Document RpKxZe6ky5v4zB2e3eNpQxjyk
To: T. H. Huffman
(nttroffka Communication
From: Date:
Subject:
D. C. Skokna July 23, 1992
ABERDEEN MONTHLY PHOGKESS REPORT
June, 1992
There were two first aid and one OSHA recordable injuries
reported in June.
The recordable injury (MTO) Involved a
Compound Operator who fell and sprained his wrist. At month
end, the plant's employees had worked 4744 days (6,359,937
employee hours) since the last lost time injury.
FY1992 Kev Statistical Information
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
Costs
June
37.1 91.8 98.1 1.0563
5.9 97.5
1.8 96.2
1.6 81.6 < 8.4> <207.4> <153.2>
Y.T.D.
329.1 85.5 97.0
1.0356 47.1 96.5 18.0 97.7 12.9 79.8
< 13.3> <567.0> <585.4>
The unfavorable efficiency variance is primarily due to above budget VCM consumption.
Fixed costs were above budget due to accruing all accounts for
the RWE year-end closing, a correction of a mis-accrual of the
May payroll,
trackmobile and
OSHA
Operations
PVC ran at full production during June. New agitator blades in D-745 resulted in improved 5385 resin quality and the batch size was increased by 5000 pounds.
VAB.0001189208
T. H. Huffman 07/23/92
Aberdeen Monthly Progress Report Page 2
- June,
1992
Operations - Continued
The flexible compound unit ran at high rates on Lines I and III. Rates on these lines increased some as fever product changes were taken as compared to previous months. Line V and the dry blend unit both operated with reduced staffing.
The plant received Southwire's Quality Supplier Award. Environmental
A meeting was held with MDEQ and EPA remediation activities at the plant. presentations, the EPA representative sampling was not needed.
to discuss progress on After listening to our indicated that further
We met with MDEQ to discuss progress in meeting the more stringent BOD limits contained in the 1993 NPDES permit. MDEQ requested a followup meeting this Fall.
Cleanout of Pond 2 continued with satisfactory progress being made.
D. C. Skokna Plant Superintendent
rah
VAB.0001189209
f
\
DISTRIBUTION Hous ton
J. D. Burns J. R. Ball
COVER LETTER X X
R. T. Ferrell
X
T. H. Huffman
C. J. Matson
H. R. Flammer
R. R. Smith
B. J. Bean
R. H. Gerlach
R. D. Gamblln
C. R. Miller
L. R. Kardos
M. J. SchneIder
Austin
R. L. Foe
X
H. J. Hall
Oklafrpma City
H. D. Garrison
LGVCM Plant
P. E. Markey
LCCP Plant
J. Friend
LCLAB Plant
J. V. Hare
X
Baltimore
L. R. Bauer
X
Hammond
J. Pavao
X
Premiere
P. L. Foote
Aberdeen RVS/DCS (File Copy), JBA, JEB, JME, SCH DAB, DAM , JEN, JDO, BLT
ENTIRE REPORT
X X X X X X X X X X
X X X X
A
VAB.0001189210
SAren - B. L. Trego
First Aid OSHA Recordable
Total Injuries
Number of Restricted Workday Cases Number of Lost Workday Cases
Injuries bv Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
Injuries bv Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
June
2 i 3
0 0
0 2
0
0 0 1 3
2 0 0 0 1 0 0 3
Fiscal Y.T.D. 1992
14 _4 18
2 0
Fiscal Y.T.D. 1991
11 _6 17
4 0
4 6
7
0 0
_1 18
9 0 4 1 3 1 Ji 18
Lost Workday Cases Days Lost
0 66
0 11 127
First Aid Cases Medical Treatment Cases Lost Workday Cases
Safety Record
034 00 1 00 1
Last lost time injury - 7/5/79
Days since -
4,744
Employee hours since - 6,359,937
On June 30, 1992, the employees of the Aberdeen plant completed 4,744 days with no lost time injury.
i
VAB.0001189211
safety - Continued
Annual first aid review was given to Lab Technicians during the month.
The June safety training topic was "Electrical Hazards" which culminated with employee involvement in a plant-wide electrical hazards survey.
Routine dosimetry results for the month were:
Chemical
> PEL__________
Number
Percent
VCH Lead Total Particulates
76 98.7
6 100.0
5 100.0
1 1 0
Both overexposures were with benefit of respiratory protection.
Monthly Injury Summary
Xnlurv Class FA
Department Process Engineering
FA Compound MT Compound
Description
Contusion of left shoulder; abrasion of left arm, left lower leg, and left side of forehead.
Abrasion and contusions of upper back, right mid-back, and forearm.
Strain of left wrist.
