Document Rgx6ezkrB9aegnXwYzNmreQE
R.D. SovO/Xa f4O3J5f8f COtiPUS CHRIST1, TEXAS
78408
BhRRY CONTRACTING, INC
Industrial Contractor!
December 30, 1981
jAeo'i-
1414 COHN PRODUCTS ROAD AC 512 884-2100 TELEX 773446
COASTAL STATES PETROCHEMICAL CO. P. 0. Box 521 Corpus Christi, Texas 78403 Attn: Mr. John Baden
Dear Mr. Baden:
Enclosed please find revised labor rate sheets fo.r youp files, These revised rates are the result of contract wage increases,
We would appreciate your incorporating these rates into the rate packages we have on file in your offices,.
Thank you for the opportunity of submitting this revised rate information. We look forward to being of continued service to you.
Sincerely
BERRY CONTRACTING, INC.
enclosure
B. D. Daniels Sales Manager
/
CED0006454
RATE CHANGE ANALY515
exhibit "a" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEHI CAL CO.
Page
Craft
BOILERMAKER
Effective 6/10/81
thru 6/9/82
OLD RATES EFFECTIVE 7-1-80
1ST SHI ft/t)flijJj&u/tfJC. /wt>JcA. M&Odofijsmucnod
OLD RATE
Straight Time h INC,.
s3 /27
Boilermaker Sub-Boilermaker
19.5&5 15.285
$22,410 17-415
14.5 13.9
1st Pd. App. 70% 14.42
16.415
13.8
2nd Pd. App. 75% 40 3rd Pd. App. 80%
4th Pd. App. 85%
15.285 lto.475 17.00
17.415 18.415 19.415
13.9 H.8 14.2
4&5th Pd. App. 90% 17.85
20.410
143
6th Pd. App. 95% 18.715
21.410
\4A
12 ^1 Jz\
Assistant Foreman 2o.z4
Foreman
20.SIS
General Foreman 2.1.25
Superintendent
21.925
23.285 23.760 24.095 24.770
15.0 15,5 13.4 13.0
Over Time
$30,920 23.795 22.370 23.795 25.225 26.650 28.070 29.495 32.170 32.845 33.325 34.285
Double Time
$39,430 30.180 28.330 30.180 32.030 33-880 35.730 37.580 41.050 41.930 42.550 43.800
The above rales include wcges, benelils. applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premium: or. insur ance. overhead and prolit. These rates do not include any othor costs or contingencies such as revorb or uninsured losses
CED0006455
~ EXHIBIT ''A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for
^
COASTAL STATES PETROCHEMICAL CO.
Page
1A
Craft
BOILERMAKEREffective
6/10/81
thru
6/9/82
OLD RftT EFFECTIVE 7-l~8o
2ND SHIFT - NEW CONSTRUCTION
OLD RAT
Straight Time
Over Time
%MC.
Boilermaker
22.k95
Sub-BoiIermaker 17,(oU>
1st Pd. App. 701 \<o.an
2nd Pd. App. 752 n.(oU>
3rd Pd. App. 80% I8.fck5
4th Pd. App. 85% n.6i5
5th Pd. App. 90% 20. k8
6th Pd. App. 95% 21*6>9
Assistant Foreman 23,43.5
Foreman
23.885
General Foreman
24.6>7
Superintendent
25.3k
$25.*i05 19.670 18.510 19-670 20.815 21.965 23.110 24.260 26.420 26.960 27.350 28.120
n.9 11.4 11.0 11.4 11.5 11.& 11.a 11.8 12.5 J2.9 10.9 10.9
$35,190 27.010 25.360 27.010 28.645 30.285 31.920 33.555 36.635 37.405 37.965 39.060
Double Time
$44,980 34.355 32.205 34.355 36.480 38.605 40.730 42.855 46.855 47.855 48.580 50.005
--r-'\
The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tex, and the premiums on insur ance, overhead end profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006456
^ exhibit "A" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMICAL CO.
