Instructions for Inerteen Insulating Fluid P.D.S. 54201 CM and Installation and Maintenance of Inerteen Transformers
Westinghouse Electric Corporation
Point Tnnafomm Dtorion, Sharon, Pa. I. B. 43-063-99B Efftcttra Sapttnibar, 1968 ...____a LI. 4S4M49A A9d IMS. LL 4MIM.. LL 4*4100 Mat 1951. LL *04i04Mv 1911. LL 4i LL 414504 Mar 1951. LL 4i4iSr lm lift 4(J
m IiHhil.
MGAlS 08051*0
Supplement to * .1.43-063-MS, Japcsmbar ll4
lnorteen5and Environmental Contamination
O il
Imcuu Ii p synthetic Insulating fluid odd* by cha chlorination of a relatively common chemical, blphanyl. Ihe ehlorlMtloa is necessary to impart noaflaaabla proparela* to tha Inartaaa. Tha ratulelai poly* ehlorloatad biphenyl (PCI's) are relatively lntoluble In eater but teluble la fee, and are axereaaly pare latent 1a tha environment. It hat been Indicated by eeveral laboretorlet that measurable amount* of tha PCI'e are preeent In our general environment and may have tome affect on certain special of ulldllfe. While retards are generally regarded ae being non
toxic to humane, It la reasonable to assume that very high standards of control will be Issued by the Government In the overall program against pollution. Therefore, tight control on tha usage and disposal ot laartaem must be exercised.
While eha electrical users of aakarel type fluids provide sealed* ayetame,
chare sclll remains a problem of watts disposal when tha eqyipfcBet steeds
Its useful life or undergoes repair.
1
Tor scrap Increase fluid, Monsanto has arranged for rel material In sealed drums. Ship prepaid to
Monsanto Coopany W. C. Kruamrleh Plant Saugac, Illinois
Attn: Supervisor Dept. 246
A charge will be made for all returned Inarteen.
Inartaaa seabed colls, insulation scrap, filter cartridges, and ocher materials must be stored until appropriate methods can ba provided to dispose of them properly.
Than la considerable work being done at cha present time on this whole problem. We will continue tha use of Inarteen because of Its out standing performance record and safety feacures. If aodlflcaelon ot the present asksrela can ba made without sacrificing tha nonflammable end other Insulating properties! but which still make them lass harmful to wildlife, they will be used 'i our Inarteen.
!
Westlnghouse Electric Corporation
POWIR TflANIPORMfR DIVISION SMAHON, PA. MUNCH. INO. S. POSTON. VA.
MQNS UttObhS
Ensiled in li J A.
Part l - Inartean* Insulating Fluid
CHAXAcmvncs
5. Dielectric constant:
Inerteen is > highly pun, synthetic non-inflam mable and non-explosive Intulatinf and cooling liquid. Chemically iubl and nearly watar white in color, Inartatn la not affected by naction with other materials regularly used In the manufacture of Inertaan apparatus. It is non-oxidizing and non-corrosive at temperatures considerably above those normally obtained in Inertaan apparatus. Inerteen will not sludge under any operating condition. Watar is tha main enemy of Inertaan and keeping it dry will insure long service life.
The dielectric strength of Inerteen will com part favorably with that of Insulating oil when tested under the same conditions. Quality samples of Inerteen tested under laboratory conditions may show a dielectric strength In excess of 40 kv. Can must be exercised in handling and testing Inerteen. Inerteen must be kept , in clean, sealed containers to prevent loss by evaporation or contamination by moisture or dirt.
Inerteen exerts a strong solvent action on most varnishes, gums, and paints. Such materials are not used in the construction of Inerteen appa ratus. No materials should be used in Inerteen apparatus except those approved by the Westinghouse Electric Corporation.
Inerteen has an irritating effect upon the skin. If it is necessary to handle it, see the caution note on the title page. It should be remembered that mineral oil la completely miscible with Inerteen; In fact, it Is impossible to separate mineral ell and Inurteen.
Specific Characteristics of Inerteen
As outlined In "Method of Testing Askarels A.S.T.M. D90I," the specific characteristics of Inerteen are;
1. Bum point: None
At 1000 cycles 77F (250O. 3.7 to 3.9 At 1000 eyelet 212F (IOOC). 4.g to 3.0
i. Dielectric strength: (Minimum) 77F (23C)
At point of shipment, 33 kv At point of receipt, 30 kv
7. Electrical Resistivity: (Minimum)
300xlO9 ohms/cm3 (2I2F (I00C) at 300 volte d-c)
8. Power factor:
.
