Document RgJZbreRBjg9jn78RaOordqV

FlfOk`. iNAMI A Ifji.AllON' H. S. Bergen - B2SL July 28, 1975 = PCB CONTINGENCY PLAN Your Memo July 1, 1975 TO : F. J. Fitzgerald - B3SA CC: PERSONAL & CONFIDENTIAL Attached is our proposed worldwide PCB Contingency Plan based on the stated premise of a government ban with a 90-day phase-out period, assuming an October 1, 1976 ban effective 1/1/77* Also attached is a proposed PCB Contingency Plan based on a case which the business group feels is possibly realistic considering present government attitudes and actions, customer responses and the "state of the art." This premise is a government ban announced 1/1/76 but with a compliance program and the ban to be effective 1/1/78. We have had detailed inputs from Monsanto-Europe, as well as much detailed input from our business group personnel, our plants, plus Bill Papageorge and the Law Department. In summary, we feel these two cases "bracket" the worst potential situation. In either case, certain actions are identical -- only the timing, odds of success and the financial impact on Monsanto are different. The two-year compliance Case is on balance,in our opinion, the optimum for the U.S.government position, the total welfare of the population, the electrical utilities and other end users and the transformer and capacitor industry position and Monsanto's position. We'll be glad to review this with you in detail if you desire. Please advise if these meet with your approval for the premises stated. There are other premises which can be evaluated should the occasion demand. . /t 1 Attachments' DSW 231801 STLCOPCB4053799 DISCUSSION OF CASE I This case is the worst and most unlikely to occur for the following reasons: 1. Industry does not have thoroughly tested and approved replacement products for use in capacitors. At least 18 months more time is needed. 2. Industry does not have a fire-resistant liquid transformer fluid tested or approved. At least 2 years more time is needed. 3. The consumer would be exposed to dramatically different and inferior performance standards of capacitors and transformers which will affect his safety and energy costs and availabi1ity. 4. The U.S. government is leaning towards a three-year compliance program for the toxic pollutant products. Compliance may be possible in that time frame. 5. The alleged carcinogenic properties are not proven. 6. There will be law suits against the U.S. government. 7. The odds of success are the lowest from the standpoint of technical and commercial viewpoints. This case is the worst economically for Monsanto and industry. There ^ 31802 is very little chance of our successfully developing a transformer replacement product in this case. It would be difficut to successfully O introduce non-PCB products to other world areas outside of Canada as long as those governments allowed PCBs to be used. STLCOPCB4053800 CASE I - PCS CONTINGENCY'PLAN - MAJOR STEPS - 7/28/75 CM STLCOPCB4053801 RREM'ISE: U.S.A. government barn 10/1/75 effective 1/1/76. No Imports allowed. U.K. government follows U.S.A. along with OECt) member countries* Eighteen month time lag behind U.S.A. Imports allowed for ,18 mos. Monsanto-Europe follows U.S.A. Monsanto timing. European competitors lag 18 mos. '}(Mast Critical Steps ACTION ODDS-OF WHO WHEN SUCCESS 1. COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION *1.- Clarify exact conditions of ban with the U.S.A. government and industry. W. B. Papageorge W. Easley, D. Wood A.S.A.P. 80-90% a in 3. ICSO5 0oCO0 k. Monsanto submit plan for phase-out to government and CAC and formally announce intention to cease selling PCBs on 1/1/76. . Determine need for worker surveillance by OSHA. From EPA, determine need for continued plant effluent surveillance. 5. ^6. Take action on any class action law suits or other law suits against the government and Monsanto. Present available toxicological and environmental data on replacement products to government. II. CONCERN FOR CUSTOMERS . H. S. Bergen F. J. Fitzgerald W. B. Papageorge P. R. Department W. B. Papageorge Dr. G. Roush W. B. Papageorge W. Easley D. B. Hosmer Law Department W. B. Papageorge W. Easley, R&D, Medical Department 10/16/75 100% 10/16/75 100% 10/16/75 100% As need arises 100% 10/16/75 .100% . 