Document RpZdQdgNw0Kme1yDJpVp7Qdon

j0; T. H. Huffman Interoffice Communication From: Date: Subject: R. W. Seymour June 27, 1990 ABERDEEN MONTHLY PROGRESS REPORT MAY, 1990 Safety There was one first aid case reported In May. At month's end, Aberdeen plant employees had worked 3988 days (5,298,464 manhours) since the last lost time injury. FY 1990 Kev Statistical Information Mav Y.T.D. PVC Production, MM Lbs/ Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M 39.2 92.9 98.4 1.0097 6.1 99.0 5.4 99.8 1.5 81.3 < 4.0> < 82.4> 18.0 299.0 88.0 97.1 1.0019 48.6 98.2 39.5 99.6 12.2 88.7 < 7.7> 229.2 553.6 Caoacitv Utilization Factors Resin Flexible Compound Rigid Compound Plasticizer 103.7 78.8 90.9 63.9 100.9 77.9 82.7 71.5 Operations The latest clean wall test was successful keeping the reactor clean through a ninety batch run of 5305. Resin contamination numbers were good throughout the run. A successful test batch of 5325 was made for Premiere Polymers. Flexible compound inventory dropped about 600M pounds in May with packaged shipments exceeding April by 500M pounds. Line V operated only 3.5 days. PLENEX polymer trials consumed fifty- nine hours on Line I producing new jacket formulations for Ufa E C I V E D Rigid compound demand remained strong through May. cca 000006*02 l JUL 0 L- ^ WiU-IAM L McCLAiu T. H. Huffman 6/27/90 Aberdeen Monthly Progress Report Page 2 - May, 1990 Costs The overall efficiency variance for the month was favorable by $18.0M. The resin and flexible compound groups continue success ful off-grade reduction programs with resin off-grade 56% below budget and flexible compound mill scrap 36% below budget. Fixed costs were essentially at budget except for the $83M payroll correction for April. OMP 1. Roy Richards, the Southwire Company's CEO, travelled to Aberdeen "on May" 24 with other Southwire management personnel to present Vista a plaque for achieving the "Certified Quality Vendor" rating. This award was for performance in Southwire's Vendor Excellence Program for the six-month period November 1, 1989 to April 30, 1990. 2. Vista signed a new one-year Vendor Excellence Quality Agreement with Southwire beginning May 1, 1990. 3. This month 94.9% of the plant's natural teams met and the average number of meetings per natural team was 1.15. 4. R. W. Seymour made an MBWA visit with Eric Strouder to Intex in Corinth, Mississippi. R. W. Seymour Plant Manager rah CCR 0006403 DISTRIBUTION Houston J. D, Bums COVER LETTER X ENTIRE. REPORT R. T. Ferrell X T. H. Huffman X C. J. Matson X D. F. Hannan X H. R. Flammer X R. R. Smith X B. J. Bean X . R. H. Gerlach X .. R. D. Gamblin t/ W. L. McClain X X J. P. Stokes X Austin R* L. Poe X Oklahoma Citv LCVCM Plant H. J. Hall H. D. Garrison R. A. Conrad X X X LCCP Plant LCIAB Plant J. Friend J. W. Ware X X Baltimore Hammond Blane Premiere Aberdeen L. R. Bauer X J. Pavao X C. R. Miller P. L. Foote RWS/DCS (File Copy), TJA, JBA, JEB, JME, SCH, MRK, JEL, DAM, RBN, JEN, JDO, REP, BLT X X CCR 000006404 SAFETY - B. L. Trego Mav Fiscal Y.T.D. 1990 Fiscal Y.T.D. 1989 First Aid OSHA Recordable Total Injuries 1 13 12 Q. _4 _ 1 17 18 Number of Restricted Workday Cases Number of Lost Workday Cases 0 0 32 00 Injuries bv Department Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office Totals Injuries bv Tvr>e 00 05 1 10 01 00 <2 a 1 17 2 4 10 1 0 _1 18 Cuts and Abrasions Eye Injuries Bums Bruises Strains/Sprains Stings Other Totals 16 01 03 02 01 02 0 JL I 17 3 0 6 4 3 0 JL 18 Non-Occuoational Injuries Lost Workday Cases Days Lost 36 35 119 2 42 Safety Record Last lost time injury - 7/5/79 Days since - 3988 Employee hours since - 5,298,464 On May 31, 1990, the employees of the Aberdeen plant completed 3988 days with no lost time injury. The main topic of plant safety meetings during the month was "Energy Lockout Procedures". The Drill Planning Team held four chlorine emergency response drills in May; one for each shift. Following each drill, response training was held for several chlorine emergency situations. CCR 000006405 SAFETY - Continued Routine dosimetry results for the month were: Chemical VCM Lead Total Particulates Monthlv Tnlurv Summarv < PEL Number Pecea 80 100.0 16 100.0 6 100.0 > PEL Number Percent 0 0.0 0 0.0 0 0.0 Tnlurv Class Deoartment Description FA Maintenance Cut, right forearm. CCR 000006406 QUALITY MANAGEMENT PROCESS - T. J. Arbeiter Vista signed a new one-year Vendor Excellence Quality Agreement with Southwire Company, our largest customer at the Aberdeen plant. The agreement covers all 5415 resin sold to Southwire. The agreement clarifies in detail the mutually agreed upon requirements relating to product quality, service and delivery, wire and cable commitment, technical support and exemplary service. This last category takes into account Vista's attitude and commitment towards a long-term partnership with Southwire and our willingness to support Southwire's quality improvement efforts. Our previous quality agreement with Southwire was six months in duration (November 1, 1989 - April 30, 1990). During these six months of our first agreement, Vista achieved a rating of 99.7 out of a possible 108 points. This score earned Vista a "Certified Quality Vendor" rating. A score of 100 points or more earns the highest rating of "Excellent Vendor". As of this time, no one has achieved this highest rating. Southwire's top management, including Roy Richards, Southwire's CEO, travelled to Aberdeen May 25 to present Vista with a plaque in honor of our achieving the "Certified Quality Vendor" rating. Approxi mately 110 Vista employees attended presentations in the plant auditorium and the Vinyl Department control room. R. W. Seymour made one customer MBWA visit during May with Eric Strouder to Intex in Corinth, Mississippi. D. G. Mouldings of Marion, Virginia, visited the plant for a general information exchange and tour. 94.9% of the plant's natural teams met during May. meetings per natural team were 1.15. The average CCR 000006407 COST VARIANCES - D. C. Skofcns Variable Costs Product ______Mav. 1990 Variance. $K______ Efficiency Price Total PVC Flexible Compound Rigid Compound Plasticizer $10.0 73.3 ( 36.1) (-29.21 $ 18.0 C$163.2) 39.1 78.9 39^ ($ 5.6) ($153.2) 112.4 42.8 10-4 $ 12.4 PVC - Operations were essentially at budget. Off-grade production was 56% below budget. Flexible Compound - Raw material usage was $22.4M favorable; product mix variance was $45.0M favorable; and the variance due to off-grade was $12.2M favorable. Scrap rates . were 36% below budget. Rigid Compound - The unfavorable variance was due to an unfavorable product mix variance of $96.8M offset by a favorable raw material variance of $60.3M. Most of the raw material variance was due to a favorable Ti02 variance that was caused by difficulties in accurately gauging the Xi02 hopper. Plasticizer - Raw material consumption was over budget. Price Variances ____$M - Resin to Rigid Compound - Resin to Flexible Compound - Natural Gas - Alfol 610* Alcohols - VCM - Other Price Variances Total Fixed Cost Variances 69.5 23.6 20.0 30.9 (188.1) 38.5 ($ 5.6) - Payroll and Benefits - MM&C - Miscellaneous - TI&D - Clearances Total ($ 97.5) 34.2 ( 28.4) ( 5.1) 14.4 ($ 82.4) CCR 000006408 ) COST VARIANCES - Continued Payroll and Benefits - The accounting error made in May ($83M of May payroll rates were not accrued) was corrected. M. M. & C. - Activity was below budgeted levels. Miscellaneous: Packaging supplies were $26.8M favorable. Moving, home assistance was $25.OM unfavorable due to John Olson's move. - Processing supplies were $10.8M unfavorable. Contract costs - operating were $31.1M unfavorable due to - changes related to preparing for a potential work stoppage. Clearances - The $14.4M favorable variance was due to the sale of some surplus equipment. CCR 000006409 VINYL - J. D. Olson, J. K. Vinoskt The Vinyl Department had no first aid or OSHA recordable injuries during the month of May. The monthly safety meeting topic was "Lockout and Tagout Procedures". General 1. The latest BUS-80 test was successful. The temporary injection system on D745 kept the reactor clean through ninety batches of 5305 resin. Resin contamination numbers were good throughout the run. 2. A test batch of 5325 resin was made for Premiere Polymers. Specifications for the resin produced were very close to those targeted. Further results are expected next month. 3. The resin raw materials in the 744 account were valued at $419.9M. Mav YTD - Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime % 39.2 1264.5 103.7 934.0 30.1 92.9 88.3 98.1 98.4 299.0 1230.5 100.9 7028.0 28.9 88.0 79.4 91.6 97.1 Reactor Downtime Hours - Operational downtime (recovery scheduling conflicts, New Module rinse/charge water conflicts, waiting for Q.C. data before charging, 0-ring leaks, no place to dump, rinsing chem wash tanks). 341 Maintenance downtime (condenser drilling on D744 and D400, reactor cleaning on D700, hydroblasting and drilling on D745, dump valve change on D300, and miscellaneous valve and instrument repairs). 184 CCR 000006410 VINYL - Continued Dryer Downtime % of Total Downtime Reactor limited production. 49.2 Operational downtime (centrifuge plugs, dryer cleaning, and flameouts). 25.8 Maintenance downtime (exhauster, centrifuge, baghouse and activator maintenance, and screw conveyor repairs). 25.0 Key Maintenance Work - J. B. Autrey, J. B. Hegwood Reactors 400 and 744 were shut down during the month for condenser drilling because of cooling control problems. Reactor 745 was shut down during the month drilling and hydroblasting as part of the control program. for condenser contamination The reactor agitator gearbox on reactor 745 was shut down during the month because of an excessive vibration problem. The fluid coupling was replaced and the gearbox and motor realigned. Reactor 700 was shut down during the month for hydroblasting as part of the contamination control program. The chem wash pumps in the old reactor unit were shut down during the montfi for repairs to their bases. The bases were leveled and grouted in place. The pumps were then realigned and put back in service. There were two Corken VC unloading compressors rebuilt during the month. The 690 compressor had bad rings and a bad bearing on the crank shaft. The 490 compressor was leaking around the packing. There were two major valves changed out in the reactor area during the month. CCR 000006411 COMPOUND - J. E. Nickerson, K. G. Akins Safety The Compound Department worked without injury in May. The revised lockout/tagout procedures were reviewed during the monthly safety meetings. General Flexible compound inventories fell from 7.54MM pounds to 6.97MM pounds during the month. Packaged compound shipments were up 500M pounds from April. Line V only operated 3.5 days during this month for inventory control. Line I was down for fifty-nine hours for PLENEX polymer testing and production. This month several new jacket formulations were produced for extrusion onto wire and submittal to UL for testing. . Demand for rigid compound remained strong in May. Current orders have the unit on an extremely tight production schedule into July. Operating Cortroound Production Davs _______Production CM Lbs.) Month Ave./Dav Fiscal Y.T.D. Line 1 30 Line III 31 Line V : 3.5 Total .- . % Prime Capacity Utilization Factor 1884 63 4066 131 - 180 -51 6130 245 99.0 .788 15937 27648 5019 48604 98.2 .779 Downtime Hours Line I - Product Changes - PLENEX Polymer Testing - Miscellaneous Maintenance - Quality Problems & Control - Dicer Problems & Maintenance 85 59 25 12 12 Une HI - Product Changes - Miscellaneous Maintenance - Quality Problems & Control - Dicer Problems & Maintenance Line V 52 17 13 8 - Product Changes - Miscellaneous Maintenance 15 15 CCR 000006412 COMPOUND - Continued Operating Days Month Production (M Lbs. ) Avg. /Day Fiscal Y.T_.J> Rigid Compound 30.5 % Prime Capacity Utilization Factor 5412 99.8 .909 177 39493 99.6 .827 Downtime Hours Product Changes Miscellaneous Maintenance Quality Problems & Control Scales Maintenance 73 73 42 22 Operating Days Month Production (M Lbs ^ Avg./Dav Fiscal Y.T.D Plasticizer 31 % Prime Capacity Utilization Factor 1479 81.3 .639 . 48 12166 88.7 .715 Kev Maintenance Work - J. B- Autrey, J. B. Hegwood The Line I Banbury was shut down during the month for /a seal replacement. The lubrication return lines for the mill were also cleaned during the month because of plugging. - The middle compound cooling tower pump was put back in service during the month. The pump had been sent out for reconditioning. The control panel on the #1 dicer was repaired during the month. The ground sensor, contact, and two resistors were changed out on the panel. CCR 000006413 ENGINEERING - R. E. Polk, S. C. Hillman, M. R. Kane PROJECTS IN DEVELOPMENT - GENERAL EVC Cleanvall Technology The D745 cleanwall trial was successfully run during the month of May in 5305/5265 service. Reactor jacket modifications to cool the vapor space alleviated the wall buildup problems experienced previously with the low molecular weight formulas. Additional testing with 5415 resin will be conducted in early July. Initial testing of an alternative reactor cleaning nozzle has been completed out of the reactor. The need for in-reactor testing is being evaluated. * Donnelly Dusting Problem - H Steve Hillman and John Levardsen visited Donnelly, a flexible compound customer, to assist them in solving a dusting problem at their compound pellet storage silos. A letter was sent to Donnelly with suggestions as to how to resolve the problem. , Patco Ant is tat Trials Initial testing of an alternative antistat made by Patco was done on 5415 resin In a rotary dryer. This new antistat has the potential to eliminate fluid bed dusting problems and replace wet calcium stearate in 5385 resin. Q.C. testing at the plant showed no quality problems. Samples will be sent to R&D for evaluation. Additional testing on 5415 resin in the fluid bed dryer and 5385 resin is being planned. Fourth Fiscal Quarter Capital Budget The fourth quarter budget was sent to Houston on June 8. AFE's for five of the six projects were submitted with the budget. CCR 000006414 ENGINEERING - R.E. POLK, S.C. HILLMAN, H.R. KANE ABERDEEN CHEMICAL PLANT APPROVED CAPITAL PROJECTS AFE NUMBER PROJECT DESCRIPTION STATUS 51*7900000 A65B D8IB A5I9 A649 A909 C919 0619 0629 0749 D789 0049 D859 D699 F579 F669 F699 F739 F779 6569 6659 6719 6759 6619 6839 K679 H729 o H76? r H799 73 H829 H879 A540 6560 H50Q HSIO H520 L5J0 ALTERNATE NATURAL CAS PIPELINE VINYL VALVE UP6RADE PLANT ELECTRICAL UPGRADE VINYL CONTROL SYSTEM MODERNIIATION INERTS REMOVAL MODIFICATIONS NEK NATER NELL PROPANE STDRA6E AREA DELU6E SY5TEN COMPOUND REDLENO TRANSFER SYSTEM LEAD HANDLING AND EXPOSURE REDUCTION INERT 6AS PURGING OF PA TANKS COMPOUND LINE 3 SEMI-BULK IEAO HANDLKN6 COMPOUND 51L0 BRIDGE BREAKING RAILCAR CLEANIN6 RACK COMPOUND BOXING HOPPER NA6NETS COMPOUND LINE S HEATED PLASTICIZER LON MOLECULAR UEI6HT RESIN EXPANSION DRYER NO.8 CONTAMINATION REDUCTION DRVEAS NO. 4 6 5 CONTAMINATION REDUCTION DRTBLEND OIV.VALVE AND CHUTE REPLACEMENT NEK DRYER BA6H0U5ES COMPOUND 5ENER REVISIONS WASTE OIL REDUCTION VCt! SI6HT ELASS REPLACEMENT PLANT HATER RECYCLE PLASTICIZER REACTOR AGITATORS TORQUE RHEOMETER REPLACEMENT PLANT DIVERTER VALVE REPLACEMENT HIGHWAY 25 LAND PURCHASE RECOVERY SYSTEM COMPRESSOR - SPARE ROOF UPGRADE REDUCED FLAME 6 SMOKE COMPOUND PROJECT TC SPILL CONTAINMENT PLANT HATER SYSTEM HEST INCINERATOR REPLACEMENT MISCELLANEOUS CAPITAL PROJECTS < 4I5H FURNITURE AND OFFICE EQUIPMENT THE SYSTEM NAS BEEN STARTED UP AND IS OPERATIONAL. PUNCHLIST ITEMS ARE IN PROGRESS. INSTALLATION IS IN PROGRESS AND PLANNED FOR COMPLETION IN OCTOBER. CONSTRUCTION IS 98Z COMPLETE AND IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR JUNE. ENGINEERING IS IK PROGRESS. CONTROL ROOM CONSTRUCTION IS IN PROGRESS KITH COMPLETION PLANNED FDR SEPTEMBER. CONSTRUCTION IS IN PRD6RESS KITH COMPLETION SCHEDULED FOR AUGUST. CLOSED TO FIELD CHARGES. INSTALLATION KILL BE COMPLETED BY H1D-JUNE. INSTALLATION IS COMPLETE EXCEPT FOR PUNCHLIST ITEMS. INSTALLATION IS IN PROGRESS KITH COMPLETION PLANNED FOR JULY. CLOSED TO FIELD CHARGES. L0N6 LEAO ITEMS HAVE BEEN PLACED ON ORDER. PROJECT COMPLETION IS PLANNED FOR 10/90. LONG LEAO ITEMS HAVE BEEN PLACED ON ORDER. COMPLETION IS PLANNED FOR 10/90. DESIGN IS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR 11/90. CLOSED TO FIELD CHARGES. ENGINEERING IS IN PRQ6RESS. PROJECT COMPLETION IS PLANNED FOR JULY. INSTALLATION IS IN PROGRESS KITH COMPLETION PLANNED FOR JULY. CLOSED TO FIELD CHAR6ES. DESIGN IS COMPLETE AND LONG LEAD ITEMS ARE ON ORDER. DESI6N IS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR JULY. MODIFICATIONS TO THE INLET AIR BAFFLES ARE BEING TESTED. INSTALLATION IS IN PROGRESS KITH COMPLETION IN JULY. PUNCHLIST ITEMS ARE IN PR06RESS WITH COMPLETION PLANNEO FOR MID-JUNE. DESIGN IS IN PRD6RESS. PROJECT COMPLETION IS PLANKED FOR AUGUST. DESIGN IS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR OCTOBER. CLOSED 70 FIELO CHARGES. CLOSED TO FIELD CHARGES. INSTALLATION IS COMPLETE EXCEPT FOR PUNCHLIST ITEMS. NEGOTIATIONS ARE UNDERNAY. CLOSED TO FIELD CHARGES, CL05ED TO FIELD CHAR6ES. INSTALLATION IS COHPLETE ON ALL DESIRED MODIFICATIONS TO DATE. 0ESI6N IS COMPLETE. BIOS ARE DUE IN EARLY JULY. ENGINEERING IS IN PROGRESS. PROJECT COMPLETION IS PLANNEO FOR AID-1991. THE INCINERATOR KILL BE PLACED OF ORDER IN JUNE. DELIVERY IS EXPECTED IN 44-48 NKS. ENGINEERING (S IN PR06RESS ON 28 PROJECTS. EQUIPMENT IS ON ORDER. ENVIRONMENTAL - F. G. Jeanson Water All wastewater discharge parameters were met for the month of May. The Mississippi Department of Environmental Quality (MDEQ) conducted an inspection of all wastewater outfalls. No problems were found during this inspection. Waste Waste shipments for the month included: - One bulk load of separator oil was shipped to M&M Chemicals in Gadsden, Alabama. One load of plasticizer filter cake (seventy-seven drums) was shipped to CWM in Emelle, AL. A letter was written describing the plant recommendations for old pond #1 which is a past landfill site. Sunerfund ___ A visit to Sun Polymers to evaluate pond resin recovery was conducted this month. Conoco and Vista participated in this visit. Sun Polymers is currently recovering two ponds of PVC resin, 40MM pounds, from a B.F. Goodrich plant in Canada. A meeting was set up with the MDEQ in June to review our sites and any remediation plans. Conoco will be involved in this meeting. Several meetings were held with employees and city officials to explain the Superfund sites on our property and an EPA study that was done on these sites. The MDEQ was also notified of findings in the EPA study. Air The modeling study on VCM emissions from the plant was completed in late May and submitted to the MDEQ. If the MDEQ approves the study, they will issue a public notice for our modified air permit application. Thirty days later if there are no objections from the public, the MDEQ permit board will review and hopefully approve the application. Miscellaneous I attended a MISTAP regulation review conference during the month. An environmental training seminar was held for plant operations and engineering personnel. I attended the annual environmental meeting in Austin, TX. CCR 000006416 ENERGY CONSERVATION - D. A. Moore Mav. 1990 I. Energy Conservation Data(,) A. Unadjusted EUI <4.0%> B. Adjusted EUI <3.9%> C. BTU/Lb. Product 2554.0 D. Total Energy Consumption MMM BTU 132.44 Fiscal Y.T.D < 7.7%> < 7.9%> 2644.0 1053.20 II. Plant Energy Conservation Program A. Maintenance There were sixteen energy related items completed in May,. 1990. Fifteen of these items were steam leak repairs. The remaining one was steam trap repairs. - III. Boiler Operation Boiler Combustion Efficiency % Mav.. 90 Fiscal Y.T.D. No. 1 No. 2 No. 3 83.3% 83.0<o 82.9% 83.4% 83.3% 83.0% (1) Boiler number two was operated one day during the month. CCft 000006417 SUMRBf RESOTTRCB RggQR? May, 1990 Peraonnfll - J. E. Beall Rmfti ^yaent Allen Bodron - Rehire Berlin Genetti - New Hire Anthoney Deanes - New Hire Proaotions/Tra^^-f^" Robert "Bud" Stone - promoted from General Mechanic MBM .......... to General Mechanic "A". .Timothy Arbeiter - transferred from Senior Analyst - Houston, Tx. to Quality Management Coordinator - Aberdeen- - - - -............-- ' rwaentS None Terminationa/Resionationg Brian Aftergut To/Froa Leave of Absence None CCR 00064ie ABERDEEN, MISSISSIPPI MAY > 1990 MONTHLY PERSONNEL REPORT Salaried Employees Hourly Employees _ Total Employees 79* 172 251 gmplqyceg .(HwrlX). New Employees Minority Employees #, % Salaried 22. Hourly 66 38Z Total 73 222 Hourly Min. Hired Terminations \ Min. Hired Hourly Kin. Term. % Min. Term. DEPARTMENTS PAR #EMPLOYEES MIN. EMP. %MIN. NEW HIRES YTD TERM. YTP. TURNOVER YTD. Warehouse 16 Can. Plane 13 Maintenance 41 laboratory 24 Compound 40 15 8 16 ' --J':5 41 10 24 5 38 26 -Sl24-- -22-- 67 _CU _G-- o 0` -SL SL o Vinyl 33 Plasticizer 5 33 5 10 ____2______ 30 40 JL- 0 0 Number of Applicants: Month _______0_ Year To Date APPLICANT BREAKDOWN: n # Minority Q * Minority 0 # Female 0 % Female ___0 Hires (Hourly): Month n Year To Date ___q. Terminations (Hourly): Month 0 Year To Date 0 Overall Turnover Q Projected Annual Turnover __Q_ CC* OOq 06 9 U3=i u_ _*ec - to. =* --<r> lj a---jt*i L--u>. 'X i/1 <c ce. _} to3nc JU--S >o AO Z 13 --* Si i o * ^ 1> || U"i 4 CM SC <T 1 . <ro 1 UJ 1 Jj . e i >- -- 1 J i J1 -- ! 1 * . /! 1 -- _a_ | !w ! e *1 J-rf l xo i UJ Z } 1o luj 1 ! i is i o C 1 u- 1 i w>3 1 "1 Io I^ | ^| 1 JJ | 1 n 1 CJ O T Si J C( o\ Os 1 CCt < 1 <r z --.-v -- 1 i <-<Z cm 1 -w X 1 "=> 'J7 1-- i o<xtn 1 o4 1 1^ (O 1 .TO 1 it 1 XJ ILftJ 1 UJ _U l I Z O If- j " 9s ICC 1 z z | CO l> 1 3<_> >o 1 o z 1 o1 1 --1 1 UJ O in --- z ! ae <n 1 i 'n ZSZ ! 1 t 1 ! o si o PO <o o o o i ti i t <. i -' o 1 o 1 o i n t 0 1 d 4 => ! 9 o 1 0 ! .=. 1 => o ! O 1 -3. i *rr 1 ! 1 ' 1 1i i 1 1i fi -o 1 00 i m 4 n p-- r- T 1 sp i > <r 1 r-i 1O i 1 1 rT> 1 4O 0 I I i4 01O i~n -O . *T4 in T 1 4 P* 1 o 1 !O 1 PI 1 C*J p C*J J, 4O L* J 4 -c 1 o 1 I -0 i 0 j ; f 1 1 ! 1 i *0 t i m 1 4TM j 1 o 1 0 1 r-j 0 41 1 = 1 o* 3 1 O 1 O O ... r 0 *d !! t , ,. *T 1 1o O 4 -O 4 Nj 1 CO 1 o O ! O ; 0 0 o 1 -o 1 => 4 4 1 1 t <-** 1 o 1o 3 i O JO m 4 4{ 1O 0 0 4 1 4 1 o 1 r*- 4 O 1 O 4 -- 1 3 1 -n rg ! 0 1 * VS 10 0* 1 o m 1 <x> m i o 1 r-i 1040 1 4 ~o 1 -o 0 t0 1M 1i 41 11 t 4i 1 1 c.- 1 1 ao i m 1 . 1O i pi 00 1 o p^ 1 0 1 CO 1t 1 I J4 11t e o1o 0 1 o 1 O 1 O 1 m 4 C-i r-- t C4 9 1 1 m1 r t 1 I t t i1 1i o 194 1 1 1 1 A 1 O 1 0 1 PM 1o O - 1 m 1 11 41 1 l 11 o <O\ m m 1 o p-- 1 r-j 1 P'1 0 1 "3 i ^ i 1 i o m i j *^1 r <T 1O i <1 14 [ 14 1 aa1 | 1 1 u< 1 CJ 4 4 I 1 X i f 'Jj | 1 UJ 1 CO | 1 4 | 1 a. 1 'UJ cn 0 1 S" 1 UJ 1 _i 1 CO I ^ lU | l z t CJ i <z 1 s 4 iZm i UJ 4 1^1 1 v> 1 a 1 0 3 1 p- 00 1 1 rr 10 1 ro 1 p~ 1 CM ao i h* 1 CO 1 CM 1 CM | 1 UI 1 r-i -0 1 r1 1 | 1 1 | 1 0 .fc 1 -- UJ 1 > 0 0 ao 1 1 i (O' I'O 1 r-i 1 -r 4 0 10 4 1 j i-r s m4 0 Ti j 0 4 m j >* 1 *s O0 1O 1j 'Z 0 -3 00 1 1 l m0 --0 103 4 0 1 <3 ip>- CM 1*43 1 1 1 O mO ICO ir-j 11 r- 1 O im CM 4 IPO 1 <o t <S f CM 1 1-0 I'O OO O 1 1 itn mi 1 1 1 1 1 U4 Cm. i 1a im 1 4 1 4 i 1 1 't ? 1 -9 ;* O Os OoOo fj 3 CM ---r.ir U>J CE -It =* ' 3 Ll_ aeoeoe OOO uiosaconece=ne3 00=3 <E <X <= Cl. U. C<_ >: <t sc ooo 000006^20 CCR Dt.Kr.RfMkHI Al HOURS ANALYSIS RfcPURT Glt'iKlUOTI*1, LIST RWS, JfC. JVU, DEFAfUfitHI HEALS, FILE. z 19 CO > 1 'JU * a <r X a 1 1 1 J* *. * i i1 as w 1 ^X -01 o Cu j to 1 1 -a _i1 z _l o. AOS <r=c 1* O uj J"l J 1 in A CO 9 -J U1K A -- in n- zu 1 zo o -- CC as Z r -r i rj a* c_> f m oi SL uj a 9 i * sc no a rj i i -\ -a 9 1 9 9 1 91 o 1 1 19 CM 1 CO m M * *r CJ 11 1 o I 9 fn 1 in i r- r * 44 1 W | m i 9 i | | 1 i1 4 +r 4 1 --1o 1 > 1 <3 | -o i 9 1 4 -O f-- i i -*T *r i Kmt 9 rO 1 _ 1 ` 4 CO i m i O* 1 9 4| 41 40 a \ 9 1 -- 4 9 4 9 < J 1I 11 1 i 9 1 a 9 1 in * ^ 1 >r> 1 > 1 r-J 4 9 j o 1 1O1 3 9 9 91 11 14 1 l 1 CM l mQ * ar rt l <a 1| 9 9 9m 1-3 t !-3 1 9 I 9 1 in r- 1 1 im o 1 9 M1 1 - 11 rt ->- 1 in *o r 1 1 a a| 0 1 cm 1 in i CO m r | 1 1 in 1 9 1 9 1 9 r-- CM in <9 f 00 1 in 1 in i in <1 O in i 9 9 f- t 9 9 r-4 o* 1 ~o <> 1 m i t Ml t in 1 1 ___ i ___ 1 i 9 91 m * 1 1 Ml \ in m i co 1b*1 m i r<i 1 O 9 9- r-i ii 1 11 | 1 1 1 t im I <c Lbl 1 al I 1 ^1 a ^ < ."a 1 t1 \ t CO i aS UJ tn 1 T3 UJ iz iO n i 1 JZ CO UJ i _i LU 1 <T i --J 1 3 1 LO 1 9 9 |O oim COinM Itf CoCOM 1I .' 4 It a ', 9i 1 \ O 9 1 to t 1 1 91 I 1 1 mr iii 1 in i ^o SO CJ I 1 im in r-i iii . o i in r-j i r>* lTI i 1< iiii eo CM I ^ -ino ii o 1 1 .s i -O > II >CM oo> ii in 1 mim 1 1 1 4 .a A1 9 | >_j j 5* CO J CM OMP- o o 9 3<t>t a za z --<E 3 <c lu "iza seas as OOO tcfndcsnaten Z -=<S<E O _J -3 0 0 CCR 0000064 21 ADMINISTRATIVE SERVICES - J. . Little Safety There were no safety instances this month. Cost Savings Savings due to competitive bidding were $16,475 for May, and $91,419 for FY1990. Savings due to prompt payment discounts were $2257 for May, and $16,332 for FY1990. Savings due to vising excess materials (AFE and work order stores) were $561 for May, and $17,090 for FY1990. Warehouse - Finished Goods Inventory Slow moving and off-grade inventories are still a major concern approximately 35% of total packaged inventories. Strategic Initiatives Darrel Peterson, U.E.&C., conducted VMS overview training May 15-17. Pre-implementation work is progressing well. I met with Price-Waterhouse to discuss activity based cost accounting. Employee Development Mike Swierc and Tommy Cummings attended IPSM May 16 & 17. Tommy Cummings and Amy Vaughn attended Mississippi State Tax Seminar in Tupelo, MS, on May 10. Ruth Morris, Data Processing, was in Aberdeen May 25-28 to make additional revisions to the payroll management system. Meetings 5/02 5/09 Price-Waterhouse - activity based cost accounting. Gold Bond visit - discussed raw material coordination. 5/09 Mike Swierc met with Motion Industries concerning quality program. CCR 000006422 ADMINISTRATIVE SERVICES - Continued Meetings 1/11 continued The Stores Team made a presentation to Bob Seymour's Natural Team. 5/16 Southwire meeting OASIS - task review 5/24 Hike Swierc visited Halstab (Hammond, Ind.) for the supplier recognition presentation. 5/25 Southwire presentation 1/31 The Stores Team made a presentation to Engineering. CCR 000006423 mmu cuiicu puir siipfiig uiusis Bit 19S9 -SI1FIIITS BI FIDWCTS- PUBLIC 80IT1 1PT/1TC IICUKI IISII-BOLK IISII-PACUGIB 20,947,361 11.272,OBI 367,209 442,331 352,059 6 UIZIBLI COBPOBM-BPLI 1,815,211 329,959 ILIUM COIPQOH-FICUGW 3,112,513 09,171 9 0 III BOSIIISS 13,101 0 tlGU CQIPOOH-BBU 2,134,411 1.236,550 liGIB CMPM-P4CIlStt 411,142 9 0 9 TOUZK - Bill T0UII6 - FiCUGIB 1 0 597,390 1 90 tusncuu 215,360 110,550 384,060 torn -siimns it ion- 30,573,166 14,051,150 1,250,360 ' - 179 PUBLIC 1PT/1TC UCS&SGt 159,083,172 76,635.359 1,956,408 2,523,000 1,754,000 0 11.762,510 7,646.290 25,100,875 1,254,237 0 0 37,070 0 0 25,046,210 6,933.400 1,735,325 268.723 9 9 0 0 5,255,078 0 8 128,265 1.133,460 1,932.060 1.471.619 226,420,822 96.424,650 8,811,545 MI: mit IISU ILtliBlt COEPOIIB 11619 COIPQBIB rusTiciiii TOTAL U1 niicu 154 13 24 3 204 C0ST0BH COflBQI PICKUP Cilill! 19 65 0t 0 13 1T 21 65 .... tom 248 21 37 10 316 im 11511 numi cmfowb II6IB COBPOIII PtlSTIClIIl 1,181 201 462 !T 11 35 111 15 129 1> 0 21 rCR 00000642^ 1,663 143 325 48 TOTAL ITB MIT 227 675 2.3T9 F1CUGD: lilt ttsu numi coipooib IJGIB COBPOTIB FUSTlCIIll Tom ui coatoiii CQRIQI F1C1IF CAIX1II $ 11 31 72 1 16 I0 36 106 TOTC C0IU1IKI ill/BPS I1 00 06 00 5 14 9 0 00 19 TOTAL 28 UT 16 8 161 tlTCt USII fliKUBLI COBFOOID II61B COIPOOIB PUSTICtitt 10TU ITB 30 101 0 0 ITS 579 4 0 IB TO 9 1 1 3 00 213 753 4 1 60 31 1 1 93 191 767 82 4 1.064 LABORATORY - J. M. Edwards, Jr. A. Safety - There were no safety incidents in the Laboratory during May. The monthly safety meeting topic was the new "Lockout/Tagout Procedure" taught by Bruce Trego. B. Customer Contacts - There were five customer contacts during May. 1. Jim Edwards, accompanied by Justyn Miller, visited Gold Bond in Sardis, Mississippi. The target specifications for color in RP-28 WHT 122 were discussed. The call was made on 5/23. 2. D. G. Mouldings made a plant visit and a lab tour was given on 5/11. 3. Representatives from Gold Bond made a plant visit on 5/9 and a lab tour was given. - 4. Southwire made a plant visit on 5/25 to present the . Certified Quality Vendor award to Vista. A lab tour was given. 5. A representative from Intex visited the plant on 5/29/90 and was given a lab tour. C. Customer O.C. Problem Reports 5/07 PVC Compounders. Kendallville. IN PVC Compounders reported high moisture content in a 5415 railcar. Samples of the car were sent to Aberdeen and were confirmed to be high moisture content. The railcar had been loaded from silos filled while the fluid bed dryer was experiencing high moisture problems. The car was returned to Vista. 5/08 AT&T Network Systems. Omaha. Nebraska AT&T sent the Aberdeen lab a sample of con tamination from a screen pak running 34862 GRY 546. The contamination sample was iden tified by AT&T as brownish granular material and metal pieces. The sample was sent to R&D Austin for analysis. The metal was determined to be stainless steel. The granular material was mostly chlorine with small amounts of aluminum, silicone and lead. A formal response will be written and sent to AT&T. 000006425 CCR LABORATORY - Continued C. Customer O.C. Problem Reports 5/09 Flexible Technologies. Abbeville. SC Flexible Technologies reported bad dicing and stringers in 18031 VAT C, lot 10Q13. Boxes with the same lot number in Aberdeen were inspected. Four of the twenty-four boxes on the floor were found to have bad dicing. Seven were down-graded as a precaution. 5/29 & 6/2 Gold Bond. Sardis. MS Gold Bond returned two railcars of RP-28 on 5/29 and on 6/2. The complaint was that the dry blend was too dark. Quality control records show a definite shift lower in L value for that production run. The reason for that shift is still under investigation. 5/31 Vvtron Corporation. Loudon. TN Vytron complained that 17462 BLK (lot 59L12) and 17462 NAT (lot 50R15) will not produce acceptable extrusions. A review of produc tion records show high hard particle problems during the production of both lots of material. D. Requests for Corrective Action There were no requests for corrective action during the month of May. E. Product Waivers Customer Product Reason No. Vulcan Plastics F. RVCM Summary 5385-3P Bulk Density Range 1 R/C RVCM of In-Process Samples The following is a summary of residual VCM results on in- process samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of May, 1990. Number of Samples Average RVCM, ppm Reactor Slurries 931 134 _________Drier 5265 5305 36 0.417 70 0.294 CCR 000006426 LABORATORY - Continued RVCM of Shipment Samples The following is a summary of the residual VCM analysis of shipment samples for the month of May, 1990. Product Wnrnher of Samples Average RVCM. ppm 5265 5305 5385 5395 5415 Dry Blend Debox Pond 39 106 59 11 67 47 12 -1 0.101 0.157 0.539 0.116 0.053 0.047 0.336 0.530 Resin Process Caoabil.ities Abased on dryer "regulars") 5261 -520 5385 5395 ?415 Bulk Density Inherent Viscosity (vs. 0.715 - 0.744) L Color A Color B Color % on Pan (vs. 2%, max.) % thru 140 Mesh Drytime Mets I.R. (vs. 95% of control) Hard Particles, (% > 10) Average particle size, microns 1.50 2.17 -- 8.11 3.17 2.83 1.29 -- 1.07 -- -- -- -- 138 0.78 0.60 0.33 2.92 8.67 2.67 1.18 -- 0.63 -- -- -- ------- 134 2.75 0.67 3.00 ---------- 2.50 1.56 -- 1.45 2.00 -- -- 19.4 160 0 0.90 6.67 2.67 0.94 -------0.84 2.33 4.13 -------4.6 139 1.40 0.77 4.44 6.33 2.75 0.25 2.54 2.00 2.22 1.52 0.9 174 H. Flexible Compound Quality Summary Hardness Color Hard Particles Heat Stability Contamination Dicing Totals Adiustnnents M Lbs.. m 26.0 52.0 -- 7.0 -- ._.. 85.0 <0.42> <0.84> .... <0.11> .... <1.37> Reiections M Lbs _ Xil 7.5 1.4 11.7 -- 14.8 9.1 44.5 <0.12> <0.02> <0.19> .... <0.24> <0.15> <0.72> 00006*27 LABORATORY - Continued I. Rigid Compound Quality Summary Relections M Lbs. Torque Rheometry Color Total 6.3 <0.12> 44.8 <0.82> 51.1 <0.94> J * Miscellaneous 1. Software is being written for the Q.C. Supervisor to review, add customers and print out a certificate of analysis for customer shipments. 2. Dave Cox assisted Blane with setting up their G.C. for _ plasticizer analysis. Methods were tested and samples were sent. 3. The lab re-issued six compound formulas with added BPA due to removing BPA from the 108P plasticizer. 4. Billy Paul Sizemore attended two days of XPSM training. 5. Jim Edwards attended two days of rigid formulations and testing training in Austin. 6. All six natural teams met once during the month. 7. The National Sanitation Foundation (NSF) made its annual inspection this month. They found no violations in production, facilities, quality records or procedures. CCR 0000064P8 RESIN Ship Date 5/02/90 5/02/90 5/02/90 5/08/90 5/08/90 5/07/90 5/07/90 5/16/90 5/16/90 5/18/90 5/21/90 5/22/90 5/22/90 5/25/90 5/30/90 5/31/90 SAMPLE SHIPMENTS MAT 1990 Product Pond Resin Pond Resin Pond Resin Pond Resin 5385 5385 5265 - 5265 5305 5385 5385 5385 5385 Pond Resin 5415 5415 5465 Amount 5 lbs. Customer W. K. Merriman Inc. 50 lbs. V. P. I. 50 lbs. American Trading 50 lbs. Shawnee Chemical 2 lbs. CONNIE NAKAMURA 200 lbs. Solem Industries 500 lbs. Arlington Mills 2 lbs. 2 lbs. Procter & Gamble 100 lbs. D. G. Moulding 5 lbs. KOHKOKU, USA 2X2 lbs. Dayton Extruded Plastics 5 lbs Uniroyal Chemical Co. 50 lbs. American Trading 50 lbs. KOHKOKU, USA 5 lbs. Uniroyal Chemical 50 lbs. KOHKOKU, USA COMPOUND Ship Date 5/02/90 5/09/90 5/18/90 5/22/90 Product 18031 WAT CL 48451 BLK 48562 BLK 34643 NAT 419-67B BLK 419-68 BLK Amount 1500 lbs. 50 lbs. Customer Furon/Synflex LOF Tech 50 lbs. 1500 lbs. 1500 lbs. CABLEBOL Times Fiber CCR 000006429 COMPOUND (Cont.) 5/22/90 38601 BLK 5/23/90 1220-06X NAT 5/24/90 27121 NAT 5/25/90 15072 NAT 18961 NAT 5/30/90 16841 NAT OG 17462 WHT OG 18162 BLK OG 18031 WAT CL OG 5/31/90 38601 NAT Sample Shipments/May 19S0 Page 2 200 lbs. ELECTROCONDUCTORES 4500 lbs. Inovative Plastics 50 lbs. ABC Plastics 100 lbs. 100 lbs. Macklanburg-Duncan 30 lbs. 30 lbs. 30 lbs. 2 X 30 lbs. Ron Walker 200 lbs. ELECTROCONDUCTORES PLASTICIZER Ship Date 5/09/90 Product 610P Amount 1 gal. Customer Blane Polymers CCR 000006430 NUMBER O r NJURIES ABERDEEN CHEMICAL PLANT INJURIES a TOTAL INJURIES O OSHA RECORDABLE CCR 000006431 ABERDEEN ENERGY CONSUMPTION BTU/LB en/rus CCR 000006432 MONTHLY ------- 12 MONTH AVERAGE TO: DISTRIBUTION 0^ Intftrefflcs Communication FROM: DATE: H. Garrison August 8, 1990 SUBJECT: RAILCAR QUALITY DATA - July, 1990 Attached for your information are copies of control charts for a number of key quality parameters as measured in railcars loaded at OKC in July, 1990. A brief comparison of July results versus the three previous months is presented in the following table: JUL 1990 JDN 1990 MAY 199Q APR 1990 Rulk Densitv AVG UCL LCL UCL-LCL cpk fSnec . --0.510 min.1 0.567 0.571 0.605 0.604 0.529 0.538 0.076 0.066 1.5 1.8 0.562 0.598 0.525 0.073 1.4 0.561 0.621 0.501 0.120 0.9 St Moisture AVG UCL LCL UCL-LCL cpk fSoec. -0.30 max.1 0.12 0.15 0.09 0.06 5.5 0.12 0.16 0.08 0.08 4.4 0.12 0.17 0.08 0.09 4.1 0.10 0.15 0.05 0.10 4.3 St thru 140 AVG UCL LCL UCL-LCL cpk fSoec. -20.0 max') 6.8 9.0 4.5 4.5 5.9 6.8 8.4 5.1 3.3 8.1 7.4 9.7 5.1 4.6 5.5 8.0 11.0 5.1 5.9 4.1 % on Pan (Spec. -- 5.0 max.1 AVG 2.3 UCL 3.1 LCL 1.5 UCL-LCL 1.6 cpk 3.5 2.1 2.6 1.6 1.0 5.6 2.3 3.0 1.5 1.5 3.6 1.9 3.0 0.8 2.2 2.9 RVCM (PPM^ AVG UCL LCL UCL-LCL cpk (Spec. -2.0 max. 0.9 1.4 0.3 1.1 2.3 P1t>e/8.5 max. 0.6 1.0 0.3 0.7 3.8 siding 0.7 1.3 0.1 1.2 2.2 0.8 1.5 0.1 1.8 1.8 OOOOOb^3 CCR RAILCAR QUALITY DATA - July, 1990 August 8, 1990 Page 2 Average results and consistency (as measured by UCL-LCL and cpk) for most parameters (except % moisture) slipped from June levels but were for the most part an Improvement versus prior months. The only attributable cause is the erratic operations in July --- up and down operations, coarse batch, recovery system problems, etc. In light of these problems, it is extremely encouraging to see that the plant was able to maintain its focus and-minimize the impact on quality - - - clearly a sign of a changing culture! H. GARRISON PLANT MANAGER HDG/gsc raildata.Jul CCR 000006434 BULK DENSnY < /c c ) OKC PVC SHIPMENTS (X CHART) JULY 1990 OKC PVC SHIPMENTS (R CHART) JULY 1990 CCR 000006435 BULK DENSITY (O /C C ) QIC AC DAU JHLV 1990 TOTAL DATA WIIT5: 102.00 CPAs 1.52 nmuummumummuumwmuummmmmwwmmmmmmmm DAU CAP BULK NOVltf CURRENT LOADED 10085k DEIS RAtet a m fi (Aft OCl A ICl A OCL it mmu mmmimmimtmm mmi uittttt tmtttt mum mmu mum 40 10 73391 41 10 42249 50 10 4(404 51 17 73300 52 17 73303 0.5(0 0.570 0.505 0.5(0 0.5(0 0.001 8.0D2 8.015 0.017 0.000 0.5(7 Mil 0.5(1 0.567 0.5(1 0.014 8.014 0.QU 0.014 0.014 0.(05 6.(05 0.(05 0.(05 0.(05 0.529 0.529 0.529 0.529 0.529 0.046 0.041 1.041 0.046 0.046 53 17 73394 54 17 73301 55 10 44750 51 10 40394 51 10 73410 50 10 73401 50 10 43717 00 10 45701 11 10 41042 $2 19 73403 03 10 52472 (4 10 4(470 05 10 73403 00 20 43749 07 23 41507 00 23 4(530 00 23 45710 70 24 43(99 71 24 40401 72 25 40472 73 25 40507 74 25 4(530 75 25 41(45 70 25 44154 77 20 4(464 78 25 4(503 70 20 404E5 00 25 42057 01 27 4(547 82 27 46451 03 27 4(4(3 84 27 41610 85 28 42101 0.503 0.5(5 0.510 (L5(5 0.560 0.5(5 0.553 0.5(0 0.551 0.584 0.570 0.5(4 0.500 0.550 0.550 0.548 0.5(0 0.580 0.570 0.503 9.553 0.503 0.573 0.5(0 0.570 0.580 0.540 0.533 0.500 0.58b 0.5(3 0.5(8 0.580 0.015 0.017 0.005 0.005 0.005 0.005 0.013 0.008 0.004 0.028 0.006 0.014 0.016 0.022 0.000 0.010 0.012 0.020 0.010 0.023 0.040 0.030 0.010 0.012 0.010 0.018 0.047 0.007 0.055 0.003 0.022 0.005 0.012 0.5(7 0.5(7 0.5(7 0.517 0.567 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(1 0.5(7 . 0.5(7 0.5(7 0.6(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(7 0.5(1 0.5(7 0.5(1 0.6(7 0.5(7 0.5(7 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0.014 0,014 0.014 0.014 0.014 0.(05 0.(05 0.(05 0.(05 0.(05 0.(05 8.(05 0.(05 0.105 0.(05 0.(05 0.(05 -9.(05 0.(05 0.(05 0.(05 0.(05 0.(05 0.105 0.(05 0.(05 0.105 0.(05 0.(05 0.(05 0.605 0.(05 0.(05 0.(05 0.(05 0.(05 0.105 0.(05 0.529 0.529 0.529 0.529 9.529 0.529 0.521 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 1.