Interoffice Communication To G. T. Hinton From R. W. Churns Date January 4, 1973 Subject New Instrument Air Dryer (conoco) Attached is the flow sheet showing the installation of the new instrument air dryer which was obtained from Trainer. The recommended location for this dryer is between T-609, the instrument air receiver, and BL-606, the auxiliary air compressor. Please proceed with the installation of this dryer as soon as possible. R. W. Churns Process Engineer is / Enc CC: RHG-RDG-GTH(S)-JRH(4)-JDW-JCL-DCS CCR 000034079 BY_^!_A____ b=^_..DATE CHKD. BYDATE.__________ SUBJECT__;__J-_,,^.;___ __1________________________________ SHEET NOOF___ _____ ____________ A. -- ' JOB NO C? ^ v urr*E= ^ CCR 000034080