4l. ^2. *3. Appoint PCB task force to handle: (a) phase-out of PCBs, (b) introduction of replacement products. Conduct USA salesmen's seminar with selected U.S. export Monsanto reps.invited (Europe/Latin America/ Australia/India/Far East). Notify customers of government ban, terminate any contracts and explain Monsanto plan. H. S. Bergen F. J. Fitzgerald A.S.A.P. T. L. Gossage, C.Paton 10/15/75 D. Wood, RsD T. L. Gossage, C.Paton 10/16/75 D. Wood, Regional Managers, Salesmen 100% 100% 90-100% STLCOPCB4053802 Page 2 - Case I ACTION *k. Hold industry dielectric meeting in St. Louis to answer immediate customer questions and explain production plans of replacement products. ' #5. Visit each customer individually to establish pre. liminary non-PCB fluid forecast and technical pro grams as well as PCB requirements during phase-out period. 6. o 00 o If requested by customers, prepare P.R. statement for PCB ultimate users; i.e., utilities, transformer "top up," etc. Determine non-PCB market forecast. Announce Monsanto intention to proceed to interim production of MCS 1238 effective 2/1/76 and also Monsanto commitment to a new plant to come onstream in 18 months to 2 years. * .8 Establish shipping and production plan and allocation if necessary of PCB fluids as well as announcing warehouse and incineration and return goods policies. #9. Establish allocation of replacement fluids with customers. .10 With industry, develop suitable standards -- ASTM, EIA, Cigre, OED, etc. III. CONTINUITY S ECONOMICS OF OUR CONTINUING BUSINESS 1. See attached Table I for economic impact. &2. Submit AR for non-PCB dielectric plant and Santosol 200 plant to CAC. ' IV. INTERNAL MONSANTO ACTIONS 4l. Present Monsanto phase-out plan to CAC and gain approva1. &2. Gain approval for PIR for non-PCB Santosol 200 plant. . WHO............................ Marketing, R&D and Manufacturing ...................... ODDS OF WHEN................. SUCCESS 11/1/75 90-100% Marketing and Task Force 11/8/75 80-100% . Chairman.of.Task Force and P.R. Marketing and P.R. Department 11/25/75 1/1/76 80-100% A0% Marketing Task Force Marketing Task Force Marketing/R&D . - 10/1V75 80-100% 12/15/75 1/1/76 and Continuing 40% . 50% H. S. Bergen F. J. Fitzgerald H. H. Bible H. S. Bergen F. J. Fitzgerald H. H. Bible Same 2/15/76 10/13/75 10/13/75 100% 100% 90-100% Page 3 - Case I ACTION WHO WHEN A. Marketing Related ^1. Obtain all needed new product information presentable in a commercial form. (This includes toxicity data and product acceptability data on MCS 1238 and 1538, finished goods, manufacturing specifications, storage stability tests and product application testing to date.) RD, Medical Product Accept. Manufacturing 9/15/75 *2. No transformer replacement product is available. No action by Marketing. RSD continue to define and develop product. B. Manufacturing Related <$]. Inform Purchasing Department and other Monsanto business groups of change of raw material require ments and,most importantly, obtain sufficient allocation of toluene sulfonyl chlorid_e from Plasticizers Division to give us 1.5 M lb/yr rate. (The following raw material will decline in usage: benzene and chlorine and trichlorobenzene. The following products will increase in usage, at least temporarily: toluene sulfonyl chloride. When Aroclor is shut down, a shortage of chloro- sulfonic acid will result which is used to make toluene sulfonyl chloride and other products. . There must be an agreed on allocation plan. Another alternative solution would be an inventory build-up in penta. The effect of chlorine cell house operation needs to be studied.) ' H. S. Bergen ; A.S.A.P. F. J. Fitzgerald S. A. Heininger . G. L. Bratsch J. R. Savage Purchasing Department *2. Set up manufacturing phase-out plan for PCBs. Develop manufacturing plan schedule for nonPCB with