Document RMN6GR8gD6znmYBn60akDa4X

460.0902 - Asbestos-Procedures Building Management Programs Dallas, November , 1990 District Manager-Building Operations & Maintenance - Houston (Bill Nicks) District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Construction Management - Houston: (Peter M. Mistrot) Area Manager-Architecture - Houston: (Jim White) Area Manager-Architecture - San Antonio: (Pete Campos) Area Manager-Planning - Dallas: (Howard Ratcliff) Area Manager-Network Engineering - Dallas: (Mel West) Manager-Architecture - San Antonio: (Doyle R. Griffin) Manager-Architecture - Dallas: (David Keeling) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Buildings - El Paso: (Bettye G. Marable Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Dallas: (Marion Solomon) Manager-Building Engineering - Houston: (Charles E. Broussard) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Manager-Architecture - Dallas: (Rebecca Kavanaugh) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Buildings - Dallas: (J.J. Garza) Manager-BOCC-Technical Support - Dallas: (Becky Brigham) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety - Dallas: (T.L. Bland) Senior Reports Clerk - Dallas: (Susan Papesh) The next North Texas Building Asbestos Committee meeting will be on Thursday, January 17, 1991, at 9:30 a.m., One Bell Plaza, Room 1309, Dallas, Texas. The meeting will adjourn at 3:00 p.ra. Please schedule your plane reservations appropriately. Attached are November meeting: * Member list * Prior meeting attendee list * Action Items * Subcommittees * Resolutions * Future Topics Should you have any questions, please contact me on 464-2228. Operations Staff Operations & Maintenance Attachments cc: G.W. Fox Roberta Ballantyne Dave Baldwin BUILDING ASBESTOS COMMITTEE North Texas Area Correspondence Identification: 460.0902 - Asbestos-Procedures Building Management Programs Revised: 11/16/90 District Manager-Bldg. Opers. & Mtce. - Houston (Bill Nicks) 3100 Main/r607 (77002) District Manager-Architecture - San Antonio: (Herb Looney) 4119 Broadway/rG60E 512-841-0788 Area Manager-Buildings- Dallas: (Tobey D. Nealy) I Bell/rPCIO 214-464-2228 Area Manager-Environmental Regulation - Houston: (Peter M. Mistrot) 3100 Main/r609 (77002) 713-521-8976 Area Manager-Architecture - Houston: (Jim White) 3100 Main/r609 (77002) Area Manager-Architecture - San Antonio: (Pete Campos) 4119 Broadway/rG60J 512-841-0797 Area Manager-Planning - Dallas: (Howard Ratcliff) I Bell/r3310.01 214-464-3762 Area Manager-Network Engineering - Dallas: (Mel West) I Bell/rl640.08 214-464-5919 Manager-Architecture - San Antonio: (Doyle R. Griffin) 4119 Broadway G60J (78209) 512-841-0802 Manager-Architecture - Dallas : (Rebecca Kavanaugh) III Bell/r804 214/464-3467 Manager-Architecture - Dallas : (David Keeling) III Bell/r804 214/464-3834 Manager-Architecture - Dallas : (Yadira Lopez) III Bell/r804 214/464-4762 Manager-Architecture - Dallas : (Kathy Schneider) III Bell/r804 214/464-6075 Manager-Architecture - Dallas : (Mike Oliver) III Bell/r804 214-464-4074 Manager-Buildings - Houston: (Ronnie H. Brandenberg) 3100 Main/rl05 (77002) 713-521-7414 Manager-Buildings - Dallas: (J. J. Garza) III Bell/rSB-2A 214/464-4879 Manager-Buildings - El Paso: (Bettye G. Marable) 510 Texas/rll5 ( 79901 ) 915-542-4670 Manager-Buildings - Ft. Worth : (Ralph McCloud) 1116 Houston/r800 (76118) 817-338-6083 Manager-Buildings - Dallas: (Marion Solomon) I Bell Plaza/rPBlO 214-464-3400 Manager-BOCC-Technical Support - Dallas: (Becky Brigham) III Bell/r904 214-464-3872 Manager-Building Engineering - Houston: (Charles E. Broussard) 3100 Main/r609 (77002) 713-521-8524 Manager-Safety - Dallas: (T. L. Bland) I Bell/r910 214-464-7052 Manager-Safety Network Operations - Dallas: Larry M. Peterson) I Bell/r3240 214-464-8755 Manager-Removal Operations - Dallas: (Mike Miller) I Bell/rl903 214-464-6693 Senior Reports Clerk - Dallas: (Susan Papesh Go e xj -*X09~ 3 Bell/r804 214-464-6670 BUILDING ASBESTOS COMMITTEE MEETING ATTENDANCE NOVEMBER 16, 1990 IN ATTENDANCE: District