Document RpgRv4zpRDd85Nwwg1m0XxEyB
SURPLUS PROPERTY DECLARATION
LOCATION:
J52.
(UNIT CODE)
-515
(LOC. NO.)
SOLVENTS & COATINGS MATERIALS
(DIVISION NAME)
TEXAS CITY
(CITY)
TEXAS (STATE)
C'i*
n*T
r/93
TO BE COMPLETED AT ORIGINATING LOCATION
FACILITY:
n POWERHOUSE
BUILDING NUMBER
_Zi
DEPT./SYS. Q0020,0Q544> profit CENTER _.:9$fr..<fr32Ca^67
DATE AVAILABLE
7kmGROSS FIXED INVESTME
NET BOOK VALUE ON
fr316,607 ^T'3% ,028-
7,171,244 1,267.604
rSflMATED LOCATION COSTS.'
SHUTDOWN AND CLEANING; PREPARATION FOR REMOVAL (SHOW PROCEDURES ON
BACK OF THIS FORM)
LABOR -----MATERIAL . OVERHEAD. TOTAL ____
25,071.60
10.028.64 5.265.00
40.365.00
EST.BY H.Srhlesingpr/C.R.Halrer
GENERAL DESCRIPTION OF FACILITY: (ATTACH ADDITIONAL SHEET IF NEEDED)
No. 2 Powerhouse including three power steam boilers, two steam turbine driven generators,one gas turbine-air compressoi and all auxiliaries.
REASON FOR SHUTDOWN: Obsolete & not needed.
HAZARDOUS MATERIALS PRODUCED OR HANDLED
(LIST BY NAME)
1. Caustic 2. Chemical Liquid
Residue 3. Fuel Gas 4. Asbestos
VALUE OF ASSOCIATED STORES _ (.#., 701, 703, 704, 720, 723, 740)
$500,000.
IRD-3-1470 (RV.7-81)
UCTC 06178
SHUTDOWN AND CLEANING PROCEDURES:
4 3/ tils'
List ony speciol conditions: Piping or wiring changes, utility relocations, hazardous moterials, cleaning procedures, disposal of cleaning agents
Costs to be included in Location Cost Estimate
Industrial Hygiene
1. Training of personnel/contractors on asbestos must be carried out. 2. Respiratory protection must be used.
3. Area must be roped off with signs.
4. Equipment/installations/building must be wetted prior to and during dismantling.
5. Waste/debris must be cleaned and put in impermeable containers labeled according to OSHA regulations for asbestos.
6. I.H. Dept, should be contacted prior to dismantling date to arrange for personnel/area monitoring. A. P. Yalcinkaya
Safety
1. All lines entering or leaving Bldg. 75, especially lines containing hazardous
or flammable materials, must be blind flanged, capped or plugged at the battery limits.
2. Develop plan for handling and disposing of all asbestos containing insulation.
3. Disconnect all electric circuits, including lighting circuits, at the source.
4. Consider having the demolition area classified as an "OPEN FLAME AREA" or prepare a Hazardous Work Permit for burning each day the demolition is in progress.
5. Use the Master Card/Lock-Out Procedure as necessary to prepare and isolate
equipment for demolition; however. Master Cards should be cleared once the equipment has been isolated and made safe.
Environmental Protection (begins on next page)
H. P. Brady
UCTC 06179
LOCATION STAFF APPROVALS HEALTH.SAFETY,ENVIRONMENTAL
The above recommendations are advisory and
based upon project information provided to the HS&EA Dept. If you have questions or need ac<;ictanrp rnntarz lhr> appropriate HS&EA ren. .
-j f
j; ^ ______
L-
Environmental Protection
1. The 12 Powerhouse area was inspected with (lorry iMltn . Materials that were used/produced in the area include: fuel gas, residue fuel, oir, steam, cycle water, lube oil, caustic.
2. The air, steam and cycle water lines are assumed not in contain any residues
after purging. The caustic line (25") has been flushed and is also expected to be free of hazardous residues. The lube oil can be removed to the RBA oil tank for fuel recovery.
3. The 1-1/2" residue fuel line contains an odorous film in the pipe. This will be sampled and tested before this line could be sold as scrap.
4. The 10" fuel gas lines contain a thin coating of a coke/tar residue. This will also be sampled and tested before beingdisposed of.
5. Any water washing of lines or equipment can be bandied in vacuum trucks to the wastewater system.
6. Ash in the boilers will be tested and removed to proper location for disposal based on an analysis.
7. The fire brick will also be tested for heavy n> i.ils and oti.cr CCP.A charac
teristics. Then it will be handled as rcqunvd tv
n r'-sults.
8. With cooperation from Energy '.vstei.s, all n` ;> : .i f < i i.il cun bn cl.issifind in an expeditious manner.
9. Except for the items listed, and the ash.*-ii; im th.it must so
to
Gulf Coast Landfill, it is not expected that . ha/ardmi, waste will be
generated from the demolition of *2 Powerhou e.
). M.H< !h>ii
10. This facil ity may contain asbestos. As'siuh. d.mol i i inn work ray be
applicable to the NESHAPS notification minirnnents as well as asbestos
handling requirements. The demolition con trad or- must contact us to assure comp!iance.
11. The flare that was installed on the No. 2 Powerhouse structure for the burning of air oxidation process blowoff from the organic acids process (0. H. Cunningham) is included in the conditions of their TACB Operating Permit and must not be included in the salvage package. The flare installation belongs to the Solvents & Acids Unit as required backup to the recently installed incinerator. This flare may not be moved or dismantled until arrangements have been made to re-install it for the required back-up service.
J. F. Erdmann
UCTC 06180
'fa >3N
s -3 a-
20
JLO
Q q 5?
Q
"1
v> tSj
Q) v3
{*
0
sj
csl
o >
Qq >
N*J
-9
N
Cic
f 'r
V %c
"n.
*i cvj ^f- - - Os!
*1 <\j
/ wc
VqJ;
"4 VH
u_ Q.
*--1 Ct;
VQJ
Q VJ
Vvcj
^J Uj
2
qQ
Q VeJ
e
--
j? g
5^CXJ Q 2:
i-^5
*2
o>-* H
^&
e 8 CxJ oVI
i
^
U Q
<5. > s *
a
9 H 25 O
i*
3>
' * m *}
?|
i
3^
>4
8vi Q
5 fc V. *
1**
VJ
N w
1<*
ki
Vil K <>*j Q
S3
\*CQ
tf 2
Os* i
'n
%
Q
q '3- Q
*
>3 >s q
%
e sj
rv Q
vf\qj q
Q
q
Ci
li 13
<\i q-s rn
r^->1v *Vl t
laQ K
qO\ rv ,s N|
Vi
q
X
VJ
Ssj
$ vrf
>*. H <3
tV! '41 1^
Q:
VI
Q
o: >i Q
tv <!
q- *0
-
ucrrc<>6181
i1
i ! t1
i i ii i ;
-i i ri
UNION CARBIDE CORPORATION Solvents & Coatings Materials Division
Old Rldgeburv Road Oanbury, CT 06817
TO: J. E. Knap-
CC: F. L. Harvey J. B. Murrin F. S. Provenzano R. L. Yelton
OATE: November 9, 1983 SUBJECT: No. 2 Powerhouse - Texas City
Attached is the Surplus Property Declaration for the No. 2 Powerhouse at Texas City. It has the appropriate approvals.
08S:dag att. 0320d
UCTC 06177