Document Rp4V6MLrvLVZRa3gdp3Rq5QkB

ELECTRONIC EMAIL CONFIRMATION OF EMAIL RECEIPT REQUESTED Billie Bales Director of Finance Gecon Leasing, LLC 1557 S. Broad Street Monroe, Georgia 30665 geconleasing@gmail.com Re: Mayfield Lagoon Compliance Evaluation Inspection Report NPDES Permit No. GA0021873 Dear Billie Bales: The U.S. Environmental Protection Agency, Region 4 and the Georgia Environmental Protection Division inspected the Mayfield Water Pollution Control Plant located at Hamburg State Park Road, Jewell, Georgia on December 4, 2023, for compliance with its National Pollutant Discharge Elimination System permit and the Clean Water Act. The inspection findings are provided in the enclosed Compliance Evaluation Inspection Report. If you have any questions about the inspection report, please contact Mr. William Joyner at 404-562-8795 or via email at joyner.william@epa.gov. Sincerely, JAIRO Digitally signed by JAIRO CASTILLO CASTILLO Date: 2024.02.12 17:01:29 -05'00' Jairo Castillo, P.E., Chief Wastewater Enforcement Section Water Enforcement Branch Enclosure cc: Johanna Smith, P.E. Georgia Environmental Protection Division johanna.smith@dnr.ga.gov Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 United States Environmental Protection Agency Region 4 Enforcement and Compliance Assurance Division Water Enforcement Branch 61 Forsyth Street, SW Atlanta, Georgia 30303 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant NPDES Permit: GA0021873 Project No. CV-GA0021873-12042023 Hamburg State Park Road Jewell, Georgia, 31045 Inspection Date: December 04, 2023 Inspector: William Joyner, EPA Region 4 Tristan Odekirk, EPA Region 4 Inspection Report Prepared by: William Joyner 1 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 Approval Sheet Title: Compliance Evaluation Inspection, Mayfield Water Pollution Control Plant, Jewell, Georgia Approving Official: JAIRO CASTILLO Digitally signed by JAIRO CASTILLO Date: 2024.02.12 17:02:16 -05'00' Jairo Castillo, P.E., Chief Wastewater Enforcement Section Water Enforcement Branch Enforcement Officer: Joyner, William Digitally signed by Joyner, William Date: 2024.02.12 16:53:54 -05'00' William Joyner, Environmental Engineer Wastewater Enforcement Section Water Enforcement Branch 2 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 Table of Contents 1. INTRODUCTION...............................................................................................................................4 2. PARTICIPANTS..................................................................................................................................4 3. FACILITY DESCRIPTION.....................................................................................................................4 4. INSPECTION PROCEDURES...............................................................................................................4 5. FINDINGS AND CONCLUSIONS ........................................................................................................4 A. PERMITS.....................................................................................................................................4 B. RECORDS AND REPORTS............................................................................................................5 C. FLOW MEASUREMENTS.............................................................................................................5 D. SAMPLING REVIEW....................................................................................................................5 E. OPERATIONS AND MAINTENANCE.............................................................................................5 F. EFFLUENT AND RECEIVING WATERS..........................................................................................5 6. DISCUSSION.....................................................................................................................................5 APPENDIX 1 Photographic Log ..............................................................................................................7 APPENDIX 2 Permit Compliance History ...........................................................................................10 3 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 1. INTRODUCTION Representatives of the U.S. Environmental Protection Agency, Region 4 and the Georgia Department of Natural Resources, Environmental Protection Division (GA-EPD) conducted a Compliance Evaluation Inspection (CEI) at the Mayfield Water Pollution Control Plant (WPCP) owned by Gecon Leasing, LLC. The WPCP is located at Hamburg State Park Road, Jewel, Georgia. The inspection was conducted under the authority of Section 308 of the Clean Water Act (CWA), as amended. The WPCP was purchased by Gecon Leasing, LLC in September of 2022. This narrative report and attachments present the results of the inspection. An opening conference was held on December 4, 2023, at the Gecon Leasing, LLC office followed by a walk through of the facility. 