Manager-Architecture - San Antonio: (Herb Looney) Area Manager-Buildings - Dallas: (Tobey D. Nealy) Area Manager-Environmental Regulation - Houston: (Peter M. Area Manager- Planning - Dallas: (Howard Ratcliff) Area Manager- Network Engineering - Dallas: (Mel West) Manager-Architecture - San Antonio: (Doyle R. Griffin) Manager-Architecture - Dallas: (David Keeling) Manager-Architecture - Dallas: (Yadira Lopez) Manager-Architecture - Dallas: (Kathy Schneider) Manager-Buildings - El Paso: (Bettye G. Marable) Manager-Buildings - Dallas: (Marion Solomon) Manager-Buildings - Dallas: (J.J. Garza) Senior Reports Clerk - Dallas: (Susan Papesh) Mistrot) ABSENT: District Manager-Building Operations & Maintenance - Houston: (Bill Nicks) Area Manager-Architecture - Houston: (Jim White) Area Manager-Architecture - San Antonio: (Pete Campos) Manager-Architecture - Dallas: (Mike Oliver) Manager-Buildings - Ft. Worth: (Ralph McCloud) Manager-Buildings - Houston: (Ronald H. Brandenberg) Manager-Building Engineering - Houston: (Charles E. Broussard) Manager-BOCC-Technical Support - Dallas: (Becky Brigham) Manager-Safety-Network Operations - Dallas: (Larry Peterson) Manager-Removal Operations - Dallas: (Mike Miller) Manager-Safety - Dallas: (T.L. Bland) Manager-Architecture - Dallas: (Rebecca Kavanaugh) 0'j3423 Building Asbestos Committee Action I teas November 16, 1990 FOR OUR NEXT MEETING: 1. Susan Papesh will revise the Project Input Form for the centralized record keeping function. It is to include: Semi-annual air monitoring, Labeling of asbestos, Date the survey is scheduled to be performed. 2. Kathy Schneider is to prepare a management plan for a small C.O. that has already been surveyed. 3. David Keeling is to update the committee on the CAD progress as related to Asbestos. 4. Mel West is to find out if the Power Engineering Group is performing asbestos surveys on the generator exhaust stacks. 5. Mel and Susan are to investigate the TNESS mainframe system to determine if it would be a good location for the Asbestos Database. 6. Dennis Virzi is to have a prototype database if it is determined that the Asbestos Database is to be a PC application. (See #5 above) 7. Kathy Schneider is to revise the decision tree to reflect three classifications rather than eight. 8. Yadira Lopez is to have the standard contract reviewed, and ready for use by next meeting. 9. Tobey is to have the 0 & M Procedures reviewed by our next meeting. 10. T.L. Bland has developed an air monitoring schedule for North Texas. Members should receive copies soon. 0'j3424 Sub-Committees Established on 7/12/90 1. "CAD" Standardization of Symbols - Layering of CAD Becky Kavanaugh - leaving the committee GOALS: 1) Standardize symbols 2) Develop CAD layering standards 3) Network frame planners to receive copies? RESULTS: David Keeling is to investigate and report in our 1/17/91 meeting. 2. "Small Glove Bag and Abatement Projects" {Especially outlying areas) J. J. Garza Bettye Marable Kathy Schneider Ralph McCloud (Reported) GOALS: 1) Plan procedure for handling. 2) Centralization of records. RESULTS: 1) It was determined that the Architects would handle the majority of the glove bag operations. Building Operations will handle only those emergency situations requiring immediate action. In those cases the Building Manager will need to forward the appropriate paperwork to the Centralized Record Center immediately upon completion of the project. Drilling of VAT can be performed by Network: providing that an exhibit 24 is completed and approved prior to beginning the work; the work is done in accordance to the Practice and laws; that a qualified contractor is utilized to do the work; and that all paperwork is completed and forwarded to the Centralized Record Center immediately upon completion of the work. 0-jG425 3. "Asbestos Action Items" J. J. Garza Mike Oliver Kathy Schneider (Reported) Bettye Marable Larry Peterson T. L. Bland RESULTS: 1) Plan developed 2) The committee determined that there should be three action levels: significant damage, damage, no damage. 