4-
VAB.0001189212
QUA~LXTY MAWACTMFHT PROCESS - E. E. Smith
The plant natural teams continue to meet on a regular basis. The Vinyl Department and support groups received the Southwire Quality Supplier Award for 1992. The Aberdeen Plant continues to work hard to obtain and maintain an "Excellent Supplier Award" rating from Southwire. No customer audits were conducted in June.
VAB.0001189213
1
*
cost VARTANCKS - D. C. Skokna
Variable Costs
Product
June. 1992 Variance. SM
Efficiency
Price
Total
PVC Flexible Compound Rigid Compound
Total
<$159.5> < 35.2>
6.5 35.0 <$153.2>
<$24.3>
< 11.7>
< 37.0>
14.5
<$58.5>
<$183.8>
< 46.9> < 30.5>
49.5
<$211.7>
PVC
VCM consumption was above the unfavorable variance. We believe it is due to accounting errors
not found before the submittal of the final IPA.
Flexible Compound Raw material use was above budget
Rigid Compound
Operations were essentially at budget Plasticizer
Raw material use was below budget.
Malor Price Variances:
Variance - SM
Debox Resin Credit PVC Reactor Initiators Electricity Phthalic Anhydride Rigid Compound "BC" Grade Credit Resin to Rigid Compound Natural Gas Resin to Flexible Compound VCM Other Price Variances
Total
$45.6
21.1
17.6
12.2
< 13.1>
< 18.7> < 26.3>
< 37.1> < 76.9> ____17.1 <$58.5>
Fixed Cost Variances
Payroll and Benefits MM&C Miscellaneous
TI&D
Clearances
Variance - $M
Total
<$ 69.6> < 50.2> < 83.3>
< 8.3>
4^2 <$207.4>
VAB.0001189214
COST variances - Continued
Payroll & Benefits
Salaried payroll was $18.3M unfavorable due to above budget engineering staffing. Hourly payrolls were $50.2M unfavorable due primarily to not accurately accruing the Hay payroll and the overtime to cover a high number of people out on either leave of absences or long term illness.
MM&C
The $50.2M unfavorable variance is due primarily to accruing all work. In addition, there were approximately $20M of accruals related to the pond 2 cleanout that will be paid by Conoco in July.
m T&E - S12.4M Unfavorable - Accruals of current travel and costs associated with moving the Compound Customer Service Representa tive function to Aberdeen caused this unfavorable variance.
- Extensive repairs to the plant's trackmobile caused most of the unfavorable variance.
- Contract designers were brought in to document electrical equipment
labelling and VCSM documentation. We expect this category to be $50M favorable at year-end.
that were paid in June
This is due to two May
cars back to the plant so that the resin could be bagged.
Tlfrfi - This category was $8.3M unfavorable due to insurance ($4.2M unfavorable); FICA taxes <$16.2M unfavorable); and advalorem taxes ($2.5M unfavorable).
VAB.0001189215
VINYL - J. D. Olson, D. E. Knittig
The
The monthly safety meetings were held on shift led by the shift supervisor
General
1 Fluid bed dryer process changes have improved contamination
performance of the dryer since the installation of the
additional heating panels. progress.
We will continue to monitor its
2 New agitator blades were installed in D-745 to improve hard
particles and increase batch size. D-745 could only produce type IIIlIl 5385 due to hard particles but with the new blades produces type I resin. The batch size was increased by 5000 pounds per batch. Testing has not been completed to fully evaluate the benefit to low molecular weight resins.
June
- Production, MM Lbs. - Daily Rate, M Lbs./C.D.
- Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), % - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
37.1 1236.7
93.2 908.0
30.3 91.8 90.1 95.1 98.1
Reactor Downtime
Operational downtime (recovery scheduling conflicts, charge/rinse water conflicts, Q.C. data delays, dump conflicts, and no blend tank space).
YTD
329.1 1201.1
90.6 7868.0
28.7 85.5 90.8 89.6 97.0
Hours
353.0
Maintenance downtime (D-741 annual inspection, D-744 condenser cleaning, D-400 seal replace* ment, D-600 PVA ram valve, D-742 steam line, new module slurry pumps, D-742 condenser cleaning, D-700 rinse supply valve, D-745 agitator blade changeout, D-741 PM, D-742 PVA ram valve, D-742 jacket weld, D-400 jacket weld, and D-745 rinse nozzle).
236.0
k
VAB.0001189216
t
VINYL - Continued Dryer Time
% of Total Downtime
Operational downtime (centrifuge plugs, dryer cleaning, flameouts).
m Maintenance downtime (activator problems, centrifuge repair).
m Reactor limited production.
25.2
8.2
66.6
J. B. Autrey, S. A. Truitt
The fluid bed dryer pick heater was removed from service and rebuilt.
