Document Ra0M7eJOVyXJ4Ojv8zB4GVz4k

Section No. 1-00 E. A. No. 761.10-4-408 Date: March 20, 1964 By: Ft. S. Yates Approved by: RPS Page 1 of 12 Revised July 9, 1965 1-00 General Design BaslB The conception of this project stems from: 1) Forecasted sales of aroclors in excess of our present capacity. 2) The desirability of up to 30# more capacity than indicated in sales forecasts. 3) Anticipated need for facilities for higher chlorinated aroclors than now produced. 4) The desire to upgrade existing operations so that production can be expanded without additional labor. 5) The need for more HC1 recovery capacity at Anniston to match higher aroclor production. Evaluation studies by engineering have indicated the desirability of expanding capacity at both Krummrlch and Anniston. Evaluation grade estimates by Engineering for the Anniston aroclor phase of the expansion, together with rough estimates based on TSD work at both plants, were used to scope out the desired project with the Product Director, the Director of Engineering and the Technical Production Manager. The estimated cost is $750,000; this amount is the limit which will be committed rather than a specific esti mate based on a well defined scope. In effect, the scope will be defined so as not to exceed this amount. The original design basis has been upgraded to include a second appropriation of $350,000 (Project 1772A) and a third appropriation of $214,000 (Project 1931). 1.1 Project Objectives a) To increase our total aroclor capacity to 00-90 lbs./yr. b) To Install a separate solid aroclor unit at Anniston de signed to minimize present operating difficulties and to increase capacity to approximately 10 lbs./yr. c) To increase liquid aroclor capacity at both WGK and Anniston by modifications to the existing chlorlnators. d) To increase muriatic acid capacity at Anniston to match the new chlorlnator capacity. e) Accomplish the above, if possible, without Increasing operating labor. MONS 036162 Section No. 1-00 E.A. No. 761.10-4-430 Date : March 20, 1964 By: R. S. Yates Approved by: RPS Page 2 ol' 12 Revised: July 9, 1965 1.2 The Process 1.21 Aroclors are the reaction products formed by the chlorination of biphenyl or terphenyls In the presence of Iron and Iron chloride catalysts. Biphenyl or terphenyl Is chlorinated to a specified specific gravity or "hold point" which is a measure of chlorine content. The off gas hydrogen chloride Is piped to recovery systems. The crude aroclors are air blown to remove residual hydrogen chloride, then transferred to stills or tanks. The material Is distilled under vacuum, seml-contlnuously, or batchwlse. In a direct takeover still with an external gas fired heater. The distillate from the liquid aroclor distillation Is agitated with dry attapulgus earth, filtered and stored for shipment. Distillate from the solid aroclor distillation is drummed, flaked or ground and packaged for shipment. Distillation resi dues are generally discarded as waste or sold as Montars. Process documents to be used for detailed design: "Standard Operating Instructions", July 1964 - J. W. Molloy. "Process Description for the Manufacture of Aroclor In Dept. 246" December 17, 1962 - E. E. Martin "W. 0. Krummrich Operating Instructions - Dept. 246" September 7, 1961 - E. E. Martin "Standard Manufacturing Process for Aroclor - Anniston" October 22, 1957 - M. J- Williams & R. L. Hedworth "Dept. 27 - Operating Instructions" February 20, 1961 "Standard Manufacturing Process for Muriatic Acid" October 22, 1957 - M. J. Williams * R. L. Hedworth "Pinal Report on the Continuous Chlorination of Biphenyl" June 4, 1957 - R. A. Simone "Tentative Process for Continuous Chlorination of Biphenyl" March 23, 1956 - R. A. Simone "Pinal Report on the Continuous Chlorination of Aroclors - Plant Demonstration" May 7, 1950 - H. L. Merten MONS 036163 Section No. 1-00 E. A. No. 761.10-4-400 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 3 of 12 Revised: July 9, 1965 "Process for the Production of Aroclors, Pyranols, Etc. at the Anniston and Krumrarlch Plants" April, 1955 - E. Mather 1.22 Haw Materials Specifications Supply Chlorine is in sufficient supply at the Krummrlch Plant. At the Anniston Plant, It Is supplied from outside sources when shortages develop. Biphenyl Is In sufficient supply for both plants. Santowax "R" is In sufficient supply for the solid aroclor production requirement. Quality Quality of Diphenyl and Santowax "R" Is satisfactory. However, the quality of the chlorine is quite variable at both plants. Sulfuric acid carryover In the Krummrlch system has resulted In low quality aroclors being produced. Variable air to chlorine ratios will result In chlorine, biphenyl and/or aroclor carryover Into the muriatic acid off gas system. 