Document RRpxZZj7Ng239mgBewKMdkzk
Monsanto
from .name a location,
a. E. Leisy, W. G. Krummrich Plant
DATE
October 13, 1975
:W. B. Papageorge - BIND
REFERENCE
VERSAR VISIT
TO
Mr. R. W . Flint`S
The technical people from Versar requested information on types and control of waste effluents, both air and water from the incinerator and the operating departments. They were also interested in the control equipment operating and technical techniques. The following is a summary of information discussed.
1. Incinerator
Cost of cons truction
$900,000 plus site preparation and utilities
Operating expenses Operating capacity Permit exists Safeguards to insure Limits of analysis Air and sewer losses High costs result of
$600,000 in 1976 est. 6,000,000 pounds plus
complete combustion 10 ppb No detectable amount and 0
high temperature to burn PCB
to 0.4 ///day completely.
They visited the incine rat ion a r ea an d asked to see tank
truck, tank car, and dr urn unloa ding a reas an d we r e in teres
in how we controlled th e s umps and ac tually f o 11 owe d lines
(without help) to confi rm sumps wer e pumped th ro u gh s ample
station. There was a n ega tive commen t about a re a a ro und
drum emptying station, A block ske t c h on b 1 ac kb o ar d indi-
cated flow of material for them
-
2. Department
Entire area curbed with all liquid flow through sampling and measuring station. HC1 scrubbed and sent to another area for PCB removal. Flow varied from 150-300 gpm depending upon operations.
FeCl3 and CaOH solids to residue to incineration.
Heat transfer units air cooled except for 1016 system which had water unit but run under vacuum system to prevent water contamination. Ejector tail pipes directed to sumped area. Air sampling results negative -- no PCB found. Average PCB losses from department at 0.5 pound per day or less to sewer.
dSNN 330404
STLCOPCB4077048
Mr. R. W. Flint VERSAR VISIT
Page 2 10/13/75 WGK
2. Department (Cont'd) '
The subject of direct contact--process water--PCB came up. Visitors considered ejectors were possible source. No others existed. The question was asked as to people tolerance to product. Information was given that there had been no case where any person had adverse reaction to the products during any time with Aroclors. They were aware that Aroclors 1221, 1242, 1254, and 1016 were now being produced, and had some knowledge as to what happened to HC1 off-gas.
3. Tank Car Loading
Area sumped under cars. Procedures existed for insuring integrity of car before leaving Monsanto. Prior knowledge existed that customer owned (F.O.B. WGK). Imparted our reactions to calls for help in case of spill,etc.
4. Subjects that were referred to W.B.P.
Technical papers on carboh/foam effluent studies. Soil migration studies. Bi0 - they brought up Who else burns PCB Background loss Solids disposal prior to incinerator use Sauget Treatment Plant Incinerator permit, and permit application Process info re temperatures, pressures, compositions,
operating techniques
and
Discussion subjects were limited generally to hardware for control of effluents.
5. Information not brought up and not discussed.
Personnel monitoring Current disposal of solids such as Types/locations of landfills Individual stream PCB losses Protective equipment Losses of PCB from WGK plant. Disposal of returned empty drums
rags
/tm attachment: Copies of written
information supplied to visitors per W.B.P.
STLCOPCB4077049