3) Rewrite to be part of "Administrative Plan" 4) Kathy is revising the decision tree to reflect 3 levels. 4, "Updating Surveys and Centralized Bookkeeping" Susan Papish Ralph McCloud Kathy Schneider Becky Kavanaugh Dennis Virzi David Keeling (Reported) Charles Broussard RESULTS! The committee came up with a Project Input Form that is to be utilized by the Architects when surveys are scheduled and performed, when removal projects are completed in asbestos areas, and when labeling has been completed. In additon, the committee is determining whether the database should be maintained on TNESS or a PC. 5. "Management Plan Development" Yadira Lopes Kathy Schneider T. L. Bland (Reported) Charles Broussard Marion Solomon Ronnie Brandenberg GOALS: 1) Prepare a management plan for a small C.O. by 1/17/91. 2) Establish a time frame by which all surveyed buildings are to have plans developed. 0-j3426 RESULTS: 1} Management Plan Teams will consist of the Building Manager, an Architect or Engineer, and a Planner. 2) The Management Plans will consist of: Survey; 0 & M Procedures; Schedule for removal, enclosure, encapsulation, or 0 & M of asbestos areas; Administrative Procedures; Letter of notification to tenants (copy); Awareness training records for SWBT employees; Asbestos Practice; Air Monitoring Results; Follow-up survey reports; Contact list. $??? S. "Standardized Asbestos Contract" Yadira Lopez (Reported) T. L. Bland Jim White Larry Peterson GOALS! 1) Prepare a standard contract. 2) Reference NIBS (National Institute of Building Sciences) contract RESULTS: 1. GHQ is preparing a "Shell Document" contract to be used on Asbestos projects. Committee to follow-up with Legal and GHQ for a scheduled completion date for contract. Maxim Engineering has reviewed the contract and made comment. These comments are to be discussed with legal and the final contract brought to the 1/17/90 committee meeting. 0uS427 RESOLUTIONS - STATEOF TEXAS 1. Six (6) copies of Asbestos survey are to be prepared: 2 for BOM 1 for Arch 1 for Network Operatons 1 for Safety 1 for District Asbestos Library 1 for ATT (condo buildings only) 2. INSURANCE A) All policies must be approved by Julie Dople. B) Certificates are required on each job and are approved by the Project Manager. 3. Drilling Holes in Vinyl Asbestos Tile (VAT) A) Law Engineering Associates will be developing the procedures for drilling VAT. B) No "Dry Drilling" is to be done. 4. All managers are to keep track of all asbestos related expenditures. 5. (Page 33) All buildings where asbestos has been identified requires a notice as employees enter the building that asbestos is present. 6. 33% likelihood of earthquake in Arkansas. For a 24 hour window either side of December 4th, 1990. If shocks are felt in Texas cities, then evacuation of employees may be required. - Pete Mistro 7. Network Engineering is to receive list of surveyed building from the Architects. 8. Architects are to supply a list of buildings to Safety for six (6) month air monitoring. Safety is to forward air monitoring results to the Architects. 9. All AIA contracts with Scope of Work need not go through Legal. Only if they are modified. 10. It was determined that the Architects would handle the majority of the glove bag operations. Building Operations will handle only those emergency situations requiring immediate action. In those cases the Building Manager will need to forward the appropriate paperwork to the Centralized Record Center immediately upon completion of the project. OjS428 11. Drilling of VAT can be performed by Network: providing that an exhibit 24 is completed and approved prior t beginning the work; the work is done in accordance to the Practice and laws; that a qualified contractor is utilized to do the work; and that all paperwork is completed and forwarded to the Centralised Record Center immediately upon completion of the work. Guo129 FUTURE TOPICS Procedures for drilling vinyl asbestos tile. Developing a schedule for Management Plan Preparation. Asbestos labeling.