1.23 Products and By-Products Minor changes to the present chlorlnator tank design for solids chlorinatlons may result In some product differences as measured by isomer ratio of components. Research agrees with this approach however, and the changes envisioned should not affect the finished product specifications for these aroclors. 1 .24 Packaging No changes are contemplated In the existing packaging methods in use at this time. A separate project will be submitted to cover material handling and warehousing. 1.25 Waste Streams No additions to the waste streams are contemplated. HONS 0361b'* Section No. 1-00 E. A. No. 761.10-4-430 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 4 of 12 Revised July 9, 1965 1.26 Toxicity and. Safety Fire Hazard Biphenyl has a flash point of 255F CO and tcrphenyls a flash point of 340CF. to 410"F. 00. The aroclors do not have any flash points and are considered ncn-flammable. Toxicity - Chlorine Chlorine Is an extremely tcxlc gas. The allowable concentration for an eight hour day is reported to be irom 0,35 to 2 parts per million. An exposure of 1000 ppm Is rapidly latal. It is readily detectable by odor at a cot. cent rat ion of 3,5 ppm and 15.I ppm gives throat Irritation. Toxicity - Biphenyl Large concentrations of biphenyl vapors cause intoxication. Respiratory equipment should be worn when working In contact with its vapors. Toxicity - Aroclors Aroclors can give rise to dermatitis when contacted with the skin. Inhalation of vapors is usally followed by systemic poisoning. Proper protective clothing should be worn when handling aroclors. Respiratory equipment should be used when vapor contact Is anticipated. 1.3 The Facilities I.31 The following facilities will be added to the aroclor department at Anniston: One 2400 gallon chlorination tank and accessory equipment to be used for solids cnlorinations. One 2500 gallon still pot, external heater, vapor condenser, receiver and ejector system for solids distillations. One 2000 gallon Monel tank to debottleneck the existing 1242 distillation system. External coolers on the existing chlorinators. MOMS 036165 Section No. 1-00 E. A. No. 761.10-4-483 Date : March 20, 1964 By: R. S. Yates Approved by: RPS Page 5 of 12 Revised July 9, 1965 A chlorine feed control system for each chlorlnator. A thermlnol heater to provide a heating medium for Jacketed process and transfer lines at the solid still and chlorlnator. A new control room at the second or operating level containing instruments for both stills and chiorinators. Installation of three heavy duty pumps on the chlorlnators. Minor relocations and alterations to equipment in the chlorination area. New biphenyl feed pump for the continuous chlorlnators, and a new transfer pump for the crude material from the continuous chlorlnators. A new tar withdrawal system for the four still units. A new supervisor's office. Demisters (Brink type) on all of the chlorlnator units with one heat exchanger on the solid system and one on the liquid system to remove any entrainment from the gas stream. A muriatic acid plant which will include a new absorber and tails tower, carbon towers for continuous processing of muriatic acid solution, relocation of the existing filter and installation of four 13,600 gallon storage tanks for acid. A vent system for tank truck and tank car loading to remove muriatic acid fumes during loading. A new motor control center and power transformer and conversion of all existing power circuits from 220 volts to 440 volts. The following facilities will be added to the aroclor department at Krummrlch: External coolers on 4 of the existing chlorlnators 5 already has one). New circulating pumps on 4 of the 5 chlorlnators (#5 already has been modified). HONS 036166 Section No. 1-00 E. A. No. 761.10-A-488 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 6 of 12 Revised July 9 1965 A chlorine feed control system for each chlorinator. A gravity indication on one chlorinator system to permit moni toring the course and end point of the reaction without manual sampling. 