Document RgJZbreRBjg9jn78RaOordqV
FlfOk`. iNAMI A Ifji.AllON'
H. S. Bergen - B2SL
July 28, 1975 = PCB CONTINGENCY PLAN
Your Memo July 1, 1975 TO : F. J. Fitzgerald - B3SA
CC:
PERSONAL & CONFIDENTIAL
Attached is our proposed worldwide PCB Contingency Plan based on the stated premise of a government ban with a 90-day phase-out period, assuming an October 1, 1976 ban effective 1/1/77*
Also attached is a proposed PCB Contingency Plan based on a case which the business group feels is possibly realistic considering present government attitudes and actions, customer responses and the "state of the art." This premise is a government ban announced 1/1/76 but with a compliance program and the ban to be effective 1/1/78.
We have had detailed inputs from Monsanto-Europe, as well as much detailed input from our business group personnel, our plants, plus Bill Papageorge and the Law Department.
In summary, we feel these two cases "bracket" the worst potential situation. In either case, certain actions are identical -- only the timing, odds of success and the financial impact on Monsanto are different. The two-year compliance Case is on balance,in our opinion, the optimum for the U.S.government position, the total welfare of the population, the electrical utilities and other end users and the transformer and capacitor industry position and Monsanto's position.
We'll be glad to review this with you in detail if you desire.
Please advise if these meet with your approval for the premises
stated. There are other premises which can be evaluated should
the occasion demand.
.
/t 1 Attachments'
DSW 231801
STLCOPCB4053799
DISCUSSION OF CASE I
This case is the worst and most unlikely to occur for the following reasons:
1. Industry does not have thoroughly tested and approved replacement products for use in capacitors. At least 18 months more time is needed.
2. Industry does not have a fire-resistant liquid transformer fluid tested or approved. At least 2 years more time is needed.
3. The consumer would be exposed to dramatically different and inferior performance standards of capacitors and transformers which will affect his safety and energy costs and availabi1ity.
4. The U.S. government is leaning towards a three-year compliance program for the toxic pollutant products. Compliance may be possible in that time frame.
5. The alleged carcinogenic properties are not proven.
6. There will be law suits against the U.S. government.
7. The odds of success are the lowest from the standpoint of technical and commercial viewpoints.
This case is the worst economically for Monsanto and industry. There
^ 31802
is very little chance of our successfully developing a transformer
replacement product in this case. It would be difficut to successfully O
introduce non-PCB products to other world areas outside of Canada as long
as those governments allowed PCBs to be used.
STLCOPCB4053800
CASE I - PCS CONTINGENCY'PLAN - MAJOR STEPS - 7/28/75
CM
STLCOPCB4053801
RREM'ISE:
U.S.A. government barn 10/1/75 effective 1/1/76. No Imports allowed. U.K. government follows U.S.A. along with OECt) member countries* Eighteen month time lag behind U.S.A. Imports allowed for ,18 mos. Monsanto-Europe follows U.S.A. Monsanto timing. European competitors lag 18 mos.
'}(Mast Critical Steps ACTION
ODDS-OF
WHO
WHEN
SUCCESS
1. COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION
*1.-
Clarify exact conditions of ban with the U.S.A. government and industry.
W. B. Papageorge W. Easley, D. Wood
A.S.A.P.
80-90%
a in 3. ICSO5 0oCO0 k.
Monsanto submit plan for phase-out to government
and CAC and formally announce intention to cease
selling PCBs on 1/1/76.
.
Determine need for worker surveillance by OSHA.
From EPA, determine need for continued plant effluent surveillance.
5. ^6.
Take action on any class action law suits or other law suits against the government and Monsanto.
Present available toxicological and environmental data on replacement products to government.
II. CONCERN FOR CUSTOMERS
.
H. S. Bergen F. J. Fitzgerald W. B. Papageorge P. R. Department
W. B. Papageorge Dr. G. Roush
W. B. Papageorge W. Easley D. B. Hosmer Law Department
W. B. Papageorge W. Easley, R&D, Medical Department
10/16/75
100%
10/16/75
100%
10/16/75
100%
As need arises 100%
10/16/75
.100% .
4l. ^2. *3.
Appoint PCB task force to handle:
(a) phase-out of PCBs, (b) introduction of replacement products.
Conduct USA salesmen's seminar with selected U.S. export Monsanto reps.invited (Europe/Latin America/ Australia/India/Far East).
