Document Rab5jBydnmqx1YQXgn2Kd4Ydn

U/t/~oo<f INTERN AL CORRESPONDENCE UNION CARBIDE CORPORAT ION = -i -ji. 1 ' 1 J HM> .1 n n n ` it; I i( Ji I I M ( .11 A ML. i ' 1 i r K\|. W V : -j;- I: it ):. j ...H. E. Rucker 2009 1..... 512 A' < - Cn(;v B. H. Avashia, M.D. - 512/22 J. W. Barna - 512/2009 W. L. Browning - 512/2149 R. E. Coyner - 512/2009 C. P. Maxwell - 511/701-2 B. R. McMakin - 512/2009 O- ,- n Si .1 September 18, 1987 EM&TS - HS&EA Industrial Hygiene Asbestos Exposure Monitoring / Attached are the results of asbestos monitoring for two days at the #1 Pumphouse. Approximately 310 feet of 8, 1 and 1/2 inch lines were stripped plus about 50 square feet of asbestos was removed from a reactor at Building 9. An enclosure was built over the pumps at the #1 Pumphouse but could not be sealed because of the size and configuration of the pumps and piping. One of the personal samples was above the 0.2 fibers/cc permissible exposure per OSHA asbestos standard 29CFR 1926.58. Two samples were above the 0.1 fiber/cc action level per the same standard. Employees wore no street clothes, two pair of coveralls, headcovers, boots, gloves and AO R57-A HEPA half-face cartridge respirators. They showered before meals and at the end of the workday before leaving plant. Exposure monitoring may not be required in some instances where supplied air respirators in the positive pressure demand mode are being used for asbestos abatement projects. We encourage the use of supplied air respirators whenever possible. UCC 011354 Asbestos Monitoring - continued -2- September 18, 1987 Please inform their exposure monitoring results as soon as possible. Have them sign and date this report and return to M. A. Patel at Building 701-330. If you have any questions or if we can be of further assistance, call us on extension 3750 or 6485. WORK BY: APPROVED BY: / r^ Manhar A. Patel HJK:VES:MAP:rab 2700P UCC 011355 Carp. Ref: W2279 W2280 ASBESTOS EXPOSURE MONITORING Date Sample Type/ Employee Name Sampling Time Air Cone, fibers/cc TVlAg fibers/cc COMMENTS 6-4-87 6-4-87 il 6-4-87 6/5/87 1 1 1 1 6/5/87 1 1 6/5/87 1 < 418 min 418 min 417 min 666 min 0.113 0.130 0.101 0.076 660 min 0.190 661 min 0.040 0.099 0.113 0.087 0.101 0.262 0.054 Stripped, bagged and vacuumed approx. 160 feet of line - #1 Punphouse purps. / Stripped, bagged and vacuumed approx. 160 feet of line - #1 Putphouse purps. Stripped, bagged and vacuumed approx. 160 feet of line - #1 Puiphouse purps. Stripped, bagged and vacuumed approx. 150 feet of line at #1 Purphouse purps plus approx. 50 square feet off reactor at Building 9. Stripped, bagged and vacuumed approx. 150 feet of line at #1 Purphouse purps plus approx. 50 square feet off reactor at Building 9. Stripped, bagged and vacuumed approx. 150 feet of line at #1 Putphouse purps plus approx. 50 square feet off reactor at Building 9. 2700P UCC 011356