Reactor 741 gearbox PM schedule was completed.
Spray nozzle on reactor 700 was changed and reactor 745 was changed twice. Failure was due to no lubrication in the gear section.
The new test blades on the agitator were installed in reactor 745.
Reactors 742 and 744 were hydroblasted and agitator gearboxes were PM'd.
The old unit rinse pump was removed from service, sent to Gould's to be rebuilt, and re-installed. Normal wear due to some cavitation was reason for rebuilding.
Critical instrument PMs were completed on the following systems:
a. Reactor 400 b. Reactor 742 c. Reactor 744 d. Reactor 745 e. Dryer #1
Cooling tower 4B fan motor was removed from service to replace the bearings.
The east bio-disc blower motors were sent out for repair due to bad bearings.
VAB.0001189217
COMPOUND - S. C. Hillman J. B. Hegwood
b.
The Compound Department had one OSHA recordable Injury for the month. A Compound Operator Incurred a sprained wrist due to an accidental fall. The Compound Department also had a restricted work case during the month, but this was deemed a none work related accident and was not considered OSHA recordable.
General
>
Orders continue to be tight on Line I and Line III. Production for the month is up slightly from last month due to a decrease of downtime from product changes. Line V and Dryblend continue to operate a reduced staffing.
Operating
Line I
30
Line III
30
Line V
18
Total
% Prime
Capacity Utilization Factor
Production II (Lbs.3 MSOtil 4TC/Pt7 Fiscal Y.T.D.
1815 3554
528 5896 97.50 72.47
60 118
29 197
14116 29132
3815 47064 96.48 67.28
Downtime
Hours
Line I
- Product Changes - One Dicer Offline - Miscellaneous Maintenance - Quality
106 29 33 18
Line III
- Product Changes - Miscellaneous Maintenance - Quality
Line V
72 29
5
- Product Changes - Quality * Miscellaneous Maintenance - Coverage for Other Lines
42 11 10 36
VAB.0001189218
COMPOUND - Continued
Operating
Rigid Compound
18
% Prime
Capacity Utilization Factor
Production Of Lbs.) Avtt./Dav F1C1 T.T.P.
1782 96.20 35.17
99
18033 97.65 38.76
Downtime
- Product Changes - Miscellaneous Maintenance - Quality
Operating P*TS
Plasticizer % Prime Capacity Utilization Factor
Hours
36 11 25
Konsb
1590 81.63 65.33
^fgi/Pty
IrTtlh
12894 79.82 59.19
Key Maintenance Items - J. B. Autrey, S. A. Truitt
m PMs were completed on the following:
- #5 cooling tower - #5 and #6 dicers - Grove crane
The new hydraulic pump on Line 1 Banbury was replaced. The system had been running on a rental unit since the old unit failed.
The south nitrogen blower in P-1 was overhauled due to bad vibration.
m Line 111 #6 dicer motor was replaced and repaired. Bad windings were responsible for the motor failure.
VAB.0001189219
ENGIWKEWtwc . j. E. Nickerson, T. R. Kackay, R. H. Sneed, M. L. Carter PROJECTS IN PEVKUOFMENT - CENERAT.
Staffing
Erik Smith was transferred to Quality Management Coordinator starting July 1.
Water Plant
i
Equipment delivery delays continue to push back startup dates. Startup is scheduled for mid-August.
The first issue of the pond 3 and 4 bottom aeration design is complete. An oxidant test run will be scheduled later in the year. Test results would be more applicable if the test was after the summer months. A wastewater team has been formed to speed project execution and pursue parallel avenues of solutions.
Plasticizer Expansion
Discussions with consultants and vendors confirmed the overhead condenser design. A pressure control scheme was confirmed with the process controls group in Houston. Preliminary quotes have been received on all major equipment. Class "A" design passed a plant review and will be given to estimating after a Process Hazardous Analysis in early July.
Ultraclean
Rinse segregation, dumping slurry and rinse water to separate blend tanks, was trialed for five days. Segregation and processing rinse water separate from prime showed promising results. An improvement in dry resin contamination of 15-25% was noted.
Discussions continue with a vendor of an alternate reactor cleaning machine. This machine has an externally driven spray head and should require less maintenance than the existing reactor cleaning machines.
A new initiator dispersion test was proposed this month. Instead of charging initiator to the reactors with water, the initiator will be pulled out of the charge pot with an eductor. Better dispersion can be accomplished in this manner. Scheduling for the test has been delayed until the new agitator blades in reactor 745 are evaluated.
