Document Rp76423JDKvKGjXD0K8jQ80w7
PLAINTIFF'S EXHIBIT
RMC-50
m JUNE 1992 m MONTHLY MANAGEMENT REPORT
by NORTHWEST ENVIROCON, INC.
for the REYNOLDS METALS COMPANY
SHERWIN PLANT
1]
n
u
a n
g
g B.000650
m
a
a
a
a a
a
a a u a a a a n
ii
a
i
NORTHWEST ENVIROCON, INC. REYNOLDS METALS SHERUIN PLANT
JUNE 1992 MONTHLY REPORT This report is inclusive of Asbestos removal activities from May 31, 1992 until June 27, 1992. There were three contractors on site, TGI Stephens, Industrial Specialists Incorporated, and Falcon Associates. TGI Stephens was issued an exception report qr 6/16/92. The type of exception was non-compliance with state/federal asbestos regulations. The classification was serious and citable by the regulatory agency. The action that was required by NWE was for the contractor to stop work, submit a plan to correct the deficiency within 4 hours. Please see the attached Exception Report form. This month there was one reportable injury from TGI Stephens. The inj'ury occurred at the #12 Washer. The employee that was inj'ured reported a skin burn. Communications between Reynolds Metals, Northwest Envirocon, Inc. and the three contractors seems to be excellent at this time. Respectfully Submitted,
Tommy White Vice President, National Operations Northwest Envirccon, Inc. July 10, 1992
B.000651
i
If
N
REYNOLDS METALS - SHERWIN PLANT
' WEEKLY REPORT
WEEK ENDING JUNE 6, 1992
This week there were three capital projects, one maintenance project, and four small scale/short duration project worked this week. There were three contractors on site to perform the work TGI Stephens, Industrial Specialists, Inc. and Falcon Associates.
OLD MEDICAL BUILDING. Industrial Specialists, Inc. was the contractor to perform the work on this capital project. I.S.I. has nine workers and three supervisors on the project. I instructed them to fix the holes in the flaps and leave the flaps down. One PDM machine was adequate for the manometer to read .02 inches of water. On 06/01/92 I discussed with Mr. Rodriguez of I.S.I. that the mastic had not been completely removed from the two rooms and that this should be done before the pipe and the duct is done. Mr. Rodriguez informed me they would place poly over the floors in order to set the ladders down I.S.I. did ceiling scrapes and glove bagging. They cut down duct and pipe double wrapping them both. I did final cleaning on the ceiling scrape on 6/02/92. During the inspection I showed Mr. Ordonez of I.S.I. where RACM was on the beams and ceiling. The enclosure did not pass. Paul Matula of RMC came by and I informed him that the ceiling scrape was not completed and the contractors were standing on planks on the hand rail of the rolling scaffold. Mr. Matula told I.S.I. to change the scaffold.
C STATION DESUPER HEATER. TGI Stephens was the contractor to perform the work on this small scale/short duration project. The contractor had three men and a supervisor in tyvecks and PAFR's on the job site. There were three glove bags removed. I showed Mr. Arriaga of TGI Stephens three places to tape where the seam was not taped solid. I called Mr. Smith of TGI Stephens and informed him about his crew not taping up the glove bags all the way. This project had high fiber counts of 1.16 F/CC.
#4 BOILER. Industrial Specialists, Inc. was the contractor to perform the work on this maintenance project. Mr. Rodriguez removed his crew from the 84 Boiler project to work in the Old Medical Building. The power box was out and the contractor hooked up 110 for airless and negative air machines.
page 1 of 2
B.000652
\
NORlHWtSI tNViKUUON, INC. REYNOLDS METALS.- SHERUIN PLANT
# #6 ESP. Falcon Associates was the contractor to work this capital project. The contractor arrived on 6/01/92. but the paperwork was incomplete. I informed them they could unload, but could not proceed beyond that point until the paperwork
was complete.
#12 WASHER. TGI Stephens was the contractor to perform the work on this capital project. On 6/02/92 it was still raining and the contractor was unable to work on the enclosure. I performed the visual on 6/03/92, On 6/04/92 the contractor finished up an area by the West Over flow that had to be taped. I requested another row of tape be added. I inspected the NW side and Mr. Gonzales did the SE side inspection. TGI Stephens had 18 men on site. The manometer was .05 inches of water. There were 9 POM machines with two blowing cool air. Abatement began on the West side.
BUILDING 111 STEAM PIPING. Industrial Specialists, Inc. was the contractor to perform the work on this small scale/short duration project. There were three lines that were wrapped, cut, and disposed of.
5-7 DISCHARGE LINE. Industrial Specialists, Inc. was the
contractor to perform the work on this small scale/short
duration project. The contractor performed glove bags to
abate the discharge line on overtime.
'
CAPITAL PROJECTS #12 WASHER - ON GOING
#6 ESP - ON GOING OLD MEDICAL BUILDING - ON GOING
MAINTENANCE PROJECT #4 BOILER - ON GOING
SMALL SCALE/SHORT DURATION PROJECTS BUILDING 111 STEAM PIPING - COMPLETED
C STATION DESUPER HEATER - COMPLETED 5-7 DISCHARGE LINE - COMPLETED
STEVEN J. FARNHAh
NORTHWEST ENVIROCON, INC. PROJECT ADMINISTRATOR REYNOLDS METALS - SFERWIN PLANT
page 2 of 2
B. 000653
\
.................... .
X WU .