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.04( 0.046 0.046 0.046 0.046 0.046 0.046 0.04$ 0.046 fi.Q4( 0.046 0.046 0.046 0.046 0.041 0.046 0.046 0.046 0.045 0.046 0.041 0.04$ 0.846 0.046 0.046 0.046 0.041 0.046 0.046 0.046 0.046 0.046 0.046 05 28 48045 87 20 41(05 88 28 46410 00 28 48051 00 20 4(485 91 29 48031 92 20 46030 03 30 41406 --------i" ___ 0.563 0.011 0.550 0.012 0.578 0.027 0.580 0.002 0.573 Q.007 0.580 0.001 0.523 0.051 0.5(4 0.041 ---------O fc'il __D H'n 0.5(1 0.014 0.5(7 0.014 0.5(1 0.014 0.5(7 Q.0H 0.5(1 0.014 0.5(7 0.1114 0.5(1 0.014 0.5(1 0.014 n m____n nil 0.605 0.529 0.046 0.(05 0.(05 0.529 0.529 0.046 0.046 0.(05 0.529 0.046 0.605 0.529 0.046 0.605 0.629 0.046 0.(05 0.529 0.046 0.(05 0.529 0.046 n silk ___0-57,9 -- fl-DK CCR 000006^36 tmmmmtmmmtmmtmmmtuimmtmmmmrmmmmmimimm QIC fiC DATA JULY 1990 I01AL DAiA P0iXl$= 102.00 CPA s U2 mmimiimumummmumimmmimmtnmmmutimimimmmmt DAIt CAK mu MOVING COKRtNi LOAlifcll ftMBbti 09NS mi A OAK K0AR UCL A LCL A UCL R mum tiKimmmmtmmtu mu mmu mm ttutm mmu mstm 33 4(391 96 30 4450 91 30 4514 91 31 4933 99 31 4944 100 31 4901 101 31 4991 102 31 41471 0.999 0.911 0.968 0.993 0.963 0.969 0.983 0.912 0.094 0.013 0.016 0.009 0.029 0.006 0.013 0.010 0.961 0.961 0.961 0.9(1 0.961 0.961 0.3(1 0.561 0.014 0.014 0.014 0.014 O.0U 0.014 0.014 O.OU 0.605 0.603 0.605 0.605 0.605 0.605 0.605 0.605 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.529 0.04 0.04 0.046 0.04 0.04 0.04 0.04 0.04 000006437 CCR MOISTURE OKC PVC SHIPMENTS (R CHART) JULY 1MO CCR 000006438 OKC PVC SHIPMENTS (R CHART) JULY 1990 rarcmuFB MOISTURE c itiiiiiiijiimmimmmmtnnmmmmmmnwnunmmmmttmtnnn Otc ft OAfA JKLr llffl TOfAL CAfA P0W$: 162.60 m- 5.54 tmmmiumumttimmimmmmmttmummmmmnnimtmuttmti OAU CAR MVIRG CURRENT LOADED mm MISTUKE RAISE X IAR R BAR UCL X LCL X UCL I mmnmmmmmmmmin mtm mmu mum immi mmn tmtm 46400 43730 44600 4(585 46303 42U1 44391 4(473 45889 44296 43708 45750 um 44747 13402 41636 46601 73316 76408 46410 464$2 40064 48076 43737 46390 44766 46640 42121 48066 73392 46629 46392 73406 46496 43861 46611 46618 46404 41189 44)66 46764 46646 73411 43743 46616 46678 46491 0.128 0.123 ... -8.no 0.120 0.126 0.120 ''0.123 0.118 - 0.126 0.123 0.128 0.136 0.730 0.140 0.108 0.115 0.123 - . ... 0.110 8.120 0.108 0.133 0.126 0.116 0.113 0.113 0.126 0.120 0.12! 0.108 0.108 0.128 0.085 0.086 0.080 0.143 Q.I39 0.11b 0.128 0.130 0.123 0.108 0.103 0.093 0.086 0.080 0.118 0.100 0.006 0.012 1.010 1.005 .1.006 0.003 0.006 0.007 1.003 0.006 . 0.000 0.605 0.010 0.033 0.008 0.007 0.012 0.010 0.012 0.026 0.008 0.010 0.003 MOO 0.012 0.006 0.002 0.020 0.000 0.020 1.042 9.000 0.006 0.063 6.004 0.024 0.012 0.003 0.008 0.016 0.006 0.010 0.007 0.006 0.038 0.018 .122 0.012 0.122 8.012 6.122 6.012 0.122 0.122 0.012 0.012 .0.122 0.122 0.012 0.012 1.122 6.612 1.122 0.012 0.122 0.122 0.012 0.012 0.122. -0.012 6.122 0.122 6.612 0.012 0.122 6.122 0.012 0.012 0.122 0.122 0.122 0.012 0.012 0.012 1.122 0.012 6.122 0.QU 0.122 0.012 6.122 6.122 6.672 6.012 0.122 0.012 0.122 0.122 0.112 0.012 0.122 0.012 0.122 0,012 0.122 0.012 0.122 0.012 0.122 0.612 6.122 0.122 0.122 6.012 0.012 0.012 0.122 0.012 0.722 0.012 0.122 0.012 0.122 0.122 Q.122 0.012 0.012 0.012 0.122 0.122 0.012 0.012 0.122 0.012 8.122 0.122 0.012 0.012 0.122 0.012 0.164 0.090 0.164 0.090 6.154 .6.690 0.164 0.090 0.164 0.090 -0.164 -6.090 . 0.164 0.010 0.039 6.039 6.039 1.039 0.039 0.03! 6.039 0.154 0.164 0.010 1.090 6.03! 0.039 0.164 0.154 0.090 0.090 0.039 0.039 -0.154 Jl.090 -0.039 6.154 6.696 0.039 6.154 1.010 0.039 6.154 0.090 0.039 6.164 8.698 0.039 0.164 0.690 0.039 -6.U4 --6.090 .. -0.039 6.154 0.090 0.031 0.154 0.091 1.039 0.164 0.690 0.839 0.154 0.090 0.039 0.154 0.690 0.039 6.154 6.896 0.039 0.154 0.810 0.039 0.154 0.090 0.039 - 0.154 M90 6.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 6.154 6.690 0.039 6.164 6.898 0.839 Q.164 0.090 0.039 0.164 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.090 0.039 0.154 0.154 0.090 0.090 0.039 0.039 0.154 0.090 O.039 . cop. 6*^ kOOOO OK Kim Ml lltt I0IAL MU NUTS: 102.00 Ctts 5.54 mmmmmmsmmmmmnmmmmiittmmnunmtmimmmmmti m CA0 MUtt MW --------- lOAOfctt MO MMSlIHfc ftAKt X BAR X0AR DEL A LCL X DCL K nmu mtuu mum immi :tmmt iutmu ( ft 73397 e. lot 1.007 1.122 0.012 6.154 0.090 0.039 t 42249 0.093 0.015 0.122 0.012 0.154 0.090 0.039 H 46434 1.123 0.030 0.122 0.012 - 0.154 6.690 0.039 17 73310 0.140 0.010 0.122 0.012 0.154 1.090 0.039 17 73393 0.140 0.000 0.122 0.012 0.154 0.090 0.039 17 13394 0.143 -0.003 *0.122 0.012 0.154 -0.090 -0.639 ( 17 7331) '0.125 0.018 0.122 0.012 6.154 0.090 6.639 It 44760 1.155 1.030 0.122 0.012 0.154 0.690 0.039 ft 41394 0.H3 0.812 0.122 -1.012 -6.154 6.690 - 6.031 i tt 73410 0.153 0.010 0.122 0.012 0.154 0.090 6.039 11 73401 0.143 0.010 0.122 0.012 0.tS4 0.090 0.039 - u 43117 - 0.163 0.020 -0.122 -0.012 0.154 1.690 - 6.039 ' ft 43761 0.113 1.045 0.122 0.012 0.154 0.096 6.039 It 41842 0.115 1.003 0.122 0.012 0.154 0.090 0.631 .... iV It 13403 ft 52472 It 46416 fl 13403 to 43749 23 41591 23 46538 23 45716 24 43699 24 46481 23 43472 0.133 0.126 0.130 0.138 0.155 0.115 0.123 0.136 0.120 0.135 0.133 0.016 0.005 0.003 0.006 1.017 0.040 0.001 0.015 0.018 0.015 0.003 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.122 0.612 0.0(2 M12 0.012 0.012 0.012 0.012 6.012 0.01Z 0.012 6.012 - 6.154 -<.690 0.154 0.090 0.154 0.090 0.154 -0.016 0.154 0.090 1.154 1.090 0.154 -0.690 0.154 0.090 0.154 0.090 0.154 0.090 0.154 0.090 6.039 6.039 6.639 6.039 6.039 6.639 - 0.039 0.039 0.639 6.039 0.039 23 4(507 23 4(530 23 41645 2b 44754 2b 464(4 21 43563 2b 4(4(5 26 42051 27 45547 2'f 4(45! 27 464(3 0.120 0.150 0.148 0.13b 0.138 0.133 0.108 0.128 0.113 0.110 Q.123 0.012 0.030 0.602 6.010 0.006 0.005 0.025 0.020 0.015 0.003 0.013 0.122 0.122 6.122 0.122 0.122 0.722 0.122 0.122 6.122 0.122 8.122 0.012 0.612 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.154 0.154 0.154 0.154 0.154 0.154 6.154 0.154 0.154 0.154 0.154 0.090 6.090 0.090 0.090 6.090 0.090 1.090 0.090 0.090 0.090 0.Q9Q 0.039 0.039 0.039 0.039 6.039 0.039 0.039 0.039 0.039 0.Q39 0.039 27 41318 21 42181 0.148 0.123 0.016 0.016 0.122 0.122 0.012 0.012 0.154 0.154 0.090 0.090 0.939 0.039 26 23 23 26 29 29 29 30 ----------____________U_ 46043 41(85 46470 43051 4(435 4(031 4(030 4140b 464(0 0.123 0.000 0.122 0.118 0.005 0.122 0.103 0.010 0.122 0.130 0.023 0.122 0.138 0.008 0.122 0.125 0.013 0.122 0.133 0.008 0.122 6.IK 0.015 0.122 --------- 0-126 -0.010 --PrIZZ 0.012 0.612 0.012 0.012 0.012 0.012 0.012 0.012 0.012 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.154 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.090 0.039 0.039 0.039 0.039 0.939 0.039 0.039 0.839 0.039 000006^ ' QIC RC DA1A JtlLT 1010 V;. TOTAL DATA POUTS- 102.00 ms 5.54 mtiiHiimtitiniuiiiiiititnmtmmmmtnmmmmimntimmmmmu m CAR LOADED mm mm CORREKT noisiest RANK X BAR ROAR UCL X LCL X UCL R ummmmtmmmmmtms turns timm smmt ttsttm tuttttt mtnu 39 4139? 30 44439 0.113 0.190 0.012 0.004 0.122 0.122 0.012 0.012 0.154 0.154 0.090 0.090 0.039 0.039 30 44314 31 44333 31 44944 0.123 0.120 0.113 .0.013 0.003 0.00? 0.122 0.122 0.122 0.012 0.012 0.012 0.154 ..0,090 0.154 0.090 0.154 0.090 0.039 0.039 0.039 31 44341 31 44341 31 444?1 0.110 0.120 0.123 0.005 0.003 0.005 0.122 0.122 0.122 0.012 0.012 0.012 0.154 0.154 0.154 0.090 0.090 0.090 0.039 0.039 0.039 /' l I OOOOOb^1 CCft TM RU 140* OKC PVC SHIPMENTS (X CHART) JULY 1990 10 CCR 000006* OKC PVC SHIPMENTS (R CHART) JULY 1990 % THRU 140 c mtmmmmmmmtmvmmmmmCTmmmmsmummmmmnmm OK RC mu. JULY 1190 - TOTAL GAIA POUTS: 102.00 ' CPI =';; ~-'r. .is. DATE CAR X THRU ROVING CURREII LOAOtfi mm 140 RANGE X OAR ROAR MIX UU tfCL ft tmmmmimitnmmmmn mtm tmmi nnitti titmtt tttmss :nmm ---- 1 41400 5.80 1.76 0.84 8.19 4.52 -2,74 1 43130 7.00 1.20 6.76 0.84 8.99 4.52 1.74 1 46S08 1.20 -1.26 - 1.76 -6.84 - 8.99 -4.52 --2.74 -- 1 46586 1.00 0.20 6.76 0.84 M9 4.52 2.74 1 46383 6.00 2.00 6.76 0.84 8.99 4.52 2.74 2 42181 -1.40 0.40 -6.71 -6.84 - 0.99 --4.52 - 2.74 - - 2 4(318 ' 6.60 0.20 6.76 0.84 8.99 4.52 2.74 2 46413 6.20 0.40 6.76 0.84 1.19 4.52 2.14 3 4S886 -------?. 