Notify customers of government ban, terminate any contracts and explain Monsanto plan.
H. S. Bergen F. J. Fitzgerald
A.S.A.P.
T. L. Gossage, C.Paton 10/15/75 D. Wood, RsD
T. L. Gossage, C.Paton 10/16/75 D. Wood, Regional Managers, Salesmen
100% 100% 90-100%
STLCOPCB4053802
Page 2 - Case I
ACTION
*k. Hold industry dielectric meeting in St. Louis to
answer immediate customer questions and explain
production plans of replacement products.
'
#5. Visit each customer individually to establish pre. liminary non-PCB fluid forecast and technical pro grams as well as PCB requirements during phase-out period.
6.
o
00
o
If requested by customers, prepare P.R. statement for PCB ultimate users; i.e., utilities, transformer "top up," etc.
Determine non-PCB market forecast. Announce Monsanto intention to proceed to interim production of MCS 1238 effective 2/1/76 and also Monsanto commitment to a new plant to come onstream in 18 months to 2 years.
* .8 Establish shipping and production plan and allocation
if necessary of PCB fluids as well as announcing
warehouse and incineration and return goods policies.
#9. Establish allocation of replacement fluids with customers.
.10 With industry, develop suitable standards -- ASTM,
EIA, Cigre, OED, etc.
III. CONTINUITY S ECONOMICS OF OUR CONTINUING BUSINESS
1. See attached Table I for economic impact.
&2. Submit AR for non-PCB dielectric plant and Santosol
200 plant to CAC.
'
IV. INTERNAL MONSANTO ACTIONS
4l. Present Monsanto phase-out plan to CAC and gain approva1.
&2. Gain approval for PIR for non-PCB Santosol 200 plant.
. WHO............................
Marketing, R&D and Manufacturing
...................... ODDS OF WHEN................. SUCCESS
11/1/75
90-100%
Marketing and Task Force
11/8/75
80-100% .
Chairman.of.Task Force and P.R.
Marketing and P.R. Department
11/25/75 1/1/76
80-100% A0%
Marketing Task Force
Marketing Task Force
Marketing/R&D .
- 10/1V75
80-100%
12/15/75
1/1/76 and Continuing
40% .
50%
H. S. Bergen F. J. Fitzgerald H. H. Bible
H. S. Bergen F. J. Fitzgerald H. H. Bible
Same
2/15/76 10/13/75 10/13/75
100% 100%
90-100%
Page 3 - Case I
ACTION
WHO WHEN
A. Marketing Related
^1.
Obtain all needed new product information presentable in a commercial form. (This includes toxicity data and product acceptability data on MCS 1238 and 1538, finished goods, manufacturing specifications, storage stability tests and product application testing to date.)
RD, Medical Product Accept. Manufacturing
9/15/75
*2. No transformer replacement product is available.
No action by Marketing. RSD continue to define and develop product.
B. Manufacturing Related
<$]. Inform Purchasing Department and other Monsanto
business groups of change of raw material require
ments and,most importantly, obtain sufficient
allocation of toluene sulfonyl chlorid_e from
Plasticizers Division to give us 1.5 M lb/yr rate.
(The following raw material will decline in usage:
benzene and chlorine and trichlorobenzene. The
following products will increase in usage, at
least temporarily: toluene sulfonyl chloride.
When Aroclor is shut down, a shortage of chloro-
sulfonic acid will result which is used to make
toluene sulfonyl chloride and other products.
. There must be an agreed on allocation plan.
Another alternative solution would be an inventory
build-up in penta. The effect of chlorine cell
house operation needs to be studied.) '
H. S. Bergen
; A.S.A.P.
F. J. Fitzgerald
S. A. Heininger
.
G. L. Bratsch
J. R. Savage
Purchasing Department
*2.
Set up manufacturing phase-out plan for PCBs. Develop manufacturing plan schedule for nonPCB with outside converter. (Mil liken Chemical/ Anderson Development). ^Production to start as soon as possible and be up to 16QM pounds per month TXS by 2/1/78.
J. R. Savage J. R. Savage
J. R. Savage/ Outside Converter
A.S.A.P. 2/1/76
3. Plant decommissioning, decontamination of equip ment site and tank cars and plant dismantling.
J. R. Savage/ FIint/Leisy
Begin 1/1/76
DSW 231805
ODDS OF SUCCESS 10-201
10%
70-80%
100% 80-90% 60-70% 100%
DSW 231806
Page A - Case l , _________ ACTION____________________________________________________ Qk. Start-up of new non-PCB Santosol 200 plant.
