Document Rgx6ezkrB9aegnXwYzNmreQE

R.D. SovO/Xa f4O3J5f8f COtiPUS CHRIST1, TEXAS 78408 BhRRY CONTRACTING, INC Industrial Contractor! December 30, 1981 jAeo'i- 1414 COHN PRODUCTS ROAD AC 512 884-2100 TELEX 773446 COASTAL STATES PETROCHEMICAL CO. P. 0. Box 521 Corpus Christi, Texas 78403 Attn: Mr. John Baden Dear Mr. Baden: Enclosed please find revised labor rate sheets fo.r youp files, These revised rates are the result of contract wage increases, We would appreciate your incorporating these rates into the rate packages we have on file in your offices,. Thank you for the opportunity of submitting this revised rate information. We look forward to being of continued service to you. Sincerely BERRY CONTRACTING, INC. enclosure B. D. Daniels Sales Manager / CED0006454 RATE CHANGE ANALY515 exhibit "a" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEHI CAL CO. Page Craft BOILERMAKER Effective 6/10/81 thru 6/9/82 OLD RATES EFFECTIVE 7-1-80 1ST SHI ft/t)flijJj&u/tfJC. /wt>JcA. M&Odofijsmucnod OLD RATE Straight Time h INC,. s3 /27 Boilermaker Sub-Boilermaker 19.5&5 15.285 $22,410 17-415 14.5 13.9 1st Pd. App. 70% 14.42 16.415 13.8 2nd Pd. App. 75% 40 3rd Pd. App. 80% 4th Pd. App. 85% 15.285 lto.475 17.00 17.415 18.415 19.415 13.9 H.8 14.2 4&5th Pd. App. 90% 17.85 20.410 143 6th Pd. App. 95% 18.715 21.410 \4A 12 ^1 Jz\ Assistant Foreman 2o.z4 Foreman 20.SIS General Foreman 2.1.25 Superintendent 21.925 23.285 23.760 24.095 24.770 15.0 15,5 13.4 13.0 Over Time $30,920 23.795 22.370 23.795 25.225 26.650 28.070 29.495 32.170 32.845 33.325 34.285 Double Time $39,430 30.180 28.330 30.180 32.030 33-880 35.730 37.580 41.050 41.930 42.550 43.800 The above rales include wcges, benelils. applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premium: or. insur ance. overhead and prolit. These rates do not include any othor costs or contingencies such as revorb or uninsured losses CED0006455 ~ EXHIBIT ''A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for ^ COASTAL STATES PETROCHEMICAL CO. Page 1A Craft BOILERMAKEREffective 6/10/81 thru 6/9/82 OLD RftT EFFECTIVE 7-l~8o 2ND SHIFT - NEW CONSTRUCTION OLD RAT Straight Time Over Time %MC. Boilermaker 22.k95 Sub-BoiIermaker 17,(oU> 1st Pd. App. 701 \<o.an 2nd Pd. App. 752 n.(oU> 3rd Pd. App. 80% I8.fck5 4th Pd. App. 85% n.6i5 5th Pd. App. 90% 20. k8 6th Pd. App. 95% 21*6>9 Assistant Foreman 23,43.5 Foreman 23.885 General Foreman 24.6>7 Superintendent 25.3k $25.*i05 19.670 18.510 19-670 20.815 21.965 23.110 24.260 26.420 26.960 27.350 28.120 n.9 11.4 11.0 11.4 11.5 11.& 11.a 11.8 12.5 J2.9 10.9 10.9 $35,190 27.010 25.360 27.010 28.645 30.285 31.920 33.555 36.635 37.405 37.965 39.060 Double Time $44,980 34.355 32.205 34.355 36.480 38.605 40.730 42.855 46.855 47.855 48.580 50.005 --r-'\ The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tex, and the premiums on insur ance, overhead end profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006456 ^ exhibit "A" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMICAL CO. Page 18 Craft BOILERMAKEREffective 6/10/81thru 6/9/82 OLD RATES EFPE CTIVE 7-1 ~S<0 2ND SHIFT - MAINTENANCE Straight Time Over Time OLD KATE % INC.. 'J 4> / 28 Boi1ermaker Sub-Boilermaker 20.43 15.935 $23.MO ~ 18.170 M.fe 14.0 $32,345 24.875 1st Pd. App. 702 15.03 17-120 13.9 23.375 2nd Pd. App. 752 15.935 18.170 19.0 24.875 4*1 3rd Pd. App. 802 I&.825 19.210 19.2 26.355 Mh Pd. App. 852 17.73 20.265 19.3 27.860 43 5th Pd. App. 902 18.&35 21.315 19.4 29.380 6th Pd. App. 952 19.525 22.355 14.5 31.200 1* /4 /2 (p Assistant Foreman Foreman General Foreman Superin tenden t 21.13 21 AS 22.IS5 22.9 O 24.325 24.825 25.175 26.615 15.1 15.(o 13.4 f (0.2. 