UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION III
1600 John F Kennedy Boulevard Four Penn Center
Philadelphia, Pennsylvania 19103
Report Title: Inspection Date(s): Regulatory Program(s): Type of Activity: Facility Name: Permittee(s): Facility Operator: Facility Address: Lat/Long: County/Parish: Permit Number: NAICS & SIC Codes: Unique Project #:
Clean Water Act Compliance Inspection Report 08/11/2022 National Pollutant Discharge Elimination System (NPDES) Pretreatment - Industrial User Inspection TE Connectivity TE Connectivity TE Connectivity 627 N GRANT ST, WAYNESBORO, PA 17268 39.764214/-77.577429 Franklin PAP120621 334513/3625 3E22WN037A
Facility Representative(s): Edward Jones - Senior Operations Leader - TE Connectivity Phone: (717) 762-9186 Email: ejones@te.com
Point of Contact
EPA Inspectors:
Aaron Thomson - EPA Inspector (3ED13)
Phone: 215-814-2116
Email: Thomson.aaron@epa.gov
Report Preparer Signature/Date
Supervisor Signature/Date
AARON THOMSON
Digitally signed by AARON THOMSON Date: 2022.10.03 08:53:27 -04'00'
Aaron Thomson (3ED13)
Date
Four Penn Center
Philadelphia, Pennsylvania 19103
Digitally signed by ZELMA
ZELMA MALDONADO MALDONADO
Date: 2022.10.03 09:24:25 -04'00'
Zelma Maldonado, Acting Chief, ES Section
Date
Four Penn Center
Philadelphia, Pennsylvania 19103
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
Table of Contents
I. Introduction ......................................................................................................................................................... 3
A. Inspection Opening Conference ............................................................................................................... 3
B. Weather and Precipitation Conditions...................................................................................................... 3
II. Facility Activity/Walkthrough ........................................................................................................................... 3
III. Observations ..................................................................................................................................................... 5
IV. Records Review .............................................................................................................................................. 10
V. Closing Conference.......................................................................................................................................... 11
VI. List of Attachments......................................................................................................................................... 11
Unique Project #: 3E22WN037A
Page 2 of 11
I. Introduction
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
On August 11, 2022, Aaron Thomson (hereinafter, "Inspector Thomson" and/or "EPA Inspector") an inspector from the U.S. Environmental Protection Agency ("EPA") Region III conducted an on-site inspection of the TE Connectivity facility in Waynesboro, PA (hereinafter, "TE" and/or "the facility")'s pretreatment program. The facility is a manufacturing plant, producing electronic leads and related hand tools. The facility is located at 627 North Grant Street, Waynesboro, PA 17268. TE provided a letter from EPA, dated June 7, 2000, (Attachments 1 and 2) stating, amongst other things, that regarding the facility, EPA is the controlling authority (Waynesboro does not have an EPA-approved pre-treatment program). The aforementioned letter also includes discharge and monitoring requirements. TE also provided a document (Attachment 3) with two letters from the Borough of Waynesboro, the earliest letter dated November 10, 2006 stating "...the Waynesboro Borough Authority and Waynesboro Borough Council will permit Tyco Electronics (now known as TE) to discharge wastewater into the Borough's sanitary sewer system..." The other letter in Attachment 3, dated June 22, 2010, confirms that "none of the discharge parameters for the Tyco facility have changed." According to facility representative Mr. Brad Rine, this (Attachment 3) is the most up-to-date document related to the control mechanism. The purpose of the inspection was to observe the program's compliance with the Clean Water Act (CWA) and the applicable Federal Pretreatment Regulations. The Pennsylvania Department of Environmental Protection was invited to the inspection but chose not to attend.
A. Inspection Opening Conference The EPA Inspector arrived at the facility at est. 11:00 AM for the on-site inspection. Inspector Thomson met with the following facility representatives:
Name Aaron Thomson
Brad Rine
Table 1: Inspection Attendee List
Affiliation
Telephone
Email
EPA Region III Inspectors and Contractors
EPA - Philadelphia
215-814-2116
Thomson.aaron@epa.gov
Site/Facility Representatives
TE
(717) 762-9186
Brad.rine@te.com
Inspector Thomson displayed his credentials to Mr. Rine at the outset of the inspection, and explained the purpose of the inspection was to observe compliance with the Federal Pretreatment Regulations. The EPA Inspector informed Mr. Rine that any information that the Facility deemed to be confidential business information ("CBI") should be identified to EPA representatives during the inspection and it would be handled as CBI according to EPA's CBI procedures.