2. PARTICIPANTS Name William Joyner Tristan Odekirk Samantha Wagner Lynn Whitaker Position EPA Inspector EPA Inspector GA-EPD Inspector Mayfield Property Manager Phone umber 404-562-8795 404-562- 9295 404-473-1226 706-444-6288 3. FACILITY DESCRIPTION The WPCP is a single cell facultative lagoon that consist of an influent pump station and wet well and chlorination contact chamber. Disinfection is achieved by liquid chlorine prior to dechlorination. Sodium Sulfate tablet de-chlorination is used to remove residual chlorine prior to entering the receiving stream. Wastewater is collected from approximately 48 residences. 4. INSPECTION PROCEDURES The overall objective of this CEI was to evaluate the condition and operational performance of the WPCP and the permittee's self-monitoring program and offer compliance assistance as needed. Specific tasks included an opening conference, conducting an interview with the utilities operator, reviewing Discharge Monitoring Reports (DMRs) and other records, conducting a site visit, and a closing conference. 5. FINDINGS AND CONCLUSIONS A. PERMIT The National Pollutant Discharge Elimination System (NPDES) permit number GA0021873 was not available at the time of the inspection. The permittee is authorized to discharge treated domestic wastewater into Fulsome Creek through Outfall 001. 4 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 B. RECORDS AND REPORTS There were no records or reports available to review at the time of the inspection. Facility documents were located at the Gecon Leasing office in Monroe, Georgia. EPA conducted a review of the Integrated Compliance Information System database for the months of December 2020 through June 2023. Appendix 2 shows the summary of the City's compliance history of the NPDES permit effluent limits. C. FLOW MEASUREMENT The flow meter and the effluent totalizer chart were operational. D. Sampling Review The permittee had no analytical laboratory results, DMR's, or operator log documents to review at the time of the inspection. According to the property manager the permittee used CSRA Analytical Laboratories, Inc until September of 2023. As of December 2023, CSRA Informed the permittee that they would not be returning to service the WPCP. E. Operations and Maintenance (Refer to Attachment 1 for cited photographs) Both Influent pumps were operational (Photo 1,2). Effluent flowing through Palmer-Bowlus Flume (Photos 3). The calibration label on the flow meter was illegible (Photo 4). Liquid chlorine is added via a 30-40-gallon drum 24 hours a day (Photo 5). Effluent chart was operating (Photo 6). The Chlorine contact chamber chlorine injector pumps were operating. However, excessive foaming was observed (Photo 7). Sodium Sulfate tablet de-chlorination tank was observed in good conditions (Photo 8). EPA observed excessive vegetative growth inside the perimeter of the lagoon near the water line (Photo 10). F. Effluent and Receiving Waters The effluent discharging to the creek was gray in color (See Photo 11). 6. Discussion The permittee was informed of the inspection and confirmed that facility documents would be available for the inspection. However, during the opening conference the property manager called the permittees office and was unable to confirm documents would be available for the meeting. 5 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 A. Part II A. (Proper Operation and Maintenance Requirements) of the NPDES permit states, "The permittee shall properly maintain and operate effectively all treatment or control facilities and related equipment installed or used by the permittee to achieve compliance with this permit. Efficient operation and maintenance include effective performance, adequate funding, adequate operator staffing and training, and adequate laboratory and process controls, including appropriate quality assurance procedures. Back-up or auxiliary facilities or similar systems shall be operated only when necessary to achieve permit compliance." i. Excessive algae growth can potentially impact disinfection efficiency and can cause effluent limits exceedances. ii. Excessive brush and tree growth on the banks of the lagoon can lead to a degradation of the lagoon banks over time. The town should manage and control the vegetation on the lagoon banks to prevent root penetration of the bank. iii. Maintaining adequate laboratory and process control is an element of proper operation and maintenance of the facility. EPA advises the permittee to retain