ELECTRICAL SAFETY AND RELIABILITY AUDIT CHECK LIST
FOR INCOMING ELECTRICAL SERVICES
f
INCOMING SERVICE LOCATION I.D. #:
LJrJL
INCOMING ELECTRICAL SERVICES
Yes No N/A
1. Are all the oil-filled devices (oil-filled cutouts, transformers, capacitors, etc.) non-PCB?
2. Are all the insulators for the line, switch, terminator, etc., clean?
3. Is the messenger or static wire grounded at the pole base?
4. Are the lightning arresters properly connected and grounded?
/
5. Is the pole switch operating mechanism in good
yworking order and free of corrosion?
6. Is the pole switch operator handle properly grounded?
/
7. Are ail the equipment and cables pi -erly supported?
/
8. Is there physical protection (bam -te fence, etc.) provided at grade for underground conduit risers?
9. Does the plant have dual feeders?
10. Does the plant have transfer capability.
z ____ y
11. Has there been a successful transfer?
12. Is the transfer automatic upon the loss of power?
--
13. Are the cables adequately ana properly supported?
14. Are the cable support blocks constructed of NGN-MAGNETIC Materials?
DO A 045098 CONFIDENTIAL
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL
ADMINISTRATIVE GUIDELINE
G7A-0099-01 14-JUN-1996 PAGE 2 OF 2
Yes NO N/A
l\kM ^ K
15. Is the pole-line hardware adequate?
16. Are the lashing rods made of corrosion resistant material?
17. Is the wood pole in good condition?
18. Are oil fused cutouts in good condition?
19. Is the pole mounted transformer or capacitor free of leaking oil?
20. Are fences grounded?
____ ____ 4^
21. Are the coordinates of underground cables known
and on drawings?
____ ____
Incoming Electrical Services Index Score: