Document RZYBekN227N2g1vzxYjg6D5V

Halfway Measures Make Good Incineration Impossible| An old boiler and a growing combustible-waste diiposal problem teemed Io be made for one another. Here's how (1) the temptation to take the easy way ou| boomorongod, and then (2) the slept we took to return to sound fundamentals finally produced a lopnotch, workable Incinerator Br MELVIN EVANS, CUccco, III. Our plant kept -turning up heavy loadi of paper, rosin, hair, wood scraps, shavings or what have you, in the daily course of doing business. Like many other plants we got rid of this rubbish somehow--usually the easiest way out'. Finally we recognized the problem of waste-matter disposal was getting no bet ter fast, and steps had to be taken to bring it under eonttol. We had an old low-setting boiler, crowding SO years o( oge, quite a little distance from the main plant buildings. It looked like-e natural foreur problem. We pulled it out of service and added a dutch oven. That, we felt, would do the trick. With this arrangement we plenoed to burn ell our refuse end sel vage some low-pressure steam. Right from the start the seheme back fired. We found any steam generated would be costly because licensed opera tors had to be assigned to (he unit: firing was intermittent and heavy. What was even tougher to handle was our stack-dischorge problems. Flames were shooting out the 75-ft stack! Ash and spark emissions were a sight to behold, and enough to throw the /car of the hereefter into our neighbors. Refractory replacement and atack repair were ter rific. Finally, the drums, tubes and headers fell In and severely damaged the walls. We just had to do something. Incinerator Selection. Best starting- oil point was a chock on the incinerator equipment available- There seemed to be no accepted etondarda, but tbe In cinerator Institute of America and the Air Pollution Control Assn came closest to agreement. Boats for satisfactory incinerator so lution and operation, we found, is the proper analysis of the waste end refuse you've got to burn. There ere six major classes of waste fuel, ranging from mix tures of garbage with rubbish to-by product wastes. Our mlxture~paper, resin, wood scraps, shavings--came closest to what eaperts describe as Type 3 waste fuel, or rubbish, consisting of dry, combustible waste with a moisture content not crceodfng 25% by weight. The term rubbish means paper, rags, scraps, canons, floor sweepings. The 259b moisture represents normal mois ture content In dry-waste materials. Type 3 fuel is based on not more than 6500 Dtu as fired per lb, having 10% ash and 25% maximum moisture. Next, we observed that the large-scute industrial incinerator, designed for the fuel we had and' the load we expected, looks somewhat like a brick-set boiler from the front. It has hinged and guil lotine-type charging doors, on the end or on either side of the firebox depend^ on where the incinerator is pat a&dt^ room around it. Clean-cut doors below the grate level as well as it tj bottom of the various chambers. It is quite normal to find the toclatj tor divided Into primary and secoadt or emoke-burning chambers. Sods <j signs otfd a third or flyosh settling chr" her, see ''after" aketch. With o' waste fuel such si we 1 readily combustible, a grate with I 50% air openings is considered j3 about right Next, you should hsieS secondary chamber of baffled brlek^1 with refractory lining, where the c buction products leaving the prboijf chamber have time to burn complete* 11 the burning is complete enough, 1 ntey even lose enough of the heat i* *1 gos in a third chamber so you demage the usual chimney. You see, we felt the old eMm would be a natural for any incioersi^j But we hod to take some steps to p k against tbe high-iemperelure gts1 incinerator puta out. It nini nw higher than the usual boiler flue In fact, It eels up around 1500 F. *ja unless the flue, breeching, chimney *jjj incinerator chambers weie large enooEr to let this hot gas dilute and t^ Vij safe temperature level, we woale s* PUNT OPERATION AND MAINTENANCE SECTION ute. The "after" aketch shows the com Rtstocos wM new flat roof pleted job. Incinerator Operation. W start up our incinerator by sprinkling oil on a bed of waste paper. Flashback Is nilIn fact, our aleck la actually too high lor the job. But, fortunately, the baffling adds enough resistance to the gas flow to hold down the draft to the proper con trol point. Operation, so far, haa been good and we feel there's n<\ need to put in any dampers at the breeching. See ppSjnf trunt OJ before } "after" aketch. We bring.in trash to the incinerator firing level and.fced it in aboui.5(hcu-ft lots to tbe Incinerator, Opetator'pushts SStr V f ,\ U ' ert*\ the waste onto the front of tne grate aa fast as he can. Combustion Is excellent. Maintenance costs have dropped down to an insignificant amount. Stack tem peratures ere down where they present no special problems. Emission is not noticeable to anyone. In fact, we need no orrester at that level at ell.- Labor for cleaning out tho ashpit Is well bebSW the old setup. Our combustion rates rfre much higher and we need a lot less labor. For our money, we've got a crackerjack incinerator at very Hill* Simple, strolght-tuba, boflled boiler' about 50 years old looked like a cost. noturol for burning rubbish, to we oddod o small dutch oven to help Incinerator Derails. Actually, If you're lacing a growing rubbish-disposal prob lem--and who Isn't?--you'll find ft .Seth} watts Suspend** f*n oreti ter tap [ smart policy to plan for a large-scale or industrial-type incinerator. Starting from scratch there ere some definite ad vantages you can build Into your layout. I First and least obvious ts selecting the right piece to set up the Incinerator. Modern designs are no eyesore and you needn't feel you hove to get them out of sight on that score. Your major consid eration at this point ought to ho con venience. The easier you make It to get refuse into the-Incinerator, the better It Geer* will be. As an example. H you spot It right neat the major waste producers, you will have fewer handling problems Outett eeen to lick. Next (n order is feeding method. If |TCp This streamlined, converted layout, property baffled and checkered, gives ilUt Qn ideal Incinerator with llyosh separation, and tow stock-Qas temperature your ehoTgfns method or way of feeding the waste onto the aretes Is the heat for your class of refuse, this operation should he no headache- Dry refuse lends Jwdon the old stack as unsuitable. bcs we got to thinking of salvaging PId boiler plant we decided not to gP.wilh the chimney. Instead, the jjS?.layout came in for study with the jjfa mlnd of making our own mein- The following tells the story. Conversion. The "before" thews what we started with. The ^ oven, about IS It long by \0 It ft as wide as the boiler front. We -- I_aut drums, headers and tubes, in full-width, self-supporting. jSr*red baffle* to classify the ash and UP* a better beot dissipation. We divided the furnace length into thirds. Then, at obout half the furnace height, we cut the solid wall setting at (he Aral third of the furnace. On top of tbit went the first-pass, self-supporting, checkered baffles. Then et the next or seeoftd-thfrd point, ve did the reverse. We started with the checkered baffles from tho furnace Door, ran them up abmn hall the furnace height, and fin ished off with o solid woll. Our last third of (lie furnace area could be sized, then* to take care oi the decreasing volume of gas to meet a max imum gas velocity of 1500 ft per min itself to a feed system like the one we use. Garbage or wet material is a dif ferent story. Siring is the third advantage you want to include In your original selection. Remember- Incineration la seldom a con tinuous operation. In some instances the whole day's collection Is burned within a few hours. $o sizing has to be based on burning rate rather than on o day's total. By the tamo token, ollow time for clean-out and stoking. At lower capacities o damper (itatallaiion In dm breeching to the stack helps regulate orarfirn drafts for adequate cnmhustlon. &1H) PIANT OPERATION AMD MAINTENANCE SECTION It)