Page
18
Craft
BOILERMAKEREffective
6/10/81thru 6/9/82 OLD RATES EFPE CTIVE 7-1 ~S<0
2ND SHIFT - MAINTENANCE
Straight Time
Over Time
OLD KATE
% INC..
'J 4> / 28
Boi1ermaker Sub-Boilermaker
20.43 15.935
$23.MO ~ 18.170
M.fe 14.0
$32,345 24.875
1st Pd. App. 702 15.03
17-120
13.9
23.375
2nd Pd. App. 752 15.935
18.170
19.0
24.875
4*1 3rd Pd. App. 802 I&.825
19.210
19.2
26.355
Mh Pd. App. 852 17.73
20.265
19.3
27.860
43 5th Pd. App. 902 18.&35
21.315
19.4
29.380
6th Pd. App. 952
19.525
22.355
14.5
31.200
1* /4
/2 (p
Assistant Foreman Foreman General Foreman Superin tenden t
21.13 21 AS 22.IS5 22.9 O
24.325 24.825 25.175 26.615
15.1 15.(o 13.4 f (0.2.
33.650 34.365 34.865 36.610
Double Time
$41,280 31.580 29.630 31.580 33.505 35.455 37.405 39.330 42.980
- 43.905 44.550 46.600
-----------------------------------------------------------------------------------O-----------------------------------------------------------------------------------
The above rales include wages, benefits, applicable payToll burdens such as F.I.C.A.. Withholding Tax, and the premiums or. insur ance, overhead and piolit. These rales do not include any other costj or contingencies such as rework or uninsured losses.
CED0006457
' Craft
EXHIBIT "A" BERRY CONTRACTING, INC.
LABOR RATE SCHEDULE for
Pago ___ 1C
COASTAL STATES PETROCHEMI CAL CO.
NEW RATES FOR
SHIFT
BOILERMAKEREffective 6/10/81thru_______________________________ 6/9/82
3RD SHIFT - MAINTENANCE
Boilermaker Sub-Boilermaker 1st Pd. App. 70% 2nd Pd. App. 752 3fd Pd. App. 80% 4th Pd. App. 85% 5th Pd. App. 90% 6th Pd. App. 95% Assistant Foreman Foreman General Foreman Superintendent
Straight Time
$24,410 18.915 17.820 18.915 20.005 21.115 ' 22.205 23.315 25-380 25.895 26.270 27.015
Over Time
$33,770 25.935 24.375 25.935 27.490 29.075 30.630 32.210 35.155 35.890 36.425
..37.485
Double Time
$43,130 32.955 30.930 32.955 34.980 37.030 39.050 4l.105 44.930 45.880 46.580 47-955
-----------------------------------------------------------------------------------O-----------------------------------------------------------------------------------
The QDove rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and Ihe prei;;iurr.s on insur ance. overhead er.d profit. These rates do not include any other costs or contingencies such as rework or unineured losses.
CED0006458
--' EXHIBIT "A" BERRY CONTRACTING. INC. LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMICAL CO.
Page ____ 2
Craft CARPENTERSEffective ____________________________________
10/1/81thru
3/31/82
MAINTENANCE QIP.*!>-]- 2\
Straight Ti me
Carpent<er
Mk
% ZtHL
13.W-S $13-600
1st Pd. App. 55% I.Tir 8.025
2nd Pd. App. 55%
9-265
3rd Pd. App. 70% ^5SS~ 9-885 c-,~
4th Pd. App. 75%
10.510
5th Pd. App. 80% |0-511.130
3-U *.
6th Pd. App. 85% U-'iS' 11.735 S.-\-
7th Pd. App. 90% HSt! 12.355 b>*\-
8th Pd. App. 95% \a.ar 12.980 5-'\
Saw Ope rator or frilert3Sl5l3-770 i fi
General Foreman !bMrj 15.625 3.0
Foreman
14.275 <*, , ^V
Time & One Half
$18,870 10.925 12.690 13.575 14.465 15.350 16.215 17-100 17.990 19-115 21.760 19-835
Double Time
$24,145 13.820 16.120 17-270 18.420 19.570 20.695 21.840 22.995 24.460 27.895" 25.395
----------------------------------------------------------------------------------- O-----------------------------------------------------------------------------------
The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax. and the premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006459
EXHIBIT "A" BERRY CONTRACTING, INC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMICAL CO.