a properly certified laboratory in lieu of CSRA Analytical Laboratories should CSRA continue to not provide services in the future to conduct sample analysis. B. Part II.A.6 (Operator Certification Requirements) of the NPDES Permit states, "The person responsible for the daily operation of the facility must be a Class III Certified Operator in compliance with the Georgia State Board of Examiners for Certification of Water and Wastewater Plant Operators and Laboratory Analysts Act, as amended, and as specified by Subparagraph 391-3-6-.12 of the Rules and Regulations for Water Quality Control. All other operators must have the minimum certification required by this Act." i. The EPA advises the permittee to secure a Class III operator as soon as possible. 6 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 APPENDIX 1 Photographic Log Photo 1. Influent pump station. Photo 2. Both influent submersible pumps were operational. Photo 3. Effluent flowing through the Palmer Bowlus Photo 4. Flow Meter calibration label was illegible. Flume. 7 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 Photo 5. Liquid Chlorine tank. Photo 6. Effluent chart was operational. Photo 7. Chlorine contact Chamber. Photo 8. Sodium Sulfate tablet de-chlorination Tank. 8 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 Photo 9. Effluent flowing into lagoon. 10. Vegetative growth observed inside the perimeter of the lagoon near the water line. Photo 11. Effluent at outfall was gray in color. 9 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 monitoring Period End Date 12/31/2020 12/31/2020 1/31/2021 1/31/2021 2/28/2021 2/28/2021 3/31/2021 3/31/2021 4/30/2021 8/31/2021 8/31/2021 9/30/2021 10/31/2021 11/30/2021 12/31/2021 12/31/2021 1/31/2022 2/28/2022 2/28/2022 3/31/2022 3/31/2022 3/31/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 4/30/2022 5/31/2022 APPENDIX 2 Permit Compliance History Permit Parameter Limit DMR Description Value Value Units Solids, total suspended 8.5 17.1 kg/d Solids, total suspended 45 76.5 mg/L Flow 0.075 0.088 MGD Flow 0.06 0.077 MGD Flow 0.06 0.123 MGD Flow 0.075 0.196 MGD Flow 0.075 0.188 MGD Flow 0.06 0.079 MGD Flow 0.075 0.099 MGD Solids, total suspended 8.5 13.5 kg/d Flow 0.075 0.292 MGD Flow 0.075 0.094 MGD Chlorine, total residual 0.01 0.02 mg/L Chlorine, total residual 0.01 0.11 mg/L Flow 0.08 0.089 MGD Chlorine, total residual 0.01 0.19 mg/L Chlorine, total residual 0.01 0.21 Flow 0.06 0.075 Chlorine, total residual 0.01 0.18 Flow 0.08 0.135 Chlorine, total residual 0.01 0.19 Coliform, fecal general 400 1200 BOD, 5-day, 20 deg. C 8.5 11.4 Solids, total suspended 8.5 13.3 Flow 0.06 0.09 MGD Flow 0.08 0.86 MGD Chlorine, total residual 0.01 0.31 mg/L Chlorine, total residual 0.01 0.019 mg/L Violation Type Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance Significant/Category I Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance Significant/Category I Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance Significant/Category I Noncompliance 10 of 11 Compliance Evaluation Inspection Report City of Mayfield Water Pollution Control Plant Project #CV-GA0021873-12042023 6/30/2022 7/31/2022 8/31/2022 9/30/2022 10/31/2022 10/31/2022 10/31/2022 11/30/2022 12/31/2022 12/31/2022 12/31/2022 1/31/2023 1/31/2023 1/31/2023 1/31/2023 2/28/2023 2/28/2023 2/28/2023 3/31/2023 3/31/2023 3/31/2023 4/30/2023 5/31/2023 6/30/2023 Chlorine, total residual Flow Chlorine, total residual Chlorine, total residual BOD, 5-day, 20 deg. C BOD, 5-day, 20 deg. C Chlorine, total residual Chlorine, total residual BOD, 5-day, 20 deg. C Flow Chlorine, total residual Solids, total suspended Flow Flow Chlorine, total residual Flow Flow Chlorine, total residual Flow Flow Chlorine, total residual Chlorine, total residual Chlorine, total residual Chlorine, total residual Significant/Category I 0.01 0.1 mg/L Noncompliance 0.08 0.104 MGD Non-Reportable Noncompliance Significant/Category I 0.01 0.24 mg/L Noncompliance Significant/Category I 0.01 0.38 mg/L Noncompliance 45 105 mg/L Non-Reportable Noncompliance 30 50.9 mg/L Non-Reportable Noncompliance Significant/Category I 0.01 0.14 mg/L Noncompliance Significant/Category I 0.01 0.1 Noncompliance 8.5 9.68 0.08 0.084 0.01 0.49 Non-Reportable Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance 8.5 11.7 0.08 0.26 0.06 0.075 0.01 0.11 0.08 0.133 0.06 0.097 0.01 0.25 0.08 0.128 0.06 0.088 Non-Reportable Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance Significant/Category I Noncompliance Non-Reportable Noncompliance Non-Reportable Noncompliance 0.01 0.12 Non-Reportable Noncompliance Significant/Category I 0.01 0.19 mg/L Noncompliance Significant/Category I 0.01 0.13 mg/L Noncompliance Significant/Category I 0.01 0.16 mg/L Noncompliance END OF REPORT 11 of 11