1,32 Design Capacity Operating Stream Time Operating stream time Is 7900 hours per year. This assumes 3 shifts per day 7 days per week operation with 10# downtime for necessary repairs. Rated Annual Capacity Rated annual capacity will be: At Anniston On liquid aroclors On solids aroclors On muriatic acid 48.6 R lbs./yr. 10.0 R lbs./yr. 32.8 R lbs./yr. At Krummrlch On liquid aroclors 28.6 R lbs./yr. Total Aroclors 87.2 R lbs./yr. Present capacity of the two plants, based on cost standard rates and on the production shown in the sales forecast is: At Anniston On liquids & solids 27-6 R lbs./yr. At Krummrlch On liquids Total 20.4 R lbB./yr. 48.0 R lbs./yr. Design Capacity . At Anniston On liquid aroclor products other than Aroclor 1242 On Aroclor 1242 thru the continuous unit On solid aroclors thru the new chlorinator On muriatic acid (as 100# gas) 3160 lbs. 2980 lbs. 1266 lbs. 4120 lbs. HONS 036167 V^ ^ ^ Section No. 1-00 S. A. No. 761.10-4-403 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 7 of 12 Revised July 9, 1965 At Krummrloh On liquid products 3620 lbs./tor. Design capacities of the various aroclors are as follows: At Anniston Chlorlnatlon-Llquld Aroclors Batch Continuous Chlorlnator Size Chlorlnator Loading Number of Chlorlnators Cycle Productlvlty/tor. ofaroolor 940 gals. 50# Four (4) Variable 790 lbs. 940 gals. 51# Four (4) Continuous 2980 lbs. Dlstlllatlon-Llquld Aroclors Type of operation Number of stills Size of still pots Productivity per still per hour No. 1 No. 2 No. 3 Chlorination-Solid.Aroclors Seml-contlnuous Three (3) 1285 gallons 1550 lbs. 2300 lbs. 2300 lbs. / Type of operation Chlorlnator sice Number of chlorlnators Cycle Productivity per hour of aroolor Batch 2400 gallons One (1) Variable 1480 lbs. S-vy* Plstlllatlon-Solld Aroclors Type of operation Number of stills Size of still pot Productivity per hour Batoh One (1) .. 2500' gallons 1286 lbs. I 0-15=0 HONS 036168 Section No. 1-00 E. A. No. 761.10-4-1*03 Date: March 20, 1964 By: Ft. S. Yates Approved by: RPS Page 0 of 12 Ftevlsed July 9, 1965 At Krummrich Chlorination - Liquid Aroclors Type of operation Chlorlnator Size Chlorlnator Loading Number of Chiorlnators Cycle Distillation - Liquid Aroclors 'type of operation Number of stills Size of still pots No. 1 No. 2 Productlvlty/hr. of Aroclor Batch 1090 gallons 60# Five (5) Variable Semi-continuous Two (2) 1280 gallons 2500 gallons 3620 lbs. 1.33 Flexibility of Operation Chlorination Addition of external air cooling to the chlorlnators will allow the chlorlnators to operate at increased capacity. We expect from this change a capacity Increase of 40# at Krummrich and 25# at Anniston. External air cooling eliminates the need for water cooling to Jackets and coils and will result lri less operating downtime and lower maintenance costs. Distillation A commercially designed heater of correct design should result In some fuel savings and some maintenance savings. A unit of this type will be installed on the new solids still at Anniston and will provide comparative data for replacement heaters for the future. A separate Thermlnol heater to provide hot Thermlnol for line heating at the new solids still at Anniston will result in greater throughput due to decreased blockages from frozen iines. Aroclor 1260 has a hold point of 150 to 170*C and the other solid aroclors have high viscosities at relatively high temperatures. HONS 036169 _ Section No. 1-00 E. A. No. 761.10-4-400 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 9 of 12 Revised July 9, 1965 Installation of a new 2000 gallon receiver for Still No. 3 In place of the existing 1000 gallon receiver will result In a 4-1/2 hr. blend and filtering cycle Instead of the existing 9 hr. cycle. Time cycle for the new solid distillation will be: Charge Heat Up Distill Empty Xtra \V '' Total 1.0 hr. 2.0 hrs. 10.2 hrB. 2.0 hrs. 1.0 hrs. lJ^O hrs. VU 1.34 Future Expansion \-ft g If the large chlorlnator proves feasible, the present batch type chlorlnators can be replaced with a saving In space and attendant production Increase. Additional still capacity can be added at Anniston in the existing Bldg. 27 by replacing existing systems with larger units. Additional still capacity at Krummrlch may have to go on a new structure north of the existing control room and office. 