PLANTS
Puget Sound
DEPARTMENTS
RP&S - Docks
"
CLASSIFICATIONS Pumper Helper A . ' .TRAINEES
mi lilt run--n'imllnmir~"":^"TifniTT.ii>ii-|. ,*
------------ -r~ >. *+>,*-.
B . ON-. THE JOB TRAINING - . ' ;
--------v ^ ^-nuriT ihiii^-t-- >--. i^rrtrn.Tlr-T
DATE .
: 1, Load tank cars.
h-;'.
NAME uCmaiMiq
20 Load tank trucks.
; 3o Load, tank oars, LPS.and Butane '
4. . Load tank trucks; LP8
.
% Unload tank cars a, Refinedoil and slop oil
b0 Petrox
c,, Additives
60 Unload tank cars IPO and Butane
- . To Unload tank trucks LPG- .
8. Handle Records and Reports
9o Charge odorant and methanol drums . {LFG shipments)
10o Assist with meter proving - Truck Rack ilo Petrox trailer.truck
12. Inject Petrox in gasoline shipments
a. Tank trucks
13o ' Unload TEL fluid tank cars
14, Sample Spheroids
15o ffauge tanks
l60 . Prepare pumpa for repairs
27o Ullage gauge cargoes
l8. Assist at Blending Plant
WA-TEX 001802
job contents
Page'&
PLANTS
Puget Sound
DEPARTMENTS . RP&S ~ Docks
CLASSIFICATIONS Pumper Helper A
JaUiiiiiii i i t-' -- ri -m ireni-
Bo ON THE JCB TRAINING
5yHKnlnti 1
<iii<m--|^iwiii on
~ - --
w.. .ilji ;i' ,
19 o Ad just pump and mixer packing
' 26y!-:;;Siopi'-6Il /system
; - :
TRAINEES
DATE
vrVT'r vtitgi . -
NAME
21 o Slop, oil injection,. 22, - 10" utility. system
; .
23o, .Ship. ;spe?jt .caustic to NoW, Petro
chemical
: vv ,
.24o Deliver-to OPL
,:
25o Operate' automatic crude sampler
NOTE; Bumper Helper A also required to perform all items listed on the Job Content of the Pumper Helper ,B,,
Employe Qualified
Signed;
Date
iuiauauuu
= :
(Foreman)
WA-TEX 001803
4 v
PLANT i- '
DEPARTMENT t , CLASSIFICATION* OPERATIONS.
Puget Sound v - - :
RPSsS - Docks Pumper Helped A B-l Load Tank Cars
key-.
M'
, ./"iOfehehal information : Tahk' qat'.sf.'to be ;loadd'rW|ii^v^^S5p^'d'':< .i'.V-'.S\H
I .' `V
; 'On.;the: tank-'oar/rack
'. />:..
ad:'that'loading, apou-q
, ; ;: ,'v:'r r,
,
' in dome .of oars for filling,, Tank hafs . .
will be. of different, sisesv- <.
; '.* "it
' \ ,, /
Always load cars with- the.outlet cap:;.-
cff. .and only a dripping of the 'liquid1
is permissible,,
\'
2, Safety Equipment ;
The tank car rack is equipped -'With''the following equipment to prepare and
load cars in a safe manner.. .
a,, Safety Toe Boards to,.be, used,-..as a means of reaching the' car dome.,
DO NOT JUMP FROM .RACK ONTO GARS ,,
b. Gm mask, with breather hose, .safety harness and safety line to be used by' the loader when a car has to be entered for cleaning.or internal inspection made of the outlet valv.e and seat. NEVER ENTER A.TANK OAR which has omsmssrmsmm~
EOmPP^T/xyiJ^^HEOrOSE ,, ^SAFETY
'&t-ationed on'ToiT"outside of the car at the dome.,
Co A wooden or aluminum ladder equipped with safety feet approximately 8 feet long to be used inside' the- car which affords a means for the man to enteroar for cleaning and inspection.,
d 0 A bucket made of sp&rk proof material.
e,, A small broom.
fo A vapor proof permissible type flashlight.
/
WA-TEX 001804
' ""'Vv-:: \^tqb-b^-ki>;ow \
PLANTs- -x- -v- ^Puget Sound
. ..... 1,.
DEPARTMENT?
RF&-S - Docks
CLAESTEICATlCiNs.
Helper \ft ,
OPERATIONS.. ' '-B-l- Load Tank :cara (lonty);
jyS
IMPORTANTSTEPS (SShisv).;. :'.'i\'/
- 3. Prepare to Load ;
..
KEY.POINTS
g,.- A.;botfcle/of;,N9^f.og^fpir''-.cleaning1'"
lenses in gas mask,
. v ^x
:.
'h'. An explosion-JHttjQf' ;.6igiteif.-^>nv;vcf^ry-'/..
She.:self-powered t^pebt
'
'- help. irf case of emergency.; , il-'il.
l 1,1
a. Place BLUE FLAG near' Switch- p6ihy. . /V
beyond^Txead" of"rack arid open block'
'/..l'
valve to'rack:.
' ' -.;
; / ! * 7 ' >
.1
b. Check form R-84 and identify cars - - :
to be loaded..
, '. .
c ,, Lower safety foe - boards or* to car,' using care that the board is secure^ ly supported.
d. Remove dome cover and swing to top
side .of dome.
.
e. Inspect car to see if it is empty. If more-than-4" of product is found
in the car,, notify your supervisor before taking the next "step,"
f. Inspect-car for cleanliness. If
usual inspection from top of dome reveals the car is clean and no: water presentj, not necessary to enter ear for cleaning. If oar . appears dirty it will be necessary to enter and clean.
g. Check outlet valve in closed position.
,h.,Loosen cutlet cap by unscrewing a couple of threads to release any pressure which may be in the outlet 3 eg.
1. Remove cutlet cap from leg as soon as pressure is released.
WA-TEX 001805
' '
JOB BREAKDOWN .
PLANTS : .Puget Sound
DEPARTMENTS . ; RP&S . Docks .
CLASSIFICATIONS Pumper Helper A
OPERATIONS
B"i: Load Tank Cars (Cont*)
....... :B+1'.
' :' : ' -v;
W\
;-&t --1-
. ,1^I>jjni
11*1 rr?itirw'^.jwiii -m111 imtfVirni >i,iw unmmiiinmg------------------------------------------------------------------------------------------
>. ioIMPORTANT;STEPS/;; V ;^. - , , KEY POINTS;
______
3* : prepare to Load : '. v''i,(COnt*)>
1 *1 Open outlet valve using handle or V : t.':^}:vp H:
' wheel inside, car. dome 'ailpwihg. car'
'tb."drhin'bff'Into^-'sewer'.w
:'
.,/ k* Close outlet Valve, after . car has - ',.. >. y.:
drained*
;; -'-y'-``i:-; ^d
ip Place loading arm over dome of car*.
..f-
m. Place loading spout inside car and: . -
then connect to loading am*
'
.
n* Cover dome with vapor shield on all gasoline cars*
4* Load Car'
a. Open valves on rack riser and load ing arm and fill car*
b* Lead all ears shel.l~fu.il*
c* All, ears filled MUST he loaded at least to shell^full*
d* Lay car seal in relief valve hous. ing of car on dome*
e. Pill out sample tag and place on "grab" rail of dome while car is loading*
. .
f* Replace undercap on outlet leg* . after car is loaded* Cap not to be replaced if excessive .leakage occurs *
g, Remove loading spent and swing loading arm clear of car*
5* Prepare Car for Shipment
a* Gauge car with Dorris gauge stick which is provided on rack*
b* Place thermometer in car and allow to remain at least two minutes and then take temperature*
WA-TEX 00180$
V
' JOB BREAKDOWN . /
R-l
.v;.->v
.....PLANTS
: Puget Sound.
DEPARTMENTS
RP&S - Docks /
CLASSIFICATION? ' Pumper Helper A
OPERATIONs
B-J Load Tank Cars (Cont.);
""" .IMPORTANT STEPS'
5 ;Prepare Car "for Shipment (Cont.)
>i--ifaim
key< points-
11 < i'~i i iii i mm itn--Stmi- " *--!--'--*--h |n)i ''ft
. . 'g .`ThiOf: Oar, ifOr. water afterv-'l'dadlh^y',.
: dy Record gauge .-.temperature, andwaber
thief on R=>84. ''
"'
e* Take one .quart average sample from -'.
car . and .tag bottle'.
::
NOTE? Samples are to be protected from sunlight until taken tip ;
Laboratory.
f. Close dome cover and bolt or screw down securely3 noting that dome gasket is in good condition.
g. Seal dome cover and record seal number on r-84.
h. Finish filling out R~84 in required captions.
i. Place "Dangerous" placards In holders on both ends and both sides of car if loaded with gasoline.
j-. Inspect car for any leakage9 especially the undercap.
k. Notify Pumper that car is loaded. The Pumper is to inspect the car as to sealing* placards and any possible leaks.
NOTE; Cars are not to be shipped In a leaking condition.
l. Pumper to sign R~8A for "General Inspection."
m. Close block valve to loading rack.
/
WA-TEX 001807
_ --y5-: :r:'/.--."*: ; ;br&a:'r:
TT^rr^-.,.
V'VpLANT?:-:\r ve" '' -Puget Sound > ...y.f-..-
.
DEPARTMENT? '. RP&S - Doclcs
' f'-
:
CLASSIFICATION 5- "Pumper; Helper. A '
' OPERATION?.