33.650 34.365 34.865 36.610 Double Time $41,280 31.580 29.630 31.580 33.505 35.455 37.405 39.330 42.980 - 43.905 44.550 46.600 -----------------------------------------------------------------------------------O----------------------------------------------------------------------------------- The above rales include wages, benefits, applicable payToll burdens such as F.I.C.A.. Withholding Tax, and the premiums or. insur ance, overhead and piolit. These rales do not include any other costj or contingencies such as rework or uninsured losses. CED0006457 ' Craft EXHIBIT "A" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for Pago ___ 1C COASTAL STATES PETROCHEMI CAL CO. NEW RATES FOR SHIFT BOILERMAKEREffective 6/10/81thru_______________________________ 6/9/82 3RD SHIFT - MAINTENANCE Boilermaker Sub-Boilermaker 1st Pd. App. 70% 2nd Pd. App. 752 3fd Pd. App. 80% 4th Pd. App. 85% 5th Pd. App. 90% 6th Pd. App. 95% Assistant Foreman Foreman General Foreman Superintendent Straight Time $24,410 18.915 17.820 18.915 20.005 21.115 ' 22.205 23.315 25-380 25.895 26.270 27.015 Over Time $33,770 25.935 24.375 25.935 27.490 29.075 30.630 32.210 35.155 35.890 36.425 ..37.485 Double Time $43,130 32.955 30.930 32.955 34.980 37.030 39.050 4l.105 44.930 45.880 46.580 47-955 -----------------------------------------------------------------------------------O----------------------------------------------------------------------------------- The QDove rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and Ihe prei;;iurr.s on insur ance. overhead er.d profit. These rates do not include any other costs or contingencies such as rework or unineured losses. CED0006458 --' EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMICAL CO. Page ____ 2 Craft CARPENTERSEffective ____________________________________ 10/1/81thru 3/31/82 MAINTENANCE QIP.*!>-]- 2\ Straight Ti me Carpent<er Mk % ZtHL 13.W-S $13-600 1st Pd. App. 55% I.Tir 8.025 2nd Pd. App. 55% 9-265 3rd Pd. App. 70% ^5SS~ 9-885 c-,~ 4th Pd. App. 75% 10.510 5th Pd. App. 80% |0-511.130 3-U *. 6th Pd. App. 85% U-'iS' 11.735 S.-\- 7th Pd. App. 90% HSt! 12.355 b>*\- 8th Pd. App. 95% \a.ar 12.980 5-'\ Saw Ope rator or frilert3Sl5l3-770 i fi General Foreman !bMrj 15.625 3.0 Foreman 14.275 <*, , ^V Time & One Half $18,870 10.925 12.690 13.575 14.465 15.350 16.215 17-100 17.990 19-115 21.760 19-835 Double Time $24,145 13.820 16.120 17-270 18.420 19.570 20.695 21.840 22.995 24.460 27.895" 25.395 ----------------------------------------------------------------------------------- O----------------------------------------------------------------------------------- The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax. and the premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006459 EXHIBIT "A" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMICAL CO. --V Page 3 Craft CEMENT FINISHERSEffectlve _____________________________________ 10/1/81thru3/31/82 maintenance ^T4rr=.TTi~))< 4-i-?l Straight Ti me OLD. R K i VCement Finisher 15-2.V, $15,995 Foreman 16.670 A Mr i'i' M.5- Machine Operator fS-Crtc 16.335 1st Pd. App. 60% <3,1^ S' 9-600 2nd Pd. App. 70% |0"7& 11.190 3rd Pd. App. 80% |.S'r> 12.800 h-4 4th Pd. App. 90% l3.-p.-ri4.390 Time One Half $22,810 23.770 23.290 13.690 15-955 18.250 20.520 Double Til $29,620 30.870 30.250 17-775 20.725 23.700 26.650 ----------------------------------------------------------------------------------- O------------------------------------------------------------------------------- The above rate* include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax. and the premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses CED0006460 EXHIBIT ''A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES Craf tI RONWORKERSEf f ective 4/1/82thru 9/30/82 Maintenance Straight Time Overtime 1 ronworker /7,S> $19 .21 1st Pd. App. 602 //. 77 12 .58 2nd Pd. App. 702 /' *W.~''! 