Document RrGOq51o5DGK6Mk1pE3585En
I
internal correspondence
UC 149-- Z
CHEMICALS AND PLASTICS
TO (NAME) COMPANY
location
copies to:
R. L. Frantz J. Poole J. L. Jones R. Arnold M. E. Eisenhour G. T. Pyle R. P. Keefe
R. Q.^ayne W. M. Reeves J. Tannos K, L. Topham Dr. D. Montgomery A. A. Peterson F. L. Johnson
R. W. Sesler K. E. Ross
DATE
P. O. BOX 471 TEXAS CITY, TEXAS 7 7 5;m
November 4, 1974
subject Update: VCl Action Plan for Compliance
Gentlemen:
Written comments on the attachment are capsuled minutes of a meeting held on October .50 in the No, 1 Conference Room to discuss the Suspension/Non-Solvent unit's progress in implementing projects to minimize vinyl chloride exposures.
OAS/sld attachment
CL 4.SL&*. O. A. Shelton
UCC 090942
6&peRp 4VA on lo/l7/'TsK
TABLE II PROJECTS TO BE IMPLEMENTED IN 1974/75 TO REDUCE VINYL CHLORIDE EXPOSURES IN THE
SUSPENSION/NON -SOLVENT UNIT
Project Description for Compliance
1. Non-Solvent high pressure 1. a) Modify No. 1 VC1 recovery system to allow
vent
recovery of contained vinyl chloride in high
._
UfP*re: MUW1 U TO >.UWT MIIKU
pressure vent by scrubbing in Solvent Vinyls acclone strippi,,g
* *)u> kjent Responsibility: R. May, O. Shelton
Deadline;
November 15, 1974
f CWOtf* 0 AND T6 PM*nh) If plan (a) does not work, plan of actioli is
*N SeitoMCC e*) ft/UNPAi 04 w. 4).
to send non-solvent high pressure vent to
No. 1 Powerhouse as fuel for boilers.
-pc y
Responsibility: J. Tannos, R, Payne, O.Shelton
Deadline:
November 15, 1974
(c) A solvent scrubbing system may be installed
in 1975
Responsibility: J. Tannos, A. Peterson
Deadline:
April 1, 197 5
2. (^Suspension high pressure
(a| Initially, these high pressure vent streams
(ra,vent off-gas^recoverv
will be sent to the No. 1 Powerhouse for
^system vent
burning in boilers as fuel.
VPP*re: cw<wnv#Rin<; vjcgx wmHjbvbo but
oipff'euuTy ih Tn*w4 *AlNTtUUce.T.?tr#|e,
, f Responsibility:
J. Tannos, R. Payne O. Shelton
Deadline:
November 15, 1974
A solvent scrubbing system may be installed
MP in remMN^ be+ffeywetc. *)*> ^ "l*e $(4m(
in 1975.
Responsibility: J. Tannos, A. Peterson
Deadline:
April 1, 197 5
^rtuur*. v**vfc
(c) Install a gas holder to eliminate surges
Me. | introduced to VC! recovery system by
it
HI*
suspension autoclave batch process. A
three per cent improvement in vinyl chloride
efficiency is expected. (Comment: Initial
efforts for procuring gas holder will come
from upper management. )
UCC 090943
VCl Solvent Scrubbing System To avoid 930 financing delays, D. Dechman suggests we use dimethyL ether column, high pressure tanks, and pumps at Bldg. 17 to solvent scrub vinyl chloride vent streams from Suspension/Non-Solvent and Ethyleneamines units. Besides being available for immediate use, it is also centrally located between both units. J. Tannos, A. Peterson, and W. Reeves will get together to work out details of Engineering assignments. Tentative deadline for project completion is end of IstQTR, 1975. Dr. D. Montgomery determined the major impurities in the ethyleneamines vent stream are vinylidene chloride, ethyl ether, and ammonia. Even though vinylidene chloride is a reaction inhibitor for the Suspension Vinyls reaction mechanism, it should not cause major problems at the concentrations it will be used.
UCC 090944
Table II Projects To Be Implemented in 1974/75 To Reduce Vinyl Chloride Exposures In The Suspension/Non-Solvent Unit
2.
Emission Source
Project Description For Compliance
3 Nos. 3 & 4 Stripping Tank 3. Recirculate Nos. 3 & 4 stripping tank effluent to
effluent
eliminate flashing of vinyl chloride vapors to the
atmosphere from effluent water.
Responsibility: O. Shelton, R. P. Keefe
Deadline:
January 1, 1975
4. Decant Tanks 14107, 14108, 4. Decanting of Non-Solvent recovered monomer tanks
14111, 14112 (Non-Solvent)
to the atmosphere has been discontinued. A
project is being implemented to automatically
decant tanks to VCl recovery systems.
/ ^___\
(Comment: Project is essentially complete. ) t ^
hZSX*
5. Decant tanks C-10, C-ll
5. Recovered monomer tanks, C-10 & C-ll, will
(Suspension)
be decanted to the No. 3 stripping tank instead
of the sewer.
Responsibility: R. P. Keefe, O. Shelton
Deadline:
November l, 1974
6. Blown autoclave rupture discs
6.
aul rupUxre VkAm.
"lypc. lit* VTJ
r* placed -%.
Uaa PU* M'3*
^
a.s- *, I Imsi*.