B-l' Load Tank Cars (Cont.)
vi * _ ----------
<-'-*
~ ` '- Ml >!<
V^'V:YiVrjvrT^^r.
Kj^v-P01lgipa
j'...-:
'-- I II II I l~-------------
i--A----m----1 I'I
. s-Va; .;f:>=f >S-"vVv.; -i;; v J^v
locations;
o. Wash- down any oil from leaks or spills into- the .rack sewer 0
; p, Remove. BlUe Flag,.;..
<1. Take R84 card arid sample to Laboratory.
WA-TEX 001808
job breakdown
: ,'v-;','-t,-''-
: PLANT*
. Puget souhd, .. -
DEPARTMENTS
RP&S'- Docks .
-
CLASSIFICATIONS Pumper Helper A
OPERATIONS . /.
Load Tank' Trucks ,
.;</
'
B-&. Page 1 -
. -v"'
, :: "
:v ;
IMPORTANT STEPS
'1 Prepare Truck to Load :
KEg POINTS
'-V.v~
. aoSpottruekwIth dpme haiGft .under
desired loading spout.
7
7^:` 7` 77- .5 7 -
bv Shu7bf.'truck' motor.7' *r:s-v.- *_
"
.77
Co Driver to .set, brakes.-
-,v d'; Lower, safety toe board, to truck.--.
- e7Connect static wire to body of- > -
V ' ' truck.
j'-:
fo Throw, switch on grounding circuit to "On" and cheek grounding light.
g. Remove cover from loading hatch.
h. Inspect compartment(s) for clean
liness 6 If truck last loaded gaso line and is to load with Burner Oil or'Diesels a small amount of product is.to be flushed into truckcorapartment and drained out. Gasoline will lower the flash point on products mentioned above.
1* Caution driver that all truck outlet. ' valves are to be closed and truck
- . lights off.
3..Caution driver to keep hands off '
'
meters.
;
k.,Caution driver to do no work on truck.
1. Lower loading spout and place inside loading hatch.
ra. Insert ticket in meter and record ' "opening" on ticket with hand lever.
n. Set stop meter for desired amount.
W&-TEX 001809
V
JOB BREAKDOWN' "
^
;
. v:. '"'7'' 'I... \
M\
=Page %,
. PLANTS
Puget Sound :
77'7'.
77,;
DEPARTMENT2
; RP&S - DdckS
`
; -'
' C^SSIFXCATION r' Pumpez* Helper A
;
OPERATION'? B-&; I^^vTankATiraelcs, (Cehtr);*,.-
7. V
: r ":lCEY.POIN^ - /
' 7 /\VU
; s2V;^';Doad:'T?^ote%;-;.' y V-;7 'av\Open;yalye,'ena>;ioad;.ti?uek:' tip.the:.
:7y -y7; .""y-y''/''/artoupLt' shpw4V-`ofe;^^'o|J-Th'JLs can
. :
7,_ ''777 7.. 7 .
-iV';' 7
be .idete^in^d;:b5r;yr%a4iLpgy,the counter ^..
" ................
or. register, oxi meters f 7y -: ' '
Remove loading: spdut'and Replace: hatch cover.
c. Record closing;. oh:- meter ticket with hand lever and. remove ticket.
d. dive truck driver copy, of ticket
: which will also serve as a Bill of
Lading.
,
e. Throw grounding switch, to "OFF" positiono
f. Disconnect static wire.
g Pull up toe board..
h0 Record truck number* product loaded* amount metered' and time, on the truck loading report. '
NOTE; Heavy Fuel Oil trucks will be weighed in arid out in stead of . metered.
3. Sealing Trucks '
There may be cases when truck compart ments and outlets will be' required to be sealed. In such, cases* record seal
numbers on truck loading report.
c WA-TEX 001810
\
.PLANT? . DEPARTMENTS. . CLASSIFICATION OPERATION s
JOS BREAKDOWN.
;B3> page/i
I V' .'OenepaiV.inforttetion: o.e,?^i^^e^latiojpis
jjurkauj of ,E?cj>.lp3ives;; re^VlPfe'
-pi,.
WeC cheek all- -cars -before, We load -V-LVj .
thenV-'fo}? overdue testing; dates.; pp'/
These are found on-the. right hahd t
: end: of -the car. a you; face ' It from
either side. You will find; there
the dafce^the ear .was!built and last .
; date; .ear and;
were tested,. ;
A' check, list will be. issued' and from this you can determine when the next
testing is due, if overdue., we do;, not load the car-6
Check car carefully before you start to lead to see that all fittings are. visibly in good condition - plugs are present and in place, etc.
If after starting to load, any leaks occur that y6u cannot repair, shut down- loading and advise Pumper or Foreman.
2. Prepare Car for Loading
a. Erect barricade at each end of loading rack and place Blue Flag across track and open cock (block valve) on loading line.
b. Set car brakes.
'.
c,, Lower safety toe board from rack on to car.
d. Remove metal cover or plate on
steel housing at top center of tank car.
m-TEX 001811
-i
CO
' '.'.''"S'"
JOB BREAKDOWN "
' B~3. '
. -
. PLANTS. DEPARTMENT.?,
... ,-.v..Page.2' -;
Puget Sound
' v/'
RP&S -'Ddeks
r,
CLASSIFICATION 5 . Pufttpar .H^lpai? A; OPERATION? . . B^3 Loadr..TAnk: cars ~ LP.G. and. Butane :(Gdht,)
V' .
.. IMFQRTANTSTEPS 2 /' Prepare Car far:
V Loading' (Cont; ).
3,, Connect Loading Hose
:;;.KEY .P03OT:;, : /vCC.CC/
y-m iwh.ji.--"^rnrpinwTf*''**>*1-- - i ini>nitnMTTi-|'iT`Utirrnrm
1
-- <***'"
e, Remove' plug/ahd^open/l/A".: valve on > , :
'' samplingscannedbloh which<:e&$endi^C/C-C/-:
- -thranghcvhe -lmanboie: -dOver', &>;fcfagc<; : &' '.yC;
snmp in the'i'bottorn o.fthe car, C : "v C` C:\
. Allow enoughvapor or gas to "blow"
; to empty the sump in bottom of car,; . C-
and of any water:,which occasionally
may be in the sump when .ears have'
beep, unloadedwith air#
NOTE;
L0P,G (Propane) vapors re maining. in an empty car
normally are dry,, however, some tank cars are returned containing vapor saturated with moisture This is
particularly true when butane has been shipped in a propane
car the previous trip,
f, Exhaust wet gases thru the.1/4" bottom' sampler connection,
a. Connect the. 2" liquid and the 2" vapor, hose to the liquid and vapor connections Inside the tank dome,
NOTE?
These' are 2" screw angle
globe valves, which are flanged to the dome cover. The 2".liquid eductor valves are connected to 2" lines, ."
which extend to the bottom ofthe tank ear shell. These
lines are used for unloading as well as^loading. In each line, there is a plug type ex
cess flow check valve, which is not affected by loading
operations, but which will
close to prevent escape of IinP-,6, in event a valve or line is broken, or if the valve is opened suddenly.
If an excess flow check valve closes, the 2" globe valve
WA-TEX 001812
'' JOB BREAKDOWN " '
:i '. $-3 : >'
-- . . ' .
. ' 'n'Y'
Pag 3: \V
PLANT;
Puget Sound;
: T-V-'vV
' 'YY -Y
DEPARTMENTS
RP&S - Docks
; - ' v ';V
CLASSIFICATIONS . Pumper/Helper A ;, . / .......
OPERATIONS
B-3' Load "Tank .Oars: -:LP&. and- Butane --(Conti);b:.
.-1: : IMPORTANT SFTM
'~l---------- - Ji"-i r~~rt~i
.KEY POINTS :
3.. 'Connect .Loading-\ a. UNb^s ^Cont^
.`yyY^'-Y Y\ :Y-, - < YY;
;;.Ho'se'.(Conte ). -' " Y':Y sftoulciy;be ;(oloSed /''and^-tNe^eac^ess;^-',
'i chdd,k"vaTve * will ^opeh^asv dodri
- as the pressure equalizes In the
' line .
' V ;:-
b,': Check and make sure that,.liquid and : vapori hose are made'up tight tdithe"
tank eari connections andt support/'. hose if necessary. /, . ' . ; . , .
cl Close vents on gauge and bottom sampling.connectionso
NOTE? Due to tank car spotting In relation to our rack' connec tions it is very possible that 2" nipples and ells will be used to make a satis-,
factory connection of the.' liquid and vapor hose,. The ; nipples and ells.of various. lengths Will be available on tank car rack.-
4. Start Loading Tank Car
d0 Remove plug and lower thermometer in thermometer well of oar.
>\,v'
a,, Check form R-84 for all necessary information such as correct car number, outage gauge and destina tion.
b. Open 2" liquid valve in dome of car.
c. Open 2" vapor valve in dome of car.
d. Record pressure in car on R-84..
e. Open vapor line on rack.
f. ,, Start loading pump.
g. Open liquid line on rack.
hu Throttle flow with rack liquid . line valve as desired.
WA-TEX 001813 v
A -
;
PLANT?? DEPARTMENTS , CLASSIFICATION ? OPERATIONS'
~n.......JOB BREAKDOWN :: ' y -t; ;;;/ ...
- / - B-3 ~r:r/. page i}..; v; .
