Document RpqNpZyDYRLyka7QKyZ6Z5BeV
Hicks, et at. v. ACandS, Inc., et al.
...
6/1/01 - Paul L. LeCour
Page 142
Page 144
1 .2
3 4
5 6 7 8 9 10 II . 12 13 14 IS . 16 17 18 19 20 21 22 23 24 23
A. In referring to Document 28, the verbiage that was being used here was taken off of this (indicating), . because BP1 owned Raybestos Manhattan.
And so BP! sold -- BPI makes the friction material. They sell to Rayloc, and they sell to Raybestos Manhattan, who they own.
Q. Just so I'm clear, you went out and duplicated ' or used theirs as a guide?
A. 1 would say as a guide, because 1 don't think it's verbatim on everything.
Q. And who's responsible for the decision of what to include and what not to include?
A. That would have been the product manager at Rayloc and the sales manager, marketing - sales and marketing manager, and our president of our division. And I'm sure it went to headquarters.
' (Plaintiffs' Exhibit LeCour 30 was marked.) Q. (By Mr. Dumler) I'm going to give you what's marked as Exhibit 30 and ask you if you can identity this document from Century Insurance? , A. Century Insurance, October 26th, 1971. It's to Mr. David Childress, who was the gcncrpl manager of the Memphis plant at that time. Q. This is in connection with your insurance company's efforts to regulate what's happening at the
1 Were you notified of that at the time? 2 A. I knew we took corrective action in those 3 departments. 4 Q. The bum room, what is ihe - the bum room 5 is when the old lining is taken off? -6 A. Uh-huli. ' 7 Q. Is.thai segregated away from the other . 8 operations? 9 A'. Uh-huli. 10 MR. RILEY; Use a word. ' II Q. (By Mr. Dumler) Is that a "yes"? ' 1,2 A. Yes. 13 Q. So the bum room is segregated away from the 14 other operations in the plant? 15 A. Yes. .16 Q. And the bum room is where the old lining is 17 . taken off of the core? .18 A. Yes. 19 Q. Is that particular area is that a dusty. 20 operation? 21 A. Is it? 22 . Q. Yes.. 23 A. At what time? 24 Q. In 1989, when they were doing the air sampling 25 by Travelers.
Page 143
Page 145
1 plant or investigate what's happening at the plant? 2 A. This would indicate their involvement. 3 Q. Was sampling done each year at the plant? 4 A. Yes. 5 (Plaintiffs' Exhibit LeCour 31 was marked.) 6 Q. (By Mr. Dumler) The next document I'm going 7 to give you is 31, which is a Travelers Engineering 8 Rgaort dated February 28, 1989. Are you familiar with 9 this document? . 10 A. No, I'm not. 11 Q. Are you familigr with Travelers performing 12 air sampling at the Rayloc plant? 13 A. I'm familiar with them being there and 14 performing the tests, yes. 15 Q. Were you involved ar all in their notification 16 that in certain areas, the samples were above ,17 recommended levels? 18 A. Was I notified officially by Travelers? 19 Q. Were you notified by anybody, officially or 20 unofficially? 21 A. No. 22 Q. The report indicates that the eight-hour 23 . TWa exposure to asbestos fibers for the clutch disc 24 drilling, the bum room, and the disc brake riveting 25 operators exceeded the permissible exposure level.
1 A. To answer (hat, it was a dusty application 2 that had vacuum equipment in place, but we added 3 additional procedure to get back within compliance. ' 4 Q. So after this air sample was taken in 1989,. .
5 there were additional procedures put in place to reduce 6 the level ol'asbestos exposure? 7 A. Yes. 8 Q. And the exposure or the asbestos that was 9 monitored there would have been the material that 10 existed after the brake came back, afipr it had already 11 been used essentially, correct? 12 A. Well, actually, no. Tlte dust would have 13 been.created after it had gone through gOO degrees 14 , Fahrenheit -- excuse me -- 1800 degrees Fahrenheit for 15 five minutes, which takes and extracts all the res -- 16 not all of it, but burns out some of the resins that . 17 hold the fibers together. So that's where it created
18 the dust. 19 When it came back to us from the jobber and on 20 our receiving belt, where we also monitored, no problem. 21 because it was still in solid form and had grease on it, 22 had brake Duid on it. So had no problem there..It's 23 after one of our procedures. 24. Q. Okay. The asbestos that's being produced and 25 exceeding permissible levels is coming.from the lining
. _ 37 (Pages 142 to 145) WHEELER REPORTING COMPANY, rNC.,-4.04-351-4577