1.35 Physical Appearance At Anniston Consolidation of chlorination and distillation controls In a new control j?oom will allow us to dismantle the existing con trol rooms. - The west section of Bldg. 27 will be dismantled to provide space for the new solidB Btlll. Existing No. 2 Blowing Tank in the chlorlnator area will be dismantled. The Mitor Control Center will be Installed In a new structure Immediately under the control room. At Krummrlch No extensive changes are contemplated except those changes which will be a part of the debottlenecking work. MONS 036170 Section No. 1-00 E. A. No. 761.10-4-480 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 10 of 12 Revised July 9, 1965 1.36 Raw Material and Product Storage and Shipping Requirements No additional storage tanks are provided for In this project. Storage capacity at the completion of this project and TSD projects underway Is listed below: Intermediate Storage Anniston Krummrlch Blowing Tanks 1 - 750 gal. (cont.) 2 - 2,200 gal 4 - 2,500 gal. Still Peed Tanks 1 -10,000 gal. 1 -12,000 gal. None Still Receivers 2 - 1,000 gal. 2 - 2,000 gal. 2 - 1,000 gal Blend Tanks ) Filter Receivers ) Plaker Hold Tank ) 6-2,000 gal. 4 - 2,000 gal Finished Storage 60, 000 gal. 116,000 gal. 1.4 Service Requirements 1.41 Utilities Utilities are now available in both plant areas. The use of highly efficient still heaters should partly offset any additional gas consumption required for increased production. The use of external air cooled heat exchangers will actually decrease the amount of cooling water now required. Electric power consumption will increase, and a new power transformer will be installed- to satisfy the new loading. 1.42 Services At Anniston A new supervisor's office will be added. No other additions to service facilities are planned at this time. MONS 036171 Section No. 1-00 E. a. No. 761.10-4-408 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 11 of 12 Revised July 9, 1965 At Krummrlch No additions are planned at this time. 1.43 Personnel At Anniston Por Entire Dept One chief operator For Chlorlnators One head- operator. One operator who assists the head operator and operates the muriatic system. For Stills and Filter One operator. Por Flaker One operator utilized on an overtime basis. Drumming and Biphenyl Flaking At Krummrlch For Chlorlnators Still8, Blending and Filtering Two laborers who drum aroclors, bag flaked material, flake and bag biphenyl and clean cars. One chlorinetor-still operator. One operator who charges the chlorlnators, earth treats the distilled product and filters and makes the Pyranol Blends Drumming No change in labor requirements, either additions or deletions, are contemplated by this project. 1.5 Costs 1.51 Capital Cost Estimate MQNS 0361li An equipment list. Instrument list, process piping diagram, definitive scope and preliminary layouts were used in estab lishing the cost estimate for the aroclor additions at the Krummrlch and Anniston Plants. Section No. 1-00 E. A. No. 761.10-4-400 Date: March 20, 1964 By: R. S. Yates Approved by: RPS Page 12 of 12 Revised July 9, 1965 1.52 Manufacturing Cost Estimate Manufacturing cost estimates were made by scaling up both the Krummrich and Anniston aroclor plant variable costs from the standards of January 1, 1964 and leaving the cost of labor unchanged. Repair costs and depreciation were scaled upward based on the new capital that is being added to the two plants. The cost estimate as submitted is based on Production Dept, estimates. 1.53 Scope of Work Scope of work for the aroclor and muriatic acid plants is based on definitive definition of the additions proposed at Anniston and Krummrich. 1.6 Plans and Schedules Engineering design is complete. The Krummrich phase of the work will be carried out first, followed by the Anniston phases. Target dates are: June 15, 1964 complete design package for Krummrich Plant. July 1, 1964 start construction at Krummrich Plant. September 1, 1964 complete construction at Krummrich Plant start construction at Annl3ton Plant. May 15, 1965 complete construction of aroclor facilities at Anniston Plant. July 15, 1965 complete construction of muriatic acid facilities at Anniston Plant. Oct. 1, 1965 complete construction of miscellaneous additions. MQNS 036173