Puget Sound
,
RF&S - Docks
;
Pumper Helper A
B~3 Load Tank Cars - LPG and Butane (Cont.) "
IMPORTANT STEPS
5. Check Car While .
Loading
V
KEY POINTS
a. Check car while.filling In order to
. detej^he\i^:-the-yha^;^ -`being:' . at the' desired rate. . This check; -can: be made by first, opening the valve . on thb; sample'llrie,v and;: bleed'.Voff/.v;\ making' sure;- that liquid' is ehterit^
the car, Then# second# to determine the rate at which:-the bar Is; loading. is- to .use .the..slip tube' onthe.gauging device. The . gauging slip tube does not extend into the well at. the. bottom of the car/.so when approxi mately 12" Of liquid is, in the ear the slip tube'can be lowered as far as possible and then vented . When liquid appears it is known that, car is filling. Be sure to close 1/4" vent when finished checking.
6. Apply Odorant
a. Open connections.oh odorant drum into the liquid filling line arid supply
the required amount of Ethyl Mercaptan while the caf is filling'. When com
pleted# close off .on odorant, drum and liquid line connections..
NOTE?
Odorant required can be added to L.P.G, at any time# but it is preferably added soon after loading starts# as the odorant becomes well mixed by the agitating action caused by loading the remainder of the car.
b. Methanol is to be added - October 1 to April 30.
7 Filling the Car
a. Grasp the slip tube firmly with one
hand and unlock the hold-down latch with the other hand.
b. Raise the slip tube slowly to about'
the half-way point of the car capacity.
WA-TEX 001814
PLANTS DEPARTMENTS CLASSIFICATION t OPERATIONS
JOB BREAKDOWN
B~3
Page 5
Puget Sound
RP&S Docks
Pumper Helper A
B-3 Load Tank Cars - LPG and Butane (Cont,)
IMPORTANT STEPS
7. Filling the Car (Confc.)
KEY POINTS
e* Open 1/4" valve on gauging tube and vent when it Is expected that the ear should be approximately half full,
d. Raise or lower the slip tube at a
very slow rate until liquid starts to discharge from the vent valve,
e, Close vent valve and read outage gauge opposite the fixed pointer.
NOTES DO NOT HOLD FACE OR ANY PART
8, Topping!Out Car
a. Check outage gauge shown on the R-84* when the car Is over half full,
b. Raise slip tube to a point where the tube will read an additional 4" of outage than the outage shown on the R~84. As the car fills bleed off at vent valve often enough* so that the car will not over*=fill.
c. Set the slip tube at the same outage as shown on R-84 as soon as the car has filled to the first setting,
d. Stand by ear with vent on slip tube open,
e. Close off liquid line on rack as soon as liquid starts to discharge from the vent tube.
f, Close off vapor return line on rack and liquid* and vapor loading valveson car.
! WA-TEX 001815
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN Page 6
Puget Sound RP&S - Docks Pumper Helper A B-3 Load Tank Cars - LFG and Butane (Cont.)
important STEPS
8. Topping Out Car (Cont.)
KEY POINTS
g,, Reeheck outage gauge on car with that on R~84 If outage is more than that shown on R-84* open rack valves and bring car up to required gauge. If outage is less than a half Inch of that shown on R-84* notify your super visor.
h. Insert gauge and pressure readings on r-84.
i. Shut down L,,P,,G. pump.
9. Take Temperature of Car
a. Remove thermometer from well and quickly read temperature.
b. Insert temperature on R-84.
NOTEs
The Shipping Department may require a temperature when car is about half full. In such cases take temperature and phone to office..
If the temperature on the car at the half way point is lower
or higher than the Shipping Department used to figure the outage gauge* the contents of
the car will have to be re figured and the outage gauge changed on R-84.
10. Moisture Test
After the car is loaded and depending on customer specifications* it may be re quired to test for moisture by the cobaltbromide method to be sure the product is satisfactorily dry before shipment. If the test shows that the L.P.G. is web* it may often be dried by venting for a
few minutes. If ear remains wet after venting for a reasonable length of time* notify your supervisor.
WA-TEX 001816
PLANT? DEPARTMENTS CLASSIFICATION s
OPERATIONS
JOB BREAKDOWN
Puget Soured RP&S - Docks Pumper Helper A B-3 Load Tank Cars
B"3 Page T
LPG and Butane (Cont.)
IMPORTANT STEPS 11. Sample Car
KEY POINTS
a. Attach flexible tube from sample bomb., furnished by Laboratory onto the sampling connection In the dome housing of the car.
b. Open valve on vent line of car and Inlet valve on bomb.
c. Slowly open the outlet valve on the bottom of bomb and allow bomb to
fill.
d. Close off bomb and tank car valve when liquid appears at outlet of bomb.
e. Disconnect bomb and slowly bleed small quantity from outlet for two seconds to allow space for liquid expansion.
f. Tag sample bomb showing the date,
product, tank car number and sphere loaded from. Store bomb in a pro tected or shady location until taken to Laboratory.
12. Disconnect Hose From Car
.a. Check that all valves and vents in ear dome are closed and the liquid
and vapor line valves on the rack riser are closed.
b Open vent valves on rack risers into the venting system and release the liquid and vapor return hose of product and pressure. The venting system ties into a vent stack, located a safe distance from the
loading rack.
e. Disconnect hose and fittings from tank car and store hose on rack as
provided.
j WA-TEX 001817
PLANT? DEPARTMENT? CLASSIFICATION? OPERATION?
JOB BREAKDOWN
B~3
Page 8
Puget Sound
RP&8 - Docks
Pumper- Helper A
B-3 Load Tank Cars - LPG and Butane (Cent.)
IMPORTANT STEPS
12.,, Disconnect HOse From Car (Cont.)
KEg POINTS
d. Replace screwed plugB in all valves in car dome including thermometer well,,
' e. Check slip tube to see that it is not leaking*
f. Replace slip tube gauge housing.
g. Check carefully to see that no valves or connections are leaking.
h. Lower dome housing and attach seal.
1. Fill out all necessary captions on form R84.
j. Place placards* labeled "DANGEROUS-
LIQUIFIED PETROLEUM GASES" in all placard holders on tank car.
k. Close off block cock to tank car rack.
, 1. Remove toe board.
ra* Remove "Blue Flag" if no other loading at the rack is taking place and remove barricades.
n. Notify Pumper to make general inspection.
WA-TEX 001818
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATIONS
OPERATIONS
Puget Sound RP&S - Docks Pumper Helper A B-4 Load Tank Truck L.P.G.
B-4 Page 1
IMPORTANT STEPS J,, Safety Precautions
KEY POINTS
a0 Do not allow any motor driven vehicles to approach rack while truck is loading.
b. Shut down loading and any venting of truck if another truck is re quired to be spotted for loading. When second truck is spotted and motor turned off o.k. to again
start loading first truck.
NOTEs If area is gaseous do not permit any truck to enter or start motor.
2. Loading Order
a. Check loading order issued by Shipping Department. Do not load without order.
3. Prepare Truck For Loading
a. . Weigh truck on scales and stamp tare weight on weigh ticket,
b. Spot truck on rack for loading,
e, Shut off truck motor.
d. .Set hand brake.
e. Open vent valve on truck and determine that truck is empty
and free of moisture.
f. Connect liquid and vapor hose to truck connections. Be sure hose is made-up tight.
Load Truck
a. Open truck loading connections.
b. Start loading pump.
c. Open both liquid and vapor lines on truck rack.
d. Regulate loading valve on rack .liquid line as required.
WA-TEX 001819
JOB. BREAKDOWN
PLANTS DEPARTMENT? CLASSIFICATIONS OPERATION;
Puget Sound
RF&S - Docks Pumpe'r Helper1 A
B-4 Load Tank Truck L.P.Or.
(Cont.)
B-4
Page 2
______IMPORTANT STEPS
4. Load Truck (Cont,,)
KEY POINTS
e* Driver sets dial gauge on truck to determine if product is loading correctly#
NOTE;
The gauging device on a truck includes a dial with pointer
and can be set to load to any desired outage0
Extended from the pointer is a vent valve and operates on the same principle as the tank car vent on the slip tube,
f. Check gauge on truck while loading to establish the loading rate#
g. Open connections on odorant drum and inject necessary odorant.
h. Repeat operation adding Methanol (when required).
i. Set truck gauging device to desired outage.
j. Vent gauging tube until liquid L.P.O. starts to discharge from vent valve.
k. Shut down loading by first closing liquid line on rack and then vapor
line on rack.
l. Shut down loading pump.
m. Close off truck loading connections.
5. Moisture Test
a. Check truck for moisture if required by the cobalt-bromide method.
6. Sample Truck
a. Sample truck if required, using special bomb container as described under Loading Tank Cars L.P.0.
\
I
WA-TEX 001820
JOB BREAKDOWN
PLANT? DEPARTMENT? CLASSIFICATION? OPERATIONS
Puget Sound RP&S - Docks Pumper Helper1 A B-4 'Load Tank Truck L0F.G.
(Conb.)
