PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING DECEMBER 16, 1981 Present were: G.A. Danner G.W. -Daues J.A. Glass D.E. Kaldenberg B. Nappier for B.C. Lancaster J.J. McClellan A.J. Bolton for C.M. McCullough D.W. Metten C.F. Navarrete M.L. Owens J.J. McClellan for G.T. Ryan D.R. Wise for J.G. Trafton M.A. Riddle, Visitor I. REVIEW OF STATISTICS--J.A. Glass A. Texas City Plant Safety Performance Summary - November 1981 TOTAL INJURY CASES RECORDABLE CASES (A) WITHOUT LOST WORKDAYS (medical treatment only) (B) LOST WORKDAYS **BX RESTRICTED ACTIVITY **B2 DAYS A?AY FROM WORK (C) FATALITIES *TOTAL RECORDABLE CASES 1980 Nov. YTD 11 211 1981 1981 Nov YTD TARGETS 9 228 0 9 2 18 9 0 0 0 __ 0 2 0 2 __ 0 0 0 0 0 62 0-- 6-- 0-- __ 2 11 __ 2 24 11 INJURY RATES PER 200,000 MANHOURS 1980 1981 1981 MTD YTD MTD YTD TARGETS TOTAL INJURY - TIR TOTAL RECORDABLE - TRR TOTAL LOST WORKDAY - TLWR DAYS-AWAY-FROM-W ORK - DAWR 8.57 13.34 0.00 0.70 0.00 0.13 0.00 0.13 6.71 1.49 0.00 0.00 14.61 1.54 0.38 0.38 -- 0.64 0.12 -- YTD 1981 MCIC TARGET YTD ----- ----- 1.84 1.42 ----- 0.27 ----- 0.22 SC 003293 LAIVI004307 PMSB Meeting Minutes - December 16, 1981 Page 2 B. Comments on Statistics--J.A. Glass We experienced nine total injuries during November. Two of these injuries were recordable: 1) An employee was involved in an accident off plant while on com pany business. He received a fractured arm, multiple bruises, and loss of several teeth; 2) An operator was in the process of lighting a furnace when a flashback occurred resulting in first and second degree bums to his neck and chest. This was the second bum incident we've had within a month involving the lighting of burners. This is a good time to review departmental operating procedures for lighting burners on gas fired equipment. The number of bum cases in the plant has been increasing. We have an excellent video tape, "Bum Emergency", which can be used to help present a safety meeting on this topic. It should help increase employee safety awareness of the effects of burns, and also demonstrates proper emergency care procedures. C. Contractor Safety--C.M. McCullough Safety statistics for total contractor safety and capital project contractor safety are attached to these minutes. November was a good month with no recordable in plant support, and only one in capital projects. D. CEP Project Safety--B.C. Lancaster Accident statistics for the CED construction group were tabulated and listed as attachments the minutes of this meeting. II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--G.W. Daues A. INTERLOCK BYPASSING Comments received from the PMSB in November were incorporated into the new P-Bulletin on protective devices. In addition, portions of P-0123 on relief valves have been added. The P-Bulletin is now being circulated for final approval. Target date for issue: Mid January 1982. B. NEW PLANTWIDE SAFETY PROGRAM The LP&S superintendent reviewed a proposal for a program aimed at increasing safety awareness in the first quarter of 1982. SAC was favorably impressed and recommends he review it with the PMSB in December. SC 003294 LAM004308 PMSB Meeting Minutes - December 16, 1981 Page 3 C. MANAGING AND COMMUNICATING SAFETY PROGRAMS - SUPERVISOR TRAINING PROGRAM LP&S briefly described a new program aimed at improving one-on-one communications on safety* SAC requested more detail from LP&S at their January meeting. D. STATUS OF P-BPLLETINS SHAC has studied all P-Bulletins to determine which need updating. LP&S and SAC reviewed SHAC's findings and assisted in assigning responsibilities for updating. These were distributed and reviewed. Status of revisions will be reviewed at January PMSB. E. CONTROL ROOM CONSTRUCTION - S&PP SURVEY III. Plant Services will explore alternative locations, design, standards, and relocation of existing combustible walls and panels in control houses and recommend appropriate action. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)--J.J. McClellan A. 1981 Safety and Housekeeping Inspection October 13,14, & 15--- J. A. Glass Copies of the Inspection Report from chairman Needham Coppedge, has been received and distributed to members of the PMSB. LP&S will send out a list of recommendations with it proposed assignments attached for review at the February meeting. B. Status of S-T-A-R-T Safety Program--J.J- McClellan Slides for the 1st quarter of 1982 had not yet been prepared, but expected them to be ready in January. C. Hourly Safety Committee Item--J.J. McClellan There were no items of concern at the last Hourly Safety Committee meeting. Ed Crow presented a program for the Hourly Committee about Contractor Safety. Doug Metten will present the program at the next meeting. D. Safety Showers A review of the safety shower situation pointed out that the emphasis in the new ANSI Standard was on major equipment revisions. The PMSB expressed its concern that we focus our attention on compliance with the OSHA and corporate standards. LP&S will propose to the SAC appropriate actions in compliance with this request. SC 003295 LAM004309 PMSB Meeting Minutes - December 16, 1981 Page 4 E. EMERGENCY PROCEDURE PLAN TEST The test of the emergency procedure plan was scheduled to follow the PMSB meeting on December 16. (This.test was actually held) IV. LOSS REPORTING--R.T. HAMMANN/J.A. GLASS There were no delinquent loss reports outstanding at this time. V. 1981 S&PP SURVEY AUGDST 31. THRO SEPTEMBER 4--R.T. HAMMANN/J.A. GLASS The final report will be issued in late December (the report was actually Issued before the end of the year). VI. STATUS OF BREATHING AIR SYSTEM PROJECT--G.T. RYAN Ryan reported that the project was cleaning up a punch list of items and the unit was not expected to be ready until after the end of the year. One outstanding piece of business was the procedure to be used for the notification of the users in case hydrocarbon levels in the breathing air reached action levels. vn. REVIEW OF INCIDENTS The following Monsanto incidents were reviewed: Date Incident No. Description 11/26/81 81-48 Recordable Injury--While lighting pilot light on heater, man sustained burns to neck, chest and hand; 35P (D. Kos) 12/4/81 81-49 No injury--Overhead crane cable failure; Shops Building; failure to check after changing electrical (G. McVay) Contractor Incidents NONE VIII. OTHER ITEMS A. OFFICE SAFETY SLIDES, OFFICE SAFETY COMMITTEE--R.T. HAMMANN The PMSB requests that each time our safety awareness slides are pre pared for plant use that the Office Safety Committee prepare similar slides for use in the office areas. SC 003296 LAM004310 PMSB Meeting Minutes - December 16, 1981 Page 5 B. EMERGENCY PROCEDURE DISASTER DRILL--J.A. GLASS Reviewed the steps to be taken and the general purpose of the Disaster Drill to be held later that day. IX. PLANT MANAGER'S COMMENTS The Plant Manager sent the message that we should not wait until the January program is launched to try to achieve an improvement in safety performance. Line communications should be used to increase safety awareness throughout the plant. J. Arnold Glass es SC 003297 UAW1004311 TOTAL PLANT CONTRACTOR SAFETY TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES *81 YTD 69 12 5 TOTAL MANHOURS WORKED (MHW) FREQUENCY RATES/200,000 MHW TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE 490,331 28.1 4.8 2.0 Nov.81 9 0 0 33,295 1980 Totals 87 13 0 3 525,532 54 33.1 0 4.9 0 0 1.1 Sc 3298 LAM004312 iDIAL LO.N IRAU70RS*' _Total Injuries ^Total Injury Rate 1 Cummulatlve In ju rie s C um m ulatlyeTIR C u m u la tiv e Recordable In ju rie s ` Cum m ulatlve RIR Recordable Injuries Recordable Injury Rate SC 003299 LAM004313 CAPITAL PROJECTS CONTRACTORS TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES '81 YTD 18 4 2 TOTAL MANHOURS WORKED (MHW) FREOUENCY RATES/200.000 MHW 150,133 TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE 23.9 5.3 2.6 Nov.81 5 1 0 12,771 1980 Totals 41 6 0 2 232,120 78.3 15.6 0 35.3 5.1 0 1.7 SC 003300 J-A/W004374 Cununulatlve TIR 1 00H9} Ua wCn mo>HU u3 -T-'Cfl- i'a.-zn-^V.ilUlAL ~T.%UjhCTS"~~ ' ' ---- ' " p-no0udo$> 01 > ^ tJdJ! j sc 003301 _Recordable Injuries -Recordable Injury Rate cHa* <rnHt- tMo ?3 LAM004315 1 Mi CED CONSTRUCTION TEXAS CITE PLANT ACCIDENT STATISTICS NUMBER OF CASES Without Lost Workdays (Medical Treatment Only) Lost Workdays (Days Away) Fatalities Total Injury Total Recordable " FREQUENCY RATES Total Injury Total Recordable Total Lost Workdays 5 0 0 5 0 20.4 0 0 MANHOURS WORKED sc 003302 49,117 YTD AS OF 12/1/81 139 16 0 139 21 46.7 7.1 5.4 594,736 LAM004316 J C^l '2%: \ J SC 003292 LAM004306