REYNOLDS METALS - SHERWIN PLANT
WEEKLY REPORT
WEEK ENDING JUNE 13, 1992
This week there were three contractors on site, Falcon Associates, Industrial Specialists, Inc., and TGI Stephens. There were two capital projects and one maintenance project performed this week.
84 BOILER. Industrial Specialists, Inc. was the contractor to perform the work on this maintenance project. Mr. Rodriguez had his crew working on the pit cleaning up the oil inside of the pit. On 6/11/92 at 10:00 I.S.I. was performing final cleaning on the North Side enclosure. After the clearance passed, I.S.I. built the enclosure on the South side.
OLD MEDICAL BUILDING. Industrial Specialists, Inc. was the contractor to perform the work on this capital project. A visual was done on the ceiling and it was very clean. The floor was not clean and the area had to be gone back over . On 6/9/92 I checked the sewing room and I.S.I. had not started glove bagging the elbows or the RACM from the pipe. The contractor had been abating RACM Mag block, air cell, vat, and mastic from the sewing room. The X-ray room had four areas that needed re-cleaning. I checked the containment floor which was 3/4 covered with 2-6 inches of liquid caustic. I passed the visual and informed I.S.I. they could encapsulate. The caustic was cleaned out after the clearance. Clearance passed at .003 F/CC. I informed Mr. Rodriguez of the four elbows in the sewing room that had to be abated. At 8:20 I.S.I. had three workers which began to abate the elbows. The Hepa Vac was not turned on. The workers were in 1/2 masks and tyvecks glove bagging.
812 Washer. TGI Stephens was the contractor to perform the work on this on going capital project. Mr. Paul Matula called and asked if the contractor could abate a pipe on top of the 8 12 Washer open air. I informed Mr. Matula that the tar paper was RACM. On 6/10/92 TGI Stephens was prepping the East side of the Washer and was abating oh the 4th level inside. On 6/11/92 TGI Stephens was abating the West side and hanging poly on the East side.
page 1 of 2
\
m
B.000654 ji
REYNOLDS METALS - SHERWIN PLANT
CAPITAL PROJECTS #12 WASHER - ON GOING OLD MEDICAL BUILDING - ON GOING
MAINTENANCE PROJECTS #4 80ILER - ON GOING
STEVEN J. FARNHAM
NORTHWEST ENVIROCON, INC. PROJECT ADMINISTRATOR REYNOLDS METALS - SHERWIN PLANT
page 2 of 2
\
H
u
II
n
n
ii
n B.000655
REYNOLDS METALS - SHERWIN PLANT
s WEEKLY REPORT
WEEK ENDING JUNE 20, 1992
This week there were three capital projects, one maintenance project, two small scale/short duration project worked, and one encapsualtion project worked this week. There were three contractors on site to perform the work. Industrial Specialists, Incorporated, TGI Stephens, and Falcon Associates.
#6 ESP. Falcon Associates was the contractor performing the work on this ongoing Capital project. The contractor had a crew of eleven men hanging poly. They were also working on the decon. I performed a pre-abatement visual on 6/17. They were prepping the bottom of the enclosure along with patching and taping the weak areas in the poly. Mr. Paul Matula of RMC asked me if Falcon could store all the bags up and around the #6 ESP. I said yes as long as there is poly under the bags and danger tape around the bag storage area. Mr. Ernesto Gonzales of NWE did the pre-abatement visual on 6/17/92. There were numerous holes and the roof was down. The enclosure was not ready for the inspection. On 6/18 Mr. Whitman had not placed the power panel topside. The manometers did not work, so the inspection regained pending.
#12 WASHER. TGI Stephens was the contractor to perform the work on this ongoing capital project. The crew was hanging poly and performing abatement. The contractor was abating on the bottom level and began to detail the top level. Roger Fay took PDM air samples and the readings were high. I told Mr. Tommy Smith of TGI Stephens that the four PDM machines on the top of # 12 Washer needed to be shut down
1 and the HEPA's changed, wiped out and then restarted. On 6/18/92 TGI Stephens had seventeen abatement workers performing final cleaning and working on the east side enclosure .
#8 ESP Industrial Soecialists, Inc. was the contractor to perform the work or. this maintenance project. This week consisted of building framework and hanging poly with a crew of seven men.
3-1 FLASH TANK. Industrial Specialists, Inc. was the contractor to perform the work on this encapsulation project. The job consisted of two men applying fab cloth and mastic.
page 1 of 2 OLD MEDICAL BUILDING. Industrial Specialists, Inc. was the
1 contractor to perform the work on this ongoing capital project. Mr. Paul Matula instructed NWE to pull bulk samples
B.0006 5 6
s
I uj.1i vV ixT. vvwsUTUuUurT'*^rVnt ^. REYNOLOS METALS - SHERWIN PLANT
m
on the Air* Conditioning and the duct on the outside of the Old Medical Building. The samples tested positive for RACM. Mr. Rodriguez and I checked the duct and an estimation was made by Mr. Rodriguez that he could cut the duct in a couple of places, but he needed a cherry picker.
I checked the mobile decon trailer that belonged to I.S.I. and found it filthy. I picked up a 1/2 mask respirator with filters from the clean room. It was not in a bag and the filters were not taped.
#4 BOILER PENTHOUSE. Industrial Specialists, Inc. was the contractor to perform the work on this ongoing maintenance project. On 6/16/92 a pre-abatement visual was done on the decon and bag out. The work area itself is inside the boiler and does not require poly. The contractor patched and taped two areas in the decon. The manometer read .,02 .inches of water. I pointed out to George Acosta of I.S.I. that the waste water pump was in front of the filters and it could get debris and RACM in it that may contaminate or destroy the pump. On 6/17 I performed the post abatement visual and found four areas that required additional cleaning.
1 & 2 CLEAR FILTRATE STATION HEADER. Industrial Specialists, Inc. was the contractor to perform the work on this small scale/short duration project. I.S.I. performed glove bags on two sections of 14" pipe.
ORANGE S HEADERS, Industrial Specialists, Inc. was the contractor to remove the tar paper from the header at the #5 Filter Feed Tank. This was done on overtime after RMC removed the pipe and lowered it to the ground. Only the weather coat was RACM.
CAPITAL PROJECTS 46 ESP - ON GOING 4 12 WASHER - ON GOING OLD MEDICAL BUILDING - COMPLETED MAINTENANCE PROJECT 44 BOILER PENTHOUSE - ON GOING ENCAPSULATION PROJECT 3-1 FLASH TANK - COMPLETED SMALL SCALE/SHORT DURATION PROJECTS 1 & 2 CLEAR FILTRATE STATION HEADER - COMPLETED ORANGE S HEADER 4 S FILTER FEED TANK - COMPLETED
B
NORTHWEST ENVIROCON, INC. PROJECT ADMINISTRATOR REYNOLDS METAL - SHERWIN PLANT
WEEKLY REPORT
B.000657
REYNOLDS METALS - SHERWIN PLANT
WEEK ENDING JUNE 27, 1992
This week there were two capital projects, one maintenance project worked this week. There were three contractors on site this week. Industrial Specialists, Inc, TGI Stephens, and Falcon Associates.
I]
II II
u
II
II
n
#12 WASHER. This was an on going capital project. TGI
Stephens had six men repairing the enclosure. The contractor
had a great deal of workers quit because the enclosure is
extremely hot. The contractors crew was detailing the West
Side using electric hammers. On 6/25/92 a PDM machine
failed. Mr. Tommy Smith of TGI Stephens sealed both of the
ends and shut the machine down. He felt that the reason the
machine failed was because fibers were blowing across the top
of # 12 Washer.
'
#8 KILN DUST HOPPER. Industrial Specialists, Inc. was the contractor to perform the work on this ongoing maintenance project. The contractor was setting up the PDM machines. Mr. Rodriguez informed Mr. Hector De La Garza the #8 ESP had a large opening through the roof that was to be abated and they had 3 PDM machines running and could not draw in .02 inches of water of the manometer . A decision was made to poly the roof and when .02 inches of water was achieved the Hopper and Cyclone could be abated.
#6 ESP. Falcon Associates was the contractor performing the work on this ongoing capital project. The contractor had continuing problems with the manometer. Mr. Whitman called his office for more negative air machines and a new manometer. The roof came down again and it had to be repaired. Abatement began using the wet method of abatement. There were numerous olaces on the bottom and sides of the enclosure that leaked small amounts of contaminated water. Falcon fixed the prcolem by taping the leaks and Hepa Vacuuming the water. I talked to Mr. Matula about the heat at 86 ESP caused by the 5 & 7 ESP running. The heat may cause the walls of tne enclosure to fall down. Mr. Matula said that the only tning that could be done, was to keep the enclosure repaired
page 1 of 2
B. 000658
ni
i
m m
rvt iMUkud j tL- ni-v
m-Anxii l-'WrMHi
CAPITAL PROJECTS #6 ESP ~ ON GOING #12 WASHER - ON GOING
MAINTENANCE PROJECT #8 KILN OUST HOPPER - ON GOING
STEVEN J. FARNHAM
11 PROJECT ADMINISTRATOR NORTHWEST ENVIROCON, INC REYNOLDS METALS
N SHERWIN PLANT II
n n
u
ii
ft
n
n
n
n
B.000659
* Project Report-Saall Scale-Short Duration Projects Reynolds Metals ME Job 3711
START FINISH AREA FAC DESCRIPTION LIN FT SO FT ST OT $CF HOT OATS DATE
33 INSULATION
REMOVAL FROM ORANGE S OF HEADER
3.0 6.0 N N 06-24-32 06-24-32
45 FACILITY 45 501 120 300 220.5 37.S N Y 05-19-32 05-28-32 STEAM LINE
110 *C` STATION DESUPERHEATER
14
N Y 05-29-92 05-29-92
110 STEAM PIPING 2TBEAH ANO EAST SIDE 8LD 111
12
5.0 N N 06-02-92 06-02-92
110 12 CONDENSATE PUHP/PIPING
302 N Y 01-01-99 51-01-99
2 30 5-4 DIGESTER HEATER
3
30.0 Y Y 05-28-92 05-28-92
2 30 5-7 FLASH TANK DISCHARGE LINE
26
4.0 14.0 Y N 06-08-92 06-08-92
2 30 4-12 HEATER
07-01-92 07-01-92
2 3C 4-11 HEATER
Y N 07-06-92 07-06-92
2 42 46 EVAPORATOR STEAM LINES (GLOVE SAG 20LF CL.UP 200SF)
20 200 68.0
Y N 02-18-92 01-01-99
2 42 5-4 EVAPORATOR EFFECT CONE
2 42 18 EVAPORATOR
1 N N 05-28-92 05-28-92
l V N 06-30-92 06-30-92
3 33 42 CLEAR FILTRATE OISCHARGE LINE
6
7.S N N 06-08-92 06-08-92
3 35 SI i 42 CLEAR FILTRATE STATION HEADER
3.0 6.0 N Y 06-24-92 06-24-92
Total:
231 503 333. S 71.0
Page 1 \
B.000660
\
Project Report-Maintenance Projects Reynolds Metals HUE Job 3722
START FINISH AREA FAC DESCRIPTION LIN FT $Q FT ST or SCF HOT OATE OATE
50 (8 KILN ESP
760 220
Y N 06-08-92 01-01-99
110 34 BOILER PENTHOUSE
2180 301
N N 06-01-92 06-15-92
Total:
0 2940 S21 0
Page 1 *
B.000661
Project Report Clean-Up Projects Reynolds Metals HUE Job 3722
AREA FAC DESCRIPTION UN fl SO FI SI
SIARI FINISH 01 SCF HOT OATE OATE
40 FAC 40 CAUSTIC CLEANING TANK
100
05-29-92 05-29-92
Iota!