--V
Page
3
Craft CEMENT FINISHERSEffectlve _____________________________________
10/1/81thru3/31/82
maintenance
^T4rr=.TTi~))< 4-i-?l
Straight Ti me
OLD. R K i VCement Finisher 15-2.V, $15,995
Foreman
16.670
A
Mr i'i'
M.5-
Machine Operator fS-Crtc 16.335
1st Pd. App. 60% <3,1^ S' 9-600
2nd Pd. App. 70% |0"7& 11.190 3rd Pd. App. 80% |.S'r> 12.800
h-4
4th Pd. App. 90% l3.-p.-ri4.390
Time One Half
$22,810 23.770 23.290 13.690 15-955 18.250 20.520
Double Til
$29,620 30.870 30.250 17-775 20.725 23.700 26.650
----------------------------------------------------------------------------------- O-------------------------------------------------------------------------------
The above rate* include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax. and the premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses
CED0006460
EXHIBIT ''A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES
Craf tI RONWORKERSEf f ective
4/1/82thru
9/30/82
Maintenance
Straight Time
Overtime
1 ronworker
/7,S> $19 .21
1st Pd. App. 602 //. 77 12 .58
2nd Pd. App. 702 /' *W.~''! 14,.23 3rd Pd. App. 75% AA 0s 15..06
4 th Pd. App. 802 H.
15..89
5th Pd. App. 85% /e.58 16. 71
6th Pd. App. 902 /<o.4 17. 55
Genera 1 Foreman -CiO-OJ 21 ,M
Foreman
19.C6 20..60
7.&
7.C 7. 7.j 7-2. 7.^ <p.7 1.0
$26.26 16.81 19.16 20.35 21.53 22.70 23-90 29-43 28.25
Doubie Time
$33 .32 21,.04 24..10 25..64 27..17 28..69 30..25 37..44 35. 90
o
The cbove rates include wages. benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and The premiums on insur ance. overhead and protit. These rates do net include any other costs or contingencies such as rework or uninsured losses
CED0006461
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROLEUM CO.
Craf t
MILLWRIGHTSEffective 5/27/81thru
3/31/82
Page ____6
Mi 1Iwright 1st Pd. App. 60% 2nd Pd. App. 65% 3rd Pd. App. 70% 4th Pd. App. 75% 5th Pd. App. 80% 6th Pd. App. 85% 7th Pd. App. 90% 8th Pd. App. 95% Foreman Genera] Foreman
Straight Time
$19,235 11.540 12.500 13.475 14.430 15.390 16.350 17.320 18.280 20.585 21.260
Time and One Ha 1f
$27,430 16.455 17.825 19-215 20.575 21.945 23.315 24.695 26.065 29.355 30.315
Double Time
$35,620 21.370 23.150 24.950 26.725 28.500 30.275 32.075 33.850 38.120 ^9.370
o
The above rales include wages, benelits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance, overhead and proiit. These rales do not include any other costs or contingencies such cs rework or uninsured losses.
CED0006462
Craft LABORERS
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES
>-v
Page
Effective
4/1/82
thru
3/31/33
MA ,NTENANCE&/?/5l# PfTfflTtVi. V/f/%! f'
OLOffiL.