outside converter. (Mil liken Chemical/ Anderson Development). ^Production to start as soon as possible and be up to 16QM pounds per month TXS by 2/1/78. J. R. Savage J. R. Savage J. R. Savage/ Outside Converter A.S.A.P. 2/1/76 3. Plant decommissioning, decontamination of equip ment site and tank cars and plant dismantling. J. R. Savage/ FIint/Leisy Begin 1/1/76 DSW 231805 ODDS OF SUCCESS 10-201 10% 70-80% 100% 80-90% 60-70% 100% DSW 231806 Page A - Case l , _________ ACTION____________________________________________________ Qk. Start-up of new non-PCB Santosol 200 plant. C. Accounting Related ^1. ' Establish reserves for plant write-off and plant dismantling and anticipated incineration reserve and any other anticipated needs. #2. Administrative reassignment of any redundant personnel. WHO...................... J. R. Savage Manufacturing Dept. WHEN 9/77 A. J. Koenig L. B. Skatoff H. S. Bergen F. J. Fitzgerald C. A. Sweets G. L. Bratsch 12/1/76 10/1/76 ODDS OF SUCCESS 80-90% 100%- 100% TABLE 1 SPECIALTY PRODUCTS PCB DIELECTRIC BAN 90 DAYS FOLLOWING 10/1/75 PHASE-OUT COSTS S WRITEOFFS - TAKE IN 1975 I. Fixed Investment: Write-off and Dismantling $M Krummrich Plant Newport Plant 1*10 690 $M 2100 II. Decontamination and Reassignment kk PCB TC's kOO III. Decontamination - Newport TOTAL 150 2650 IV. Plant FIE Redistributed to Rest of Plant Krummrich Newport 300 100 A00 V. Task Force to Phase-Out PCB Dielectrics Domestic & U.S. Export Ex. USA 150 75 225 /tl 7/28/75 ' DSW 231807 STLCOPCB4053805 i DISCUSSION OF CASE I I This case, which represents another "worse case" type situation, is more apt to occur and other related variations of it are more likely to occur for the following reasons: 1. The USA government wants a' toxic substances law that is workable and accepted by Congress, the population and industry. An outright PCD ban, with severe time parameters which create other risks to society, is not conducive to positive legislative steps. Many court cases will result. The U.S. government is more apt to go along With any one or a combination of the following: a) a ban to be effective in a long enough time frame to permit industry to change over to something else with less total risk; b) a ban on certain PCBs -- like \25b and higher homologues -- but allow continued production and use of MCS 10^3 and 1016 which are considerably more biodegradable and which do not accumulate in body fat to the extent of higher homologues; c) a "controlled" and monitored production and use of certain PCBs -- with effluent standards tightly controlled. .2 There are too many other alleged carcinogens with greater production and distribution for the U.S. government to single out PCBs. DSW 231808 STLCOPCB4053806 Page 2 3. Monsanto and industry will propose to the U.S. government -- prior to a "total" ban on PCBs -- various programs which will dramatically reduce production and use of the higher homologue (less biodegradable) PCBs with only minimum risk from all other aspects. This case would entail Monsanto offering only Aroclors 1016 and 10*3 for transformers and capacitors and reducing the production of the "non-biodegradable" 125** by 10-12 M pounds/year. There are certain other risks here but these possibly could be resolved with only slightly higher costs and fire safety risks. **. The total industry is more apt to accept it because it gives the time necessary for an "all-out" emergency changeover situation. The industry really wants three years -- but could live with two. The .industry is not prepared for a 90-day ban. 5. The odds of success are considerably better than Case I. This case imposes a "tight" but more possible time frame for Monsanto and industry. It represents considerably better economics to Monsanto and gives us a 50% chance of developing a transformer replacement product. It would be easier to introduce and gain acceptance of non-PCB products in other world areas. DSW 231809 7/28/75 STLCOPCB4053807 CASE M - PCB CONTINGENCY PLAN - MAJOR STEPS - 7/28/75 PREMISE: U.S.A. government ban 1/1/76 with