0.00 6.76 -- 1.84 8.99 4.52 --1.74 - 3 44296 3 43108 6.80 0.20 6.76 0.84 9.99 4.52 2.74 7.00 0.20 6.76 8.84 8.99 4.52 2.74 3 4S1S0 4 42112 4 44141 --J.H 6.00 6.76 0.84 * 1.19 --4.52 --2.74 9.00 2.00 6.76~ 8.84 " 0.11 4.52 2.74 7.20 1.80 1.76 0.84 8.99 4.52 2.74 5 73402 $ 4163S 3 46S01 7.20 0.00 6.76 0.84 1.19 4.52 1.74 6.20 1.00 6.76 0.84 8.19 4.52 2.74 5.10 0.60 6.76 0.84 2.99 4.52 2.74 5 13396 0.20 -0.60 6.76 1.84 8.19 -4.52 r 2.74 - 5 16408 7.40 1.20 6.76 8.84 9.99 4.52 2.74 6 4(410 3 4(462 3 48054 6.20 1.20 f.7l 0.84 8.11 4.52 2.74 6.00 0.20 6.76 --1.84 8.99 -4.52 - 1.74 7,00 1.00 6.76 0.84 8.99 4.52 2.74 f 48076 6 43)37 7 46390 1 447S6 7 '46540 1 42121 8 4805S 8 13392 5.00 1.20 6.76 0.84 8.99 4.52 2.74 6.80 t.00 6.76 0.84 8.99 4.52 2.74 6.60 0.20 (.16 8.84 8.99 4.52 2.74 6.40 0.20 6.76 0.84 8.99 4.52 2.74 6.60 0.20 (.76 0.14 - 8.91 4.52 -2.74 5.60 1.00 f.76 0.84 1.99 4.52 2.74 6.60 1.00 6.76 0.84 8.99 4.52 2.74 7.46 0.80 6.76 0.84 9.99 4.52 2.74 8 46529 i 46392 9 13m f 46498 n 43857 14 46511 5.4Q 2.00 6.76 0.84 8.99 4.52 2.74 6.40 1.00 6.76 0.84 8.19 4.52 2.74 6.26 Q.2Q 6.76 6.84 8.99 4.52 2.14 6.20 0.00 6.76 0.84 8.99 4.52 2.74 6.60 0.40 6.76 Q.84 8.99 4.52 2.74 6.26 0.40 6.76 0.84 8.99 4.52 2.74 14 46518 5.40 0.80 6.76 0.84 8.99 4.52 2.74 14 46404 14 41189 5.40 0.00 6.76 0.84 8.99 4.52 2.74 4.80 0.60 6.76 0.84 8.99 4.52 2.74 u 447SS 6.00 1.20 6.76 0.84 0.19 4.52 2.74 IS 45154 IS 46546 7.60 1.60 6.76 0.84 8.99 4.52 2.74 5.80 1.80 6.76 0.84 8.99 4.52 2.74 IS 73411 IS 43743 11 46515 6.00 0.20 (.76 0.84 8.91 4.52 2.74 9.20 3.20 6.16 0.84 8.99 4,52 2.14 7.80 1.40 6.76 0.84 8.99 4.52 2.74 IS 46518 6.80 1.00 6.76 0.84 8.99 4.52 2.74 16 46491 1.80 1.00 6.16 0.84 8.99 4.52 2.74 CCR 000006443 OURCDAU Ml 1190 .. TOTAL Oil* WlllS: 102.09 ninmiittininiiinnwtutmitrnimmnmmmroimnnnmwntmmw OAU CAR S THRU ROVlftO CURRENT LOADED MM 140 RAISE X OAR ROAR IfCl X ItlX tfCL R mmimmmmmtnmmim mttn mxmi mtmi tmtm mum.mmn 11 73317 7.00 0.80 0.71 0.94 8.81 4.52 2.74 19 42249 It 49464 7.20 0.20 9.79 M4 8.00 4.52 2.74 _____3.20 _o.oo ...Ml-. -- 0.84. _ -0.10 --4.52 - 2.74 17 73390 7.26 t.oo 9.79 0.04 0.09 4.52 2.74 17 73393 7.60 0.90 9.79 0.04 O.lt 4.52 2.74 _17 . J3394 17 73391 . 7.60 . 0.00 ' 7.00 0.80 9.19 . 0.04 ___l.lt ___M2 __2.74 9.76 0.04 0.91 4.52 - 2.74 It 44790 It 49394 7.00 0.00 1.40 . 0.90 1.71 0.84 Ml 9.79 - 0*84 jj.11 4.52 ' 2.14 4.52--- 2.74 .. It It -.11 73410 73401 -U37U 7.40 1.00 6.40 1.00 ----------- JJW ..-jjo (.71 9.79 -9J6 0.94 8.19 4.52 0.04 0.10 4.52 - 0.04 __J.I1 --M2 2.74 2.74 _ 2.74 It 49701 It 41142 It 73403 1.90 0.00 9.76 0.84 '8.00 M2 2.74 9.20 0.40 9.79 0.04 l.lt 4.52 2.74 9.20 0.00 9.79 0.04 --4.01 --4.52 2.74. 19 92472 It 46476 9.60 0.40 6.79 0.84 Ml 4.52 2.74 6.60 0.20 9.79 0.04 MO 4.52 2.74 -IS 73403 -------------9.20 0.90 MJ9 1.04;_M9 -,0.52..--2J4 - 20 43749 23 41997 6.40 0.20 4.76 0.04 MO . 4.52 2.74 1.40 2.00 1.76 0.84 M0 4.52 2.74 23 46930 23 49716 24 43699 1.10 0.90 4.76 0.04 M0 4.52 2.74 9.40 1.40 1.76 0.04 Ml 4.52 2.74 6.20 1.60 6.76 0.84 1.91 4.52 2.74 24 46401 29 49472 7.40 0.00 6.16 0.04 8.99 4.52 2.74 9.60 0.90 9.74 0.04 1.19 4.52 2.14 29 49907 1.20 6.40 9.79 0.84 M0 4.52 2.74 29 49930 29 41649 29 4794 21 49464 29 46903 29 49469 29 42097 9.90 1.90 9.79 0.84 0.99 4.52 2.74 7.00 1.20 6.76 0.84 M0 4.52 2.74 9.20 1.90 1.76 0.04 8.99 4.52 2.74 9.20 0.00 6.76 0.04 0.99 4.52 2.74 6.21 0.00 6.7$ 0.84 M9 4.52 2.74 1.00 2.00 6.76 0.04 M9 4.52 2.74 9.60 2.20 4.76 0.04 M9 4.52 2.74 2? 46947 9.00 0.80 6.79 0.04 M9 4.52 2.71 27 46497 7.20 1.20 1.79 0.04 M9 4.52 2.74 27 46463 9.00 1.20 9.79 0.04 MS 4.52 2.74 27 47611 21 42161 9.40 0.40 6.76 0.84 M9 4.52 2.74 7.20 1.00 4.76 0.84 M9 4.52 2.74 26 46049 21 41609 26 46470 26 46091 29 46469 29 48031 29 46030 30 41406 9.90 0.60 9.79 0.04 8.99 4.52 2.74 9.60 0.00 9.79 0.04 8.99 4.52 2.74 7.00 1.20 6.79 0.04 0.99 4.52 2.74 7.20 0.20 9.76 0.04 M9 4.52 2.74 7.40 0.20 6.79 0.04 0.99 4.52 2.74 7.20 0.20 9.76 0.84 8.99 4.52 2.74 9.90 M0 9.76 0.84 8.99 4.62 2.14 9.80 1.20 6.79 0.84 M9 4.52 2.74 CCR 000006^44 OKC RC DMA JULY 1199 TOTAL DATA POINTS: 102.00 CPI : 5.13 mwmmmummimnnimmintmnummiimimmnmiiimmumm DATE CAR I THRO ROYlNO CURRENT LOADED NUJI0EK 140 RAIGE X OAR ROAR IICLX LCt X UCt R iittmmmmmmmmmmt tmstt mmu nuttu mum mum mum 30 413!/ M0 1.20 (./< 0.04 Ml 4.52 2.T4 30 41451 30 4(514 9.40 2.(0 I.II 0.04 1.0! 4.52 2.74 T.40 2.00 O.H 0.04 0.0! 4.52 2.74 31 41533 31 4(544 5.00 1.(0 Ml 0.04 I.!! 4.52 2.74 (.00 1.00 (./( 0.04 0.!! 4.52 2.14 31 4(501 5.40 1.40 Ml 0.04 - 0.!! -4.52 2.74 31 4(551 ' (.20 0.00 l./l 0.04 M! 4.52 2.74 31 4(4/1 (.20 0.00 Ml 0.04 1.09 4.52 2.74 ooooo> 44* cc* OKC PVC SHIPMENTS (X CHART) JULY 1990 X ON PAN CUSTOMER OKC PVC SHIPMENTS (R CHART) ------------ JULY 1990 rarcmun* CCR 000006446 OkC ftC DATA JULY 1990 101AL 6ATA NlM$s 162.6Q immmmmmimmtmmmuummmmtmmnmttmtmtummmmi m car l OK CURRUJ LOADtil iwfitk PAR RAWfc X RAH ft KAR UCL X uu UCL ft ummmmmmmttmnmu tuim txtttttt tttttttx rttmrt mtmi mnrct 1 4(400 2.2 2.31 0.21 3.09 1*54 0.96 1 *3730 l mt 1 41596 1 44393 - 2 42181 2 41391 2 41473 3 45889 3 44294 3 43708 2.4 0.20 2.31 0.21 3.09 1.54 0.16 --2.8 0.40 - 2.31 ~l.ll - 3.01 - 1.54 . 1,95 2.4 0.40 2.31 0.21 3.09 1.54 0.95 2.2 0.20 2.31 0.21 3.61 1.54 0.96 - - 2.2 0.00 -2.31 . 0.29 3.09 - -1.54 -- 0.95 ` 2.1 0.40 2.31 1.29 3.69 1.54 Mb 2.0 1.80 2.31 1.29 3.69 1.54 1.96 2.4 1.40 . 2.31 - 0.29 --3.61 --1.54 - -1.95 2.4 0.00 2.31 0.29 3.09 1.54 9.95 2.4 1.00 2.31 0.29 3.09 1.54 0.96 3 -46750 4 42172 ... 2.8 3.0 0.20 -4.31. 0.40 2.31 0.29------3.19 --1.54 --1.15 0.29 "3.01 1.54 1.95 4 4747 3 73402 2.8 0.40 2.31 0.29 3.69 1.54 M5 2.8 0.00 -2.31 0.29 3.61 - U54 8.95 & 4143b 2.2 1.40 2.31 0.29 3.09 1.54 1.95 & 4tb01 2.2 0.00 2.31 0.29 3.09 1.54 0.95 33 73394 ------------:--2.4 -0.20 ---2.31 - -- M8 ^-M8 74408 2.8 1.20 2.31 0.29 3.09 t 44410 2.2 0.40 2.31 1.29 3.09 i 44442 2.0 0.20 2.31 0.21 -3.09 ---1.95 1.14 1.95 1.54 6.95 1.54 6.95 4 480b4 i 4074 2.2 0.20 2.3! 0.29 3.09 1.54 0.95 2.4 0.20 2.31 0.29 3.09 1.54 8.95 1 43737 2.4 0.00 2.31 0.29 . 3.09 1.54 -0.95 1 4390 2.4 1.00 2.31 0.29 3.01 1.54 9.95 1 47b4 2.2 0.20 2.31 0.29 3.09 1.54 9.95 1 4b40 2.2 0.00 2.31 0.21 3.99 -1.54 0.95 8 42121 2.0 0.20 2.31 0.29 3.09 1.54 0.95 1 40bb 2.4 0.40 2.31 0.29 3.09 1.54 8.95 4 73392 2.1 0.40 2.31 0.29 3.09 1.54 0.95 8 4b29 1.8 1.00 2.31 0.29 3.09 1.54 9.95 8 44392 4 73404 2.2 0.40 2.31 0.29 3.09 1.54 Mb e.oo2.2 2.31 0.29 3.01 U4 0.95 1 44498 12 43867 2.2 0.00 2.31 0.29 3.09 1.54 0.96 2.2 0.00 2.31 0.29 3.69 1.54 9.95 U 4677 2.0 0.20 2.31 0.2! 3.09 1.54 0.95 14 44518 M 0.20 2.31 0.29 3.09 1.54 0.95 14 44404 2.0 0.20 2.31 0.29 3.09 1.54 0.95 H 41189 U 44766 2.0 0.00 2.31 0.29 3.09 1.54 0.95 2.0 0.00 2.31 0.29 3.09 1.54 0.96 1b 46)64 2.4 0.40 2.31 0.29 3.09 1.54 0.95 1b 44644 1b 73411 1.8 0.60 2.31 0.29 3.09 1.54 9.95 1.8 0.00 2.31 0.29 3.09 1.54 0.95 1b 43743 3.4 1.60 2.31 0.29 3.09 1.54 0.95 14 46516 2.1 0.80 2.31 0.29 3.09 1.64 0.96 11 46i/8 2.2 0.40 2.31 0.29 3.09 1.54 0.95 _____1L--46491 ____________Li_ 0.40 --UL 0.29 3.09 1.64 0.95 CCR 000006447 mmummmmmmimmmnmnmmmmmmmummmmmifmm QIC DC OAIA my mo TOUl DAIA POUTS: 102.00 m CAR 101 CtffiREftT IQADEfl DIME* pad RADGE XIAJI 8 BAR DUX ULX DCL* ntmmtmmtitmtmmmm mmt tmmt mum mum uuuu mum It 11 It IT 11 1? 17 10 10 10 IS -10 19 It mti 42249 46404 11116 13393 13394 11391 44100 46394 134)6 1340! 43111 40701 41942 2.4 2.4 -----------8.4 2.6 2.2 - - 2.0 ! 