%taxl
Straight Time
T imo & One Half
10 Laborer
/0.&35 Sn .35
Power Tool Operator /o.sas H .62
Craft Tender or Hoi per ZO-Uo 11.75
30Labor Foreman Concrete Foreman
//bCte 12.70
// 7-/- 12.83
General Labor For-em an 11.945 13-04
Labor/Coment Finish o r / 00 l 3.00
tC-7 toA
/0 ro
? '*/'
9. S
9. A
9. /
$15.74 16.12
16 . 3 i
1 /. 66 17.''-'j 18.14
i b . y :
Double I'i
$20.10 20.62 20.87
?? .62
22.8/ 2 3.2 2 3-35
%b
o
The ubove rates include wages. benefits. applicable payroll burdens such as F.J.C.A., Withhold.nrj Tax, and the premium.; u.n ir.su: ance. overhead and profit. These rales do not include any other costs or contingencies such as rework or uninsured losses
CED0006463
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES
Craft OPERATING ENGINEERS
Effective 4/1/82thru
9/30/82
Page ___7
,,> -V
.. ^ ;V* * **/ /
fi/jl*,)/ L't MAINTENANCE
Straight Time
Time & One Half
Utility Operator
/?,J? $20.19
*- II- Heavy Equipment Operator/?-^ 20.03
+ 10..Light Equipment Operator A/o 17-76
Light Equipment Driver i 17.76
1st Year Oiler
j 16.57
2nd Year 0i1er
vrei*, tF- oreman
j 16.77 V' 20.70
'-!(
'a i
/JO
ii
i
i
V-
$28.00 27.78 2^.54 2A.5^ 22.85 23.13 28.73
Double. Time
$35-82 35.52 31.32 31.32 29.12 29-^9 36.77
7.7S 6- 76
'/> - tsCCT;Ct-: ft
^CC ,/Jtf.U- tjt'i !' / K ( //.
// CXCJ/&L Sati/Jl IrT'zM Aj /V^'1
'
Of-
o
The abovo rales include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums cn insur ance, overhead and profit. These rales do not include any other costs or contingencies such as rework or uninsured losses
CED0006464
Craft
EXHIBIT "A" BERRY CONTRACTING, INC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMICAL CO.
OUO&Jl t7Til7/2)z. o-j-zi
PAINTERSEffective 1/1/82 thru 6/30/82
MAlfjTEA(AA)C.
Page SA
Straight Time
3to Pa inter
QUO &7Z
$14.94
1st Pd. App. 53% 2.Vi* 8.36
4.0
2nd Pd. App. 60%
9.34
4.1
3rd Pd. App. 65% 9. *5? 10.04
4.0
4th Pd. App. 72% !0-iSO 11 .01
41
5th Pd. App. 78%
11.85
4.1
6th Pd. App. 85% 31 Foreman
/4L333 I4.8S
12.83 15.44
47 4. 1
Over Time
$20.89 11.52 12.91 13.91 15.29 16.49 17.89 21.60
Double Time
$26.84 14.68 16.48 17.78 19.57 21.13 23.95 27.76
-----------------------------------------------------------O------------------------------------------------ ;---------
The above rates include wages, benefits, applicable payroll burdens such as F.J.C.A., Withholding Tax, and the premiums on insur ance, orerhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006465
Craft
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMI CAL CO.
GiOAAr^ P?la7Iyz_ 77 -s/
PAINTERSEffective 1/1/82thru
6/30/82
Page ____ 8
CED0006466
EXHIBIT "A" BERRY CONTRACTING, INC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROCHEMICAL CO.