Plant StMif SiiqdIt
Preliminary economics for improving the reliability of the plant's steam system were developed. Options include retubing boiler #3 and buying a new boiler. The most attractive options were buying a new 60M lb./hr. boiler and repairing #3 as necessary to keep it in
VAB.0001189220
mm rnmmmmmmmmmmm
EBGIHEKRIHG - Continued
OSHA Process Safety
A Process Safety Management Team was formed. The team is developing and implementing a management program to comply with OSHA regula> tions.
The Employee Participation Plan is completed.
The Document Approval and Control Policy is completed. The purpose of this policy is to ensure all process safety management documents are reviewed and approved in a timely manner.
The Process Hazards Analysis Execution Policy and the Operating Procedure Development Policy were both issued for review.
Inert Gas Dryer
Startup complete; the dryer is running with no problems.
Blend Tank T-501 Sparger RevIs ions
A Class "A" design was submitted to revise spargers and the cleanout system for blend tank T-501. The design will Improve aeration and reduce cleanout times. This project is targeted for first fiscal quarter 1993.
A preliminary economic analysis indicates that buying concentrated lead in supersacks may save an estimated $41M per year. A similar economic study is now underway to determine if using reusable boxes instead of gaylords has benefits.
Centrifuge pool depth effects on wet cake moisture have been studied, tests on effluent are underway, results show possible improvements on drying rates and resin quality. A Class "A" design is underway for activator load cells.
s
VAB.0001189221
ABERDEEN CHEMICAL PLANT
MONTHLY PROGRESS REPORT
CAPITAL EXPENDITURE STATUS
M.L. CARTER JUNE REPORT
1992 F. Y. CAPITAL EXPENDITURES (M$l
____VARIANCE
ACTUAL
BUDGET
_ M$
___
Month 3rd Qtr.
251.3 736.6
280.0 791.0
- 28.6 - 54.4
-10.2% - 6.8%
YTD
2854.6
3362.0
- 758.7
-15.0%
Actual Expenditures - Expenditures in June were $28.6M less than the plant's budgeted expenditure forecast approved in the Third Quarter Budget submitted in March FY92. Total capital expenditures for the 3rd quarter were $736.6M, 6.6% less than the plants budgeted expenditure forecast.
June's FY92 capital expenditures were 10.2% less than the plant's budgeted expenditure forecast. It should be noted that the capital expenditures associated with project H612 Pond 2 Resin Drying are not accounted for in the reported actual above due to the accounting procedures and contract agreement with Conoco.
Quarter Budget - Current Quarter Expenditure Forecast as submitted and approved for the current quarter capital budget.
YTD Budget - Total of current and previous quarter approved budgets.
Forecasted Expenditures - The submitted 4th Quarter Capital Budget calls for expenditures of $479.0M and July expenditures of $105.0M.
VAB.0001189222
Ul
o Ui CM fid Os
Cd
a s
uc/>i
O) Ul auci ui
X
gf
c/> 5 8 u
</> Ui XA
Ul D Ui
r8
Uu.l
omm sUi
o
< 3E UJ
CM
p-
8
(ft 3
(A
in
COMs COMs CoM> CaM
oOC
CL
O<.
<az/ uz--i z<(/9
ua.i Ul
Uol
oOC
a.
aueoci
2a i(nJ iAn
o* SAO
iiunn_ m `VAB.0001189223
UUJi
in
UJ
u.
in ac g
UJ uj in
-OJ. UacJ
L> UJ
o* a.
<a a
UJ o
o
CM
(UOOAJf
u UofJi a.
a uj
2g
tn u.
UJ UJ
UJ O UJ
u
CJ
ofUI
ion of o
35 u (A UJ
UJ UJ
soac o
CL CJ
KJ
t
CATIONS BEING MADE TO THE CURRENT MONITORING SYSTEM
A
CON.J O
UJ CJ
UJ
VAB.0001189224
f
iA
u
o
D
liJ
aIII
aOUfl
g g
CJ Ho>
o
UJ (A
ui
s
0 1
g
Z Ul
01 o
s
Ul
u
Ui o>
ooc
Ki
u 2
(A
(o<ADc
CO
So
2 *S
Ol CO
aui uUJ
s
3-
fsJ
O'
3o
u
s
U<0J
s
5Ui 6
oS 3Ou
fM
SO ra
rxj
i
rcu* rov*i
APPROVED CAPITAL PROJECT STATUS
oUcl oc UJ
-<j
CJ CO
(A
oo
CM CM
in
CJ
VAB.0001189225
2O
APPROVED CAPITAL PROJECT STATUS
ocnc
ui
a- o 8 SS
MO
8
(VJ
</> *$
cn "
--oLri (uAi
OC
U(AI X
s 3DC Q
in
CM
CJ CM
8
CM o*
UI K
UJ
o ccnn
UJ
ui
u
8
tfk*
5
Ol
3!