At<0hertz.77F(2SqJII. : At60hartz,2l2F(1006Q2l*. -
'9. Fixed chlorine content: (Minimum) 42 per
cent
` '
10. Free chlorides: Leas than 0.10 ppm
11. Neutralization number: Lem than 0.014 mg ofNaOH/gram
12. Pour Point: (Maximum) plus 2F (minus 19C)
13. Refractive index:
At 77F (23C), 1.824 to 1.628
14. Specific gravity:
At 60TI6QPf (13.3C/1S.3C), 1.381 to IJ92
15. Density: 11.3 pounds per gallon 16. Viscosity: At 100F (37.80O, 82-92 seconds
17. Moisture: (Maximum) 33 ppm
2. Chemical stability: No generation of flee chlorides under normal operating conditions
3. Color (Maximum) 100 A.PJ1.
4. Condition; Gear
HANDLING
CAUTION
|
Inertaan la a sl^k hiilant. Unnecessary con- i
tact with tha liquid or Its vapor, particularly i
MUNS 080590
made as to the suitaMBty of the Inerteen for continued use, whether it would bo desirable tnd economical to dean it, nd to a moral wiy, tho preferred method of cleaning. la submitting samples for this tarries, tho history of tho Inerteen reptosentad ihould bo (Iron es com pletely aa possible.
Power factor tut of Inertooa at 60 cydoo can bonuda.
(For details rafor to tho noaioat Wostfaiihouu Offleo.)
RECONDITIONING
Couaoo of Dotoriorstion
The prlndple cauaos of deterioration of Inirtten are:
1. Prosenoa of water. 2. Arcia|.
Aidn| or burnins la Inertaaa produen finely divided carbon and lain which are mostly hydro tan chloride. Hydrotan chloride in the presence of moisture forms hydrochloric odd which may soon damage the insulation in the apparatus and cause rusting of ferrous materials.
Since hydrogen chloride is formed quickly after the ardng occurs, neither the fnertaen nor the apparatus should be exposed to the atmos phere (which always contains more or lets mois ture) until an attempt has been made to remove the hydrogen chloride.
Recandltlcnlug
Reconditioning win be necessary to remove water, dkt and hydrooan chloride which may be present and contaminating the Inerteen.
The blotter filter press and the Insrtaea condi tioner will remove water and dirt dapedit which may be present. Of the two methods, the Inartaan conditioner is the most effective in removing, these two contaminating agents. Any equipment used for filtering Inerteen should first be thor oughly cleaned with benzine or naphtha, (very trace of any material foreign to Inerteen must be removed. If at all possible separata equipment should be used for filtering Inerteen only.
Hydrogen chloride, caused by arcing, may be eliminated by vigorously bubbling dry nitrogen through Inerteen. The nitrogen ihould be pasted through the drain valve at the bottom of the apparatus and allowed to escape thmglu vent at the top. The nitrogen mould, bgghsharged through a pressure regulates aaashsdJo a amnd pipe above the level oL dig thirteen In dm
apparatus to prevent the Tnsciaeo Emm flowh* into the regulator. The mtrenm aheaM be bubbled through the InertOtu al a min of ana to three cubic feet per minute focshaaled 9ttm to six house. This wig require mgr ho* to dgd
cylinders (220 cu. ft each) of dqf dampen, hem on apparatus containing ISO to 2000 galtae of Inerteen.
Immediate application of the bubbling presses will reduce the deatruedve action of the hydro chloric add on the working pane and Insuiatieu, thereby making it likaly that the materials not damaged by arcing may be used in repairing the apparatus. Also, use of the process will in most cases msks it possible to satisfactorily reclaim the arced Inerteen.
After the hydrogen chloride has been removed by the bubbling ptoceee, the Inerteen should be reclaimed by use of an Inerteen conditioner.
There is no commercially suitable method for separating transformer oil from Inerteen.
M0NS 060691
Short Circuit Amperes in Percent of Load
50% 75% 85%
Maximum Temperature of the Top Inerteen
8JC 80C 7SC
To do this, dean tha damaged portion by means of a scraper or sandpaper, wipe thoroughly with a solvent dampened cloth, apply Weatinphouse primer paint and allow it to dry for at least 24 hours, then apply a coat of Westinghouse finish paint.
White tht windings or th* transformer hast up, do dot permit the temperature of the top Inerteen to exceed th* value specified for a given parctittti* of load. Thia precaution it nacaaiary basauaa the windings will heat up more quickly and operate at a higher temperature than the Inerteen. If the wtndinp ate allowed to reach too high a temperature, the insulation will be damaped. The drying of e tranafotmer should be continued until the dielectric atrenpth of semplae of inerteen taken from the transformer teat at 30 kv or higher.
The cover should be kept tightly seeled during the temperature run, and until the transformer has cooied down to room temperature to prevent condensation. This also prevents the release of hot Inerteen vapors which are quite objection able, particularly if the ventilation is poor.
CAUTION It Is not safe to attempt the drying out of transformers unless constant attention is given to the Job.
ACCESSORIES AND FITTINGS
Bushings, fittings, and accessories when boxed and shipped separately should be mounted u shown on the outline drawing. Proper Installation instructions when necemary are included In the Instruction leaflets for component parts. Cars oust be exercised when these components are fitted to eliminate the accidental introduction of moisture in any form inside the transformer. Where blind flanges are removed before fittings an mounted, the level of tha Inerteen must be lowered below the openings that will be made.