a compliance program and the ban to be effective 1/1/78. No imports allowed. U.K. government follows U.S.A. along with OECD member countries. Zero to six months time lag behind U.S.A. Monsanto-Europe follows U.S.A. timing. European competitors follow'OECD compliance. Maximum six months lag. J^Most Critical Steps ACTION WHO WHEN ODDS OF SUCCESS 1. COMPLIANCE WITH U.S.A. GOVERNMENT DIRECTION *1. Clarify exact conditions of ban with U.5.A. government and industry. - W. B. Papageorge A.S.A.P, W. Easley/D. Wood 80-90% DSW 231810 #2. Monsanto submit plan for phase-out to government and CAC and formally announce intention to cease selling PCBs on 1/1/78. H. S. Bergen 1/15/76 F. J. Fitzgerald Public Relations Dept. W. B. Papageorge 100% . 3. Determine need for worker surveillance byOSHA. W. B. Papageorge Dr. G. Roush 1/15/76 100% k. 5. >^6. From EPA, determine need for continued plant effluent surveiI lance. Take action on any class action law suits or other suits against the government and Monsanto. Present available toxicological and environmental data on replacement products to government. 11 CONCERN FOR CUSTOMERS *1. kz. Conduct USA salesmen's seminar with selected U.S. export Monsanto reps, invited (Europe /Latin America/ Australia/India/Far East). Notify customers of government ban, terminate any contracts and explain Monsanto plan. W. B. Papageorge W. Easley D. B. Hosmer Law Department 1/15/76 100% As need arises 100% W. B. Papageorge W. Easley Medical Department R5D 1/15/76 and continuing as data develops until completed, on 8/77. 100% T. L. Gossage C. Paton, D. Wood RSD T. L. Gossage C. Paton, D. Wood Regional Managers Salesmen 1/7/76 1/15/76 100% 100% Page 2 - Case I I ACTION 43. Hold industry dielectric meeting in St. Louis to answer immediate customer questions and explain production plans of replacement products. 44. Visit each customer individually to establish preliminary non-PCB fluid forecast and technical ' programs as well as PCB requirements during phase out period. DSW 231811 5. If requested by customers, prepare P.R. statement ' for PCB ultimate users; i.e., ut i 1 i t ies, transformer "top up," etc. 1*6. Determine non-PCB market forecast. Formally announce Monsanto plant start-up of new non-PCB dielectric plant 47. Establish shipping and production plan and allocation if necessary of PCB fluids as well as announcing ware house and incineration and return goods policies. 8. With industry, develop suitable standards - ASTM, EIA, Cigre, OED, etc. . III. CONTINUITY & ECONOMICS OF OUR CONTINUING BUSINESS 1. See attached Table II for economic impact. *2. Submit AR for non-PCB dielectric plant and Santosol 200 plant to CAC. IV. INTERNAL MONSANTO ACTIONS ' 4l. $2. Present Monsanto phase-out plan to CAC and gain approva1. Gain approval for PIR for non-PCB Santosol 200 plant. A. Marketing Related $1. Obtain all needed new product information presentable in a commercial form. (This WHO Marketing, R&D Manufacturing. Marketing D. Wood P.R. Department Marketing P.R. Department Marketing Distribut ion Market ing/R&D. H. S. Bergen F. J. Fitzgerald H. H. Bible H. S. F. J. H. H. Same Bergen Fitzgerald Bible R&D, Medical Product Accept. Manufacturing WHEN 1/30/76 2/15/76 ODDS OF SUCCESS ;: 100? 4 90-100? t 6/1/76 10/1/77 6/1/77 3/1/76 and Continuing 100% 80-90? 100? 70-80? 2/15/76 1/15/76 1/15/76 12/24/75 100% 100% 90-100% 75% STLCOPCB4053810 Page 3 - Case I I w B o c/> :> two 00 to C. ACTION WHO WHEN ' includes toxicity data and product acceptability data on MCS 1238 and 1538, finished goods, manu facturing specifications, storage stability tests and product application testing to date.) fte. . R&D program on replacement transformer fluids accelerated with candidates identified, pilot, plant quantities made and customer trials made. Replacement candidate, manufacturing plan developed and interim manufacturing plant established. All completed by 12/31/77- Manufacturing Related R&D/Manufacturing Medical/Marketing Start A.S.A.P. f 12/31/77 #1. *2. $3. 