0 100 4 0
iiliS S S iS l
Page 1
000662
Project Report-Capital Projects Reynolds Metals HUE Job 3722
area fac description LIN FT SQ FI sr
START FINISH OT SCE HOT DATE DATE
35 OLD MEDICAL BUILDING
641 1650 225
Y N 05-14-92 06-19-92
SO 16 ESP
3000 Y N 06-08-92 01-01-99
3 33 112 HASHER
7487 Y Y 05-11-92 01-01-99
Total:
641 12137 225
0
m
m
n
Ml
Ml
Page 1
B.000663
a
Project Report - Encapsulation Projects Reynolds Metals SUP Job 3722
START FINISH AREA FAC DESCRIPTION UN FT SQ FT ST OT SCF HOT OATE DATE
2 30 3-1 FLASH TANK
185 5
N N 06-17-92 06-17-92
a Total:
185 5 0
a
a
a a
II
II
18
18
II
a
ii
n a a
ii Page
B.000664
M
Northwest Envirocon - Sherwin Plant
NUE WEEKLY HOURS
WEEK END JUNE 6 92
g Class
Maintenance ST OT
0 Project Administrator
S Air Technician Survey Technician
11 0 10 0
00
n Administrative Coordinator Air Samples Maint:
Capital:
ii Bulk Samples
Maint:
m Capital: Personnel Totals:
Maintenance=
Capital=
I! Total Manhours
=
25.5
8 53
7 1
46.5 95
141.5 Hours
0
ii
0
u
ii
ii
ii
0
11
0V
Capital ST OT
24.5
O
62.5
0
CC
80
B. 000665
m
B
0
0 0 0
Northwest Envirocon - Sherwin Plant
NUE WEEKLY HOURS
JUNE 13 1992
Class
Maintenance ST OT
Project Administrator
70
Air Technician
16 0
Survey Technician
20
Administrative Coordinator
8.5
0
Air Samples Maint: Capital
24 105
Sulk Samples
Maint:
Capital:
11 Personnel Totals:
Maintenance^
fil Capital=
Total Manhours
=
6 4
owo . Jc 107 .5
141 Hours
11 11 11
a
H
K1
Kl
n
13 i
Capital ST OT
26 O
67 0
10
13.5
0
B. 000666
Northwest E irocon ~ Sherwin Plant
NWE WEEKLY HOURS
JUNE 20 1992
Class
EI d
to
i
B]
ll
Project Administrator
Air Technician
Survey Technician
Administrative Coordinator
Air Samples Maint: Capital:
8ulk Samples
Maint:
Capital:
Personnel Totals*
Maintenar.ce=
Capital=
Total Manhours
=
Maintenance ST OT
10 0
20.5
0
00
13 0
20 87
0 4
43.5 111
154.5 Hours
si
El
II
II
n
El
H
0
Capital ST OT
30 0
59.5
O
10
20.5
0
B.000667
Bg
m
m
Northwest Envirocon - Sherwin Plant
m NUE WEEKLY HOURS Class
JUNE 27 1992 Maintenance
n Project Administrator
ST 11
OT 0
n Air Technician Survey Technician
n Administrative Coordinator
Air Samples Maint:
4 Capital:
Bulk Samples
Maint:
Capital:
1!
Personnel Totals'
Maintenance=
11 Capital-
Total Manhours
-
26
2
12.5
28 119
6 0
51 .5 99
150.5 Hours
0 a 0
1J
U
II
I! I
%
1i
\
Capital ST OT
25.5
0
58.5
0
0O
15 0
B.000668
Bulk Sample Report Reynolds Metals NUE Job 3722
OATE SAMPLED AREA FAC
SAMPLE #
ACM % location/description
5-28-92
45 FAC 45/40CCT-007-01
N
CAUSTIC CLEANING TANK BOTTOM CONE UNDER WEATHER COAT
5-29-92 5-29-92 5-29-92 5-29-92 5-29-92 5-29-92 5-29-92 5-29-92
6-2-92
110 01-110-E-CT-06 110 01-110-N-CT-07 110 01-110-N-CT-08 110 oi-no-u-cr-oi 110 Ol-liO-S-CT-04 110 01-110-S-CT-03 110 01-110-U-CT-02 110 01-110-E-CT-05
3 35 06-35-A111-01
N #2 CONDENSATE STEAM
LINE
N #2 CONDENSATE STEAM
LINE
N #2 CONDENSATE STEAM
LINE
Y 15 #2 CONDENSATE STEAM
LINE
.