B4 Page 3
xmpMtant STEPS
7p Disconnect Hose From Truck
KEY POINTS
'
a. Check and make sure all valves and vents on truck are closed and liquid and vapor line valves on rack are closed o
b Open vent valves on rack risers into the venting system and release the liquid and vapor return hose of product and pressure,,
" Co Disconnect hose from truck and store at loading spot as provided.
d. Replace and make up tight any caps or plugs on truck connections,
s, Weigh truck and stamp gross and net weights on weigh-ticket.
f. dive one copy of weigh-ticket to driver.
g. Record truck number, product loaded, amount loaded and time on the truck loading report.
h. Attach weigh-ticket to truck loading report =
I WA-TEX 001821
PLANOJs
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
Puget Sound RP&S - Docks Pumper Helper A B"5 Unload Tank Cara
B"5"'A Page 1
(a) Refined Oil & Slop Oil
IMPORTANT STEPS
KET POINTS
1, General Information The RP&8 Department wills at times he required to unload bad order and offtest tank cars5 and in addition* cer tain additives such as Petrox and Rust
Inhibitor which will be received in tank cars for unloading into RP&S storage* Cars to be spotted at Blend ing Plant*
2. Unload Tank Cars
a. Place Blue Flag and light across track.after ear has been spotted at unloading connection*
b* Set hand brake on car*
Co Break seal on dome and record on Form R-84 along with car number.
d Gauge, temperature* thief and sample car and record on R-84.
e. Check outlet valve handle in the closed position.
f. Loosen outlet cap enough to release any pressure on outlet leg and then remove cap.
g* Connect unloading hose to outlet leg and to suction of unloading pump,
h. Open outlet valve on car.
1, Determine where to pump and set right-of-way to receive.
j. Open suction valve and start pump* then open discharge valve on pump manifold.
k. Unload car and when car is empty* shut down pump and close manifold.l.
l. Notify Assistant Pumper and close off right-of-way.
WA-TEX 001822
PLANTS DEPARTMENT?
CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-5-A
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-5 Unload Tank Cars (a) Refined Oil & Slop Oil)
(Confc.)
IMPORTANT STEPS
2,, Unload Tank Cars (Cont.)
KEY POINTS
m Close outlet valve on tank car* replace dome cover on car and bolt r screw down and turn placards (if present) to empty or blank side,
n. Disconnect unloading hose and store and replace outlet cap on leg of car.
o. Remove Blue Flag if no other opera tion taking place at rack.
p. Fill out all necessary information on R-84.
q. Notify Assistant Pumper to record 1 information on pumping record.
WA-TEX 001823
JOB BREAKDOWN
PLANTS DEPARTMENTS
CLASSIFICATIONS OPERATIONS
Puget Sound
RP&S - Docks Pumper Helper A B-5 Unload Tank Cars (b) Petrox
B~5~B Page 1
IMPORTANT STEPS (b) Petrox
KET POINTS
a. Place Blue Flag south of the Petrox unloading spot (Blending Plant Area).
b. Notify assistant pumper to line-up and gauge Petrox tank to receive.
c. Break seal on car dome and record number on R-84.
d. Gauge car with Dorris gauge stick*
temperature* thief and sample record this information on R-84,
e. Check outlet valve in closed position.
f. Loosen outlet cap enough to release any pressure on outlet leg and then remove cap.
g. Connect unloading hose to outlet leg and suction of unloading pump.
h. Open outlet valve on ear.
i. Open suction valve on pump manifold and start pump.
J. Open discharge valve on pump and unload car.
k. Close off on pump manifold when car goes on air and stop pump.l.
l. Close outlet valve on tank car* re place dome cover and bolt or screw down.
m. Disconnect unloading hose and store.
n. Replace outlet cap on leg of car and cap on suction line at unloading
pump.
j WA-TEX 001824
JOB BREAKDOWN
B-5-B
Page 2
PLANT.:
Puget Sound
DEPARTMENTS
RP&S - Docks
CLASSIFICATION? Pumper Helper A
OPERATIONs
B"5 Unload Tank Cars (b) Petrox (Cont,)
IMPORTANT STEPS
(b) Petrox (Cont.)
KEY POINTS
o. Remove Blue Flag if no other tank car operation taking place on this spur.
p. Fill out all necessary information on R-84.
q. Notify Assistant Pumper to gauge
receiving tank and record informa tion on Pumping Record.
WA-TEX 00X825
PLATOs
Puget Sound
DEPARTMENTS
RP&S - Docks
CLASSIFICATIONS Pumper Helper A
OPERATIONS
B-5 Unload Tank Cars (c) Additives
important Steps
= " ""S''poii'Ts""
(c) Additives
The unloading of additive tank ears* such as Rust Inhibitors will be handled the same as unloading Petrox tank cars at same location.
WA-TEX 001826
PLANTS DEPARTMENTS CLASSIFICATION s OPERATIONS
<TOB BREAKDOWN
B"6
Page 1
Puget Sound
RP&S - Docks
Pumper Helper1 A
B-6 Unload Tank Cars, L0F,G. ana Butane
IMPORTANT STEPS
1, Prepare Car For Unloading
KEY POINTS
a. Install Blue Flag at north end of tank car rack and erect road barri cades at each end of rack.
b<> Set oar brakes,
c. Lower safety toe board on to car and make secure,
do Break seal and record on R-84,
e. Remove metal cover or plate on steel housing at top center of car,
f Unscrew housing around slip tube gauging device*
g. Gauge and temperature car and record on R-84, being careful that slip tube does not spring up and strike face or body when it is unlocked,
h. Connect unloading hose and neces
sary fittings to the liquid and vapor valves on tank car, being sure these connections are made up tight,
i. Sample car with required sample bomb connected to the 1/4" sample valve on riser,
2, Unload Tank Car
a. Notify Assistant Pumper and make line-up at sphere and at Blending
Plant,
b. Open block valve and suction valve, at unloading pump manifold at tank'
car rack,
c. Open vapor line valves on manifold, rack and tank car dome.
v
! WA-TEX 001827
PLANT? DEPARTMENTS CLASSIFICATIONS
OPERATIONS
JOB BREAKDOWN
B"6
Page 52
Puget Sound
RF&S Docks
Pumper Helper A
B-6 Unload Tank cars., LoPoCo and Butane
(cont<,)
IMPORTANT. STEPS
2, Unload Tank Car (Conte)
KEY POINTS
do Open valve on liquid riser line And crack open the liquid line connection on tank ear,
e, Start unloading pump and then crack open discharge valve on pump manifold 0
f,, The liquid valve on tank car can be adjusted in the open position along with the discharge on the pump mani fold to a point when the ball check inside tank car connection can be heardj, making a rattling noise ,,
g. Should ball check lock on tank car connection, close the liquid line valve on tank car rack .and allow ball check to unlock. Then open the liquid line valve on rack until the ball check starts to rattle. This indicates that liquid is again leav ing the tank car,
h. Use slip tube gauging device to determine the unloading rate,
i. The suction valve in tank car dome and the discharge of the pump will have to be adjusted as the car un loads in order to maintain the' maximum rate.
j. When only vapors escape from the slip tube lowered all the way down into the car, then start testing for liquid with the sampling connec
tion.
kD When only vapors escape from the
sampling connection on the car, close off both liquid and vapor lines on rack and stop pump.
WA-TEX 001828
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-6
Page 3
Puget Sound
RP&S - Docks
Pumper Helper A
B"6 -Unload Tank Cars, L,,P0Oo and Butane
(Conto)
IMPORTANT STEPS
|0 Disconnect Car '"i
, i,
,
KEff POINTS
a, Close off liquid and vapor valves on tank car,
..
b, Vent hose into venting system,
..c. Disconnect hose and fittings and store,
do Replace all plugs in connections on car dome, screw housing around sampling device and close dome
cover,
e. Raise toe hoard,
f. Notify Assistant Pumper to close off unloading system to sphere,
g. Close off pump manifold and block valve to rack,
h. Turn placards on tank car to blank or empty side,
i. Remove Blue Flag and barricades.
Fill out all required captions on R-84 and notify Pumper for inspec
tion,
k. Take sample and R-84 to laboratory,
l, If car or fittings are found to be defective, notify RP&S Foreman by note or phone.
| WA-TEX 001829
PLiUJTs DEPARTMENTS CLASSIFICATION; OPERATIONS
JOB BREAKDOWN
B-7
Page 1
Puget Sound
RF&S - Docks
Pumper Helper A
B-7 Unload Tank Trucks* L<,P,G. and Butane
IMPORTANT STEPS
l, prepare Truck For Unloading
KEY POINTS
a. Weigh truck on platform scales and stamp gross weight on scale ticket
NOTE $
If truck has been loaded at another point and coming into our plant, driver should pre
sent bill of lading before
unloading.
bp Spot truck at L0PGo truck rack.
a. Notify Pumper to line-up sphere and lines to receive truck.
d. Connect liquid and vapor hose to truck,
e'o Gauge* temperature (and sample truck if required) and record this information on the truck unloading report.
2, Unload Truck
a. Open block valve and suction valve at unloading pump manifold at truck rack.
bo Open vapor line valves on manifold* rack riser and truck.
Co Open valve on liquid riser line and crack open the liquid line connec tion on truck,
d. Start unloading pump and then crack open discharge valve on pump mani
fold
e. Adjust the liquid line valve on truck and the discharge of the pump to obtain maximum flow without lock ing the ball check valve on truck,
f. Gauge truck to make sure unloading is taking place.
W&-TEX 001830
PLANT?
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-? Page 2
Puget Sound
RP&S - Locks
Pumper Helper A
B-7 Unload Tank Trucks, L0P,,G# and Butane
(Cent.)
IMPORTANT STEPS
2,, Unload Truck (Gdnt,)
KEY POINTS
go When pointer Is turned to empty on truck dial gauge and only vapor is discharging with vent valve open, truck is then empty.
ho Close off liquid and vapor valves on risers and stop pump.