UJ
UJ
Ui
n Uai o
8
CJ
o
ui
CJ UJ
8
uCaDti
CJ
UoJ
u
UJ
OOC
oc
UJ
o
UJ
Ucni
2 ui
8
$
co l
<
8CcnO
UJ
oc
cn
QoC UJ
cn cn
g UaJ
s ui
UJ CJ
a. a
UJ a
o
Q. UJ
cn I
cn
ao
ucn
" S5
o
8 Scn
cn
Ui
a
UJ
OC CJ
CJ *u- 3a
o UcOnJ u
s 8* 3
u
UJ
UJ
CJ UJ
su o ooc UJ cn o o
$ UJ a. CM
$
a.
0I0 00
oq
CM
KCMl
00
3
CM
UJ UJ
00 8 CM
CM CM
CM
COM COM
cn o UoJ U~JJ
CM
o>
8
COM
CJ CJ cn
C9
cn
cn oc
CJ
cn UJ
UocJ
u Ui
UJ
X UI
cn
cn o
3
8UJ g Ui
OC 1
8
cn
CJ oc
UJ
Ui 1 1
UJ k CJ
UocJ
cn
OC 1 4*4 1
CJ UJ
IL **4
3oc
ec
cn J
ooc
o
1 ^4
o1
1 UJ
Ui
CJ
<
w
UJ
tt
o
CO 1 3 s1
CJ 8 a UJ
5 CO
3
oc
UJ
cn
1
i1
CL o
u.
GO t
CM
in
UJ
VAB.0001189226i CM
o i in
CM vO
CM
CoMo
4 in in in tn
o1Q
uoi *
o
*
CM
C* in o
CM O
*oo
cn
f
Ai
UJ 33
k CL
iA
OUJ 3
iA <A
O<
S
in O in
mCM O <0
APPROVED CAPITAL PROJECT STATUS
iA M
II
U IIII H N
II
IHI
CM H
& HIIIt II
<s H II II iA II
II II II
II H
H H II
HN IHMt
iA
U
IU
H
NK
IHHI
H
HH
UH
8 NIHf o
$ $mCM
CM
ton
CM CM
UJ
VAB.0001189227
ENVIRONMENTAL - K. G. Akins
Water
All wastewater discharge parameters were met for the month of June.
A meeting with the Industrial Wastewater Control Division of the Mississippi Department of Environmental Quality (MDEQ) was held on June 3 to discuss Vista's progress on meeting the more stringent BOD limits contained in the 1993 permit. The MDEQ requested a second meeting in the Fall to update them again.
Superfund
A meeting was held with the MDEQ and EPA on June 13 to discuss progress on remediation activities at the Aberdeen plant site. Based on our presentation, the EPA said they do not intend to pursue further sampling at this time.
Waste
Waste shipments during the month included;
A bulk shipment of API sludge to Chemical Waste Management in Emelle, AL.
A 550-gallon shipment of stabilizer spill to Fisher Industrial Services in Gadsden, AL.
m A 35-gallon shipment of waste paint solvent to Fisher Industrial Services in Gadsden, AL.
An 880-gallon shipment of plasticizer filter cake to Fisher Industrial Services in Gadsden, AL.
EHKRGY CONSERVATION - J. R. Ganc
I- Energy Conservation Date
A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU
II. Boiler Operation
June. 1992
< 11.9%> < 8.4%>
2861.0 130.2
Fiscal Y.T.D.
< 15.9%> < 13.3>
2970.0 1214.5
Bellar
No. 1 No. 2 No. 3
.Twm 1992
84.1%. 84.0% 84.3%
83.3% 83.3% 83.1%
VAB.0001189229
HUMAN RBSODRCK REPORT
JUNE. 1992
PERSONNEL - J. E. Beall EMPLOYMENT Michael L. Harvey - New Hire - Chemical Engineer. Kelly D. Wood - New Hire - Chemical Engineer. Jason A. Edwards - New Hire - Mechanical Engineer. PRQMOTION8/TRAN8FBRS None. RETIREMENTS Cleveland Brown - Vinyl MAM Operator - Vinyl Department -
Incapacity Retirement. TBBMIMMTIOMS/RK8JQMATION8 William E. West - Vinyl Lead Operator - Vinyl Department -
TO/FROM LEAVE OF ABSENCE
R. Danny Flippo - Vinyl Department - Vinyl Lead Operator - Union Leave of Absence.
f
VAB.0001189230
DEPARTMENTS
#EMPLOYEES
WAREHOUSE GENERAL PLANT MAINTENANCE LABORATORY COMPOUND VINYL PLASTICIZER SUB TOTAL SALARIED
15 10 36 22 36 32
5 156
80
M
9 5 8 4 24 11 2 63 6
F
0 0 0 1 1 2 0 4 19
%M %F
60% 50% 22.2% 18.2% 66.7% 34.4% 40% 40.4% 7.5%
0 0 0 4.5% 2.8% 6.3% 0 2.6% 23.8%
TURNOVER
MO.
