Document RpVVbdok7G1jQem713v73O18z
SUITB 2300. ONE WALL STREET, NEW YORK, N. Y. 10003
f. VTXMAizx, mxaxxr
UaM tom Himnl
a. 1 iiNOn. via
KJ-ukw.iAv.iQttMxi.oHUj.i.iiyeuTAi H, l. UVTNI.TltAjmn
January 11, 1967
To: J. P. Verhalen A. E. Binge r J. H* Wittkop H. L. Levine J. Boyer F. Stumpf
J. O'Rourke L. C. Jenne H. Wilson R. Toth S. Milfcr John Baer
Gentlemen:
%n f 1 7>*f -Cc
' / ,-7
//^/6V/ er"'
/
Attached hereto you will find recommended draft of specifications for sprayed mineral fiber as prepared by the Technical Committee.
Very truly yours,
PLAINTIFFS EXHIBIT
USM-247
iJ.
G^ygua
JanaiTy 5, 1967 SSCOKP DRJUT
SP3SI7ICATIOH FOR SPRAYS) HDCTA1 71351
fireproofing Treatnent Acoustical Trntawt Themal Insulation Trsatasnt
Scope - This section shall include naterials, equijaent aM labor for the installs-
tlon of spraysd ninsral flbsr la accordance with specifications and drawings*
Contractor - Ths contractor shall bs approved by the aarnifaeturar of ths spraysd
ninexul flbsr. Ths contractor shall use materials and equipaent approved by ths naau-
factursr and shall execute all work in accordance with nanufactursr's instructions*
Product Cospliaacs - Ths nanufactursr of ths spraysd ninsral fibsr shall provide
data to indicats eonfozsity with specification rsquireaents to authorltlss having juris
diction.
KJLTSP.IA1S
Adhesive - When'required ths adhesirs shall bs approved by the sprayed ninsral
fiber nanufaeturer*
r-
Plber - Ths spraysd nintzal fiber shall be a factory blend of fiber and binders in
/ accordance vith proprietary requirements of ths saaufactursr, and shall bs delivered
to ths job sits in sealed and properly identified bags*
-continued-
Cf
' srccao DHAFT
L
____
7^
Jasuajy 5, 1967
'!
HlTSPlALS - eontiaied
Sealer - When required the sealer shall b approved by the sprayed mineral fiber
manufacturer*
~INSTALLATION
Vork of othera - The general contractor shall proride adequate electric power,
4
weter, ventilation, light cad heat, ill clips, header ta.be,, piceter rings, sleeves,
supports cad other attaehsents to the base surface ere to be installed before work proceeds*
Sasination of surface - The contractor shall exezine all surfaces which ere to b*
treated with sprayed mineral fiber cad report la writing to the general contractor cay
conditions which might impair proper iastcllctloa cad adhesion* Application shall not
proceed until unsatisfactory conditions are corrected*
Job cordjtio-a - Application shall be started only after the contractor is satis
fied that surface and weather conditions are acceptable* Freezing weather applications
shall follow the epreyed mineral fiber manufacturer's reccnnerdations.
Application - The surface shall be vetted with water or cdhesire as recomaecded by
the epreyed mineral fiber manufacturer* The fiber shall then be sprayed to the vet sur
face to the desired thiclmess* Applied fiber may be left uatanped or taaped as per the
sprayed mineral fiber manufacturer's recommendations*
-conticued-
* - T% * - **
> *<*
5EC0HD CUT? PSTJOUglCTr - continued
->
January 5, 1967
Application - contl raied
Th* finished thicixeee shall be soufficient to provide for fireproofing _____ hours of firs resistance
Acoustic*
Hoi** Reduction Coefficient
Thermal Insulation
. Resistance (R 7alu*)
Tha surface 1* than *pr*7*d with vater or **al*r a* r*oosa*nd*d by th*
sprayed mineral fiber manufacturer*
Cleanup - After cospl*tion of vork th* contractor shall sweep clean all adjoining
vails and floors upon which fiber has been deposited*
/
*.
-rr-T