2.6 - - 2.2 M 2.2 -* -- '**" 2.2 U0 0.09 - 9.00 6.26 9.40 0.(9 6.60 0.40 MO 0.46 0.40 - 9.29 0.20 9.00 2.31 0.29 3.09 - 1.S4 M5 2.31 1.29 3.69 1.64 9.95 2.31 9.29 -1.99 --t.54- - 9.95 2.31 0.21 3.06 1.64 M5 2.31 9.29 3.09 1.64 9.95 -2.31 9.29 --Ml -9.64 - 1.95 2.31 9.29 3.01 - t.54 1.15 2.31 1.29 3.69 r 1.54 M5 - 2.31 - 1.21 -- 3.M -t.54 - ' 0.95 2.31 0.29 3.09 1.54 0.95 2.31 0.29 3.09 1.54 6.95 -2.31_ - 6.21 --3.01 --1:54 -MS 2.31 0.29 " 3.09 1.54 M5 2.31 9.29 3.61 : 1.54 6.95 It 13403 11 02472 0.20 2.31 9.29 - 3.69 --1.54 - 6.95 2.2 0.20 2.31 0.29 3.01 1.54 0.95 19 4(476 It 73403 20 43749 21 41097 23 4(030 21 467K 24 43699 24 4(401 20 4(412 21 4(007 20 4(030 20 41(40 20 44704 26 414(4 26 4(003 26 46460 26 42007 21 46047 li 4(407 21 464(3 21 4K1S 20 42IJ1 28 40040 20 41(00 20 4(410 20 40001 29 4(480 20 48031 29 40030 30 41406 30 46480 2.2 1.00 2.31 0.21 3.69 1.54 -------- -1.21 - Ml -6.21 --3.69--r-U4 2.2 9.20 2.31 6.29 3.69 1.54 9.40 2.31 9.29 " 3.0* 1.54 2.( 9.00 2.31 - 6.21 -3.69 --1.54 2.2 6.40 2.31 0.29 3.69 1.54 3.0 0.00 2.31 0.29 3.09 1.54 2.4 6.(9 2.31 9.29 - 3.09 - 1.64 2.2 6.29 2.31 9.29 3.09 1.54 2.4 6.26 2.31 1.2t 3.69 1.54 6.66 2.31 1.21 - 3.09 H.64 2.4 6.00 2.31 0.29 3.69 1.54 2.2 0.20 2.31 0.29 3.09 1.54 2.2 0.06 2.31 9.21 3.09 1.54 2.2 6.00 2.31 0.29 3.09 1.64 3.2 1.60 2.31 0.21 3.09 1.54 2.2 1.00 2.31 9.29 3.69 1.54 1.0 6.40 2.31 0.29 3.09 1.54 2.4 6.60 2.31 0.29 3.09 1.54 2.9 0.46 2.31 6.29 3.09 1.54 2.2 0.20 2.31 6.29 3.06 1.54 2.4 0.20 2.31 0.29 3.09 1.54 2.0 0.40 2.31 0.29 3.09 1.54 2.0 0.00 2.31 6.29 3.09 1.54 2.4 0.40 2.31 0.29 3.09 t.5< 2.0 0.40 2.31 6.29 3.09 1.54 2.4 0.40 2.31 0.29 3.09 1.54 2.4 0.00 2.31 6.29 3.09 1.54 2.0 0.40 2.31 0.29 3.09 1.54 2.2 0.20 2.31 0.29 3.09 1.54 2.2 0,00 2.31 0.29 3.09 1.54 6.95 6.95 6.95 1.95 9.95 0.95 0.95 1.95 9.95 1.95 0.95 6.95 0.15 9.95 6.95 0.95 0.95 6.95 0.95 6.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 ooo644q r- v., c c c mnmtrammmimmmmmmimmtmmmmnnmmmRmnimimt otc rg data JULY mo ioul m mt$: 102.00 c r.. r-^.-3.41, DATE UR X ON CORKER! LOADED UMBER PM RARSfc A BAR R BAR IfCL X LCL A OCll mmmmmmmmtmmms limit tttttux mum tnttttt mum mum 11 4(39? 2.2 1.00 2.31 0.29 3.09 1.54 0.95 30 40460 3.4 1.20 2.31 0.29 3.09 1.54 0.95 . 30 41514 . 2.4 1.00 2.31 ... 0,29 3.09 _.^ii4 ___ 0.95 31 4(533 2.2 0.20 2.31 0.29 3.09 1.54 0.95 31 4(544 2.4 0.20 2.31 0.21 3,09 1.54 0.95 -- 31 4(5(1 . 31 4(551 2.2 . 0.20 2.0 0.20 2.31 2.31 0.20 _3.0f __ 1.S4 __ 0.95 ... 0.29 3.09 1.54 0.95 31 4(411 2.0 - 0.00 2.31 1.29 3.09 1.54 0.95 v. *9 (N d d ) WOAd OKC PVC SHIPMENTS (X CHART) JULY 1990 OKC PVC SHIPMENTS (R CHART) JULY 1990 (N d d ) WOAd OIC DC DATA JULl mo _ :Vv - _> " - *' TOIAL DATA POUTS: 102.00 ^2.21 mmummmnnmnnnnnmnHmmmtmmnttmmmummm DATE CAR CURRENT LOADED mm m mi X OAR R OAR KCL X ICL1 KCL R tmtmtmmummiumumt ratstt tttnm ttmra mwtt mttm mum 1 4400 1 43730 1.70 1.05 0.19 1.36 1.34 1.12 O.lfi (.20 9.05 0.19 1.3* 0.34 1.62 1 41309 1 4(306 1 46393 0.00 0.39 - 9.96 9.19 --Ml --9.34 -M2 0.90 0.30 0.05 0.19 1.36 9.34 M2 0.50 0.40 0.05 0.19 1.36 0.34 0.(2 2 2 2 -a 3 3 42111 44399 4(473 430(9 44296 mt * 0.(0 N 0.40 1.50 0.50 0.50 0.00 0.10 -1.05 - 0.19 --1.H -tM4 -M2 9.20 1.05 9.11 Ml 1.(2 0.10 1.05 0.19 1.36 1.34 M2 0.00 -6.15 - 0.19 1.31 "0.34 -- M2 0.00 0.05 0.19 1.3( 0.34 0.(2 0.30 0.05 0.19 1.36 0.34 0.(2 - 3 43730 4 42172 0.50 0.30 - 0.(6 0.11 *"0.34"--M2 (.70 0.20 0.(6 0.19 1.36 ' 0.34 0.(2 4 4474? $ 73402 5 41(33 & 4301 6 73396 - A 7(406 1 4(410 1 4(4(2 0.70 0.00 0.06 0.19 1.36 1.34 M2 0.(0 0.10 - 0.06 0.19 --1.3* --0.34 --M2 MO 0.00 0.06 0.19 1.36 1.34 M2 (.70 0.10 0.06 0.19 1.36 0.34 0.(2 0.70 - 0.00 - 0.06 - 1.19 --1.30 -r-9.84 -- M2 0.70 0.00 0.06 0.19 1.36 1.34 M2 (.60 0.10 0.06 0.19 1.36 0.34 M2 0.(0 0.00 MS 0.1* - Ml -0.34 ~ 0.(2 40034 4 40076 4 43737 0.70 0.10 0.05 . 1.19 M( 0.34 M2 (.60 0.10 0.(5 e.ti 1.36 0.34 M2 0.70 0.10 1.05 mi US 1.34 -M2 1 4(390 T 44756 7 41340 1 42121 8 40055 (.60 1.10 0.15 0.11 M( 1.34 0.(2 1.(0 0.00 M5 0.19 M( 0.34 M2 0.70 MO 0.16 -0.19 1.36 9.34 M2 1.10 0.40 0.05 0.11 1.36 0.34 M2 0.90 0.20 0.85 0.19 1.38 1.34 0.(2 8 73392 8 4529 1 4392 9 73406 9 4(490 12 43037 0.60 0.49 9.15 0.19 Ml 9.34 1.12 1.10 0.60 0.05 0.19 1.36 0.34 0.12 0.79 0.31 0.06 0.1! 1.36 0.34 0.12 0.(9 0.10 0.85 0.19 1.36 0.34 0.(2 1.26 9.37 9.85 9.19 Ml 9.34 0.(2 0.00 0.4 0.(5 0.19 1.36 0.34 0.62 14 4(317 1.30 0.50 0.05 0.19 1.36 0.34 0.62 14 4510 U 4404 u 41109 1.00 0.30 0.15 0.19 1.36 0.34 0.62 1.00 0.00 0.05 0.19 Ml 0.34 0.62 0.90 0.10 0.83 0.19 Ml 0.34 0.62 14 44755 15 43134 13 4(54 13 13411 13 43743 14 4515 16 465 iO 0.90 0.0Q 0.85 0.19 1.36 0.34 0.62 1.00 0.10 0.85 0.19 1.36 0.34 0.62 0.90 0.10 0.05 0.19 1.36 0.34 0.62 1.00 0.10 0.(5 0.19 1.36 0.34 0.62 0.70 0.30 0.05 0.19 1.36 0.34 0.(2 0.40 0.30 Q.85 0.19 1.36 0.34 0.62 0.40 0.00 0.(5 0.19 M6 0.34 0.62 H 46491 0.60 0.20 0.(3 0.19 M6 0.34 0.62 CCR 000006451 OAU UR CURRENT LOADED mm JtVCH RANGE X DAK R UR 0CI X ICl A UCl I ummtmmmmmmmimi mmi timmjtumt itmmnRrm mtmt 1$ 72317 0.10 0.00 0.15 0.18 1.31 -.34 142 11 42241 MO M0 1.8b 0.11 1.31 1.34 M2 -11 44484 _ _ _ _ ` 8.60 -0.30 _Mi ...0.11 - -1.31 -- 1.34 --M2 IT mio 8.10 0.00 Mb 0.19 1.36 0.34 1.12 1? 72393 0.60 0.00 0.8b 0.19 Ml 0.34 0.12 . IT _ 13394 IT 72311 . .... .0.60 . -0.00 _0.I5. - _0.19 ___ L31 - 0.34 ---M2 . \ MO 0.00 0.8b 0.19 Ml 0.34 0.62 U 44710 O.bt 0.10 0.8b 0.11 '1.3! 0.34 0.12 - . It 44314 ..... 8.50 - 0.00 ---1.85..... 1.19 --4J1 --10.34 10.12 .. It 73410 0.50 0.00 0.85 0.19 1.31 0.34 M2 IB 73401 0.50 0.00 0.15 0.19 Ml 0.34 0.12 .11 43717_____ --^0.10 0.10 --0.85 _f.1l _UI --J134 M2-- It 44701 0.10 0.30 0.85 Ml " 1.31 0.34 1.62 11 41142 0.50 0.40 8.85 Ml Ml 1.34 M2 11 13403 . 0.80 0.30 . . 0.85 - Ml . 1.31 -0.34 -- 0.12 11 52472 1.70 0.10 0.8b 0.19 1.31 0.34 0.12 1$ 44471 0.10 0.10 0.8b Ml Ml 0.34 0.12 11 -J3403-- ------- 0.80 --,-MO ..-045. -- 0.41 --441 -044 20 43741 21 41517 0.00 0.00 Mb Ml Ml 0.34 0.12 0.70 0.10 :04b -Ml Ml 0.34 0.12 22 44538 1.00 0.30 - 0.8b 0.19 1.38 0.34 -M2 - 22 45714 1.00 0.60 0.85 Ml Mi 0.34 0.12 24 43199 1.10 0.10 0.8b 0.11 1.36 0.34 0.62 24 44401 0.90 0.20 0.8b -0.11 Ml 044 0.62 ( 2b 44472 0.10 0.10 0.1b 0.11 1.31 044 M2 2b 41501 0.80 0.00 0.8b 0.11 Mi 044 M2 2b 44530 1.40 0.10 0.8b - Ml .... 1.31 044 0.12 -- 2b 41145 1.30 0.10 O.tb 0.1! Ml 0.34 0.12 2b 44/54 1. TO 0.20 Mb Ml Ml 044 0.12 21 44414 0.74 0.31 0.85 Ml Ml 144 M2 21 44503 1.53 0.71 0.15 0.1! Ml 0.34 0.12 21 41445 0.41 1.12 0.05 0.11 Ml 9.34 0.12 21 420b? 1.11 0.78 0.85 -0.11 Ml 0.34 042 27 41547 1.06 0.13 0.85 0.19 Ml 044 042 21 41451 0.88 0.18 0.85 0.19 Ml 044 042 27 444(3 1.00 0.12 0.85 0.11 Mi 044 042 27 41118 0.95 0.05 0.85 0.19 Mi 044 042 21 42181 1.01 0.11 0.85 0.11 1.36 044 042 21 4804b 0.08 0.18 0.85 0.19 1.31 0.34 042 28 4110b 1.00 0.12 0.85 0.19 1.31 0.34 042 28 41410 2t 48051 29 44484 21 48031 0.15 0.05 0.85 0.19 1.31 0.34 042 0.93 0.02 0.85 0.19 1.31 044 042 1.14 0.21 0.85 0.19 Mi 0.34 042 1.88 0.74 0.85 0.10 1.36 0.34 042 CCR 0006452 29 48030 2.00 0.12 0.85 0.19 1.31 044 042 10 41401 10 46480 1.20 0.80 0.85 0.19 1.31 0.34 0.12 1.10 0.10 0.8b 0.19 Ml 0.34 042 01C RC DATA JULY 1660 TOTAL DATA POUTS: 102.06 tittttttutttnntiuitttttttnnttttttiRiutttuitiutiunitnutmnnttttutntttn .........- - DATE CAR C0RREIT ' IQAOfcB UMBER men RAKE X BAR R IAR 0CL X LCL X ttLR -- ummmimmttmmmmm mm* rntnu nmm ttnnn mmn ttttxut r -- ( 10 4636? JO mi 16 mu 31 48*33 31 mu 31 48581 31 48551 31 48411 6.60 1.26 1.36 1.56 1.16 1.16 1.16 1.30 1.20 Mi 6.36 6.85 6.16 "0.65 6.20 6.15 0.40 0.85 6.66 - 6.65 0.60 6.85 0.20 0.85 6.11 6.16 -0.16 0.16 0.11 6.16 6.16 6.16 1.36 1.36 1.31 1.36 1.36 - 1.36 1.36 1.36 6.34 0.34 0.34 0.34 0.34 - 0.34 0.34 0.34 0.62 0.62 0.62 6.62 0.62 0.62 0.82 0.62 f ( l I ( 000006^53 cc*