Document RpaDBeab9djDVBpj6o5b8RGv8

Present: G. W. Bostick P. E. Brubaker J. E. Clark t G. A. Danner G. Hanks (for Daues) J. A. Glass E. H. Jones H. M. Lacy W. H. Lane J. Rasmussen (for Marsh) C. M. McCullough C. Yoas (for Peters) G. T. Ryan J. G. Trafton STATISTICS REVIEWED Time Period TOT TOT INJ TIF SI SIF Last year 1/1 - 12/31 10/1 through 10/14 1/1 through 10/14 238 73 17 12 95 0 240 96 16 5.6 0.0 6.4 REPORT OF ADVISORY COHMfTTEE - SAC -- McCullough The Safety Advisory Committee addressed a list of concerns developed during the August 13, 1976 Emergency Plant Meeting. A report dated November 19, 1976 covered the actions taken to date on the concerns listed. Details are given in a 7-page report by George Bostick dated October 15. Copies of this report were distributed to the members of the board at this meeting. REPORT OF SAFETY HOUSEKEEPING AND ACTION COMMITTEE (SHAC) -- Lacy Plans for the upcoming November 25"27, 1976 plant inspection were reviewed during this meeting. Final details of inspection routes, schedules and entertainment were reviewed. REVIEW OF SERIOUS INCIDENTS The following incidents were reviewed: a.Near-miss eye injury to operator (line 3 powder feed control) -- Daues b^ Electrician exposure to sulfuric acid -- McCullough c. Serious injury - laceration above eye (line 1) -- Daues d. Potential near miss - loose hand rail -- McCullough e. Near-miss -- drill head projectile -- Daues f. Serious injury - contract employee (hand caught in between elevator doors)-- McCullough g. Hand laceration - contract employee -- McCullough Detailed reports have been issued on each one of them. SC 002581 STG 2401902 LAM003788 PMSB - 10/20/76 Page 2 SAFETY CONTACT '76 -- Glass Less than 100 safety contact cards remain outstanding at the time of the meeting. Preliminary review of the cases indicate that they contain a lot of valuable information, suggestions and comments. The cards will be separated by departments and returned to department heads along with an appropriate outline of remaining steps in the program. J. A. Glass vf sc 002582 STG 2401903 LAM003789 MINUTES OF MEETING OF PLANT MANAGER'S SAFETY BOARD - OCTOBER 20, 1976 Present : G. W. Bostick P. E. Brubaker J. E. Clark G. A. Danner G. Hanks (for Daues) J. A. Glass E. H. Jones H. M. Lacy W. H. Lane J. Rasmussen (for Mai C. M. McCullough C. Yoas (for Peters) G. T. Ryan J. G. Trafton STATIST ICS REVIEWED Time Period Last year 1/1 - 12/31 10/1 through 10/14 1/1 through 10/14 TOT TOT INJ TIF 1L 238 73 17 12 95 0 240 96 16 SIF 5.6 0.0 6.4 REPORT iOF ADVISORY COMMITTEE - SAC -- McCullough The Safety Advisory Committee addressed a list of concerns developed during the August 13, 1976 Emergency Plant Meeting. A report dated ( November 19, 1976 covered the actions taken to date on the concerns listed. Details are given in a 7-page report by George Bostick P dated October 15. Copies of this report were distributed to the ^jj/'^members of the board at this meeting. 3^ REPORT OF SAFETY HOUSEKEEPING AND ACTION COMMITTEE (SHAC) --Lacy Plans for thqfupcoming November 25~2Z^ 1976 plant inspection were reviewed during this meet I Pig1, r Inal detaiIs of inspection routes, schedules and entertainment were reviewed. REVIEW OF SERIOUS INCIDENTS The following incidents were reviewed: a. Near-miss eye injury to operator (line 3 powder feed control) -- Daues b. Electrician exposure to sulfuric acid -- McCullough c. Serious injury - laceration above eye (line 1) -- Daues d. Potential near miss - loose hand rail -- McCullough e. Near-miss-- drill head projectile -- Daues f. Serious injury - contract employee (hand caught in between elevator doors)-- McCullough g. Hand laceration - contract employee -- McCullough Detailed reports have been issued on each one of them. LAM003790 SC 002583 STG 2401904 PMSB - 10/20/76 Page 2 SAFETY CONTACT '76 -- Glass Less than 100 safety contact cards remain outstanding at the time of the meeting. Preliminary review of the cases indicate that they contain a lot of valuable information, suggestions and comments. The cards will be separated by departments and returned to department heads along with an appropriate outline of remaining steps in the prog ram. J. A. Glass vf SO LAM003791 STG 2401905