C. Accounting Related
^1. '
Establish reserves for plant write-off and plant dismantling and anticipated incineration reserve and any other anticipated needs.
#2. Administrative reassignment of any redundant personnel.
WHO......................
J. R. Savage Manufacturing Dept.
WHEN 9/77
A. J. Koenig L. B. Skatoff
H. S. Bergen F. J. Fitzgerald C. A. Sweets G. L. Bratsch
12/1/76
10/1/76
ODDS OF SUCCESS 80-90%
100%-
100%
TABLE 1
SPECIALTY PRODUCTS
PCB DIELECTRIC BAN 90 DAYS FOLLOWING 10/1/75
PHASE-OUT COSTS S WRITEOFFS - TAKE IN 1975
I. Fixed Investment: Write-off and Dismantling
$M
Krummrich Plant Newport Plant
1*10 690
$M 2100
II. Decontamination and Reassignment kk PCB TC's
kOO
III. Decontamination - Newport TOTAL
150 2650
IV. Plant FIE Redistributed to Rest of Plant
Krummrich Newport
300 100
A00
V. Task Force to Phase-Out PCB Dielectrics
Domestic & U.S. Export Ex. USA
150 75
225
/tl 7/28/75
' DSW 231807
STLCOPCB4053805
i
DISCUSSION OF CASE I I
This case, which represents another "worse case" type situation, is more apt to occur and other related variations of it are more likely to occur for the following reasons:
1. The USA government wants a' toxic substances law that is workable and accepted by Congress, the population and industry. An outright PCD ban, with severe time parameters which create other risks to society, is not conducive to positive legislative steps. Many court cases will result. The U.S. government is more apt to go along With any one or a combination of the following: a) a ban to be effective in a long enough time frame to permit industry to change over to something else with less total risk;
b) a ban on certain PCBs -- like \25b and higher homologues -- but allow continued production and use of MCS 10^3 and 1016 which are considerably more biodegradable and which do not accumulate in body fat to the extent of higher homologues;
c) a "controlled" and monitored production and use
of certain PCBs -- with effluent standards tightly
controlled.
.2 There are too many other alleged carcinogens with greater
production and distribution for the U.S. government to single
out PCBs.
DSW 231808
STLCOPCB4053806
Page 2
3. Monsanto and industry will propose to the U.S. government -- prior to a "total" ban on PCBs -- various programs which will dramatically reduce production and use of the higher homologue (less biodegradable) PCBs with only minimum risk from all other aspects. This case would entail Monsanto offering only Aroclors 1016 and 10*3 for transformers and capacitors and reducing the production of the "non-biodegradable" 125** by 10-12 M pounds/year. There are certain other risks here but these possibly could be resolved with only slightly higher costs and fire safety risks.
**. The total industry is more apt to accept it because it gives the time necessary for an "all-out" emergency changeover situation. The industry really wants three years -- but could live with two. The .industry is not prepared for a 90-day ban.
5. The odds of success are considerably better than Case I.
This case imposes a "tight" but more possible time frame for Monsanto and industry. It represents considerably better economics to Monsanto and gives us a 50% chance of developing a transformer replacement product. It would be easier to introduce and gain acceptance of non-PCB products in other world areas.
DSW 231809
7/28/75
STLCOPCB4053807
CASE M - PCB CONTINGENCY PLAN - MAJOR STEPS - 7/28/75
PREMISE:
U.S.A. government ban 1/1/76 with a compliance program and the ban to be effective 1/1/78. No imports allowed. U.K. government follows U.S.A. along with OECD member countries. Zero to six months time lag behind U.S.A. Monsanto-Europe follows U.S.A. timing. European competitors follow'OECD compliance. Maximum six months lag.
J^Most Critical Steps ACTION
WHO
WHEN
ODDS OF SUCCESS
1. COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION
*1.
Clarify exact conditions of ban with U.5.A. government and industry.
-
W. B. Papageorge A.S.A.P, W. Easley/D. Wood
80-90%
DSW 231810
#2. Monsanto submit plan for phase-out to government and CAC and formally announce intention to cease selling PCBs on 1/1/78.
