LEVEL 13 PICKUP
A.) Both Have work for only 50$ of the time,
b.) Production will take priority.
1
3.)JANITOR:
(DAYS) LEVEL 3
REDUCTION
1
a. ) Work willbe absorbed by the shift Janitors at a
reduced frequency.
b. ) Shift work now required will be reduced.
4.) PREMIX OPERATOR: (6-2) LEVEL 10
REDUCTION
4
a.) Anytwo lines on bag resin will require an extra
man.
b. ) A new plasticizer metering system has been installed.
c. ) A new drum heater has been installed.
d. ) A new G-62 charge facility has been installed.
RSV0025095
5.) PARREL REELER PACKAGER:
(6-2) LEVEL 7 REDUCTION 4
CHANGE TO RESLSR OPERATOR:
a.) No longer lceep a record of roll numbers and weights.
b.) No longer has to cut end of run rolls or scrap while
running.
c.) Procedure on box runs will "be the same as on the
Adamson Cal.
d.) Will take care of trim.
6. ) ASST. CAL. OPERATOR:
(6-2) LEVEL 13 REDUCTION 8
a.) Create a Lead Operators position.
+4
b.) Automatic speed indicators installed on both Cals.
c.) Recording of operating conditions will he reduced
from 4 times to once a shift.
4.) Heeler Operators will assist.
7. ) GENERAL HELPER:
(6-2) LEVEL 6
REDUCTION
CHANG TO UTILITY OPERATOR:
a.) Re-arrange work - more work on mill rolls.
4
8. ) MILL ROLL OPERATORS:
(6-2) LEVEL 10 REDUCTION
8
a.) Assistance of a utility operator.
b.) Batches will be dropped on the north mill of
Parrel Cal. , except for a few heavy1, .gauge runs.
RSV0025096
9. ) COMPOUND ROLL OPERATOR: . (6-2) LEVEL 11
REDUCTION
a.) Assistance of a utility operator.
b.) Fewer product changes.
c.) Install an automatic knife on the north mill
so it can "be moved by the operator at the
south roll.
4
10. ) Total REDUCTION IS (31)