14,.23 3rd Pd. App. 75% AA 0s 15..06 4 th Pd. App. 802 H. 15..89 5th Pd. App. 85% /e.58 16. 71 6th Pd. App. 902 /<o.4 17. 55 Genera 1 Foreman -CiO-OJ 21 ,M Foreman 19.C6 20..60 7.& 7.C 7. 7.j 7-2. 7.^ <p.7 1.0 $26.26 16.81 19.16 20.35 21.53 22.70 23-90 29-43 28.25 Doubie Time $33 .32 21,.04 24..10 25..64 27..17 28..69 30..25 37..44 35. 90 o The cbove rates include wages. benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and The premiums on insur ance. overhead and protit. These rates do net include any other costs or contingencies such as rework or uninsured losses CED0006461 EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES PETROLEUM CO. Craf t MILLWRIGHTSEffective 5/27/81thru 3/31/82 Page ____6 Mi 1Iwright 1st Pd. App. 60% 2nd Pd. App. 65% 3rd Pd. App. 70% 4th Pd. App. 75% 5th Pd. App. 80% 6th Pd. App. 85% 7th Pd. App. 90% 8th Pd. App. 95% Foreman Genera] Foreman Straight Time $19,235 11.540 12.500 13.475 14.430 15.390 16.350 17.320 18.280 20.585 21.260 Time and One Ha 1f $27,430 16.455 17.825 19-215 20.575 21.945 23.315 24.695 26.065 29.355 30.315 Double Time $35,620 21.370 23.150 24.950 26.725 28.500 30.275 32.075 33.850 38.120 ^9.370 o The above rales include wages, benelits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance, overhead and proiit. These rales do not include any other costs or contingencies such cs rework or uninsured losses. CED0006462 Craft LABORERS EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES >-v Page Effective 4/1/82 thru 3/31/33 MA ,NTENANCE&/?/5l# PfTfflTtVi. V/f/%! f' OLOffiL. %taxl Straight Time T imo & One Half 10 Laborer /0.&35 Sn .35 Power Tool Operator /o.sas H .62 Craft Tender or Hoi per ZO-Uo 11.75 30Labor Foreman Concrete Foreman //bCte 12.70 // 7-/- 12.83 General Labor For-em an 11.945 13-04 Labor/Coment Finish o r / 00 l 3.00 tC-7 toA /0 ro ? '*/' 9. S 9. A 9. / $15.74 16.12 16 . 3 i 1 /. 66 17.''-'j 18.14 i b . y : Double I'i $20.10 20.62 20.87 ?? .62 22.8/ 2 3.2 2 3-35 %b o The ubove rates include wages. benefits. applicable payroll burdens such as F.J.C.A., Withhold.nrj Tax, and the premium.; u.n ir.su: ance. overhead and profit. These rales do not include any other costs or contingencies such as rework or uninsured losses CED0006463 EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES Craft OPERATING ENGINEERS Effective 4/1/82thru 9/30/82 Page ___7 ,,> -V .. ^ ;V* * **/ / fi/jl*,)/ L't MAINTENANCE Straight Time Time & One Half Utility Operator /?,J? $20.19 *- II- Heavy Equipment Operator/?-^ 20.03 + 10..Light Equipment Operator A/o 17-76 Light Equipment Driver i 17.76 1st Year Oiler j 16.57 2nd Year 0i1er vrei*, tF- oreman j 16.77 V' 20.70 '-!( 'a i /JO ii i i V- $28.00 27.78 2^.54 2A.5^ 22.85 23.13 28.73 Double. Time $35-82 35.52 31.32 31.32 29.12 29-^9 36.77 7.7S 6- 76 '/> - tsCCT;Ct-: ft ^CC ,/Jtf.U- tjt'i !' / K ( //. // CXCJ/&L Sati/Jl IrT'zM Aj /V^'1 ' Of- o The abovo rales include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums cn insur ance, overhead and profit. These rales do not include any other costs or contingencies such as rework or uninsured losses CED0006464 Craft EXHIBIT "A" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMICAL CO. OUO&Jl t7Til7/2)z. o-j-zi PAINTERSEffective 1/1/82 thru 6/30/82 MAlfjTEA(AA)C. Page SA Straight Time 3to Pa inter QUO &7Z $14.94 1st Pd. App. 53% 2.Vi* 8.36 4.0 2nd Pd. App. 60% 9.34 4.1 3rd Pd. App. 65% 9. *5? 10.04 4.0 4th Pd. App. 72% !0-iSO 11 .01 41 5th Pd. App. 78% 11.85 4.1 6th Pd. App. 85% 31 Foreman /4L333 I4.8S 12.83 15.44 47 4. 