H. S. Bergen
1/15/76
F. J. Fitzgerald
Public Relations Dept.
W. B. Papageorge
100% .
3. Determine need for worker surveillance byOSHA.
W. B. Papageorge Dr. G. Roush
1/15/76
100%
k. 5. >^6.
From EPA, determine need for continued plant effluent surveiI lance.
Take action on any class action law suits or other suits against the government and Monsanto.
Present available toxicological and environmental data on replacement products to government.
11 CONCERN FOR CUSTOMERS
*1. kz.
Conduct USA salesmen's seminar with selected U.S. export Monsanto reps, invited (Europe /Latin America/ Australia/India/Far East).
Notify customers of government ban, terminate any contracts and explain Monsanto plan.
W. B. Papageorge W. Easley
D. B. Hosmer Law Department
1/15/76
100%
As need arises
100%
W. B. Papageorge W. Easley Medical Department R5D
1/15/76 and continuing as data develops until completed, on 8/77.
100%
T. L. Gossage C. Paton, D. Wood RSD
T. L. Gossage C. Paton, D. Wood Regional Managers Salesmen
1/7/76 1/15/76
100% 100%
Page 2 - Case I I
ACTION
43. Hold industry dielectric meeting in St. Louis to answer immediate customer questions and explain production plans of replacement products.
44. Visit each customer individually to establish preliminary non-PCB fluid forecast and technical
' programs as well as PCB requirements during phase out period.
DSW 231811
5. If requested by customers, prepare P.R. statement ' for PCB ultimate users; i.e., ut i 1 i t ies, transformer "top up," etc.
1*6. Determine non-PCB market forecast. Formally announce Monsanto plant start-up of new non-PCB dielectric plant
47. Establish shipping and production plan and allocation if necessary of PCB fluids as well as announcing ware house and incineration and return goods policies.
8. With industry, develop suitable standards - ASTM, EIA, Cigre, OED, etc. .
III. CONTINUITY & ECONOMICS OF OUR CONTINUING BUSINESS
1. See attached Table II for economic impact.
*2.
Submit AR for non-PCB dielectric plant and Santosol 200 plant to CAC.
IV. INTERNAL MONSANTO ACTIONS
'
4l. $2.
Present Monsanto phase-out plan to CAC and gain approva1.
Gain approval for PIR for non-PCB Santosol 200 plant.
A. Marketing Related
$1. Obtain all needed new product information presentable in a commercial form. (This
WHO Marketing, R&D Manufacturing.
Marketing
D. Wood P.R. Department
Marketing P.R. Department Marketing Distribut ion
Market ing/R&D.
H. S. Bergen F. J. Fitzgerald H. H. Bible
H. S. F. J. H. H. Same
Bergen Fitzgerald Bible
R&D, Medical Product Accept. Manufacturing
WHEN 1/30/76
2/15/76
ODDS OF SUCCESS ;: 100?
4
90-100? t
6/1/76
10/1/77 6/1/77
3/1/76 and Continuing
100% 80-90? 100?
70-80?
2/15/76
1/15/76 1/15/76 12/24/75
100%
100% 90-100% 75%
STLCOPCB4053810
Page 3 - Case I I
w
B
o c/> :> two 00 to
C.
ACTION
WHO WHEN
' includes toxicity data and product acceptability data on MCS 1238 and 1538, finished goods, manu facturing specifications, storage stability tests and product application testing to date.)
fte. .
R&D program on replacement transformer fluids accelerated with candidates identified, pilot, plant quantities made and customer trials made. Replacement candidate, manufacturing plan developed and interim manufacturing plant established. All completed by 12/31/77-
Manufacturing Related
R&D/Manufacturing Medical/Marketing
Start A.S.A.P.
f
12/31/77
#1.
*2. $3. 14.
Inform Purchasing Department and other Monsanto business groups of change of raw material requirements and, most importantly, obtain sufficient allocation of toluene sulfonyl chloride from Plasticizers Division to tide us over critical period of April or May, 1976. (The following raw material will decline in usage: benzene and chlorine and trichlorobenzene, but not as rapidly as in the Case I. The following products will increase in usage at least temporarily: toluene sulfonyl chloride.)
Set up manufacture phase-out plan for PCBs. Develop manufacturing plan schedule for non-PCB with outside converter (Mil liken Chem/Anderson Development). Production to start as soon as possible with rates to be based on customer needs.