B. Weather and Precipitation Conditions During the inspection, the weather was sunny with a high of 83 degrees Fahrenheit.
II. Facility Activity/Walkthrough The facility is classified as a Categorical Industrial User (CIU), specifically, Metal Finishing Category which is subject to the Federal Pretreatment Regulations 40 CFR Part 403 and Categorical Industrial User Regulations 40 CFR Part 433.15 (Attachment 1). The facility discharges to the Waynesboro Borough publicly owned treatment works (POTW). Because the facility discharges into a POTW without an approved pretreatment program, EPA is designated as the Control Authority, and as such is the authority for inspections per 40 CFR Part 403.3(f).
Unique Project #: 3E22WN037A
Page 3 of 11
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022 The TE connectivity facility is an electronic lead manufacturing plant. The facility's manufacturing processes
that contribute to the wastewater stream discharged to the sewage system includes process wastewater generated
from their "blackening" process and collected overflow/wash down from chemical baths. See below for a
current flow chart of the manufacturing process contributing to the wastewater stream:
Figure 1: Facility Wastewater Flow Diagram
After the opening conference, Mr. Rine led a tour of the processes that contribute to the wastewater discharge to the sewage system. These processes includes wastewater generated from the water rinse baths and chemical bath overflow in the blackening process line, non-contact cooling water from heat treatment, air conditioner condensate, wastewater generated during their deburring operation and wash down/mop water. Troughs are installed at each of these points to collect the generated wastewater, entering a collection pit where it is then discharged to sewage system. Inspector Thomson was led to the facility's chemical bath site (Attachment 4 Photograph 1), equipped with troughs to collect any spillage. Mr. Rine stated that wastewater generated in the water rinse baths have their pH measured before being discharged to the collection drain/sewage system to
Unique Project #: 3E22WN037A
Page 4 of 11
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022 ensure the pH is within their permitted parameters. Inspection Thomson asked if any treatment occurs to any wastewater before it is discharged, and Mr. Rine said it is not. Next, Inspector Thomson was led to the collection pit (Attachment 4 Photograph 2), which includes the discharge point, where wastewater is collected and enters a drain to the sewage system (Attachment 4 Photograph 3). Located at/on top of the collection pit, Inspector Thomson was then led to the facility's sampling location, including composite sampler, (Attachment 4 Photograph 4). Inspector Thomson was then led to a supply closet nearby where he observed a monthly pH log and pH buffers that were not expired according to their labeled expiration dates. Inspector Thomson asked Mr. Rine if there was a shut-off valve installed at the collection pit to prevent discharge in the case of slug/spill; Mr. Rine said he was unaware of any such valve installed. Inspector Thomson asked Mr. Rine how the remaining chemical baths are treated if the contents become unusable, Mr. Rine stated that they would be collected in barrels and hauled off-site for treatment, but was unsure of what third-party company would be contracted by the facility. This concluded the site tour. It may be noted that wastewater generation and treatment information provided by the facility after the inspection (Attachment 10) shows that an oil-water seperator is installed on air compressors, however, the oil-water seperator was not observed by the EPA Inspector during the inspection. That same document shows chemical drums filled with "flammable/oils" being collected and shipped off-site, but does not specify the contractor used.
III. Observations A checklist was utilized during the review and is provided below. The checklist is divided into sections, with Observations listed under each section. Photographs were taken during the inspection by Inspector Aaron Thomson, and are provided in Attachment 2. Not all photographs taken during the inspection are included in this report.
Visual Observations pertaining to each section are listed at the end of each section.
Section 1. General Information
General Description of Processes and Products Are there any alternates to effluent monitoring conducted? (e.g., TTO/TOMP, Waiver requirements?) Describe in comments if "yes" Provide production rates for all processes subject to production based standards and include: 1) Process 2) production rate used for calculating limits 3) production rate for last 12 months Any anticipated changes in processes or production rates? List the production rate listed on the approval letter Shift information, list 1) Shift # 2) No. of Employees
Yes No N/A Comments Electronic leads Total Toxic Organics
monitoring required
n/a
Unique Project #: 3E22WN037A
Page 5 of 11
3) Hours 4) Work Days Is production seasonal? If yes, describe List all visual observations pertaining to this section
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
Section 2. Categorical Industry
Categorical Industry? Category(s): Subcategory(s): Regulatory New Source Date: New source?
