Document RrGOq51o5DGK6Mk1pE3585En

I internal correspondence UC 149-- Z CHEMICALS AND PLASTICS TO (NAME) COMPANY location copies to: R. L. Frantz J. Poole J. L. Jones R. Arnold M. E. Eisenhour G. T. Pyle R. P. Keefe R. Q.^ayne W. M. Reeves J. Tannos K, L. Topham Dr. D. Montgomery A. A. Peterson F. L. Johnson R. W. Sesler K. E. Ross DATE P. O. BOX 471 TEXAS CITY, TEXAS 7 7 5;m November 4, 1974 subject Update: VCl Action Plan for Compliance Gentlemen: Written comments on the attachment are capsuled minutes of a meeting held on October .50 in the No, 1 Conference Room to discuss the Suspension/Non-Solvent unit's progress in implementing projects to minimize vinyl chloride exposures. OAS/sld attachment CL 4.SL&*. O. A. Shelton UCC 090942 6&peRp 4VA on lo/l7/'TsK TABLE II PROJECTS TO BE IMPLEMENTED IN 1974/75 TO REDUCE VINYL CHLORIDE EXPOSURES IN THE SUSPENSION/NON -SOLVENT UNIT Project Description for Compliance 1. Non-Solvent high pressure 1. a) Modify No. 1 VC1 recovery system to allow vent recovery of contained vinyl chloride in high ._ UfP*re: MUW1 U TO >.UWT MIIKU pressure vent by scrubbing in Solvent Vinyls acclone strippi,,g * *)u> kjent Responsibility: R. May, O. Shelton Deadline; November 15, 1974 f CWOtf* 0 AND T6 PM*nh) If plan (a) does not work, plan of actioli is *N SeitoMCC e*) ft/UNPAi 04 w. 4). to send non-solvent high pressure vent to No. 1 Powerhouse as fuel for boilers. -pc y Responsibility: J. Tannos, R, Payne, O.Shelton Deadline: November 15, 1974 (c) A solvent scrubbing system may be installed in 1975 Responsibility: J. Tannos, A. Peterson Deadline: April 1, 197 5 2. (^Suspension high pressure (a| Initially, these high pressure vent streams (ra,vent off-gas^recoverv will be sent to the No. 1 Powerhouse for ^system vent burning in boilers as fuel. VPP*re: cw<wnv#Rin<; vjcgx wmHjbvbo but oipff'euuTy ih Tn*w4 *AlNTtUUce.T.?tr#|e, , f Responsibility: J. Tannos, R. Payne O. Shelton Deadline: November 15, 1974 A solvent scrubbing system may be installed MP in remMN^ be+ffeywetc. *)*> ^ "l*e $(4m( in 1975. Responsibility: J. Tannos, A. Peterson Deadline: April 1, 197 5 ^rtuur*. v**vfc (c) Install a gas holder to eliminate surges Me. | introduced to VC! recovery system by it HI* suspension autoclave batch process. A three per cent improvement in vinyl chloride efficiency is expected. (Comment: Initial efforts for procuring gas holder will come from upper management. ) UCC 090943 VCl Solvent Scrubbing System To avoid 930 financing delays, D. Dechman suggests we use dimethyL ether column, high pressure tanks, and pumps at Bldg. 17 to solvent scrub vinyl chloride vent streams from Suspension/Non-Solvent and Ethyleneamines units. Besides being available for immediate use, it is also centrally located between both units. J. Tannos, A. Peterson, and W. Reeves will get together to work out details of Engineering assignments. Tentative deadline for project completion is end of IstQTR, 1975. Dr. D. Montgomery determined the major impurities in the ethyleneamines vent stream are vinylidene chloride, ethyl ether, and ammonia. Even though vinylidene chloride is a reaction inhibitor for the Suspension Vinyls reaction mechanism, it should not cause major problems at the concentrations it will be used. UCC 090944 Table II Projects To Be Implemented in 1974/75 To Reduce Vinyl Chloride Exposures In The Suspension/Non-Solvent Unit 2. Emission Source Project Description For Compliance 3 Nos. 3 & 4 Stripping Tank 3. Recirculate Nos. 3 & 4 stripping tank effluent to effluent eliminate flashing of vinyl chloride vapors to the atmosphere from effluent water. Responsibility: O. Shelton, R. P. Keefe Deadline: January 1, 1975 4. Decant Tanks 14107, 14108, 4. Decanting of Non-Solvent recovered monomer tanks 14111, 14112 (Non-Solvent) to the atmosphere has been discontinued. A project is being implemented to automatically decant tanks to VCl recovery systems. / ^___\ (Comment: Project is essentially complete. ) t ^ hZSX* 5. Decant tanks C-10, C-ll 5. Recovered monomer tanks, C-10 & C-ll, will (Suspension) be decanted to the No. 3 stripping tank instead of the sewer. Responsibility: R. P. Keefe, O. Shelton Deadline: November l, 1974 6. Blown autoclave rupture discs 6. aul rupUxre VkAm. "lypc. lit* VTJ r* placed -%. Uaa PU* M'3* ^ a.s- *, I Imsi*. (a) Replacement program is under way to change types of D-autoclave rupture discs to lessen premature failures. Responsibility: R. P. Keefe, O. Shelton Deadline: December 1, 1974 (b) Autoclave wash procedures will be modified to minimize nitrogen addition to the VCl recovery systems. (Comment: Low priority since other programs are under way to take care of nitrogen. ) 7. Blown BDT/VST rupture discs 7. warn* c ANfe OftAFT>*M& ComPLA!