Document RjyMzLLD3oD0erv57ZEvzoe2v
Washington Works
MH
ao
N >OB4
O
EPA/COE Update Meeting M y 18, 2002
AR226-2552
EID781150
Agenda
Background/Recent Project Activity
--RCRA Program Status --Multi-Media Consent Order Update --GW Modeling Project
Review Preliminary GW Modeling Results RCRA Program Path Forward
--RFI Report/EPA Review --El Status
Meeting Objectives
Provide brief overview o f recent MMCO activity at Washington Works Re-assess where we stand with regard to EPA Region III RCRA program, determine next steps (i.e., RFI, E.I.s) Receive technical feedback from EPA/COE on the newly constructed Wash Works GW Flow Model
Background/Recent Activity
RCRA Program Status
- EPA reviewing RFI report --C-8 screening levels needed for completion - El evaluation also on hold pending C-8
screening levels --Ongoing GW Modeling project will address
EPA/COE 2001 comments on 1999/RFI version o f GW Model
1in0 cn
8Z0HSV
Background/Recent Activity
mH saow
j
Multi-media Consent Order (WVDEP)
Required Elements:
- Toxicology/CAT: Develop RBC-Like screening levels for dw, soil, and air
- GW/SW Investigation/GIST: Determine extent in groundwater & surface water at/near sites
- Cap/reduce emissions to air & sw
EID781154
CAT Highlights
Toxicology team met May 5-7. Nationally recognized experts. Evaluated 20 years o f tox data and TERA recommendations. Final Results:
- Drinking Water: 150 ug/L - Soil: 240 mg/kg (ingestion) - Air: Not final, range .1-6 ug/m3
GIST HighUghts
* Main Plant, Local, Dry Run, Letart Landfills. Have completed: - 1-mile water use survey & sampling (all sites) - 2-mile near Main Plant/Local LF - Ohio River PWS sampling (10 miles up/50 miles down)/1-4 events per location (15 sites) - Site monthly gw/sw sampling (4 consec. months) - Ohio River Sampling - Reports (Historical, Monthly, Summary) - Site(s) Investigation, 26 wells, ongoing - GW Model, expanded domain, ongoing
EID781156
ASH027877 EID781157
EID781157
MMCO-Emissions
Required: Cap air emissions at year 2000 levels
Voluntary Efforts in Teflon:
--Teflon Wastewater/Oberlin Filter (90% Reduction)
- Air: New scrubbers installed in April, hope to g achieve 85% reduction
oa a*4i
EID781158
MMCO-Groundwater
Modeling Project
Little Hocking WA 12/2001 results provided near -term driver Objective: Is groundwater transport off C-8 possible from DuPont
site to LHWA well field
GIST Oversight Use team offregulatory technical experts (I.e., USGS, WVDEP,
EPA, COE) throughout process
Today's Objective: - Mid-term review offprogress to-date, including model set-up, conceptual model development, calibration runs, to obtain
| early feedback and answer questions
aoto
4
00
<40
EID781159
SH027860 EID781160