List of categorical processes
List of other operations producing wastewater List all visual observations pertaining to this section
Yes No N/A Comments
40 CFR Part 433.15, Subpart A: Metal Finishing.
Blackening process, other chem bath overflow Rinse/wash
Section 3. Characterization of Wastewater Discharges (CFR 433.15)
Yes No N/A Comments
Describe the time of day discharge to sewer occurs Are discharges seasonal (if yes, describe)
Continuously
Attach a block flow diagram of manufacturing process in the Facility Activity section of the inspection report, including: chemical storage area, and wastewater generated. Identify all regulated, unregulated and dillution wastewater discharges. Include sample location, discharge flow rates and method of disposal*. Note any recent changes. *disposal method CD - Continuous discharge to sanitary ND - Not discharged or disposed BD - Batch discharge to sanitary sewer HH - Hauled as hazardous waste OD - Other disposal - not to sanitary sewer HW - Hauled as nonhazardous waste
List all visual observations pertaining to this section
Section 4. Pretreatment Facility
Unique Project #: 3E22WN037A
Yes No N/A Comments
Page 6 of 11
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
Consists of scheduled
sampling/measuring
Pretreatment installed?
parameters as discharged, no treatment claimed by
Mr. Rine, but Attachment
10 shows oil/water
seperator
Attach a schematic of the pretreatment facility in the Facility Activity section of the inspection report
(include all units and sludge storage)
Briefly describe treatment processes and operation.
Oil/water seperator
Describe sludge storage and disposal method
stored in chemical drums and hauled off-site
Describe appearance of effluent at time of inspection.
n/a
List all visual observations pertaining to this section
monitoring to verify that no [further] treatment is necessary
Section 5.
Self Monitoring
Yes No N/A Comments
Does facility have a sampling plan or protocol including use of 40 C.F.R. Part 136 techniques (obtain copy)?
Attachment 6
Is sampling location (identified on block flow diagram) the same as in control mechanism? If no, explain.
Is this sampling location permanently identified by a sign, painted number, or other means?
Is this sampling location appropriate? If no, explain... Is this sampling location shown on the chain of custody form?
Attachments 7-9 Chain of Custody (CoC)
Are any parameters monitored by approved methods more frequently than required at permitted sampling location?.
If yes to previous question, are all results submitted to the control authority?
If they were sampled above frequency, all would be
reported
Does facility resample and report within 30 days of discovering a violation?
Are sampling records maintained on site? Describe for how long.
3 years+
Is flow determined as required by permit?
How is flow determined (i.e., estimated or measured)?
Measured continuously (meter)
Is flow measurement appropriate?
Is flow measurement device calibrated? Does the facility have an operator's manual for its pH meters?
No info on who calibrates
Unique Project #: 3E22WN037A
Page 7 of 11
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
Does the facility do a proper 2-point calibration of its pH meter in accordance with the operator's manual?
Is other monitoring equipment (e.g. DO meter) calibrated? Describe how often if yes.
Monthly/when used
Is sampling and analysis done in-house or by contract? If by contract, list company.
Contract, ALS environmental
Is QA/QC program for sampling and analysis adequate? Obtain copy of plan if available. ALS
List all visual observations pertaining to this section
Section 6. Hazardous Waste Management
Yes No N/A Comments
Is IU aware of RCRA regulations?
Does facility generate any hazardous waste? If yes, indicate type of waste, method of management on site and means of disposal on a separate sheet. Describe any spillage problems or any other releases that are observed.
Has facility notified POTW and EPA of any hazardous waste discharges to the sewer?
List all visual observations pertaining to this section
Section 7.
Spill Prevention
Yes No N/A Comments
Has the facility had any spills or been responsible for slug loads? List dates of events in comments.
If yes to previous question, was POTW notified?
Does the facility have spill notification procedures posted?
Has the facility evaluated its need for a spill prevention plan at least every two years?
If yes to previous question, was it determined that they needed one?
Attachment 5
Does the IU have a spill prevention (SP) plan to address spills to the POTW?
