Subject VCM Control Report for the Period: 9/8/79 to 9/14/79
Copy to
W. R. Fogelsanger D. M. Hershkowitz F. W. Kanzler F. S. Klopp R. A. Lojewski S. P. Robbins* M. K. Rosen C. F. Rothenbeck G. X. Rozand P. D. Ruane P. R. Scarito D. I. Scofield M. E. Wagshul
*Table II Only
Area
VCM Average Level
% < 1 ppm
Number ^100 ppm
Reactor Building
0.3
3.2
0
Recovery Comp. Room
8.6
17.9
8
General Area
<0.1
0.1
0
Pilot Plant
<0.1
0.1
0
Parshall Flume
-(0.1
0.8
0
The Reactor Building remained at a low 0.3 ppm average.
Bendix TWA Analysis:
The computer TWA values for the Utility Operators and Shift Mechanics were above 1.0 ppm. These classifications were protected by the use of
breathing air.
WDB:ms
W. D. Bord
011740
nter-officememo TENNECO CHEMICALS, INC.
To W. D. Bord
From P. D. Ruane
Subject VCM Control Report for the Period: 9/8/79 to 9/14/79
At Flemington At Flemington
Date October 11, 1979
Copy to
w. R. Fogelsanger D. M. Hershkowitz F. W. Kanzler F. S. Klopp R. A. Loj ewski S. P. Robbins* M. K. Rosen C. F. Rothenbeck G. I. Rozand P. R. Scarito D. I. Scofield J. T. Sweeney M. E. Wagshul
`Table II Only
Attached is a summary of the Flemington VCM levels as determined by the Computerized Area Monitoring System for the week of September 8, 1979 to September 14, 1979.
PDRrms
fku-Q'b. fllLCtSHJLs
P. D. Ruane
011741
TABLE I AREA MONITORING SYSTEM - FLEMINGTON
Weekly Summary
Area
Average PPM,VCM
Reactor Building
0.3
Recovery Comp. Room 8.6
General Area
<0.1
Pilot Plant
<0.1
Parshall Flume
<0.1
Total Samples
6,235 955
4,790 3,835
475
Period: 9/8/79 to 9/14/79
Number of Readings & Percentages
>-1 N%
75 N%
/'25 N%
yioo
N%
201 3.2 80 1.3 6 0.1 0
0
171 17.9 111 11.6 29 3.0 8
0
3 0.1
2 0.04 1
0.02 0
0
2 0.1
00
00
0
0
4 0.8
00
00
0
0
PDR:ms
P. D,. Ruane