3. Disconnect Truck
a. Close off all unloading connections on truck#
b# Vent hose and disconnect#
c# Replace all caps and plugs on truck unloading and gauging connections #
d. Close off unloading manifold.
e# Weigh truck on platform scales and stamp "tare" weight on ticket#
f# Give driver one copy of weigh ticket#
go Record truck number, product "IN" and "OUT" times on tank truck un loading report and attach weigh tieket to same.
h# Notify Pumper to close off unloading system to sphere#
WA-TEX 001831
PLANTS
DEPARTMENTS CLASSIFICATIONS
OPERATIONS
JOB BREAKDOWN
B-8
Puget Sound
Page
RP&S - Docks
Pumper Helper A
B-8 Handle Records and Reports (a) Tank Cars
IMPORTANT STEPS
KEY POINTS
1,- General
' .
There are certain records and reports to be handled by the Pumper Helper A which are necessary to carry out his ' duties.
2 Prepare Form R-84 (a) Form R~84 Tank Car Loading Report
When tank cars are to be loaded the R~84 Is furnished by the Shipping Department showing the car number, product to be loaded, destination
and order number. The tank car loader uses this form to record the required information such as gauges temperature, outlet valve, inspection
seal number and condition of car.
The R"84 Is also used when unloading tank cars,,
WA-TEX 001832
PLANT? DEPARTMENTS
CLASSIFICATIONS
OPERATIONS
JOB BREAKDOWN
B-8
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A B=8 Handle Records & Reports (b) Tank Trucks
IMPORTANT STEPS l. Meter Tickets
KEY POINTS
a. Gasolines, Jet Fuels, Diesels and Burner Oils Will be metered into trucks
b. A meter ticket Is used to record amount of product loaded,, When a truck is to be loaded, the ticket is to he placed in the meter and
stamped "IN" or opening.
c. When the truck has finished loading
the meter ticket is to be stamped "OUT" name f product loaded inserted, time "IN" and "OUT" recorded, and ticket signed by loader and driver.
d. One copy to driver and the other two copies are to be kept in rack office
and then taken to the Blending Plant control room at the close of the day's
business.
e. The meter ticket is also used as a bill of lading.
2. Tank Truck Loading Report
(-R-207)
a. A record is to be kept of each truck loaded, listing the truck number, product loaded, amount, destination,
seal numbers and times "IN" and "OUT".
b,, This record will also be taken to the Blending Plant control room at end of
day's business.
3. Seale Tickets
a. Trucks loaded with L.P.O. and Bunker Fuel will be weighed "IN"
and "OUT".
b. A scale weigh ticket will be used to record tare and gross weights of these trucks.
c,, The scale ticket is also a combined hill of lading and is to be handled exactly the same as the Truck Meter
tickets.
| WA-TEX 001833
JOB BREAKDOWN
PLANT;
Puget Sound
DEPARTMENT;
RP&S - Docks
CLASSIFICATION; Pumper Helper A
OPERATION;
B-8 Handle Records and Reports
B-8 P&ge 3
IMPORTANT STEPS lo Gauge Book
-
KEY POINTS
a. All "hand gauges", taken with regular gauging tape, temperatures taken with hand thermometers and water thlefs are to be recorded in black gauger1s hand book at the time gauge is taken. This includes ullage gauges on ships and barges.
b. Should an incorrect gauge be in
serted in gauge book never erase, * but circle gauge and initial, then
write in correct gauge.
c. Insert time gauges are taken in gauge book.
do Sign for all gauges taken in gauge book,.
) e. All gauge books will be picked up and returned to Blending Plant con
trol room.
2. Report of Ship's Tanks -
Form R-68
a. Report of Ship's Tanks, Form R-68 are to be filled in completely by the person who has taken the ullages.
b. Make out three copies of this form; one copy (original) for Stock and Shipping Depto, one copy for ship and one copy for RP&S Department.
o. Form R-68 will be required for car goes received, before discharging and after ship is empty.
d. Form R-68 will also be required on ships coming in empty to load out.
r-68 is to be made out before the vessel starts to load and again
after ship is loaded.
e. When R-68 properly filled out, have Mate sign.
f. Have Mate or Captain sign Notice of Readiness report.
WA-TEX 001834
PlANTx
DEPARTMENT; CLASSIFICATION; OPERATION;
JOB BREAKDOWN
Puget Sound RP&S - Docks Pumper* Helper A B"8 Handle Records and Reports
B-S Page 4
(Cont,,)
IMPORTANT STEPS 3. Bill of Lading
KEY POINTS
a. All tankers loading out will require a Bill of Lading. This form is made up by Shipping Dept, in 3 copies.
b. Have Master of vessel sign all 3 copies In Ink. The Master keeps one copy and the other two copies are to be turned in to the Blending Plant Control Room along with the gauge books.
4. Vessel Loading Report Form R-253
a. All barge loadings require Form 253
b. Make out 3 copies of this formi one copy (original) for stock and. Ship ping Dept., one copy for barge and one copy for RP&S.
c. After R-253 properly filled out, have barge Captain sign.
d. This form to be turned In to the Blending Plant Control Room.
5, Declaration of
Inspection Prior to Cargo Transfer
a. All vessels required to make out in duplicate,
b. Original to vessel - copy to RP&S office.
f
( WA-TEX 001835
JOB BREAKDOWN
B-9
PLANT? DEPARTMENT: CLASSIFICATION:
OPERATIONS
Puget Sound
RP&S - Docks Pumper Helper A
B-9 Charge Odorant and Methanol Drums T/C & T/T
IMPORTANT STEPS
___________ KEY POINTS
1* General Information Ethyl mercaptan is delivered to the Truck rack in 5 gal. cans and is used throughout the year to odorize LPG shipments.
Methanol is delivered to the truck rack in 55 gal. barrels and is used in LPG shipments to protect against freeze-ups of moisture which may accumulate from October 1st to May 1st,
Requirements for tank car rack are delivered there by RP&S Department in 5 gal. cans.
Two SO gal, drums* for mercaptan and methanol* are provided at each location.
At the truck rack* the methanol is transferred from the 55 gal. barrel to the 20 gal. drum using a standard barrel pump.
The mercaptan is poured from the 5 gal. can to the 20 gal. mercaptan drum-.
The same operation Is performed at the tank car rack.
2. Safety Precautions Methanol is a toxic compound and re quires careful handling.
Rubber gloves and a face shield are
required when transferring this prod uct from one container to another as when it Is handled openly.
If splashed in the eyes, flush immedi
ately with water, and send employe to the First Aid room.
Avoid inhaling fumesii
If splashed on the skin; flush with water immediately.
Remove contaminated clothing immedi ately and wash skin with water.
WA-TEX 001836
JOB BREAKDOWN
B-10
PLANT
Puget Sound
DEPARTMENT?
RP&3 Docks
CLASSIFICATIONS Pumper Helper A
OPERATION?
B-10 Assist with Meter Proving-Truck Rack
" IMPORTANT STEPS~~
KEY~POINTS~^~ ~~~
1. General Information All products loaded Into tank trucks for shipment will- be metered with the exception of Bunker Fuel Oil and L,P.,G,
which are weighed,
2, Proving Meters
At certain Intervals the product meters will be checked for calibration to determine their accuracy. The pumper Helper A will assist with this opera tion as directed by the Pumper,
WA-TEX 001837
pT./VNTfp a
DEPARTMENTS GLASSIFICATION 2 OPERATION s'
JOB BREAKDOWN
Puget Sound RP&S ~ Docks Pumper- Helper A B-ll Petros Trailer Truck
B"ll Page 1
IMPORTANT STEPS
KEY POINTS
10 General Information Only a portion of our gasoline ship ments will contain Petros when leav
ing the plant.
On tanker loadings for Seattle and Portland Terminals, gasolines will
he shipped WITHOUT the addition of Petros. OnTarge_loading of all gasoline for the local area, Petros will be ADDED to these shipments and for theseTeTiverl.es a trailer truck is provided, to handle the Petros supply.
The trailer truck will be placed at the Petros loading spot In the Blend ing Plant area, loaded and hauled to the Dock.
2. Fill Petros Trailer
a. Connect static wire.
NOTEs Necessary to use static wire while filling trailer because gasoline will be mixed with the Petros in storage to cut viscosity account of cool weather handling.
b, Open trailer hatch and gauge amount of product and record in gauger's hand book.
c. Notify Assistant Pumper to gauge and open tank suction line to loading pump,
d. Open loading valve to trailer and suction valve on pump manifold,
e. Start pump and open discharge valve.
f Fill trailer and close off discharge of pump and stop pump.
g. Close off loading valve to trailer and suction on pump manifold.
I WA-TEX 001838 i
JOB BREAKDOWN
PLANTS
Puget Sound
DEPARTMENT?
. RP&S - Docks
CLASSIFICATION % Pumper Helper A
OPERATIONS
B-ll Petrox Trailer Truck (Cent,)
B^ii Page 2
IMPORTANT STEPS
20 Fill Petrox Trailer (Cont.)
KEY POINTS
h Take gauge and temperature of trailer and record In gauger's book#
i Disconnect static wire#
Notify Assistant Pumper that trailer is loaded and Petrox storage tank can be gauged and Information recorded on Pumping Record.
( WA-TEX 001839
PLANTS
departments
GLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-12
Page 1
Puget Sound
RP&S - Docks
Pumper Helper8 A
B"12 Inject Petrox In Gasoline Shipments
(b) Tank Trucks
IMPORTANT STEFS
KEY POINTS
1. General Information Petrox will be injected in all grades of gasoline. The concentration of gaso line in the Petrox may vary from time to time thus the amount of mixture added
to the shipment will vary. (Consult Additive Book and Operating Instructions for latest quantity.)
2. Safety Measures
Since gasoline is mixed with Petrox in varying degrees* it will have a very low "flash point" and high suscepti bility to static generation. It is, therefore3 essential to treat it with the same care in handling as you would
Avjet or gasoline.