Y 15 #2 CONDENSATE STEAM
LINE'
Y 10 #2 CONDENSATE STEAM
LINE
Y 8 #2 CONOENSATE STEAM
LINE
Y A #2 CONOENSATE STEAM
LINE
*
Y 10 OLD MEDICAL CEILING IN ENCLOSURE
6-4-92 6-4-92 6-4-92 6-4-92 6-4-92 6-4-92 6-8-92 6-8-92 6-8-92 6-S-92 6-8-92 6-8-92
2 30 01-5/4-04 2 30 01-5/4-C3 2 30 01-5/4-C5 2 30 01-5/4-C6 2 30 01-5/4-C2 2 30 01-5/4-01 2 30 01-S/7-C4 2 30 01-S/7-C3 2 30 01-5/7-C5 2 30 01-S/7-02 2 30 01-5/7-Cl 2 30 01-5/7-C6
Y 25 5-4 FLASH TANK VAPOR LINE
Y 35 5-4 FLASH TANK VAPOR LINE
Y 25 5-4 FLASH TANK VAPOR LINE
Y 35 5-4 FLASH TANK VAPOR LINE
Y 25 5-4 FLASH TANK VAPOR LINE
Y 35 5-4 FLASH TANK VAPOR
N 5-7 FLASH TANK DISCHARGE LINE
N 5-7 FLASH TANK DISCHARGE LINE
N 5-7 FLASH TANK VAPOR LINE
N 5-7 FLASH TANK DISCHARGE LINE
Y 2C 5-7 FLASH TANK DISCHARGE LINE
Y 20 5-7 FLASH TANK DISCHARGE LINE
6-8-92 6-S-92 6-8-92 6-2-92
3 33 01-12U-C2 r? 33 01-I2W-C4
3 33 01-12U-C3
3 33 01-12M-::
N #12 WASHER N #12 WASHER Y IS #12 WASHER Y 15 #12 WASHER
D ,1 o !
B.000669
11
fil
II
El
Bulk Safflpls Report Reynolds Metals NUE Job 3722
OATE SAMPLED AREA FAC
SAMPLE *
6-15-92 6-1S-92 6-15-92 6-1S-92
35 06-B35-AC-01 35 06-B3S-AC-02 35 06-B35-AC-03 35 06-B3S-AC-04
6-23-92
3 35 01-5C-02
6-23-92 6-23-92
3 35 35-01-0F-01 3 35 01-5C-01
6-23-92 6-23-92
3 35 35-01-0F-02 3 35 0L-4C-Q2
6-23-92
3 35 C1-0F-C2
6-23-92
3 35 01-4C-C1
6-23-92
3 35 01-0F-C1
ACM % LCCATICN/DESCRIPTION
Y 50 OLD MEDICAL BUILDING N OLD MEDICAL BUILDING Y 30 OLD MEDICAL BUILDING Y 25 OLD MEDICAL BUILDING
Y 20 #1 COMMON CLEAR HEADER #4 &5 CLEAR PUMP OVERFLOW TANK
Y 33 ORANGE SETTLER OVERFLOW HEACER
N COMMON CLEAR HEADER #4 &S CLEAR PUMP OVERFLOW TANK
N ORANGE SETTLER OVERFLOU HEADER
Y 35 if1 COMMON CLEAR HEAOER #4 S5 CLEAR PUMP OVERFLOU TANK
Y 30 #1 COMMON CLEAR HEACER #4 $5 CLEAR PUMP OVERFLOW TANK
Y 20 #1 COMMON CLEAR HEACER #4 SS CLEAR PUMP OVERFLOU TANK
Y 30 Jtl COMMON CLEAR HEADER #4 S3 CLEAR PUMP OVERFLOW TANK
7-1-92
110 110/4E-09-C1
Y 35 #4 BOILER UPPER WATER WALL DOOR
7-1-92 7-1-92 7-1-92 7-1-92 7-1-92
2 42 oi-ic-:l-oi 2 42 01-10-22-03 2 42 01-1D-3L-04 2 42 01-10-2L-05 2 42 01-10-2L-02
Y 25 #1 DIGESTER DISCHARGE LINE
N *1 DIGESTER DISCHARGE LINE
Y 25 #1 DIGESTER DISCHARGE LINE
Y 3C #1 DIGESTER DISCHARGE LINE
Y 40 #1 DIGESTER DISCHARGE LINE
\
B.000670
Project Name: / r? Wo,
Exception Report
v" fSh&^W'V\ - Plav\~t
Pat6:__L>ff_bjtycQ ProiecTNo.: ?t13 <3
Type of Exception(s) (Check all that apply):
Non-compliance with state/federal asbestos regulations
Non-compliance with other safety regulations
Non-compliance with other contract terms
Non-compliance with mill/site policies
Contractor employee conduct
*
^ ______ _______
^ _______
Classification of Exception(s) (Check all that apply):
Willful Serious Citable by regulatory agency General
_______ ^ ^
Action Required/fieccmmended (Check all that apply):
Stop work, correct deficiency Correct Deficiency within *-/ hours Stop work, submit a plan to correct deficiency within
hours
^
Describe exception(s) in detail, including reference to appropriate specifications
and regulations:
' .