14. Inform Purchasing Department and other Monsanto business groups of change of raw material requirements and, most importantly, obtain sufficient allocation of toluene sulfonyl chloride from Plasticizers Division to tide us over critical period of April or May, 1976. (The following raw material will decline in usage: benzene and chlorine and trichlorobenzene, but not as rapidly as in the Case I. The following products will increase in usage at least temporarily: toluene sulfonyl chloride.) Set up manufacture phase-out plan for PCBs. Develop manufacturing plan schedule for non-PCB with outside converter (Mil liken Chem/Anderson Development). Production to start as soon as possible with rates to be based on customer needs. Plant decommissioning, decontamination of equip ment, site and tank cars and plant dismantling. Start-up of new non-PCB Santosol 200 plant. H. S. Bergen A.S.A.P. F. J. Fitzgerald S. A. Heininger ; G. L. Bratsch . J. R. Savage Purchasing Department i Ufr . J. R. Savage Manufacturing D i stribut ion Manufacturing A.S.A.P. 5/15/76 1/1/78 9/77 Accounting Related . Establish reserves for plant write-offs and plant dismantling and anticipated incineration reserve and any other anticipated needs. A. J. Koenig L. B. Skatoff 12/1/77 ODDS OF SUCCESS 50% 90-100% ` 10 0% 100% 80-90% 100% Page A - Case I I ACTION *2. Administrative reassignment of any redundant personnel. WHO H. S. Bergen F. J. Fitzgerald C. A. Sweets G. L. Bratsch WHEN 1/1/78 ODDS OF SUCCESS ' 100% DSW 231813 *Ma ior TABLE II SPECIALTY PRODUCTS 977Phase-out costs & writeoffs - take in i I. Fixed Investment Write-off and Dismantling Krummrich Plant Newport Plant 850 600 I I. Decontamination and Phase-out Pom. Tank Cars III. Decontamination - Newport Total IV. Plant FIE Redistributed to Rest of Plant Krummrich Newport 330 125 V. Task Force to Phase-out PCB Dielectrics Domestic and Export Ex. USA 150 75 $M 1^50 360 150 i960 ^55 ' 225 7/28/75 STLCOPCB4053812 Monsanto FROM iNAMt & LOC H. S. Bergen - B2SL DATE July 17, 1975 SUBJECT PCBs . REFERENCE TO Your memo 7/8/75 F. J. Fitzgerald - B3SA CC; G. L. Bratsch - B3NA D. L. Eby - A3NA J. T. Garrett - A2SA T. L. Gossage G. J. Levinskas - A2SC W. B. Papageorge R. G. Potter - B3SA G. Roush - A2SA K. W. Easley - 1920 PERSONAL & CONFIDENTIAL Attached is the timetable based on actions discussed at the meeting of July 8 on PCBs. This program has been agreed upon by all those taking action. We will plan to follow up on each of these actions on the due dates indicated. We recognize that further information may modify some of the steps or actions but these will be acknowledged and future actions agreed upon. HSB/tl Attachment H. S. Bergen DSW 231815 STLCOPCB4053813 July 17, 1975 DSW 231816 PCB ACTION PLAN RELATIVE TO EPIDEMIOLOGICAL & FEEDING STUDIIES ACTION 1. Complete WGK plant employee exposure study. 2. Review epidemiological results with Dr. Shubik. 3. Review employee exposure conditions and prepare exposure guidelines. k. Implement new employee exposure guidelines. 5. Prepare Monsanto Statement: a) Toxicity b) Epidemiological study results c) Marketing policy d) Environmental presence 6. Publish results of the Monsanto studies conducted by Industrial Bio-Test Labs. 7. Discuss with government representatives (NCI, NIOSH, FDA, EPA, CEQ). 8. Discuss with key customers. c/> 9. o o 10. O O DO 00U1 CO Inform remaining customers. Feedback of government reaction to customers (as needed). RESPONSIBILITY G. Roush/G. L. Bratsch G. Roush/F. Johannsen J. T. Garrett/W. B. Papageorge G. L. Bratsch G. J. Levinskas G. Roush T. L. Gossage/W. B. Papageorge W. B. Papageorge/D. Eby G. J. Levinskas G. Roush K. W. Easley W. B. Papageorge G. Roush/G. J. Levinskas T. L. Gossage W. B. Papageorge T. L. Gossage/C. Paton T. L. Gossage/C. Paton TARGETED COMPLETION DATE Status Report by Aug. 1 ,1975 Dependent on Item I. Aug. 18, 1975 Sept. 15, 1975 Aug. 20, 1975 July 25, 1975 Dependent on Item 1. Aug. 19, 1975 July 25, 1975 Approved drafts September 1, 1975 Publication - Jan. 1, 1976 Sept. 7, 1975 Sept. 1, 1975 Sept. 15, 1975 Sept. 15, 1975