Document RpjNpr0wyQkX7ZqZpBkD4gvrv

DEPARTMENTAL CORRESPONDENCE g..hjart Insurance Claim To____ D. W. Mel 1 berg From K. L. Kellar nafa August 28, 1979 Dep't. Dep't PLAINTIFF'S EXHIBIT CC-182 Attached as discussed are rate schedule transmittals between Berry Contractors and Coastal States Petrochemical for 11/22/77 and 1/21/76. I have searched the Berry Files and find no evidence of a formal Service Agreement between Coastal and Berry at the time of Pennington's alleged accident of 3/8/77. In light of the claim and its legal ramifications, there is a certain amount of required co-operation that needs to take place between your department and the Hartford agent, Mr. Bill Padgett, who is here in Corpus. If I may further assist you, please contact me. KLK/lo cc: T. C. Covert Berry File A. W. Smith COASTAL 317 (Rev. 4/75) CED0006118 P. a BOX 4858 corns CHJUSTl, TEXAS 7840$ BERRY CONTRACTING, INC Industrial Contractors January 21, 1976 1414 CORN PROOUCT3 IOAO AC J12 >84-0373 THJEX 778444 Coastal States Petrochemical Company Post Office Drawer 521 Corpus Christi, Texas 78403 Attention: Mr. R. J. Adams Vice President Gentlemen: Attached are our revised Labor Rate Sheets, Equipment Rental Rate Sheets, Consumable List and Stress Relieving and X-Ray Rate Schedules, which are effective as of February 1, 1976. We will be happy to provide our services to perform any of your require ments for plant construction and maintenance work, or shop pipe, vessel and structural fabrication needs on the following basis: A. PLANT CONSTRUCTION AND MAINTENANCE 1. Labor and Supervision All field labor and supervision required for the perfor mance of work assigned us will be provided at the rates shown in attached "Exhibit A" Labor Rate Sheets. The rates shown on these sheets are your total cost for each craft manhour worked, and include wages and fringes, pay roll taxes and insurance, small tools, home office over head and profit. Small tools are defined as, and limited to, any tool required for the work which has an acquisition cost of under $100.00 and does not appear on attached "Exhibit B" and "Exhibit C" - Equipment Rental Rates or "Exhibit D" - Consumable Supplies. 2. Construction Equipment All construction equipment required for the performance of work assigned us will be furnished in accordance with the rates, and on the basis as shown in attached "Exhibit B" and "Exhibit C" - Equipment Rental Rates. CED0006119 Coastal States Petrochemical Company January 21, 1976 Page - 2 - 3. Materials. Consumables and Subcontract Services For any materials, consumable supplies (Exhibit D) or subcontract services you request we furnish, your cost will be our cost plus 10% markup for overhead and pro fit. For any materials or consumable supplies we fur nish on which there is a cash discount available, if we receive payment in sufficient time to earn the dis count, it will be passed on to you, otherwise this discount will remain with us. B. SHOP PIPE, VESSEL AND STRUCTURAL FABRICATION The following rates apply for any work performed on a force\o u* account basis in our Pipe and Vessel Fabricating Shops: Vc?/,. For pipe fabrication work performed in Berry Industrial Piping Shop on straight time basis .............................................$18.00 M/H For work performed on an overtime basis, add $9.00 M/H. For vessel or structural work per-- formed in Berry Fabricators Shop on straight time basis............................................... $20.00 M/H For overtime at time and one half, add $4.00 M/H For overtime at double time, add $8.00 M/H The above rates are your total cost for each manhour worked, and In addition to wages and fringes, include all costs for equipment, building and facilities, utilities, consumable supplies, tools, oxygen and acetylene, carbon steel stick weld rod, taxes and in surance, overhead and profit. Your total cost for shop work per formed would be Che actual applicable manhours worked times the rates quoted above. Engineering in connection with fabrication work, if required, will be priced on request. Any materials or subcontract work which you request we procure in connection with force account work performed in our shops for you, would be furnished on the same basis as stated in A.3 above. ^ r'[,V CED0006120 Coastal States Petrochemical Company January 21, 1976 Page - - C. STRESS RELIEVING AND X-RAY - For Field Stress Relieving and X-Ray performed in the field or our shops, rates as set forth in attached "Exhibit E" and "Exhibit F" will apply. Stress relieving performed in our 20* wide by 21* high by 79' long car bottom furnace will be priced on application'. We would be happy to provide the above services to you for any of your requirements, and assure you we would perform in a manner highly satisfactory to you. Very truly yours, BERRY CONTRACTING, INC. WHK/jlw end. Senior vicePresident CED0006121 ?. o. box iua CORPUS CHRlSTt TEXAS 73408 BERRY CONTRACTING, INC Industrial Contractors November 22, 1977 UM CORN PRODUCTS ROAD AC 312 8344373 TEIEX 773443 Coastal States Petrochemical Co. P. 0. Drawer 521 Corpus Christl, Texas 78403 Attn: Mr. Vernon Cornell Plant Manager Gentlemen: Attached are our revised Labor Race Sheets, Equipment Rental Rate Sheets, Consumable List and Stress Relieving and X-Ray Rate Schedules, which are effective as of April 1, 1977. We will be happy to provide our services to perform any of your require ments for plant construction and maintenance work, or shop pipe, vessel and structural fabrication needs on the following basis: A. PLANT CONSTRUCTION AND MAINTENANCE 1. Labor and Supervision All field labor and supervision required for the perfor mance of work assigned us will be provided at the rates shown in attached "Exhibit A", Labor Rate Sheets. The rates shown on these sheets are your total cost for each craft manhour worked, and include wages and fringes, pay roll taxes and insurance, small tools, home office over head and profit. Small tools are defined as, and limited to, any tool required for the work which has an acquisition cost of under $300.00 and does not appear on the attached "Exhibit C" - Equipment Rental Rates, or "Exhibit D" -- Consumable Supplies. 2. Construction Equipment All construction equipment required for the performance of work assigned us will be furnished in accordance with the rates, and on the basis as shown in attached "Exhibit B" and "Exhibit C" - Equipment Rental Rates. CED0006122 Page Twi November 22, 1977 3. Materials, Consumables and Subcontract Services For any materials, consumable supplies (Exhibit D) or subcontract services you request we furnish, your cost will be our cost plus 10Z markup for overhead and pro fit. For any materials or consumable supplies we fur nish on which there Is a cash discount available. If we receive payment in sufficient time to earn the dis count, it will be passed on to you, otherwise this discount will remain with us. B. SHOP PIPE, VESSEL AND STROCTORAL FABRICATION For work performed in our pipe and vessel fabrication shops, the rates set forth In the "Exhibit G" will apply. Any materials or subcontract work which you request we procure In connection with force account work performed in our shops for you, would be furnished on the same basis as stated In A.3 above. C. STRESS RELIEVING AND X-RAY For Field Stress Relieving and X-Ray performed In the field or our shops, rates as set forth in attached "Exhibit E" and "Exhibit F" will apply. Stress relieving performed in our 20? wide by 21* high by 79' long car bottom furnace will be priced on application. We would be happy to provide the above services to you for any of your require ments, and assure you we would perform in a manner highly satisfactory to you. MB/jlw attach: CED0006123