~rhp l 1 1 '---- Pv -Ol--Lin1------c^vr> "hop o~p I <-3 lUQ-SrX'-"
^A
rno i n jcn
.6) TVcC.X-s Ci~ -o bip
bu F PA___ cor cyclf
jX2X5-S
1 r ou rT iok-> fytach.i-Ate, ^5 rP'O^'^'7
^
fr'O^py ZrC/Y.VO Y'jhtep. />
-r l-* rtAfir.ki
cC5
P.av. $-2S>$oMAC
doc$\april SO^xcopiori jeport
B .000671
Page l of 2
Exception Report - Contractor's Reply
___________ 7^/? UZ/j-z/e.#- $siX`&s>f/r~' /^.nTK.rSZ^
TZ>,72 $)rdr,->
27//j?s~
7V ts / /s
y/Z
// ^ fy/u$7T
/.________________________
//
s,lCLoAtp/>,v&st y
. /__________ /
-
71^ d/hf/*>y
/)___________ i_______ __________ p r^rJltr-TT. /#<*<
\ /_______ /___________ /%/*. /Z^/
/
7*--^-
--;
/%*?. A P/iS /)/3 -p /-JA^rrTA< .
//'//A../ ^Z-1
//
I
Z^c//// f 77^ T
r ^_______ P-/i7's)sJ. //77c
i^//!/ K/trsji /> At/JZ'
r . /u/i.
*J /'./r& s?/A~<
/X-i7'/}Sf-'^ /'_ '/-///tisApf fifn/f &*/? ^/r^/'.^/r;:'
47-/'j/'/^yAZ ,c t//~s) 7sr:ec Z <fl*A
/^V. //sJsJt/sJ&t
_______________/S. /}*T' />'?*" Ttl.-'I /- 'J f/:/^
A?s>"/ A
/^ssj/y^r S^/Ak^ * idA/lAj/^ *> /^//^ JUcf.
,
a,/ ^ Zfe /V' S.cF^-7f ttrs /'JjrAS<-s/A$i. ,>) fir, y^vc^t \^. ^_____________
/
/vtj;J //T? rZ-.-V St>
I ^.
-
tt
-^ - -~Tr-T
---- - * ^ ry 7
w/ ^ *< wr
/a nJ^As-1
*7&S
o*P ///>> erj-
.Jo AAs'/rt 72AS, -*
T& T SJ^Uj-%.
6-7Z-9Z
Contractor
x
/{?///< J S '*/?;(' Contractor's Reprosen!a:.v9 (Prim Namo)
r--
/V/-/-/$
Rev. 5-25-90*MAC IT-worc .-ord Oocs\rtpni 90\exc9p:lon report
B.000672
'//} ~fj< ^/s? k/sidt**
:T-^/ /f/r "yi:/? ^?A/t/ei j4f
1 cfi%. Art) j,A $&/'**
ffi/tt/+* ffrr//rf ?2 //-.??
//*/*//** Trs^csc-AA,,
W//r fi//.J t/S /,CJi/i It- jt*.
B /)**&/ stSsrtrfi*/jp
vii -7^ /'4
jg-'-Vf /" //'r- //-c lss<T
IB -fr*
S`/1C /
- - ^-- // /- ^ . >-4 '.: /zL<z/~. -
In
iw,
/Ku/sr, fss *' s*
. :.i :
t/ /
"' ,/"A~F~'--
-^
.*,'/ rZ-rr-/ \ CC-fa-SA*
\m LZ
. J/S
si/ /;/'.'-A*:-S/s,7;r~n s7i /,^7^ hs*t,-A;+
s/d/SjJus/' sr ^7a fr'fs/-*/ Acs)
fjf C^izJJc'stA^ I'C'L"! A
il / ^ f'/ /
*"/!rtS/s'r/'.' /s*^''~/Crs` i/'/is" / />//
^S XLV S/s//siT' // 'r~.u),[1/
Hr Sk- 's/s//'' t '/`f ysr/i '
l,A w
v
f|*^XS, IJr
/ T
N I7
/
g-
l-- -
_
a,
a i
t;
J ; V1 #& 94 I
( l{ 1>
. . .
_-
S -F.: L /"Alf'/cf /'7a>A/ *J,/Z _A^Sa_
! t \im ^r-
|V< U
I /
r. *
/^-y^ u>r.~
J?IsaAc?J s.'//>
Sts'<A.^
/"*'1 Srr&cr'/Ar/
,- jL l'>/// /e/sAc^
\/&fc /?*/*/*) //ft s> /.'I's'/*-, fA
TiS Av//^^<!
lTi/A/sc Azi) s /'r/Jdfi'rrys.'r /A*' t/r.vr/s cAA^c
.
.
r Jl/AZ /A.
Jtl>{.?-,, _/jir//Js-St ys<'r>/ /'/ ?$/c.<
'&*/%. &^jsJ&i 'zXt/.fr_ &f_ui
-w-/
' /rfj-.C, /'/.
. r'iT> / AJ
Mss/** ** try/,.tf,z7?*>* - s**
7\/&*** 7/-^ AOQ , ~ r/j/'/""^s/- >lA, * A.~rA'Jtss-*s
'/At / ^ /twJ/c- JrS/y1/ /'A/As -
i/- /-'f,,/s'/st+yf t4- Z^- >^yy^C/r ^
_______'siV'/l'-t)
/X f
/A A' -//AvAA r'AsJSs///
~jj/'/-S'/S'< .J/f? f>A /A> /Jjs'p'SZ- JtfA'Sf/''?*)
fZ~X-S'sZ'/>- /As? J- OQ .