Page
9
Craft
PIPEFITTEREffective '10-1-81thru 9-30-82
__________ ______ _____________
1ST SHIFT /?//) .-v/7. TTT7.> ~7*yy
CLO fcTt
Straight % Time and Time ZZ/'Jd One Half
Double Time
f[ Pipefitter
1st Pd. App. 40% 2nd Pd. App. 50%
3rd Pd. App. 55%
4th Pd. App. 60% 5th Pd. App, 65% 6th Pd. App. 70% 7th Pd. App. 75% 8th Pd. App. 80%
*7 General Foreman $ Foreman
Area Foreman
& Superintendent
n.&iS 7.fat
$19.45 8.51
/.. 1 > hi
9 - Cj(q JD.OSS /0&&& //0>7S
10.33 11.25 12.16 13.07
//. 7
//.? // 7
//.f
13.98 fS O
iS.ZJo /V ./os'
14.90 /Q,t
15.80 /3.0
/9-S7 /. itS rt.05 GO.92,
21 .67 20.80 21.13 -23.02
/O- 7 //.*! //, 0
/o.O
$27.21 11.62 14.21 15.52 16.82 18.12 19.41 20.72 22.01 30.38 29.14 29.61 32.31
$34.98 14.72 18.09 19.79 21.48 23.17 24.85 26.55 28.22 39.09 37.48 38.09 41.59
------------------------------------------------------------------------------------------------------------- O------------------------------- :------------------ -----------------------------------------------The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and tho premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006467
^ exhibit "a" BERRY CONTRACTING, INC. LABOR RATE SCHEDULE for
^
COASTAL STATES PETROCHEMICAL CO.
Page ____ 9A
Iraft
PIPEFITTERS
Pipefitter 1st Pd. App. 40% 2nd Pd. App. 50% 3rd Pd. App. 55% 4th Pd. App. 60% 5th Pd. App. 65% 6th Pd. App. 70% 7th Pd. App. 75% 8th Pd. App. 80% cQ.'SL General Foreman <2^ Foreman Area Foreman Superintendent
Effective 10-1-81
thru 9--30-82
2ND SHI FT n/n PaTs.<
~ -v ?
603 . &7L
Straight <7o Time and Time JSlQj One Half
Double Time
19- 775* $22.19
9.60 ni
to v<%
11.70 n.9
n.B9 0-355 /-5S
12.75 n.9 13.80 /&.d 14.86 /. )
w-fes 15.89 />. a
/S'. //S / (a, ().
16.95 /). /
17.99
/
24.74 to-7
<9>'3S5 23.74 //. 3-
<5/. 24.12 //. o
9
26.29 '0.0
$31.12 13.17 16.16 17.66 19.16 20.67 22.14 23.56 25.13 34.76 33.33 33.87 36.97
$40.05. 16.74 20.62 22.57 24.52 26.48 28.39 30.35 32.27 44.77 42.92 43.62 47.65
Tha above rates include wages, benelits, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance, overhecd and prclit. These rates do not include any other costs or contingencies such as rework or uninsured losses.
CED0006468
Craft
As Bel ow
EXHIBIT "A" BERRY CONTRACTING. INC.
LABOR RATE SCHEDULE for
COASTAL STATES
Page
Ef f ec tiv e 4/1/82
thru 9/30/32
Swamper
Straight Time $12.42
Time & One Ha If $18.05
----------------------------------------------------------------------------------- O-----------------------------------------------------------------------------------
The above rates include wages, benefits, applicable payroll burdens such as F.I.C.A.. Withholding Tax, and the premiums on insur ance, overhead and profit. These rales do not include any other costs or contingencies such as rework or unineured losses
CED0006469
EXHIBIT "A" BERRY CONTRACTING. IHC.
LABOR RATE SCHEDULE for
COASTAL STATES PETROLEUM COMPANY
Page
Craft EQUIPMENT RENTAL SCHEDULES!fective March I. 1982 thru July 31. 1982
CJocfac. Description
S7.Heliarc Welding Machine
EQUIPMENT RENTAL SCHEDULE
RATE $18.65 /*<
OP
/ D^
\
o
i '/
The above rates include wages, beneilts, applicable payroll burdens such as F.I.C.A., Withholding Tax, and the premiums on insur ance. overhead and profit. These rates do not include any other costs or contingencies such as rework or uninsured losses
CED0006470
Craft
EXHIBIT "A" BERRY COXTRACTINGj, INC.
IJLBUR RATV. SCKEDULt:~~ for
COASTAL STATES PETROCHEMICAL CO.
1-
"'.ISC. PR5i<NMTL
d/Mka7tL$
yg_ ^-3o-`/
Effective I-1 -S'*
c;.ru 6-30-C2
CED0006471