Plant decommissioning, decontamination of equip ment, site and tank cars and plant dismantling.
Start-up of new non-PCB Santosol 200 plant.
H. S. Bergen
A.S.A.P.
F. J. Fitzgerald
S. A. Heininger
;
G. L. Bratsch
.
J. R. Savage
Purchasing Department
i
Ufr .
J. R. Savage
Manufacturing D i stribut ion Manufacturing
A.S.A.P.
5/15/76 1/1/78 9/77
Accounting Related
. Establish reserves for plant write-offs and plant dismantling and anticipated incineration reserve and any other anticipated needs.
A. J. Koenig L. B. Skatoff
12/1/77
ODDS OF SUCCESS
50% 90-100%
`
10 0% 100% 80-90% 100%
Page A - Case I I
ACTION
*2.
Administrative reassignment of any redundant personnel.
WHO
H. S. Bergen F. J. Fitzgerald C. A. Sweets G. L. Bratsch
WHEN 1/1/78
ODDS OF SUCCESS
' 100%
DSW 231813
*Ma ior
TABLE II SPECIALTY PRODUCTS
977Phase-out costs & writeoffs - take in i
I. Fixed Investment Write-off and Dismantling
Krummrich Plant Newport Plant
850 600
I I. Decontamination and Phase-out Pom. Tank Cars
III. Decontamination - Newport Total
IV. Plant FIE Redistributed to Rest of Plant
Krummrich Newport
330 125
V. Task Force to Phase-out PCB Dielectrics
Domestic and Export Ex. USA
150 75
$M 1^50
360 150
i960
^55
' 225
7/28/75
STLCOPCB4053812
Monsanto
FROM iNAMt & LOC
H. S. Bergen - B2SL
DATE July 17, 1975
SUBJECT
PCBs
.
REFERENCE
TO
Your memo 7/8/75 F. J. Fitzgerald - B3SA
CC; G. L. Bratsch - B3NA D. L. Eby - A3NA J. T. Garrett - A2SA T. L. Gossage G. J. Levinskas - A2SC W. B. Papageorge R. G. Potter - B3SA G. Roush - A2SA K. W. Easley - 1920
PERSONAL & CONFIDENTIAL
Attached is the timetable based on actions discussed at the meeting of July 8 on PCBs. This program has been agreed upon by all those taking action.
We will plan to follow up on each of these actions on the due dates indicated. We recognize that further information may modify some of the steps or actions but these will be acknowledged and future actions agreed upon.
HSB/tl Attachment
H. S. Bergen
DSW 231815
STLCOPCB4053813
July 17, 1975
DSW 231816
PCB ACTION PLAN RELATIVE TO EPIDEMIOLOGICAL & FEEDING STUDIIES
ACTION
1. Complete WGK plant employee exposure study.
2. Review epidemiological results with Dr. Shubik.
3. Review employee exposure conditions and prepare exposure guidelines.
k. Implement new employee exposure guidelines.
5. Prepare Monsanto Statement:
a) Toxicity b) Epidemiological study results c) Marketing policy d) Environmental presence
6. Publish results of the Monsanto studies conducted by Industrial Bio-Test Labs.
7. Discuss with government representatives (NCI, NIOSH, FDA, EPA, CEQ).
8. Discuss with key customers.
c/> 9.
o o 10.
O O DO 00U1
CO
Inform remaining customers.
Feedback of government reaction to customers (as needed).
RESPONSIBILITY G. Roush/G. L. Bratsch
G. Roush/F. Johannsen
J. T. Garrett/W. B. Papageorge
G. L. Bratsch
G. J. Levinskas G. Roush T. L. Gossage/W. B. Papageorge W. B. Papageorge/D. Eby G. J. Levinskas
G. Roush K. W. Easley W. B. Papageorge G. Roush/G. J. Levinskas T. L. Gossage W. B. Papageorge T. L. Gossage/C. Paton T. L. Gossage/C. Paton
TARGETED COMPLETION DATE Status Report by Aug. 1 ,1975
Dependent on Item I.
Aug. 18, 1975
Sept. 15, 1975
Aug. 20, 1975 July 25, 1975 Dependent on Item 1.
Aug. 19, 1975
July 25, 1975 Approved drafts September 1, 1975 Publication - Jan. 1, 1976
Sept. 7, 1975
Sept. 1, 1975
Sept. 15, 1975 Sept. 15, 1975