FINISH
Any portion of the paint flbn damaged during shipment or Installation mutt be repaired u quickly u posriblt.
FILLING
Use only all-metal hose or pipe when filling, since
the lining of most other types of hose may be
soluble in Inerteen end will contaminate it in a
short time. All joints should be tight; where
practical, fill through the drain valve to keep
aeration to a minimum end vent the top of the
tank to allow the air to escape. Ionise that valves
and pipe connections between the main tart and
any Inerteen filled compartments an open far
free drculatioa of gat and Squid. Othamrin,
trapped air or gas may cause the Inerteen level In
some para of the transforiner tobs below the
safe operating level.
'.
finIf it is accessary to a transformer out-of
doors, particularly on a damp day. care should be taken to prevent tht entrance of moisture. In order to avoid condensation the temperature inside the unit should be kept several degrees above the outside air temperstute.
The tank and compartments, if any, should be filled at ambient temperature to the point on the puges marked "2J-Liquid Level." If the ambi ent varies greatly horn 2SC (77F) when filled, the Inerteen level should be checked when the average fluid temperature is 23C; sufficient Inerteen should be added to or drained from the tank to bring the level to the proper height. The transformer should never be operated or left
standing even out of service without the Inerteen level being indicated on the pup.
Fining Under Vacuum
Entrapped air it t potential source of trouble In all liquid filled transformer!. Therefore, it Is desfeabla to fill all Inerteen transformers under e fill vacuum. This Is done for the transformers shipped ftom the factory and should be done
where practicable when trantfotmen are filled in tha field, proshUrt the transformer cases have bean so designed Bf the cases have not bean designed for Ain tfnsusn end it it imperative to
MGNb 0a059<>
}
1
I
MAKING CONNECTION*
A diagram. usudfry on th metal instruction plats attached to tbs sUs of tbs ssss, shows ths proper power tsminil connections to bo mads for various voltages. Can should bo taken to iso that all eonnsetions and only those shown ui prop erty made, for a wrong connection may cause severe damage.
Any increase In operating temperature et nor mal load should be investigated and If the emme cannot be determined, the transformer should be taken out of service and given s thorough inspection.
Any symptoms, such u unusual noises, high or low Inerteen levels, operation of relief device, etc., should be investigated at once.
Soma installations require an auxiliary source of power or control lends to be wired to terminals at the transformer; a wiring diagram, either a separate drawing or included aa part of the outline drawing, shows the connections to be made.
Voltage Application
When voltage Is first applied to the transformer, it should, if possible, be brought up Slowly to its fun value to that any wrong connection or other trouble may be disclosed before damage can result. After full voltage has been applied success fully, the transformer should be operated without load for a few hours. It should be kept under close observation during this time and also during the first few hours while loaded.
INSPECTION
It is desirable that periodic inspections of Inerteen apparatus be made and that samples of Inertsen be taken from each and bom all compartments of any apparatus and tsated after a short period of service (approximately three months for transformers). Following this, when operating conditions permit, routine sampling and teasing of the Inerteen at intervals of tlx months to one yew are suggested. Accurate records should be kept of such Inspections and tests and if the Inerteen shows a dielectric strength of lets than 21 kv, it should be conditioned. If facUltiee are not available for tearing Inerteen, see "Wcctlnghoutc inerteen Testing Service," P.L. 43425. When in appreciable amount of Inerteen is removed bom any apparatus, it should be replaced with an equal amount of new Inerteen so that the liquid level in the apparatus la maintained. The Inerteen used for replacement purpoam should have a dielectric strength of not lam than 30 kv.
Transformers which have been subjected to unusually severe operating conditions, such aa overloads, frequent short circuits, or medal units should be inspected at least once a year. This can usually be done adequately by lowering the Inerteen level tnd inspecting with a light through the manhole. Before this inapaetlea h mode, the Inerteen should be allowed to cool to leduee the amount of Inerteen fumes gtap off wWah am quite objectionable end shoujd net be Inhaled.
During periodic inspection, all irneeseriee should be inspected to see if they ase upanting properly.
SAMPLING INERTEEN
All sampling and testing equipment must be thoroughly dry and dean. It is recommended that sampling and testing equipment used for handling Intrteen tnd servicing Inerteen be used for no other purpose. Care must be used in taking ampler of Inertten and sealing them prior to testing. It is desirable that samples of Inerteen be removed from any container on clear days only, and when the temperature of the Intrteen is at leest u high si the temperature of the surround ing air.
Use only tin contaiisen with serswed metal caps or glass bottles with lnerteen-rrsistmt stoppen to hold Inerteen samples. If it recomea necessary to use other than factory sampling containers, they should be rinsed with dean naphtha, washed with strong soap >uJs. and rinsed thoroughly in hot water, and then dried at approximately 110C for four houn ith neck down in a circulating air oven. If ths containers are not used immediately after cleaning, they should bo sealed tightly and stored in a dry, clean place.
HUNS 060593 t