Document RjpkKvpv789VrNDN0aYq3G167
PLANT MANAGER'S SAFETY BOARD MINUTES OF MEETING DECEMBER 16, 1981
Present were:
G.A. Danner G.W. -Daues J.A. Glass D.E. Kaldenberg B. Nappier for B.C. Lancaster J.J. McClellan A.J. Bolton for C.M. McCullough
D.W. Metten C.F. Navarrete M.L. Owens J.J. McClellan for G.T. Ryan D.R. Wise for J.G. Trafton M.A. Riddle, Visitor
I. REVIEW OF STATISTICS--J.A. Glass A. Texas City Plant Safety Performance Summary - November 1981
TOTAL INJURY CASES
RECORDABLE CASES
(A) WITHOUT LOST WORKDAYS (medical treatment only)
(B) LOST WORKDAYS **BX RESTRICTED ACTIVITY **B2 DAYS A?AY FROM WORK (C) FATALITIES
*TOTAL RECORDABLE CASES
1980 Nov. YTD
11 211
1981
1981
Nov YTD TARGETS
9 228
0 9 2 18 9
0 0 0 __ 0
2 0 2 __ 0
0 0 0 0
62 0-- 6-- 0--
__ 2 11 __ 2 24 11
INJURY RATES PER 200,000 MANHOURS
1980
1981
1981
MTD YTD MTD YTD TARGETS
TOTAL INJURY - TIR TOTAL RECORDABLE - TRR TOTAL LOST WORKDAY - TLWR DAYS-AWAY-FROM-W ORK - DAWR
8.57 13.34 0.00 0.70 0.00 0.13 0.00 0.13
6.71 1.49 0.00 0.00
14.61 1.54 0.38 0.38
--
0.64 0.12 --
YTD 1981 MCIC TARGET YTD ----- -----
1.84 1.42 ----- 0.27 ----- 0.22
SC 003293
LAIVI004307
PMSB Meeting Minutes - December 16, 1981
Page 2
B. Comments on Statistics--J.A. Glass
We experienced nine total injuries during November. Two of these injuries were recordable:
1) An employee was involved in an accident off plant while on com pany business. He received a fractured arm, multiple bruises, and loss of several teeth;
2) An operator was in the process of lighting a furnace when a flashback occurred resulting in first and second degree bums to his neck and chest. This was the second bum incident we've had within a month involving the lighting of burners. This is a good time to review departmental operating procedures for lighting burners on gas fired equipment.
The number of bum cases in the plant has been increasing. We have an excellent video tape, "Bum Emergency", which can be used to help present a safety meeting on this topic. It should help increase employee safety awareness of the effects of burns, and also demonstrates proper emergency care procedures.
C. Contractor Safety--C.M. McCullough
Safety statistics for total contractor safety and capital project contractor safety are attached to these minutes. November was a good month with no recordable in plant support, and only one in capital projects.
D. CEP Project Safety--B.C. Lancaster
Accident statistics for the CED construction group were tabulated and listed as attachments the minutes of this meeting.
II. REPORT OF THE SAFETY ADVISORY COMMITTEE (SAC)--G.W. Daues
A. INTERLOCK BYPASSING
Comments received from the PMSB in November were incorporated into the new P-Bulletin on protective devices. In addition, portions of P-0123 on relief valves have been added. The P-Bulletin is now being circulated for final approval. Target date for issue: Mid January 1982.
B. NEW PLANTWIDE SAFETY PROGRAM
The LP&S superintendent reviewed a proposal for a program aimed at increasing safety awareness in the first quarter of 1982. SAC was favorably impressed and recommends he review it with the PMSB in December.
SC 003294
LAM004308
PMSB Meeting Minutes - December 16, 1981
Page 3
C. MANAGING AND COMMUNICATING SAFETY PROGRAMS - SUPERVISOR TRAINING PROGRAM
LP&S briefly described a new program aimed at improving one-on-one communications on safety* SAC requested more detail from LP&S at their January meeting.
D. STATUS OF P-BPLLETINS
SHAC has studied all P-Bulletins to determine which need updating.
LP&S and SAC reviewed SHAC's findings and assisted in assigning responsibilities for updating. These were distributed and reviewed. Status of revisions will be reviewed at January PMSB.
E. CONTROL ROOM CONSTRUCTION - S&PP SURVEY
III.
Plant Services will explore alternative locations, design, standards, and relocation of existing combustible walls and panels in control houses and recommend appropriate action. REPORT OF THE PLANT SAFETY AND HOUSEKEEPING ACTION COMMITTEE (SHAC)--J.J. McClellan
A. 1981 Safety and Housekeeping Inspection October 13,14, & 15--- J. A. Glass
Copies of the Inspection Report from chairman Needham Coppedge, has been received and distributed to members of the PMSB. LP&S will send out a list of recommendations with it proposed assignments attached for review at the February meeting.
B. Status of S-T-A-R-T Safety Program--J.J- McClellan
Slides for the 1st quarter of 1982 had not yet been prepared, but expected them to be ready in January.