3. Prepare to Inject PetroX
a. Set "Stop Meter1' on product riser for desired amount of gasoline.
b. Open 1" block valve on Petrox line (at switch station) to desired riser (north or south side).
c. Turn selector switch on panel to N. or S. to correspond with I" block valve selection.
d. Start Petrox pump by pushing start button.
4. Inject Petrox
a. Start flow of product to truck com partment by pressing down lever on Set Stop meter until it locks.
b. Petrox mixture will flow at a pre set rate into the product until meter reaches the desired quantity to be loaded and shuts off. (Petrox pump will continue to run until
shut down manually.) If further Petrox injection is required in other compartments* move spout to desired compartment^ re-set Stop Meter and press down lever on meter until it locks and flow is resumed
through meter.
! WA-TEX 001840
i
PLANTS
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B~12
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-12 Inject Petrox in Cfasoline Shipments
(b) Tank Trucks (Cont.)
^
IMPORTANT STEPS
---- --i'ii niiwnu > irrtTrtwni n mi-- n* li ' ~^i-------
' *"
HST POINTS
5, Shut Down Injection a. When Fetrox Injection is completed on a truck -
Shut off pump by pressing stop button,
b, Close I" block valve on Fetrox Une"at petrox Injection Station,
6, Check Operation
a. Daily, compare meter reading (open and close) on Petrox line
at least once per day. Cheek Fetrox meter on each system to see that proper amount is being injected. Chart at rack shows amount; to inject per 10 ga.1^ 50 gal., 100 gals,, etc.
W&-TEX 001841 I
JOB BREAKDOWN
PLANTS DEPARTMENTS CLASSIFICATION: OPERATION?
Puget Sound RP&S - Docks Pumper .Helper A B-13 Unload TEL Fluid Tank Cars
B-13
Page 1
-- T-ir
IMPORTANT STEFS
- ----w miiih4,ih' i i n iwT-Mimjn-iniunrTWTiKT.aiKiiumf
KEY POINTS ______________ ................................................. i
1. General Information Special training will be given to each
member of RP&S Dept, expected to handle
unloading of TEL cars, etc, and the
following Breakdown is a guide in the
order 'best suited to do the job here
at Puget Sound. As an example, the
DuPont standard instructions require
washing the tank car with gasoline
after the car is unloaded. Here at
Puget Sound we will not wash the car
with gasoline and will return same to
DuPont containing a small amount of
TEL which will be credited the refin
ery. This is in accord with special
instructions from DuPont, Regulations
are posted at TEL plant governing the
handling of Tetraethyl Lead Compounds.
, Prepare to Unload Car
a.. Place blue flag on track at South end of car.
b. Set brakes on car.
c. Check weigh tank in lead room and be sure there is ample room to re
ceive the contents of the car.
d. . Change to white clothing provided for wear while unloading TEL,
e. Put on protective gloves and have gas mask ready,
f. Break seal on dome and remove cover.
g. If ahy TEL fluid has leaked into dome from car, let car stand and
report this to your foreman AT ONCE. A lead spill or leak would be recog nized by a yellow stain or a "sweetish" odor from the tetraethyl lead.
| WA-TEX 001842
PLANTS
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B-13
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-13 Unload TEL Fluid Tank cars (Cont.)
IMPORTANT STEPS
2. Prepare to Unload Car (Cent.)
---------- ------ "
KEY POINTS
--i--rrr*l~*----
h. A yellow tag will be found Inside the dome with net weight of car written on tag. Save tag as a guide to check weight of lead re ceived when car iB unloaded.
NEVER SAMPLE A TEL CAR.
i. Read Weight-O-Oraph or scale and make record of opening weight.
J. Close vent on weigh tank.
k. Start eductor pump and circulate gasoline through the eductor* pulling vacuum on weigh tank.
3,, Connect Hose
a. The unloading hose Is of flexible metal and supported on a swing arm*
which can be raised or lowered to make connection with either a 6000 gal. or a 3000 gal. tank car,
b. Swing hose from side of lead bldg, to a position Just above the dome of the car,
c. Crack open unloading valve on metal hose and all valves back to tank.
d. Remove cover or plate on end of hose and .also remove cover or plate from unloading connection in dome of car.
e. See that ground Joints are free from any dirt and connect securely* the unloading hose to the unloading out let in dome of car,
4., Unload Car
a. When 10" of vacuum obtained on weigh tank* open valve on unloading line
.Into weigh tank.
b. Then open unloading line on car. After flow Is established open the vent on car.
| WA-TEX 001843
\
/------ r
PLANTS
DEPARTMENT; CLASSIFICATION; OPERATION;
JOB BREAKDOWN
B-13
Page 3
Puget Sound
RP&S - Docks
Pumper Helper A
B-13 Unload TEL Fluid Tank Cars (Cont.)
IMPORTANT STEPS
4, Unload Car (Cont.)
KEY POINTS
e. Watch for Increase in weight of weigh tank as car is being un loaded ,
d* When weigh tank Indicates that car is within 5000 lbs. of being empty* close down on the discharge valve
to the weigh tank. This is to slow down the lead leaving the car and
will give the inside walls of the car a longer period to drain off
any TEL into the small amount re maining before ear goes on air.
5. Disconnect Ho3e
a. When car goes on air* gauge will show slight decrease in vacuum on
eductor manifold* indicating that air is passing from the car.
b. Install vacuum gauge on vent nosale.
c. Allow vacuum to build to approximately
5". (Car must have a minimum of 3" of vacuum when shipped.)
d. Close valve on weigh tank.
e. Close vent on car* and at same time close valve on end of unloading hose.
f. Close unloading valve on car.
g. Disconnect unloading hose and re place blinds on end of hose and
over discharge valve on ear.
h. Remove gauge and plug nozzle.
1. Replace dome cover.
j. Shut down eductor pump.
k9 Close all lineups,
I# Reverse car placards should read "Dangerous Empty".
WA-TEX 001844
PLANTS
DEPARTMENTS CLASSIFICATION t OPERATIONS
JOB BREAKDOWN
B-13 , Page 4
Puget Sound
RP&S " Docks
Pumper Helper A
B-13 Unload TEL Fluid Tank cars (Cont.)
IMPORTANT STEPS 5 Disconnect Hose
(Cent.)
KEY POINTS
m. Remove blue flag from track and store.
n, Fill out TEL tank car unloading report. Send card to RP&S office
6, Special Rules and Regulations
a. Special training will be given by Manufacturer's representative on regulations for unloading and handling of TEL Anti-Knock compounds.
b. The latest rules and regulations pub
lished by the DuPont Corporation shall be adhered to, in regard to handling tetra-ethyl lead compound,
c, No operator is to be involved in the handling of these compounds unless he has had a physical examination by a doctor authorized to give TEL
physicals.
~v
j WA-TEX 001845
JOB BREAKDOWN
B-lA
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound
RP&S - Docks
Pumper Helper A B-14 Sample Spheroids
IMPORTANT STEPS
KEY POINTS
l',, General Information Spheroids are pressure type vessels and extreme care is to be exercised
when sampling* They are provided with ground level sampling stations.
2. Safety Precautions a. Use gloves to protect hands from freezing,
3* Prepare to Sample - a* Slowly open valve on sample bleeder to blow foreign material from sam ple nipple, then close valve,
b. Screw one threaded end of bomb to sampling connection. The free
end of bomb pointed up,
c. Open wide both valves on bomb,
d. Slowly open valve next to bomb on permanent sampling .connection.
e. Allow flow to pass through bomb until only liquid flows from
open valve,
4. Take Sample
a. Close valve on outlet of bomb. Close valve on inlet of bomb. Finally, close valve on permanent sample connection and slowly dis connect bomb.
b. Bleed small amount of liquid from bomb by opening one valve a very small amount then closing, (This allows room for expansion of product*)
c. Tag sample bomb and deliver to Laboratory,
J WA-TEX 001846
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound. RP&S - Docks Pumper Helper A B~15 Gauge Tanks
B-15 Page 1
IMPORTANT "STOPS
' ' ... wToiNTS
1. General Information All tanks in RP&S tank farm are equipped with automatic remote con trol gauging equipment and ground level reading gauges at each tank.
However* it will be necessary at times to "Hand Gauge" in order to check the automatic equipment. Hand gauging is also required when
receiving foreign crude both by tanker and pipe line* and in special cases on finished products.
2. Definition
The term gauging' Includes the measure ment of the height of the oil surface above the tank bottom* the amount of water at the bottom* and the tempera
ture of the oil.
3. -The Tape
The steel tape used generally is marked in feet* inches and eighths of Inches. It is wound on a hand reel.. A brass plumb bob is fastened with a snap to the bottom of the tape.
4. Inage Gauge
a. Ground body by firmly grasping the steel hand rail or touching the
roof of the tank with the bare hand.
b. Remove gauge hatch slowly and stand to windward* in order to avoid breathing escaping vapors.
c. Wipe tape clean and lower Into
tank until tape gauge lightly touches bottom of tank. The steel
tape should touch the side of the gauge hatch at all times* bo as to avert formation of static electricity*
which may Ignite vapors in tank.
d. Rewind tape until oil level marking on tape is brought up out of tank.
WA-TEX 001847
JOB BREAKDOWN
PTANT? l
DEPARTMENT? CLASSIFICATIONS OPERATIONS
Puget Sound RP&S - Docks Pumper Helper A B-15 Gauge Tanks (Cont.)
