Document Rpy6Ex5NkvkYMonJG8mv54dDa
5
MemoTb: Mr. F. Anthony
Subject:
University of Maryland Eastern Shore Swimming Pool Roof
Incorporated
from:
July 10, 1987
Re: University of Maryland Eastern Shore Swimming Pool Princess Anne, Maryland
Contract Date: 1971-1972
Completion Date: July 6, 1972"
Bird's First Notice: Sept. 25, 1986
Performance Bond: None issued
Bird's 1971 Built-Up Roofing specifications states the following on pages 3 and 6 (see enclosed copy):
"As a condition to issuing this Guarantee Bond, all built-up roofing assemblies must be applied in strict accordance with Bird & Son specifica tions, utilizing Bird & Son materials.
Bird assumes that the roof deck has been properly designed and constr ucted. Bird and Son will assume no responsibility for damage to the roof from the underlying substrate that has been improperly designed or constr ucted."
See page 6
"The use of a vapor barrier is recommended between the deck and approved insulation, but again the discussion as to whether or not to specify a vapor barrier is the Architect's or designer's ... For conditions of high humidity, such as experienced in laundries, paper mills, etc. and when winter temperatures are low, the vapor barrier should be increased to a minimum of 2 layers of Bird Bonded Base Sheet solidly cemented together with hot asphalt."
The selection Type 20A and Bird No. W 15-2-MP specifications for the roof in question do not have the written approval by Bird & Son, Inc.
Clifford J. Patenaude CP/em cc: R. Maloof