A^sS
i^C.___ ^
US>/cA/sJ f'c/s/scsWsssrsJZ'_ *
f^
7sCl -S//4-'S>/jy'2> - Z-- fl/jA.tr/s/ZyAAA /7y As*/? AC* A
aTl ^/stsrs-lS. ,cA AlZ'ZsjWs /?/j^rA/&
wA $7^ /f*j/h/s)sjc's.77' /7s- tsSsisj**?. Ass-- /4A/7/AA
'rtzS .
4Z
ysJ-/c'V>r\;A______ A /L cA-'.'io >'-
a//jr}i dt'K/te-cZ /fe S'Jvsf/
.It/TA...UMiJi:cL2fyj.j"/s':/=. j-~/y.. uYfs'.,<rs/p
/yr>-y/., ^__^ //f/.*' >r ..
yCys/s-'*: /ss7_
.`Uj/^ty/s-cS-^-L'i/x,i~Zs<rj/-yir/L.st/ifi-*?-?A-Ciw////
__
j'/o'' iyu/wc_^cls^/lcf/^^i`^A_^r______
/ . / - .// i/r J .', / //
/^
. jJclec/'-'-'/leJ.s.c ^
0j:S5s-vu? ;
ngjj
vis'*S^&s*kvMctV; 1
'Jn'jS mmm
78 H/ftfa*. ^_j?>gs/rfcZ/2-
*/j py/^y^,//j-rj/^?!'
i>/)jj?- M/telLKCt^-. ZC55& /i /jc/daAJ7'^^' ffiM?'. /}fr s?,r. r/d*s>, ^2.0640 Acn)dOsJ/?'fafutti wed /bz /?/ ^/? pJ/td*x /s rs/r.s? /r.d/:Kz^jr
f /.rvfryi /fl^/Jtt-/Lte.r*>r/*J> ctyjcjo/.. J~r-, ,,,^ ,,,,^r-. .1'**'BO&57 'is. h, a-Twfd,$/&/> r/f) /fe. /.k, c$^ m/t&t! S'i/e.
Jtj^is^mtLy/l-rVt-i ?&'j-eAd A fiZ'fc/j/ns'ste*zr_
,;/!/
./ <
v // yi
/
h/ffcc./Jj&oZt '?*' /<J_i $t;:rrZc //y>.t.///i>s/v</s/.''. rt'?~4*,A/^f/' J/t/Mic^vtJwee__
^G5LZ .A%j.*'for) S7<*.
T~a. /-jxs,/f^a^
fjSnt'Jl/^tod T 'TIjo ?fi7/^ fJZA./hktZ /.:rX*dtk> 77*
./v'~r&f))j/St>77> j+-j?-*u^e*ri-7 7777s,>> 77 ''.{'A-'t.r 'r//// ryjccKreeds/iyzlJ
7t7-_Z0^_f_jjjr,_&/_/>/%&7jyr T^rr-Sf ^/?_ tLrA//siis/*trsJc'j r./)F e7 7/-S. /;r*. /hrx. SM/rr/'/Z /'/-f /sr, /joT?
1i//cf-si .
'if '/Vf
' 0-s-j 77^.
r/s I'.+tztm //', 72'i. /*__#/
ESS
'*Z'*A
&JCC
7?/c C/f/i 7/,*. /'^ <"/ f7"L MstS/*>
C^f
`/r;Ar, U-f. /o 77r_ u>'-'rl y'rAcs,
&LM'jL___ r>-'WA. cj y'/A.,___ ______________ -.w________________ :_*_^.
7 A7
-r^.y^r-. ^yjy/~.r/.<.<yi.r___________________
ZfC:-'- yir ' C cyr~/7/il'j}y.1^.. /?/J_ / c s. ?'CL y/^-
{/>, /.
s'-*
f`r>/'*. /'/,, //i i_ firy.yc. y sy~a/>~._. /''/
r~r^l
/''A- _ `Z'.tf'S.yi._A'y_
\x/yiy)/. 'si/r*?'. .dl^l.. .'_____
B.000674
w ,. R* s/,y,,AC /,r?Ur.
>1 3
wE/L^yt*A"T /U/w w>r/J/KZ/^T
4,:>
, /V-rf/z/zf*./ Zsdr>
`c r
l^Xv/ #</Vv. /.'>7/WzZX7*~
-t
/vv, /virJ-z'Je
-
gj/bwf.'SS^.
/ . ' AJrb/Jr> Ml------------ "
j:r--- tr>./.ffs:/>rrs.7Zri
<r-' ft/'s. zf.'h >-7~~ fl-r! sf
\n r/zs-y ' ,'T-Z~Z>~.
j
'erf/J-J /-1
Ass-Mc. S^Jtrs/fJ i*/l
i f/y'///yvJ
$l/fsY/' )hl zj rf`!'X/z'/-
rv
\_s/y>/- /rU. //? A`~. ^----
/r*s ''r far-. fV/i
/>)
v? /> S''r- i'-'-'-d yfJxiA
'.>_/;/ //*/'
rzr-j. >/J /? f-rr.S^/?7s:--__. C/./'-s; /:y^ _L.C1Z.
J
t i~f-
zzM-y SrziL,Z XCAyO 4 `/Jz**
Jr^79
/" -4^
O'/vX" f &>,6/yx' mJ/ac/ /h*-x~s}r
H
)\ <J~~, or-^#z
!\(
1
_________________ s N)________________ ag*
il .
