Document RpaBkDa0DoZQk6mkL3OdpGvaa

PER TRI REACTOR HYDROBLASTING LIST DATE: ___________ WORK ORDER # ______________ REACTOR # INSTRUCTIONS: This form is to be returned to Per-Tri reactor foreman after all the jobs have been completed. The form itself is a reminder for the foreman, mechanics, and operators and a record for operations. Because we would like to keep a clean record and because of the nature of the job. this form will have an identical laminated copy Iro assist the hydroblasters in the field. The original copy will stay with the lead operator until the job is completed. The lead operator will issue the laminated copy to the hydroblasters when they pick up their vehicle entry permit. Because there will be some interaction between the hydro blasters and the lead operator, the foreman following the job or the lead operator is to sign and date the form prior to moving the equipment to another section. MATERIAL NEEDED BY HYDROBLASTERS Note: This material is to brought with the service company when they report to do the job. Delays caused by not having the equipment necessary to do the job is the responsibility of the contractor and the lead operator will make a note of such delays in the form signed by him. This list does not include the equipment v necessary to perform the task or any equipment required by the contractor. 1. Flashlights 2. Breathing protection (Personal beyond the escape respirator) 3. Face shields 4. Gloves 5. Boots 6. Slicker suits PREPARATIONS respiratory protection COSE J.DHNT I A'ii: Subject to Protective Order Of 14th Judicial District Court No. 91-1143 _____ 1* _____ 2. _____ 3. Get vehicle entry permit from Per Tri control room Re-position STOP sign after entering the unit Connect foot pedal waste water to fitting provided on the South side of reactors' structure. For safety reasons you do not have to connect the shot gun lance to this system. NOTE: This list is divided into logical stop points. Do not ask operations to inspect any items until you are satisfied that it is clean and that you are ready to sign the list. \ou may ask operations for help in identifying an item on this list. SL 021207 PAGE 1 OF 4 DONE BY INSPECTED 1. Cl ean reactor rupture d i sk nozzles 2 . Clean dome the rmowe11 no z z 1 e s 3. Cl ean charging nozzle 4. Cl ean catalyst addit i on nozzle 5. Clean inside dome (do no t to enter) 6. Clean tubes fr om the top of reactor the b est you can without ent ering the dome area _____________ 7. Verify that the flange area on all the blasted nozzles are clean. NOTE: The lead man or foreman is to go into the control room and notify the lead operator that this section is completed and he is ready for inspection before he moves the equipment. Signing this form by both, contractor and the lead operator, means that the blasters could move their equipment and continue the job. DATE: // TIME: _______ AM PM CONTRACTOR FOREMAN: LEAD OPERATOR: _____ 8. Clean reactor tubes from ground level (including flange surfaces) 9. Clean both mixed feed headers, including mixing tee and drains 10. Line mole both bayonets 11. Line mole organics feed line from demister to mixing tee (organic block valve must be open) 12 . Line mole demister drain line vapor i zer drum 13 . C1 ean vapoirizer drum 14 . Line mole pad out header from vapor i zer to header valve 15. Line mole blowdown header f rom vapor i zer to header valve 16. Clean feed line from head er bl valve to vaporizer drum <including bypass loop) ORIFICE PLATE MUST BE PAGE 2 OF 4 SL 021208 OUT OF LINE cons vdE^TIAL: Protective Or Subject to :iai District of 14 th O'udx*Ho 91-1145 17. Shot-gun cyclone inlet/outlet nozzles and flange surfaces 18. Clean ca talyst catch pot up t cyclone DATE: // TIME:AM PM CONTRACTOR FOREMAN: LEAD OPERATOR: 19. Clean demister 20. Clean vapor lines at blasting wall (including pressure transmitter nozz1e) 21. Clean vaporizer reboiler 22. Clean reactor heads. This includes the 02 risers and organics orifices DATE: // TIME: _______ AM PM 23. Clean individual feed piping by blasting wall CONTRACTOR FOREMAN: LEAD OPERATOR: .._____________________________ PLACE HIGHEST PRIORITY ON REACTOR. AREA UNDER THE REACTOR NEEDS TO BE CLEANED (DRUM WET CATALYST AND SET DRUMS BY THE BLASTING WALL BY 7:30AM. USE PLASTIC DRUMS AND PUT CAPS ON BUT DO NOT SECURE THE LIDS WITH THE RING) IMPORTANT NOTICE: HYDROBLASTERS ARE TO NOTIFY THE LEAD OPERATOR WHEN THE CLEAN UP AND Dk^...,rCC IC COMPLETED AND THE LEAD OPERATOR IS TO MAKE SURE THAT DRUMS ARE STICKERED WITH "HAZARDOUS WASTE" STICKERS LOCATED IN THE LEFT TOP DRAWER OF LEAD OPERATOR DESK. THE STICKER SHOULD READ AS FOLLOWS: SHIPPING NAME: Hazardous Waste, Solid, N.O.S.. ORM-E. NA9189. RQ (D028. D039. D033) UN OR NA#: 9189 WASTE NO.: D028. D039. D033 LABEL THE STICKERS ON THE RIGHT UPPER CORNER WITH "CATALYST WASH DOWN FROM NO. __ PER TRI REACTOR". THE ACCUMULATION DATE IS TO BE FILLED WHEN THE STICKER IS PLACED ON THE DRUM. -------- 1. Placed one "HAZARDOUS WASTE" sticker on each drum of catalyst for a total of ____ drums. Sb 02i209 PAGE 3 OF 4 2. Inspected the area and found it satisfactory 3. Drum lids were not secured by the service company. Call shift mechanics to secure the lids. 4. There are no drums out of the copper contaminated area 5. Reactor dome is clean after the tubes were blasted from under the reactor 6. Released the hydroblasters at _ AM PM TIME Rev . 4/92 AM PM LEAD OPERATOR: PAGE 4 OF 4 SL 02121