Document RpRmOdz92EYp9VLNL3pyk3xdz

JO 3 ENGINEERING BULLETW PITTSBURGH PLATE GLASS COMPANY CHEMICAL DIVISION LAKE CHARLES, LOUISIANA BULLETIN NO_____________ 211=11 DATE . -June.. 7->_1967- charge P-UQ4-2762 This bulletin is issued to release to FJRCHASIRG three (3) prints each of the below listed drawings and bill of material, and scope of work. lOA-1165.3 lQA-1176.2 IQA-H80 10A.-I181 B/M IOA.-H65, Sheets 1 through 5 and Addendum , Sheet 1 Scope of Work These prints are to be used in connect!an with Inquiry 6-102-M to Augenstien Construction Co. for installation of meter runs to Stauffer. Reference: Inquiry 6-102-M distribution WOR-tS MGR. ENG, SUPT. CHI I F CON. ENG. PUR.'-HAS S, ORA -t'g. RM. FI El o EngR. ENG. RECORD SERVICE DEPT. CH, ELEC, ENGR. Ch mrpagne KeT-'ey P-loU Inq. File Bui: .etin File BULLETIN PRINTS BM v-5 Scope WorS 3 1 1r 1 j BB 0011877*7 ) ENGINEERING DEPARTMENT SCOPE OF WORK DESCRIPTION OF WORK A. Piping 1. The contractor shall install, test and prepare for operations all of the piping shown on the drawings and/or listed on the hills of material, in accordance with the specifications and drawings. 2. Piping supports, hangers, clamps, shoes and other integral items shall he fabricated and installed where required whether or not shown on the drawings. Dig and prepare all trenches for pipe lines underground. 3. Tie into the new 12" line running underground from PPG. Reduce line to 10" and install necessary 10" piping to install two 30' meter runs and appropriate hy-passes for these runs as shown on Drawings 10A-1165-2 and lOA-1176.2. < B. Instrumentation 1. Install two 30' meter runs in the locations as shown on Drawings IOA-H65 and 10A-1176-.2. 2. Install two (2) dp Cells and one (l) pressure transmitter on each meter run. This is to include running all air lines to these instruments and all instrument lines between these and the meter house, as shewn on Drawing 10A.-ll65*2. 3. Install two (2) flow recorders and one (l) pressure and One (l) temperate recorder in the meter house. Tie all instrument lines coming into the mi house to these recorders as shown 01 Drawing IQA-II80. C. Foundations 1. Install the necessary foundations for the pipe supports on the 10" line as shown on Drawing 1QA-1176.2. 2. Install four (4) footings for the meter house and the foundation for the meter hoard in this meter house as /Shown on Drawing 1QA-1180. D. Structural 1. Place meter house and meter hoard on foundations provided for these as shown on Drawing 10A-1180. (Meter house steel framework and meter hoai will he fabricated hy other.) 2. Place siding on meter house framwork as shown on Drawing 10A-1180. E. Painting 1. Contractor shall clean and paint alL the work installed under this scope of work in accordance with owner's specification No. DES-P-404-I ? Scope of Work (Continued) -2- BULLETIN NO. f/'M _____ Painting (Continued) DES-P-404-PCB and DES-P-404-FC-C, in Being the intention of these specifications that all facilities Be cleaned and painted whether or not they are specifically mentioned therein. 2. Galvanized pipe supports shall not he painted. 3- All surfaces which are to he insulated shall he blasted and primed only. P. Insulation All 10" lines to he insulated according to PPG Specification INS-A. Notation D:2 and 1: ABCD. This shall include insulating both meter runs and small portion of 12" line from ground to reducer fitting.