B-15
Page 2
IMPORTANT STEPS
4. Inage Gauge (Cont.)
KEY POINTS
e. Read oil out, the exact place of the oil marking on the tape Indi cates the height of Oil in the tank, and this is called the tank gaugec
f. Record gauge in gauger's hand book*
5,, Outage Gauge
a. Ground body and remove gauge hatch slowly.
b. Wipe tape clean and lower gauge bob until a short length of the tape is in the oil.
c,, Read the tape at the bench mark in the hatch and rewind tape.
d0 Read the oil marking on the tape and subtract this reading from the reading taken at the hatch marking.
e. Subtract this difference from the posted tank height and the result obtained is the measurement of the oil in the tank, which is the "tank gauge".
6. Ullage Gauge
a. Ullage gauge is taken exactly the same as the inage gauge, however, the empty space in the tank is recorded instead of the amount
of product.
b. Ullage gauges are used on tankers.
To Water Gauge (Thief)
a. Coat tape or thief rod with approved water detector paste.
b,, Lower tape or thief rod to bottom of tank.
c. Hold tape or rod motionless for a few seconds (longer in heavy oil), then withdraw.
! WA-TEX 001848
JOB BREAKDOWN
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound RPSsS - Docks Pumper Helper A B-15 Gauge Tanks
(Cont.)
B"l? Page 3
IMPORTANT STEPS
~--mill inmrmrf 1 iiwiw 11
-rum 1 in
7. Water Gauge
(ThiefJ
(Cont.)
KEY POINTS
i 1.1 i!M^BnnrMmiiiuuiB>inw>.micimnwti>wp.w>w>w--11 .......------mi hum 11
do Read water cut oh tape or rod at point when paste has changed color.
e. Record In gauger's hand book.
80 Temperature
a. When it is necessary to hand tempera' ture a tank, a thermometer mounted on a metal scale, inserted in a
brass tube is used.
b,, Lower thermometer to approximately midway into the oil in tank.
c. Allow thermometer to stay in this position for one minute (longer for heavy oils) and then withdraw from
tank.
do Read quickly the temperature,
e. Record In gauger's hand book.
9. Sign Gauge
a. When complete gauge has been re corded, then initial gauge and show time gauge was taken.
b. Should a mistake be made when inserting gauge in book, do not erase, but circle and write In correct gauge on line below.
WA-TEX 001849
JOB BREAKDOWN
B-l6
PLANT? DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound RP&S - Docks Pumper Helper A b-16 PreparePumps for Repairs
IMPORTANT STEPS
l.# Safety Precaution When Pump Comes Down for Repairs First
KEY POINTS
a* Open switch on master control panel In the ''Off', position,
b. Place safety pin through slots across the starter buttons at pump base and lock out.
c. Block all valves on suction and dis charge sides of pump.
Open all bleeders to oily water sewer only and allow pump to drain as much as possible.
e. Inform Machinist or fitter as to
pump's service in order that he may
take necessary precautions to pro tect himself from leaded gasoline,
caustic or acid In pump, also as a guide in the use of correct packing when pump is not equipped with seal
rings.
2. Major Repairs
a. All pumps which are to be removed from operating areas for repair work to the shops, or open areas shall be made free of flammable
gas or liquid.
b. Attach Safety Work Permit Form r-241-A to pump showing it Is gas free and safe for hot work, if nec
essary. This precaution shall be taken to eliminate the possibility
of an accident occuring should it be necessary to perform hot work on the
pump while It is in an "open" area,
and to eliminate the Issuance of a Hot Work Permit.
3. Minor Repairs
a. If minor repairs are to be made and pump not moved from operating loca tion, It will not be necessary to
"gas free" pump.
WA-TEX 001850
JOB BREAKDOWN
PLANTi
DEPARTMENTS CLASSIFICATION! OPERATION!
Puget Sound RP&S - Docks pumper Helper A B-17 Ullage Gauge Cargoes
B-17 Page l
IMPORTANT STEPS l. General
KSg POINTS
When vessel is properly secured at berth, gangplank out and static wire connected, the ship's ullages can then be taken.
2, Prepare to Take Ullages
a. Note docking time and draft of vessel and record on R~68.
bo Contact Mate and find out if any** thing unusual should be noted re garding the cargo, such as one
' compartment leaking into another
which would change the ullage gauge on both compartments from
the figures shown at loading port,
c. Inquire if any free water is pres ent in cargo to the best of Mate's knowledge* If so notify Pumper,
3o Take Ullages
a. Ship personnel to loosen covers.on all gauge hatches,
bo In the company of the deck officer. Ullage gauge each ship's compartment containing cargo and record in
gauger's hand book,
c. With flashlight or mirror Inspect those compartments which may be
emptyo
d Thief each compartment for water,
e. Take temperatures of compartments and record in black gauger's book,
f. Compare Ullages Just taken with those of loading port. Mate has a copy in his possession.
g. If there is a noticeable difference
in the gauges on any compartment, recheck the ship's tank In question.I
I WA-TEX 001851 l
JOB BREAKDOWN
PLANTS
DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound.
RP#?S Docks Pumper Helper A Bl? Ullage Gauge Cargoes (Cont*)
B-1T Page 2
IMPORTANT STEPS ' 4, Fill Out Form R~68
~ T KEy'POINTS
a. Fill out in triplicate Report of Vessel's Tanks, showing all Ullages taken, product aboard vessel, name of ship and all captions for a com plete report*
Original copy for stock and shipping department, one copy to Mate and one copy for RP&S office*
WA-TEX.001852
JOB BREAKDOWN
B-l8
PLANT?
Puget; Sound
DEPARTMENTS
RP&S - Docks
CLASSIFICATION s pumper Helper A
OPERATION?
B"l8 Assist at Blending Plant
IMPORTANT STEPS 1, General
REST POINTS
At times the Pumper Helper A will be required to assist at the Blending Plant in the unloading of TEL cars* handling of dyes and additives, operation of valves as directed by the Assistant Pumper and such other work as the Assistant Pumper or Pumper may direct.
Must have TEL physical
j WA-TEX 001853 is
PLANT? DEPARTMENT? GLASSIFICATION?
OPERATIONS
JOB BREAKDOWN
B.-19
Puget Sound
RF&S - Docks Pumper Helper A B-I9 Adjust Pump Packing and Mixer Packing
IMPORTANT STEPS
KEY POINTS
HMMMaiwmaapnPMMHmMnmMMi
1. General information Pump rods on reciprocating pumps and some shafts on centrifugal pumps and mixers pass through packing material
. secured by packing glands much the same as valve stems,
Leaks around the stem or shaft Mill occur as wear on the packing increases.
This must be stopped to prevent waste and a potential source of fire.
To do this, normally, a degree- of snugging up on the packing gland is required.
If this does not stop the leak, re port it to the pumper.
2. Adjust Packing
a. With a suitable wrench or other tool, pull the packing gland snug a thread at a time = till desired
result is obtained*
b. Check operation for 5 minutes by carefully placing bare hand, against packing gland. If un comfortable to the touch, the gland is too tight, causing heating which may result in damage to the parts or may, in extreme cases, cause a fire. If the packing is too tight, loosen the packing aB it was tightened that is, one thread at a time and check for heating as before.
WA-TEX 001854
JOB BREAKDOWN
B.-20
PLANTS DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget Sound RP&S - Dpeks Pumper Helper A B-20 Slop Oil System
IMPORTANT STEPS
KEY POINTS
1* General Information The 6" slop oil line system is actually a gathering system with many connections and used for many purposes. Sections of
this line are insulated while others are
not, so it is well to remember that if it Is used for the transfer of heavy oils, it muBt be flushed out as soon as
possible after the movement.
The original purpose of this system was
to transfer recovered oil from the Effluent Plant to Tanks 12 & 13 or to the Crude tanks; or from Tank' 12 and 13 to the Slop tanks at the Effluent
Plant,
Two slop pumps (21N-G4 and 21N-G7) are so manifolded that they can take suc tion on the two slop tanks or any one of the three FC Chg. tanks. The dis charge from these pumps terminate at
the crude tanks (via 16" T/n system)
another section extends to the Blending Plant where it branches. One of these extends to the Effluent Plant, the
other terminates at the Receiver Trap at the Dock, (See Slop System Drawing
In RP&S Lines & Manifold Book,)
With the many connections on this line, the operator must be very cautious in
making right of way line-ups.
P?A-TEX 001855
JOB BREAKDOWN
B-21
PT.AMrT* 2
DEPARTMENTS GLASSIFICATIONS OPERATIONS
Puget; Sound
RP&S Docks Pumper- Helper A B-21 Slop Oil Injection
IMPORTANT STEPS
KEY POINTS
TT General Information In Puget Sound Plants slop oil is injec ted into the crude suction line in the
100* PAT Just before the 12" crude charge line goes below ground.