***, *ftr Sloryy h#Jrr 4 0>W 4wK An engineering project is under way to install motor valves on blowdown tanks feed headers to avoid autoclave blowdowns during vacuum stripping. Responsibility: A. Peterson, R. Payne Deadline: November 1, 1974 UCC 090945 Table II Projects To Be Implemented in 1974/75 .To Reduce Vinyl Chloride Exposures In The Suspension/Non-Solvent Unit Emission Source 8. Autoclaves - high reaction pressure 1 Bxrot *TKtiP'wc Wiu. CommcmcS TWutopAiJ0ef>Wr 3), o 4SAfcl-7 Rertri. Project Description For Compliance_________ (a) Issued new standard operating procedure for venting autoclaves with high pressure to vacuum header instead of the atmosphere. (b) Autoclave wash procedure will be modified to minimize nitrogen content left in auto claves after MEK washes. (c) Install autoclave hand vent header to future jas holder. Bldg. 120 - dryer exhaust s tacks Revise vacuum strippers to allow batch stripping of resin. Bldg. 127, 178, 184 - (Comment: Revise vacuum strippers to allow batch) storage bin Losses stripping of resin. Initiate batch stripping Bldg. 120 - surge tank technique next week. ) vents Bird effluent i'. j (4 - 1 Responsibility: R. P. Keefe, O. Shelton, A. Peterson^ . MAN H&H-Stlucnt1 Cur^t 4imsK lowe* -- S4r>f> slurry /r> U --_ . ____ Preparation of vinyl "------- Ttr1 Vinyl chloride filters wiLl be vented to the No. 3 chloride filters for stripping tank and filled with water prior to maintenance opening for maintenance. Responsibility: R. P. Keefe, O. Shelton Deadline: November 1, 1974 Priming VCl pumps 11. A program is under way to evaluate several v'JL uj ` -J Lu.|i OKi means of priming pumps. Standard operating * j procedures will be written recommending best AttouwVfei y priming techniques. W wevtVoA Responsibility: G- T. Pyle, R. P. Keefe ib>^ . o. Shelton, R. May Deadline: Try first trial by November 1, 1974 '^oarhtU cm 12.\ C-autoclaves agitator packing failures iteratenr<i c*vt+r*l \MwWr- Ua tee*. rtpecfa'w^ m Mil _ __ ________ 12. Several packing designs will be tested to minimize packing failure frequency. ' Responsibility: R. May I Deadline: Try first trial by November l, 1974 J feV lure* . _^ VCl underground barrel pump seal (atmospheric seal) ' "137 utANtf *mtnet t Xhtou. Peostert 0ARCCI. p^p fey Consideration will be given to installing double seal arrangement on barrel pump. Responsibility: D. Jordan, R. Payne Deadline: January 1, 1975 UCC 090946 1 Table II Projects To Be Implemented in 1974/75 To Reduce Vinyl Chloride Exposures In The Suspension/Non-Solvent Unit 4. Emission Source 14. VC1 loss in MEK . Project Description For Compliance 14. Reduce autoclave MEK washings by installing direct steam injection system on each D-autoclave. Responsibility: A. Peterson, J. Tannos Deadline: April 1, 197 5 15. Nash Hytor seal water 15. Vinyl chloride contained in seal water is i 'covered in No. 3 vacuum stripper. 16. VCM compressors packing leak vent and unloader packing leaks. 16. SwsrcMtuni c-l lt*4 ew Kma v*l**t' (a, Install exhaust fan on compressor room roof to minimize personnel exposures. Responsibility: R. Payne Deadline: December 1, 1974 (b) Consideration will be given to replacing reciprocating compresso.'s with rotary compressors to minimize packing leakage. (Comment; Try lead packing on compressor valve unloaders. 1 Responsibility: D. Jordan, R. Payne 17. Pilot Plant VCl emissions 17. Extend off-gas recovery system vacuum header to Bldg. 171 for VCl recovery. Responsibility; A. Peterson, D. Montgomery Deadline: January 1, 1975 18. Autoclave resin samoling 18. Redesign autoclave resin sampling equipment. (Comment: Take resin samples after batch stripping in vacuum strippers. ) 19. Maintenance food pre paration and eating facilities 19. Temporary building will be installed for re location of Suspension/Non-Solvent maintenance personnel food preparation and eating facilities. Responsibility: R. Payne _ Deadline: October 21, 1974 L TTTE"* ~rvmrre'&^ I. art/vu. ahamMX imih mm *" to- SO so ff~ + as n~> A ou/oir kit A.,,)J be erJmJ MAP >** P. (e-ioopf-'J + 16 ei h'nJ'r` .-f *s^~ UCC 090947