FYD
00
02
03
01
02
20
00
ANN.!
0 26.6% 11.1%
6.0 7.4% 8.3%
0
Month FYD Minority Female
Hourly Month FYD
Salaried Month FYD
1.7% 5.1%
8.3%
VAB.0001189231
t
o 40 O
rsi
CM rsi
N 4*
o
CM 03
Kl CM
DEPARTMENTAL SUMMARY HOURS REPORT
............... YEAR TO DATE ..................
P rin te d
6/30/92
atoc
UI lii
aa>.
o UJ aUi
CO
u
03
O<oc
ucoi BX
</>
ui
UXi
o
Ui
ui
Uo 5
CO UJ
u5
MHIMMMPWi
It IIIItt
a*
UJ
N
g
u 41
to CL
CL
mmrnmm
VAB.0001189232
t
DEPARTMENTAL SUMMARY HOURS REPORT
........... MONTHLY .............
41 S
r
l H-
JS
<H
T]
CB O. CA
L
II
s 8 5N
o
in **
*
o
O
j
s 8 8e
o n
dVi A *
o
40
O i l\l
i
8 QC *
1C11l
s 8CD to
UI UJ oae
8IAJ 8oo
auci 5
to
UI
UI
to
<8M:
*V
S3 o
Cm ^5
AHH i
H If H
3rDC 4>
UI JM
O
to
3
VAB.0001189233
P rin te d
6/30/92
APMTHTSTRATIVE SERVICES - D. A. Barclay
There were no reportable safety instances this month.
Quality
All teams met during June to review progress on their projects.
Futures
MTD
YTD
Natural Gas
$0 <$34,092,64>
Statistics
fcfifisaAfid
Wwtito
FT92
Processed Invoices
947
Working Fund Checks Written
20
Cost Savings Through Bid Process
$6,160.57
Raw Material Purchase Orders Issued
160
MRO/AFE Purchase Orders Issued
241
Spare Parts Purchase Orders Issued
170
9574 154
$28,425.76 885
1738 1740
Packaged Finished
MfrT-
Compound "An Grade
3,547,042
PLENEX
144,053
Compound Off-Grade (BC)
581,047
Compound Off-Grade (H)
231,324
Millscrap
291,642
Dry Blend "A" Grade
720,154
Dry Blend Offgrade
266,442
Resin Type I
1,175,100
Resin Type "BC"
13,600
Vacuum Dust
180.246
Total Packaged W/house 7,150,650
June. 92
3,399,031 159,878 463,256 270,429 341,660 534,150 327,276 598,200 100 .$06
6,304,586
(Decrease) /Increase
<148,011> 15,825
<117,791> 39,105 50,018
<186,004> 60,834
<576,900> < 13,500>
30.360 <846,064>
%
hjB&&
< 4.17> 10.99
<20.27> 16.90 17.15
<25.83> 22.83
<49.09> <99.26>
16.84 <11.83>
Bulk Finished Goods Ending Inventory
Compound nAn Grade Compound Offgrade Dry Blend "A" Grade Dry Blend Offgrade Resin "AM Grade Resin Offgrade
Total
Hit. 'M June. *92
567,672 0
1,003,050 598,930
16,216,208 1.983.802
20,369,662
499,675 0
1,335,580 598,930
12,588,021 _1.591.012 16,613,218
(Decrease) Increase
% Change
< 67,997>
0 332,530
0 <3,628,187>
< 392.790>
<3,756,444>
<11.98> 0
33.15 0
<22.37> <19.80> <18.44>
VAB.0001189234
A
ABERDEEN CHEMICAL PLANT SHIPPING ANALYSIS JUNE 1992
-SHIPMENTS BY PRODUCTS-
PUBLIC
MONTH IPT/1TC
EXCH/TOLL
PUBLIC
YTD IPT/ITC
01:39 PM 10-Jul-92
EXCH/TOLL
RESIN-BULK RESIN-PACKAGED
14,636,610 676,350
FLEXIBLE COMPOUND-BULK
1,510,280
FLEXIBLE COMPOUND-PACKAGED 3,066,717
19,558,630 656,800
1,440,850 0
0 0
1
0 0
167,102,520 154,051,680 4,614,305 2,940,450
3,484,440 17,074,850
27,792,301
230,753
0 0
0 0
NEW BUSINESS
RIGID COMPOUND-BULK RIGID COMPOUND-PACKAGED RIGID GOMPOUtN)-PEL LETS
1,400
609,650 341,477
0
0
637,050 6,000 0
0
0 0 0
134,834
10,237,880 3,613,939 0
0
5,226,950 181,850 0
0l 0 0
TOLLING - BULK TOLLING - PACKAGED
0 00 0 00
0 00 0 00
PLASTICIZER
83,760
925,790
0
165,060 5,094,260
917,400
TOTAL
8C| SA JL
-SHIPMENTS BY MOOE BULK:
JUNE* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
20,926,244
RAILCAR 189 8 5 5
23,225,120
CUSTOMER PICKUP
6 0 0 0
0
COMMON CARRIER
30 32 R
9 4
217,145,279 184,800,793
917,400
ttMunnanmnanua>(*&
TOTAL
225 40 14 9
TOTAL JUNE
207 6 75
288
YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
1,468 98
65 31
123 317 0 86 3 112 0 16
1,908 184 180 47
TOTAL YTD
KS8M*VSlMimmtS
PACKAGED:
JUNE* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
II II
H
It It II II
fItfi
1
*a
! IT!
