Document RaJwxxNEx5vBpmQDByy55wQeB

' INTER-O p-.cE = o TENNECO CHEMICALS, INC. v From Subject G,, I. Rozand Piscataway Date February 10, 1976 J. T. Sweeney Flemington Bendix VCM Monitoring Data Analysis Flemington Plant January 17, 1976 to January 30, 1976 Copy to Wc D, Bord D. M. Hershkowitz VJ. F. Gabel P,, A,, Lobo R. A. Lojewski W. Miringoff F. X, Ritter M,, K Rosen P. R. Scarito F. Toca Attached is the subject analysis. JTS:ms /A J. T,, Sweeney 01056? Joint No. RE-1 RE-2 RE-3 Bendix Monitoring Data Analysis Flemington Plant January 17, 1976 to January 30, 1976 Readings (PPM VCM) Point Location Center Aisle, First Floor Remarks: Problem is believed to be the result of reactor washouts - washing frequently has been reduced by 50%. Ventilation system is being redesigned. Total 951 >5 13 >25 2 RE-4 RE-5 RE-6 No. 1 and 2 Slurry Pumps, First Floor Remarks: The problem is the result of the chip basket washouts. Plans have been made to relocate the chip basket drain system - will be complete by February 6, 1976. 951 14 1 RE-7 ' Recovery Compressor Room Remarks: Intermittent leaks in vacuum pump and compressor system. Air mask must be worn in this area and ventila tion system is being redesigned. 634 74 10 RE-10 RE-11 RE-12 Center Aisle, Second Floor Remarks: General ventilation problem related to reactor ventilation and reactor washout. Engineering estimate is now being prepared covering redesign of reactor ventilation. CAR will follow 959 48 8 RE-13 RE-14 RE-15 Stripper Platform, Panel Board Area Second Floor Remarks; Problem is believed to be the result of intermittent leaks in the re covery room. Air mask must be worn when observing stripping operations. Recovery room is being sealed off completed by February 6, 1976. 953 80 8 >100 0 0 3 1 0 010! >63