1 Over Time $20.89 11.52 12.91 13.91 15.29 16.49 17.89 21.60 Double Time $26.84 14.68 16.48 17.78 19.57 21.13 23.95 27.76 -----------------------------------------------------------O------------------------------------------------ ;--------- The above rates include wages, benefits, applicable payroll burdens such as F.J.C.A., Withholding Tax, and the premiums on insur ance, orerhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006465 Craft EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMI CAL CO. GiOAAr^ P?la7Iyz_ 77 -s/ PAINTERSEffective 1/1/82thru 6/30/82 Page ____ 8 CED0006466 EXHIBIT "A" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for COASTAL STATES PETROCHEMICAL CO. Page 9 Craft PIPEFITTEREffective '10-1-81thru 9-30-82 __________ ______ _____________ 1ST SHIFT /?//) .-v/7. TTT7.> ~7*yy CLO fcTt Straight % Time and Time ZZ/'Jd One Half Double Time f[ Pipefitter 1st Pd. App. 40% 2nd Pd. App. 50% 3rd Pd. App. 55% 4th Pd. App. 60% 5th Pd. App, 65% 6th Pd. App. 70% 7th Pd. App. 75% 8th Pd. App. 80% *7 General Foreman $ Foreman Area Foreman & Superintendent n.&iS 7.fat $19.45 8.51 /.. 1 > hi 9 - Cj(q JD.OSS /0&&& //0>7S 10.33 11.25 12.16 13.07 //. 7 //.? // 7 //.f 13.98 fS O iS.ZJo /V ./os' 14.90 /Q,t 15.80 /3.0 /9-S7 /. itS rt.05 GO.92, 21 .67 20.80 21.13 -23.02 /O- 7 //.*! //, 0 /o.O $27.21 11.62 14.21 15.52 16.82 18.12 19.41 20.72 22.01 30.38 29.14 29.61 32.31 $34.98 14.72 18.09 19.79 21.48 23.17 24.85 26.55 28.22 39.09 37.48 38.09 41.59 ------------------------------------------------------------------------------------------------------------- O------------------------------- :------------------ -----------------------------------------------The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and tho premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006467 ^ exhibit "a" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for ^ COASTAL STATES PETROCHEMICAL CO. Page ____ 9A Iraft PIPEFITTERS Pipefitter 1st Pd. App. 40% 2nd Pd. App. 50% 3rd Pd. App. 55% 4th Pd. App. 60% 5th Pd. App. 65% 6th Pd. App. 70% 7th Pd. App. 75% 8th Pd. App. 80% cQ.'SL General Foreman <2^ Foreman Area Foreman Superintendent Effective 10-1-81 thru 9--30-82 2ND SHI FT n/n PaTs.< ~ -v ? 603 . &7L Straight <7o Time and Time JSlQj One Half Double Time 19- 775* $22.19 9.60 ni to v<% 11.70 n.9 n.B9 0-355 /-5S 12.75 n.9 13.80 /&.d 14.86 /. ) w-fes 15.89 />. a /S'. //S / (a, (). 16.95 /). / 17.99 / 24.74 to-7 <9>'3S5 23.74 //. 3- <5/. 24.12 //. o 9 26.29 '0.0 $31.12 13.17 16.16 17.66 19.16 20.67 22.14 23.56 25.13 34.76 33.33 33.87 36.97 $40.05. 16.74 20.62 22.57 24.52 26.48 28.39 30.35 32.27 44.77 42.92 43.62 47.65 Tha above rates include wages, benelits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance, overhecd and prclit. These rates do not include any other costs or contingencies such as rework or uninsured losses. CED0006468 Craft As Bel ow EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for COASTAL STATES Page Ef f ec tiv e 4/1/82 thru 9/30/32 Swamper Straight Time $12.42 Time & One Ha If $18.05 ----------------------------------------------------------------------------------- O----------------------------------------------------------------------------------- The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A.. Withholding Tax, and the premiums on insur ance, overhead and profit. These rales do not include any other costs or contingencies such as rework or unineured losses CED0006469 EXHIBIT "A" BERRY CONTRACTING. IHC. LABOR RATE SCHEDULE for COASTAL STATES PETROLEUM COMPANY Page Craft EQUIPMENT RENTAL SCHEDULES!fective March I. 1982 thru July 31. 1982 CJocfac. Description S7.Heliarc Welding Machine EQUIPMENT RENTAL SCHEDULE RATE $18.65 /*< OP / D^ \ o i '/ The above rates include wages, beneilts, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses CED0006470 Craft EXHIBIT "A" BERRY COXTRACTINGj, INC. IJLBUR RATV. SCKEDULt:~~ for COASTAL STATES PETROCHEMICAL CO. 1- "'.ISC. PR5i<NMTL d/Mka7tL$ yg_ ^-3o-`/ Effective I-1 -S'* c;.ru 6-30-C2 CED0006471