Attachment 5 1.1.2
If spills occurred- Did the IU follow procedures outlined in the spill plan at the time of spills?
If spills occurred- Were procedures effective in containing the spill?
Is the facility keeping records of spill events?
Have there been any changes in spill procedures recently. Describe if yes.
Unique Project #: 3E22WN037A
Page 8 of 11
List all visual observations pertaining to this section
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
Section 8.
Recordkeeping Review.
Yes No N/A Comments
Current IU control mechanism (through EPA, not a permit)
Attachment 1
Notices and correspondence with control authority including:
Self-monitoring reports
(Attachments 7-9)
a. Self monitoring report transmittals?
received by facility from ALS are sent control
authority
b. BMR if required?
c. Other?
Do sampling records include:
a. Date of sampling event?
Chain of Custody (Attachment 7-9)
b. Time of sampling event?
CoC
c. Name of sampling person and affiliation?
CoC
d. Sample collection method?
CoC
e. Method of sample preservation?
CoC
f. Description of sample location?
CoC
g. Name of person conduction analysis?
CoC
h. Date of analysis?
CoC
i. Time of analysis, if applicable (i.e., BOD, Cr?)
CoC
CoC shows requested
j. Sample analyses method?
method, analysis results (Attachment 7-9) show
method used
Is type of sample specified in control mechanism?
CoC 3
Are all parameters monitored at the required frequency? Note any discrepancies in comments.
Analytical results?
Analysis (Attachments 7- 9)
Are all monitoring results sent to the Control Authority?
Are copies sent to the POTW?
Appropriate production records for production-based standards?
unknown
Documentation of flow rates and volumes?
Are records maintained at least 3 years?
List all visual observations pertaining to this section
Unique Project #: 3E22WN037A
Page 9 of 11
Section 9. EPA Sampling
Were samples taken? Describe sampling location, method, and time: List all visual observations pertaining to this section
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022
Yes No N/A Comments
Section 10. Stormwater
Does facility have a stormwater permit? If yes, describe what type of permit along with issuance and expiration dates Does facility have a stormwater pollution prevention plan? Describe any BMPs that the facility is currently implementing. List all visual observations pertaining to this section
Yes No
N/A Comments
Outside of scope
Section 11. Current Compliance Status
Indicate compliance with:
a. effluent limits (indicate in comments the date range reviewed)
b. monitoring (indicate in comments the date range reviewed) c. recordkeeping/reporting (indicate in comments the date range and records reviewed) List all visual observations pertaining to this section
Yes No N/A Comments
Attachment 7 (6/30/20), Attachment 8 (7/2012/20) Attachment 9 (5/20/21)
IV. Records Review As part of the inspection, Inspector Thomson requested the following documentation be sent via email up to two weeks after the inspection: Control mechanism, categorical status, 2 years of monitoring reports, slug/spill prevention plan and process flow diagrams relating to the pretreatment system. Inspector Thomson sent a file request via "go anywhere" to Mr. Edward Jones, Senior Operations Leader, who responded with the requested documents between two messages, sent 9/13/22 and 9/15/22.
Unique Project #: 3E22WN037A
Page 10 of 11
TE Connectivity - Waynesboro Pretreatment - Industrial User Inspection
08/11/2022 V. Closing Conference After the facility inspection, the EPA Inspector met with the facility representatives for a closing conference. The EPA Inspection Team shared preliminary observations with the facility. The EPA Inspection Team reiterated to the facility representatives that all preliminary observations discussed were not compliance determinations. Any and all preliminary observations shared were subject to further investigation by EPA upon the additional review of records and documentation. Additional observations may be contained in this inspection report that were not identified at the time of the closing conference after EPA reviewed additional materials following the inspection.
The inspection concluded at 2:00 PM
VI. List of Attachments Attachment 1. TE-Waynesboro_Discharge Limits-Monitoring Requirement_6-00_S Attachment 2. EPA Conditions Attachment 3. Wastewater Discharge Permit Correspondence Attachment 4. Photo Log Attachment 5. Integrated Contingency Plan Attachment 6. Sampling Plan Regulated Procedure Attachment 8. ALS Water sample 2020 Attachment 9. ALS WasteWater analysis FY21 January-June Attachment 10. Table for process wastewater sources conveyance and discharge points.2016
Unique Project #: 3E22WN037A
Page 11 of 11