:
8-
s
II
3
1,662
CUSTOMER PICKUP
2 13
1 0
126
COMMON CARRIER
40 84 13
0
531
TOFC AIR/UPS
00 00 00 00
2,319
tmmmmmmmwmtI8888mVI8IBIStI888tSI8l
AIR/UPS
1
0
0 0
TOTAL
43 97 14
0
TOTAL JUNE
16 137 0 0
1
154
YTD* RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
28 215 0 0 174 768 0 0
15 109 0 0 0 000
5 23
1
0
248 965 125
0
TOTAL YTD
217 1,092 0 0
29
1,338
888I8BS8I8BB8888U8SBUBSssaaabisbbbibbiI8I88B8I88III8IV8U88B8jmummmmmmmmmmmm bbkbibbxbi[SSSBBBBSIS8NSIflBBBIKtSl
DAB,TLC,MAS,AEV,JRF
i
VAB.0001189235
IjU <n
r- CM
o w- C* o -tr>
o 1
O1 <3i *
^SJ* 1
oi
CM
CO r-. r-
r^,
_r*4
r-'i
*rr* nr*
cm
O' O'
cr- O
wl
o *o O*
'w* o o li1
cm CM Cm CM CM O' O' O' <r*
CO *r o
--* w
CM
in ^ *r Cl -JO <* o o o
-o
s cm
r-- CO no
CD O cm rM oo
O' o
CoM
2 r> c> ocm iT> CD rCO CO r'- (K 4
t I r-- i nr
t i i t
co
O CM CM
M'i ^
s o*
ud
OQ : CJ SC
QC CM
u ir*
M^> w> M*1
v> CO Ui ro 5i *n
CO w
pvi in
ro iT>
CO M*G-*
CO MO
O O h*i
tO
O' o>
O' CO |M (M <^*% ^1. *4 1 >
O' ho o
lO MTi *o
1C 3C ZX
cn
<3 5
o CU
esi Cu
4jU UJ
1C
oc cc CJ u
CD
CU
cn 3C 3: ca
3
ae aie Ml M
CD
cn U.i
g oc :v*:
<c i i cn O CJ UJ CO
.
to
J(*i
*s, -*.
Crt co ae ic
** *,,
J CD 1C
<Ui
CM CM CM CM CM
O*^' C*"
>
O' --.
O" UJ CM
><
0*4 CM
"fcv^.
4C %o
MD -hO
-o
mo
Oo
CD
VAB.0001189236
Ar
ousands of lbs.)
1800 1600 1400 1200 1000
06/91 06/91
12/91 02/92 04/92 06/92
07/91 09/91 11/91 01/92 06/92 06/92
PKG'D PRODUCTS INVENTORY
VAB.0001189237
"P w-
h
LABORATORY - J. H. Edwards
A. Safety
There were no safety incidents in the Laboratory during June.
B. Customer Contacts
There were no "on the road1* customer contacts made in June.
C. Customer O.C. Problem Reports and ClIB/s 6/08 Flexible
t
The customer complained of gray pellets and white resin contamina tion in one box of 46801 Black compound. This product run followed a 34862 Gray run on Line III.
6/08 Athol. Manufacturing. Butner. NC
The customer complained of a miscommunlcation concerning the delivery time of a 5415 hopper truck. It was scheduled for 6/22 but was delivered on 6/8.
km
The customer complained of a 5385 railcar that arrived with a hatch open. Rain through the hatch wetted the resin. A bolt on the hatch had come loose.
kill Triangle Fire & Cable. Sikeston. MO
The customer complained of clogged
screen paks after running only 22
hours on 35852 compound.