C. Hourly Safety Committee Item--J.J. McClellan
There were no items of concern at the last Hourly Safety Committee meeting. Ed Crow presented a program for the Hourly Committee about Contractor Safety. Doug Metten will present the program at the next meeting.
D. Safety Showers
A review of the safety shower situation pointed out that the emphasis in the new ANSI Standard was on major equipment revisions. The PMSB expressed its concern that we focus our attention on compliance with the OSHA and corporate standards. LP&S will propose to the SAC appropriate actions in compliance with this request.
SC 003295
LAM004309
PMSB Meeting Minutes - December 16, 1981
Page 4
E. EMERGENCY PROCEDURE PLAN TEST
The test of the emergency procedure plan was scheduled to follow the PMSB meeting on December 16. (This.test was actually held)
IV. LOSS REPORTING--R.T. HAMMANN/J.A. GLASS
There were no delinquent loss reports outstanding at this time.
V. 1981 S&PP SURVEY AUGDST 31. THRO SEPTEMBER 4--R.T. HAMMANN/J.A. GLASS
The final report will be issued in late December (the report was actually Issued before the end of the year).
VI. STATUS OF BREATHING AIR SYSTEM PROJECT--G.T. RYAN
Ryan reported that the project was cleaning up a punch list of items and the unit was not expected to be ready until after the end of the year. One outstanding piece of business was the procedure to be used for the notification of the users in case hydrocarbon levels in the breathing air reached action levels.
vn. REVIEW OF INCIDENTS
The following Monsanto incidents were reviewed:
Date
Incident No.
Description
11/26/81
81-48
Recordable Injury--While lighting pilot light on heater, man sustained burns to neck, chest and hand; 35P (D. Kos)
12/4/81
81-49
No injury--Overhead crane cable failure; Shops Building; failure to check after changing electrical (G. McVay)
Contractor Incidents
NONE
VIII. OTHER ITEMS
A. OFFICE SAFETY SLIDES, OFFICE SAFETY COMMITTEE--R.T. HAMMANN
The PMSB requests that each time our safety awareness slides are pre pared for plant use that the Office Safety Committee prepare similar slides for use in the office areas.
SC 003296
LAM004310
PMSB Meeting Minutes - December 16, 1981
Page 5
B. EMERGENCY PROCEDURE DISASTER DRILL--J.A. GLASS
Reviewed the steps to be taken and the general purpose of the Disaster Drill to be held later that day.
IX. PLANT MANAGER'S COMMENTS
The Plant Manager sent the message that we should not wait until the January program is launched to try to achieve an improvement in safety performance. Line communications should be used to increase safety awareness throughout the plant.
J. Arnold Glass es
SC 003297
UAW1004311
TOTAL PLANT CONTRACTOR SAFETY
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
*81 YTD 69
12
5
TOTAL MANHOURS WORKED (MHW)
FREQUENCY RATES/200,000 MHW
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
490,331
28.1 4.8
2.0
Nov.81 9 0
0 33,295
1980 Totals 87 13 0 3
525,532
54 33.1 0 4.9
0 0 1.1
Sc 3298
LAM004312
iDIAL LO.N IRAU70RS*'
_Total Injuries ^Total Injury Rate
1
Cummulatlve In ju rie s
C um m ulatlyeTIR
C u m u la tiv e Recordable In ju rie s `
Cum m ulatlve RIR
Recordable Injuries Recordable Injury Rate
SC 003299
LAM004313
CAPITAL PROJECTS CONTRACTORS
TOTAL INJURY CASES RECORDABLE CASES LOST WORK DAY CASES DAYS AWAY CASES
'81 YTD 18 4
2
TOTAL MANHOURS WORKED (MHW) FREOUENCY RATES/200.000 MHW
150,133
TOTAL INJURY RATE TOTAL RECORDABLE INJURY RATE TOTAL LOST WORKDAY RATE TOTAL DAYS AWAY RATE
23.9 5.3
2.6
Nov.81 5 1
0 12,771
1980 Totals 41 6 0 2
232,120
78.3 15.6
0
35.3 5.1 0 1.7
SC 003300
J-A/W004374
Cununulatlve TIR
1
00H9}
Ua wCn mo>HU u3
-T-'Cfl- i'a.-zn-^V.ilUlAL ~T.%UjhCTS"~~ ' ' ---- ' "
p-no0udo$>
01 >
^ tJdJ!
j
sc 003301
_Recordable Injuries -Recordable Injury Rate
cHa* <rnHt-
tMo ?3
LAM004315
1
Mi
CED CONSTRUCTION TEXAS CITE PLANT
ACCIDENT STATISTICS
NUMBER OF CASES
Without Lost Workdays (Medical Treatment Only)
Lost Workdays (Days Away)
Fatalities
Total Injury
Total Recordable
" FREQUENCY RATES
Total Injury Total Recordable Total Lost Workdays
5
0
0 5 0
20.4 0 0
MANHOURS WORKED
sc 003302
49,117
YTD AS OF
12/1/81
139 16 0
139 21
46.7 7.1 5.4
594,736
LAM004316
J
C^l
'2%: \ J
SC 003292
LAM004306