Slop is continuously accumulated in tanks 12 & 13 from the units and recovered oil is occasionally transferred to these
tanks from the Effluent Plant,
When sufficient slop has accumulated in one of the tanks (some where between 15* and 22') the water Is to be drawn down from water draw off to Effluent Plant
until oil shows,
2, Prepare to Inject Slop
a. Switch unit stream (4" & 6") into the remaining tank,
bo Gauge tank and record in gauger's hand book,
Co Take 1 average quart from the tank to the Lab, for Grav, & BS&W,
3, Inject Slop
a. Notify operator at VPS & establish rate of Injection (after receiving
Lafo results)o
bo Open suction from selected tank,
Co Open bleeder on pump casing; to flood impellero
d0 Close bleeder,
e. Push start button,
f. Open discharge until desired rate of flow Is reached (shown by meter at pump .site),
g. Check with units and adjust rate at their request (usually 50-100 BPH),'
h. Notify units - shut down pump and block valves when tank pulled to gauge of 6* or as directed by orders.
t -*' *
WA-TEX 001856
JOB BREAKDOWN
B-2a*
pr.A *
DEPARTMENTS CLASSIFICATIONS OPERATIONS
Puget; Sound
RP&S - Docks Pumper Helper A B~22 10" Utility System
IMPORTANT STEPS
W POINTS
lo General Information A 10" line has been provided in the 100' P/W with its East end starting, about 200' west of the slop pumps (21N-G4 &
21N~G7)* At that points It ia mani folded to some of the unit run-down lines with provisions made for other connections if needed in the future*
Separate manifolds for middle distil"
lates and gasoline components are provided* The line extends west past "b" St, and terminates east of the Blending Plant*
At "b" St*, the same provisions are made to manifold to the suction lines from the Intermediate Tankage as were made at the East end of the 10" line*
Also, at the West end of the 10" line are 10" lines manifolding the 14" 448
Diesel and the l4" 431 Burner Oil lines and the 20" Bunker line to this system*
There is also a 6" line manifolding the 448 Diesel blend line to this system.
At the East end of the 10" Utility line is a 10" line running North to an InLine pump at Tank 15 which in turn Is provided with suction lines to tanks
15 & 16*
From this 10" branch to the FC Charge tanks Is a 6" line connecting this system to the S,R* Gasoline rundown line from VPS to tanks 11 and 17 (Refer to "RF&S Manifolds & Lines"
drawings.).
j WA-TEX 001857
PLANT 2
DEPARTMENTS CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN
B~23
Page 1
Puget Sound
RF&S - Docks
Pumper Helper A
B-23 Ship Spent Caustic to N.W. Petrochemical
IMPORTANT STEPS
KEY POINTS
1* General Information Spent caustic from the FCCtI Is pumped by them to tank 303 in batches averag ing about 100 bblSe When we have accumulated 6' to f level in this tanks we sample it and the Laboratory runs tests. When results are known and it is approved to ship, the Pumper contacts N.W. Petrochemical people and arranges time and gives them an idea of amount we intend to pump.
There is nearly always a layer of oil on top of the spent caustic which we
take great care not to pump.
2. Safety Precautions
This is a chemical which can be highly Irritating to the .skin and may severely
injure the eye* nn contact. Always wear "`'vher gloves* goggles, and face shield when you are working around this product
such as sampling, bleeding lines, etc.
3. preparation
a, "water cut" tank at gauge hatch and write figures in gauger's hand book.
b. Draw sample below oil level of sight glass fwearInc- fVoe shift1*. goggles and rubber gloves) and tag for
"Before Delivery to N. W, Petrochemical".
Test - "Acid Oils".
c. Determine quantity of caustic that can be pumped safely before oil reaches pump suction. (Leave 3" margin or "heel" of caustic).
d,, Contact N.W. people (when approved by Lab) and give information that they need and make arrangements for starting time. r
e. Make proper line up from tank 303 through Spent Caustic pump 35Q=G1 and through 2 line up C St, and check 2" block valve open at 9th
and C St,
WA-TEX 001858
PLANT?
DEPARTMENT s CLASSIFICATIONS OPERATIONS
JOB BREAKDOWN ----- -------------------
B-23 Page 2
Puget Sound
RP&S - Docks Pumper Helper A B=23 Ship SpentCaustic to NoWo Petrochemical
(Conb,)
in>J , nnTTr^_4^..^---->1 i i mniii n ni i i <nnriiniiii i i inmuT i~l--ifTnniii'i i hiTii ni--i--rrrra
IMPORTANT STEPS
KEST POINTS
3,, Preparation (Cont,,)
f. Close FCCU line up to caustic tank and notify them0
4 Transfer
a. Start pump and check seal and pump operation,,
b. Check gauge 1 hour after starting and calculate finish time,,
c0 Draw 1 quart sample from pump bleeds fusl*"? g3ove% goggles and face shield) and tag "Delivery to
"'No Wo Petrochemical for Acid Oils".
5. Shut Down Transfer
a, Shutdown pump when there is still
approximately 3" of caustic in tank 303 (by water cut).
b,, Record closing gauge on tank 303 in gauger's hand book.
c. Block off valves used in transfer.
d. Open FCCU lines up to Caustic tanks that you closed.' Notify FCCU operator.
e,, Calculate barrels of caustic shipped by strapping sheet on tank 303 at Blending Plant and
enter on R^&T^ko
f. Notify NoW. Petrochemical.
| WA-TEX 001859
PLANT?
DEPARTMENTS CLASSIFICATION s OPERATIONS
Puget Sound
RP&S - Docks Pumper Helper A B~24 Deliver to OPL
Page 2
IMPORTANT STEPS
KEY POINTS
1# General Information OPL (Olympic Pipe Line) is an "outside11 : company that takes delivery of all types of finished products (except Bunker and LFG) from our plant, as well
' as from other plants#
These movements are scheduled and one of these schedules is sent to the Blending Plant informing the operators of the
,, time, quantity and source#
The timing and quantity may change- -"mid-
delivery" due to unforeseen problems, but you will be advised if at all possible #
Remote controlled AOVss (Air Operated Valves) are located In the field to direct the flow of product as required#
These air valves are controlled by buttons located on a panel at the
Blending Plant and there is no "mid point" position for controlling the flow#
Should the air pressure be discontinued to the system or any Individual valve, any open valve or valves so effected will close#
Open valves are indicated by green lights and closed valves by red lights on panel at Blending Plant#
2# Preparation
a. Call OPL dispatcher on OPL phone and establish starting time.
b# Give information required, gauge, spec o, etc #
c# Cycle valves in order of transfer to be sure valves are operating proper ly. (Check the lights on panel to see that no other tanks of that grade of product are open to OPL at that time,,)
I WA-TEX 001860
JOB BREAKDOWN
PLANT? DEPARTMENTS CLASSIFICATION? OPERATION ?
Puget Sound
RP&S Docks Pumper Helper A B-24 Deliver to OPL (Cent.)
B-24 Page 2
IMPORTANT STEPS
<..11 ii-n^iim(nnii'Tiii >viim irTfrr-nnruwwnfi iiftm
2. Preparation (Cont.)
KEY POINTS
do Open valves from tank to be used first to OPL 1/2 hour before de livery* (This gives you time to operate valve from the field in case it does not operate from the panel*)
a . Record opening gauge on form R-Sl-A.
f. Check gauge on opened tank in 5 min utes to see that gauge is not dropping.
3o Deliver to OPL
a* After OPL starts pumping* they will
give you "Opening Time"* Check gauge tank "on the line" 1 hour later and compare loss to OPL schedule to check rate*
b. One-half hour before completion of
this tender* repeat operations d* e, and f above for the next tender.
c. Close out first transfer after you are notified by OPL that they are moving on 2nd tender.
d. Gauge first tank closed and record on R-61-A.
WA-TEX 001861
PIANO? s
DEPARTMENT % CLASSIFICATION s OPERATIONS
JOB. BREAKDOWN
B-25 Page 1
Puget Sound.
RP&S - Docks
Pumper Helper A
B-25 Operate Automatic Crude Sampler
IMPORTANT STEPS
.w^...TT,r
imin nr, ---
lo General Information
i ...... .. .,
--
KEY POINTS
i
i
m<v i
i i itt i-i-n i'i i i. j i i i i i h
At 9th St. north of tank 7 Is a sampling station designed to sample the crude
stream at regular periods throughout
the crude deliveries and store them in
a pressure cylinder. At the termination of the delivery to any tank you will be
required to pull the samples and deliver
them to the Laboratory.
A manifest will be sent to the Blending Plant prior to each Trans-Mountain de livery giving rates and timing.
Each division on the time selector rep resents 1 hour and cannot be set for
over 24 hours.
When empty, the rod on the sample con tainer is extended to full out position and moves In as the container fills*
Start samples when delivery begins ex cept t tank 3 which must have 20s level before sampler will operate. .
2. Start Samples
a* Check sampler - empty (plunger rod
3* Draw Sample in 75cc Bomb
b* Line up valves through sampler*
c* Check delivery time on manifest*
d* Set timer for desired time.
e* Turn switch to "Auto" position and check motor to see that It is driv ing. (Solenoid will click at short intervals *)
a. Attach 75<*c sample bomb to threaded connection on sampler*
b. Open valves on sample bomb*
WA-TEX 001862
PLANT;
DEPARTMENTS CLASSIFICATIONi OPERATIONS
JOB BREAKDOWN
B25
Page 2
Puget Sound
RP&S - Docks
Pumper Helper A
B-25 OperateAutomatic Crude Sampler (Cont*)
IMPORTANT STEPS 3o Draw Sample in
75ce Bomb (Conto)
40 Draw Sample in Gallon Can
KEY POINTS
Co Turn switch to "Manual" until bomb fillSo
d,, Close valve at upper end of bomb close valve at lower end of bomb0
e,, Shut off switch and disconnect bombo
f. Mark tag for "Chromatograph"*
a* Connect hose to sample connection,
b* Place end of hose in l gallon sample can,
c* Turn switch to manual*
d* Allow sampler to pump dry into can => (plunger handle will move to full
out position about 14".)
5. Shut Off Sampler
a. Turn switch to "Off" position*
b* Leave valve open to and from sampler*
WA-TEX 001863