I____________________________/________________
/
__ L
J1__________________ __ _____
5S< *
H
Kga
N
!
|
plr-tn
1
*]
i
i!
/ l \
\
B .00067 5
/
i a
il
f
V;( .i.i ,f
m i!i! $
*
IVKIII IUJJ
W. k..o IUUU lOi
feXAS WORKERS* COMPENSATION COMMISSION
Central Office, 4000 South IH-35, Southfield Building
ustin, Texas 78704-7491 .
Send the specified copies to your Workers' Compensa-
i Carrier and the jnjured employee. Please read
.ruction sheet CAREFULLY, giving special attention
'To'"items marked with an asterisk (*).
TWCC CLAIM #
CARRIER'S CLAIM #.
EMPLOYER'S FIRST REPORT OF INJURY OR ILLNESS
^7. Name (Last. First. M.1.1
/?AF4*L.
2. Sex
fa m
A
73. Social Secunty Number 4. Home Phone
1 `is?-Si -im
5. Oate of Birth ('"-d-y)
1 -/t -1*7
B>. Does the^Employee Speak English? II No, Speoly Language
TM YES B NO
7. Race White
Stack O
8. Elhnioty Hispanic 0^
Asian
Native American Other
9. Mailing Address
Street or P.O. Boit
dof i &,x 7/2 Ag
/i5, Oats of Injury (m-d ji
18. Time o( Injury t?. Oate Lost Tune Began (m-d-yN
6 ~/A-9^- (Q.Qb am pm
18. Nature of Injury*
19. Part of Body Injured or Exposed*
gut#
f$Ate
&<Tjsr0e
20. How and Why injury/ttlness Occurred'
U/A.VLL. UJH.S lvO*.Xt*S
T-tc-H hT -Pip.
^
+3
21. Was employee domg his regular job?
,22. Worksite Location of Injury (stairs, dock, etc.)1
YES
NO o
City
AtfSo*/
State
Tt*
ZIP Code
7 %72
County
VS A
|0. Mantel Status
Married l/^Widowed Separated Q Single O Oivorced
11. Number oi OepenOent ChitOren 12. Spouse's Name
2- Ma iA/C&eS
1^11. Doctor's Name
. Doctor's Marling Address (Street or P.O. Box)
*y _ . ^ : ^ v.V
' >.
f
m
Slate ' ** V ** *
Zip Code
23. Address Where Injury or Exposure Occurred
Name of business if incident occurred on a business site
Street or P.O. 8ox
?e/_________
City
State
County ZIP Code
2l. Cause ot Injury (tatl. loot, machine, elc.)'
2$. List Witnesses
Vff 05 Cg*
26. Return n oat t*Ww 27. 00 amptOyM 04? xp80*3 (m-d-y)
D
28. Sooervucry Kama 29. 0*M ftaponeO(m-O-y)
VbVi/
W> -It -n YES HO a/ SMfftf
j? "/>
/30. Oate o! Hire (m-0-r)
31. Was employee hired or recruited in Texas?
,32. Length of Service in Current Position
33. Length ot Service in Occupation
V|___ =1^_____
YES ^4 NO O
i: It. Employee Payroll Classification Code
months years 35. Occupation ot Injured Worker
months *7- years
36. Rate oi Pay at mu Job
3*. Full Work Week is:
38. Last Paycheck was;
39. Is employee an Owner. Panner. or Corporate Officer?
Hourly J
Weekly
Hours V Days $3^^___ (or
Hours or t{_ OayS
YES NO 0^
\ J
Name and Title ot Person Completing Form
a Aa.(&>
kaC')
42. Buameu Wailing Addresi and Telephone Number
X~ w 0.d.^`~4j^r^ii/fc*L^4'''T'fetephone(
)
41. Name ol Business
HGA 5 te ph r - s
43. Buameu LLooccJattOioln (If ditterent from mailing address)
JNumber and Street *7 "7 7 rv f r <(J <
5*u I (- r- ifS'
City ,,
,j State
ZIP Code
n ou Sfon
s
*.{Fedenf to'tieciciinft***
43. ~Pr-i-rm---ry--S---a-n--a--x-rt--1-c--l--m--h--! Ciiurfeawn (SiC] Coo*- (4
46. Soeolc StC Co<W (4
LI
<8. Workers' Compensation Insurance Company
49. Potcy Number
47. Titt Co^OTOW Tu0*yr No.
0d you request acodent prevention service* in me pit! 12 months? D KO ' H y, 3V3 fcu receive tha-m1* YES C NO Signature trd Tit* (READ INSTRUCTIONS ON INSTRUCTION SHEET BEFORE SIGNING)
Date. 6-IA-4S.
0 t (2-91}
Twer.
B.000676 _
Rule 120 7 Hart Forms A Services
Reoidei No 14.4162
tiOLSTEPHEMS ENVIRONMENTAL SPECIALISTS
Recycled pace* W
I
1
FIRST REPORT OF INJURY SUPPLEMENTAL INFORMATION
1
I INJURED EMPLOYEE NUMBER: 'fffJiMl__________________
ru\<&JOB NUMBER:.
1 JOB NAME:
I'h(o__
H
SUPERINTENDENT IN CHARGE :
^UfT__________
I
a THIS FORM MUST BE SUBMITTED ALONG WITH FIRST REPORT OF INJURY.
i
f.
; f <
B* 000677