They
normally run 72 hours on one screen
pak.
Blending procedures were
changed on Line III for 35852 to
solve the poor dispersion problem.
6/1? Freedom Plastics. Janesville. WI
The customer complained that a 5385
railcar shipment was very fluffy.
The Aberdeen Lab data showed that
V this was the finest particle size
shipment ever sent to them.
The
specification was changed to tighten
the percent through the 140 mesh.
VAB.0001189238
LABORATORY - Continued
C. Customer O.C. Problem Reports and CHR's - continued
6/19 AJLsco. Olive Branch. MS - continued
The customer complained that a 5385 railcar had very hard to open bottom outlet valves. The valves will be inspected when the car returns.
6/29 American
Melted and fused clumps of resin were caught in the unloading screen at the terminal while unloading two 5305 railcars.
The customer complained of dried clumps of 5265 resin causing problems during resin unloading and compound blending.
6/29
The customer complained of bills of lading arriving out of sequence and pre-shipment samples arriving late. A conference call was made to Donnelly to explain how shipping compound trucks from the plant instead of the terminal would affect the process including bills of lading, certificates of analysis, and samples. They were satisfied.
D- Product Waivers Issued
Customer
Product
Essex
5415
E. RVCM of In-Process Samples
Reason
Viscosity
Mo.
1 R/C
The following is a summary of residual VCM results on in-
process samples.
None of the reactor daily averages
exceeded 400 ppm RVCM during the month of June, 1992,
Number of Samples Average RVCM, ppm
Reactor Slurries
907 49
_____Dryer
5265
5305
38 0.092
69 0.128
LABORATORY - Continued F. RVCM of Shipment Samples
The following is a summary of the residual VCH analysis of shipment samples for the month of June, 1992.
Product
Humber of Samnles
Average RVCM. ppm
5225 5265 5305 5325 5385 5395 5415 5416 5465 Debox Pond Dry Blend
20 60 129
4 67
5 80
0 6 27 4 2
0.818 0.067 0.078 0.084 0.095 0.048 0.018
0 0.017 0.169 0.035 0.024
G. Flexible Compound Quality StrmnmM-r^
Hardness Color Hard Particles Heat Stability Dicing Mischarge METS-IR
Adjustments M U.
241.0 150.5
<4.02> <2.51>
5.0 <0.08>
Totals 396.5 <6.62>
M Lbs t m
5.9 31.5 34.2
4.8 4.6 33.4 10.5 124.9
<0.10> <0.53> <0.57> <0.08> <0.08> <0.56> <0.31> <2.09>
H. Rigid Compound
Color Total
Rejections
M Lbs. <%>
59_J>
59.5
<3.34> <3.34>
*
VAB.0001189240
Ed 8 8
id id o
5
^
*^
88
*
it
CM
00 ir- o O IO IO CD o CM o CM id
IOO
IO CD
r
VAB.0001189241
m m
SAMPLE SHIPMENTS JUNE 1992
RESIN Ship Date 6/01/92 6/01/92 06/10/92 6/22/92
6/24/92
Product 5305
5325
5305
5325 5395 5416
5385
Amount 500
50
4X5 lbs.
10 lbs. 10 lbs. 10 lbs.
5 tbs.
Customer Alcan Building Products
Intex Plastics Corp.
American Mirrsx
Color Custom, Inc.
Ship Mode CC
UPS Airborne
UPS
Willamette Co.
Airborne
COMPOUND ,'
Ship Date 9/09/92
Product 35852 NAT
Amount 20 Ibe.
6/12/92
6085 BLK
10 lbs.
6/24/92
55041 CB 50 58162 NAT
100 lbs. 100 lbs.
6/25/92
34862 GRY 546 (OG) 2 X 5 lbs.
Customer Vista R&D - Austin
Enterplast, Inc. Pyramid Plastics Inc.
REKO Company
Ship Mode UPS
Airborne Airborne
UPS
DRYBLEND
Ship Date
06103192
06/11/92
6/25/92
Product 80273GWHT 110
378-143 Blue 170
RP-34WHT 141
Amount 50 lbs.
200 lbs.
300 lbs.
Customer BOUGRAFOS Y LAPICES SA
NOVATEC
Formtech Enterprises Inc.
Ship Mode Airborne
Airborne
CC
VAB.0001189242
ABERDEEN CHEMICAL PLANT INJURIES
(Twelve Month Running Totals)
c
oU. 15
CD
0 t--i--i--i--i--i--i--r
J*90 A
J
o i i--i--r
JS1
*t--r
A
MONTH
T---I--I I I " I I I i--r r i
J O J*82 A
TOTAL INJURIES -H-- OQHA RECORDABLE
VAB.0001189243
aa/nia
VAB.0001189244