ASBESTOS SURVEY
On 6/6/72, air cr.pl** were taken to determine asbestos concentration* ct a number of operations using asbestoscontaining materials. Tbs results are shown en the secoapanyiqg table.
An approved air purifying respirator was worn by the insulator during asbestos removal operations. Except for on* ease, the insulation being removed was vet. lr.e wetness was a result or deteriorated gaskets in the flange or valve. All removal was dees out-of-door* and the insulator at all tines tried to keep up-vind of the operation. The total time for sacples 1 and 2 (about 20 minutes) is the average that any one insulator would spend removing asbestos materials. Removed asbestos was placed in paper or plastic bags at the operation site. This should be a regular procedure for all Insula tors, but plastic bags that are sealed would better contrcl the hazard.
In preparing the valve cover mat - fiber glass between asbestos cloth little dust was created from cutting or handling either material. Ueldera in the next bay complained that with the building doors open, fiber glass was
blown toward tnem causing sain irritation. It may oe necessary to keep the doors clcseu or else ^employ a barrier to keep cc.aplaints down. Immediate vacuuming of the work benches may also keep loose dust to a minimum.
The dust created during the hand sewing of asbestos pipe covers tended to be heavy and dropped readily into the waste barrel. Z have reservations about the vetting procedure used on the pipe cover* when handled. The spray action tends to disperse the loose dust at the same time tnat it it watting the surface of the cover. When I originally suggested wetting the asbestos prior to handling and cutting, 1 was thinking of a tubular tana wltn water in which the lnauletlon -ould be dunked.
Considering ell of the daily operations where asbestos is handled,
neither the celllng(10 fibers/ml) nor the time-weighted average (5 fibers/ml)
would have been exceeded. However, respirators will have to be used in esbest<
removal operations.
ORIGINAL SIGNED BY
RICHARD J riLTIAK
RJH/)td Enclosure
RICHARD J. HUBZAK INDUSTRIAL HYGIENIST