(a) Replacement program is under way to change
types of D-autoclave rupture discs to lessen
premature failures.
Responsibility: R. P. Keefe, O. Shelton
Deadline:
December 1, 1974
(b) Autoclave wash procedures will be modified
to minimize nitrogen addition to the VCl
recovery systems.
(Comment: Low priority since other programs
are under way to take care of
nitrogen. )
7. Blown BDT/VST rupture discs
7.
warn* c
ANfe OftAFT>*M& ComPLA!***,
*ftr Sloryy h#Jrr 4
0>W 4wK
An engineering project is under way to install
motor valves on blowdown tanks feed headers
to avoid autoclave blowdowns during vacuum
stripping.
Responsibility: A. Peterson, R. Payne
Deadline:
November 1, 1974
UCC 090945
Table II Projects To Be Implemented in 1974/75 .To Reduce Vinyl Chloride Exposures In The Suspension/Non-Solvent Unit
Emission Source
8. Autoclaves - high reaction pressure
1
Bxrot
*TKtiP'wc Wiu.
CommcmcS TWutopAiJ0ef>Wr 3),
o 4SAfcl-7 Rertri.
Project Description For Compliance_________
(a) Issued new standard operating procedure for venting autoclaves with high pressure to vacuum header instead of the atmosphere.
(b) Autoclave wash procedure will be modified to minimize nitrogen content left in auto claves after MEK washes.
(c) Install autoclave hand vent header to future jas holder.
Bldg. 120 - dryer exhaust s tacks
Revise vacuum strippers to allow batch stripping of resin.
Bldg. 127, 178, 184 -
(Comment: Revise vacuum strippers to allow batch)
storage bin Losses
stripping of resin. Initiate batch stripping
Bldg. 120 - surge tank
technique next week. )
vents Bird effluent
i'. j (4 - 1
Responsibility: R. P. Keefe, O. Shelton, A. Peterson^ . MAN
H&H-Stlucnt1 Cur^t 4imsK lowe* -- S4r>f>
slurry /r>
U
--_ .
____
Preparation of vinyl "------- Ttr1 Vinyl chloride filters wiLl be vented to the No. 3
chloride filters for
stripping tank and filled with water prior to
maintenance
opening for maintenance.
Responsibility: R. P. Keefe, O. Shelton
Deadline:
November 1, 1974
Priming VCl pumps
11. A program is under way to evaluate several
v'JL uj
`
-J
Lu.|i OKi
means of priming pumps. Standard operating
* j procedures will be written recommending best AttouwVfei y priming techniques.
W wevtVoA
Responsibility: G- T. Pyle, R. P. Keefe
ib>^
. o. Shelton, R. May Deadline: Try first trial by November 1, 1974
'^oarhtU cm 12.\ C-autoclaves agitator
packing failures
iteratenr<i
c*vt+r*l
\MwWr- Ua tee*. rtpecfa'w^ m
Mil
_
__ ________ 12. Several packing designs will be tested to
minimize packing failure frequency.
'
Responsibility: R. May
I
Deadline: Try first trial by November l, 1974 J
feV lure* .
_^
VCl underground barrel pump seal (atmospheric seal)
' "137
utANtf *mtnet t
Xhtou.
Peostert 0ARCCI. p^p fey
Consideration will be given to installing double
seal arrangement on barrel pump.
Responsibility: D. Jordan, R. Payne
Deadline:
January 1, 1975
UCC 090946
1
Table II Projects To Be Implemented in 1974/75 To Reduce Vinyl Chloride Exposures In The Suspension/Non-Solvent Unit
4.
Emission Source 14. VC1 loss in MEK
.
Project Description For Compliance
14. Reduce autoclave MEK washings by installing
direct steam injection system on each
D-autoclave.
Responsibility: A. Peterson, J. Tannos
Deadline:
April 1, 197 5
15. Nash Hytor seal water
15. Vinyl chloride contained in seal water is i 'covered in No. 3 vacuum stripper.
16. VCM compressors packing leak vent and unloader packing leaks.
16.
SwsrcMtuni c-l
lt*4
ew
Kma v*l**t'
(a, Install exhaust fan on compressor room
roof to minimize personnel exposures.
Responsibility: R. Payne
Deadline:
December 1, 1974
(b) Consideration will be given to replacing
reciprocating compresso.'s with rotary
compressors to minimize packing leakage.
(Comment; Try lead packing on compressor
valve unloaders. 1
Responsibility: D. Jordan, R. Payne
17. Pilot Plant VCl emissions
17. Extend off-gas recovery system vacuum
header to Bldg. 171 for VCl recovery.
Responsibility; A. Peterson, D. Montgomery
Deadline:
January 1, 1975
18. Autoclave resin samoling
18. Redesign autoclave resin sampling equipment. (Comment: Take resin samples after batch stripping in vacuum strippers. )
19. Maintenance food pre paration and eating facilities
19. Temporary building will be installed for re
location of Suspension/Non-Solvent maintenance
personnel food preparation and eating facilities.
Responsibility: R. Payne
_
Deadline:
October 21, 1974
L
TTTE"*
~rvmrre'&^
I.
art/vu. ahamMX imih mm
*"
to- SO
so ff~ + as n~>
A ou/oir kit A.,,)J be erJmJ MAP >**
P. (e-ioopf-'J + 16 ei h'nJ'r` .-f *s^~
UCC 090947