Document Rdg7b7vYV62d45EKpoZB6gJa
S,,G,, 7^-02
Type 2-35C-13 Eating 7500 W 3&0
^00#-7502" HgoAbs.
This turbine governor was originally purchased by Glrdler Construction Company for Northern Chemical Industries at Searsporty Maine. Presently, it la on a five year lease to Shametron Corporation..
The generator is used to supply plant power for the neighboring northern Chem ical Industries plant and also load consumed at Ghemetrono The generator is not operating In parallel x?ith any other power supply, only a small limited tie Is maintained with Central Tfeine Power for limited pleat operation in ease of
'unx gciicy
Since the original start-ug of this unit (March, 195^) there have been periods of ''hunting" experienced when, the electrical load was such that the governor valves were near a cut-in position., But due to the nature of the plant, an al most steady 7000 KM lias been maintained which is about mid-way tap on #4 valve0 When the load forced the earn near a cut-in position and the hunting started, customer would reduce steam pressure to change the cam position. This went on for quite a few years and with each overhaul, an attempt was made to correct the hunt. The amplitude of ^he hunt was approximately 02 cycle.
The plant Is presently coming out from under a very lengthy labor strike- and is
presently operating at verjT light loadSc The electrical load Is apparoacimately 1000 to 1200 KM and will remain this- way until the end of January, 1961 when the load will resume to approximately 'JOCO -KM* With the light load, customer could not reduce the hunting by lowering initial pressure and called for service.,
Elliott serviceman uncovered severe wear on the cem shaft journals and et&liaed
the Journals to
Also replaced the gear segment and pinion, which showed
over if8" wear a several teeth. Several rod ends on the servo-motor linkage
were replaced and the unit placed back In service.. The hunt persisted and this
writer went to assist the serviceman..
The unit ms secured upon arrival and the cam follower assemblies 'for #1 end #2 opening valves were removed along with the valve closing springs 0 The croBehead on the #1 valve had galled at pne time and all of the nuts locking the valve stems to the crossheads were of the commercial nut variety and not of the recent design, that of a specially faced nut perpendicular to a chased thread. The nuts were all changed, the crossheads all freed. All valves, when locked with jam nuts, were then free. The valve settings were all checked and reset to the valves s given in, the instruction book. The hunting had loosened the pinned connection between th cam follower assembly and the connecting link to the croeshead a $1 and $2 valves, so these two crossfceadp were placed in #6 and #7 valves, as the turbine* has 6of excess flow, and under plant5s heaviest load, $5 valve is still seate&o
A few othar corrections were made in the servo-EStor linkage and the unit ms brought up to speed December 15, 19&4 It came on governor and speeds were checked okay* After thejfiret over-speed test, the unit came on the governor at the minimum speed setting and proceeded to climb in speed until $X valve was tap ped with a hammer* This brought speed down to minimum seesd governor setting., The servo-motor meanwhile, had over-traveled# attempting to correct the speed rise*