Document RLjOqrOy0ag3o1m6mb0ZxKpa

FROM R. W. KNAPP MASSENA OPERATIONS T0 MR. R. C. HINKLE BADIN WORKS April 13, 1973 RE; OSHA ASBESTOS COMPLIANCE QUESTIONNAIRE - MASSENA OPERATIONS The information requested in the questionnaire attached to your letter of March 30, 1973, is attached. The information was collected at a meeting of the following: Messrs. Dr. Elder, Burgert, Lantz, Hinds, Barr, Fairbanks, McLaughlin, Besio, Pashby and Knapp. Should you have any questions regarding our reply or need more information, contact the writer at Massena 4431. You will note that we have taken some liberty with the questionnaire to record available information on the problem. By copy of this report to our Purchasing-Stores department, we are establishing a procedure for controlling non locked-in asbestos products getting into our system. R. W.KNAPP RWKrbl Attachment Cc: Messrs. Dr. M. J. Elder - Massena H. Burgert - Massena G. H. Lantz - Massena P. J. Hinds - Massena W. S. Barr - Massena G. Fairbanks - Massena H. McLaughlin - Massena H. P. Besio - Massena W. J. Pashby - Massena G. B. Scott - Massena G. H. Duckworth - Massena R. J. Kopecky - Massena L.V.Cralley/P.R.Atkins R.W.Wrenn/J.A.Dunbar S.A.Jones/G.R.Swany W. N. Dawson - Pgh. - Pgh. - Pgh. - Pgh. o.iJ ALCOA f*4968 ("CV 11*90) LOCATION MASSENA OPERATIONS DATE APRIL 11. 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE . I. Industrial Hygiene, Page 1 1. Have you elected to have the respirable asbestos fiber sampling and/or counting done by non-Alcoans or by Alcoans? Discuss. Have not elected to sample. Have concentrated on eliminating exposure to non locked-in asbestos containing products. Considerable progress has been made in area of substitution and elimination of exposure. We don't machine or saw marinite at Massena. 2. Has the initial workplace environmental monitoring survey been conducted? If not, discuss. Initial monitoring survey has not been made as explained under No. 1 above. 3. Has the initial personal monitoring survey been conducted? Initial personal monitoring survey has not been conducted as explained in No. 1 above. 4. Does your plant have the specified sampling equipment for both types of surveys? We don't have either type of sampling equipment. 5. If you plan to conduct the surveys and/or count fibers with your own people, are they presently capable? If not, what are your plans for reaching competency? Under anticipated conditions we shouldn't have to do any sampling. LOCATION MASSENA OPERATIONS DATE APRIL 11. 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE Industrial Hygiene, Page 2 6. When is your next semiannual survey scheduled? Doesn't apply. 7. Estimate the man-hours necessary to conduct your next survey, including counting. Doesn't apply. 8. As a result of your observations and/or tests, have you identified areas which exceed the current standards? 1976 standard? Have had areas which probably didn't comply with current and 1976 standards. Existing stock possibly causing noncompliance will be eliminated shortly - by July 1, 1973. 9. Have you made provision for keeping the records of personal and environmental monitoring for at least the required 3 years? Records that we have or will have will be kept at least three years. 10. Have you had requests for access to such records by employees? NO. 11. If your plant has operations which require the use of approved (for asbestos) respirators, are such respirators in use where required? YES 12. How would you rate your plants' general level of compliance in the wearing of respirators? Good. LOCATION MASSENA OPERATIONS DATE APRIL 11, 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE Industrial Hygiene, Page 3 13. List the specific types of respirators in use and make comments as you wish about each. Our carpenters and masons each have their own respirators and we use AO R8156 with R156 filters. These have been found satisfactory and have received no complaints. 'JXjL- r, 14. Do you have areas where caution signs should be displayed? How many? Are signs displayed now? ___________________________ We store asbestos in several of our storerooms. Are signs required? We don't have any. Have you established procedures for approved disposal of asbestos wastes? Discuss. Don't believe we have an exposure to "non locked-in" asbestos fibres exceeding the standard. 16. Do you have or foresee the need for providing special cloth ing for any of your workers because they work with asbestos? If so, discuss. We have a furnace to remove containing J.M. Superex and a special procedure has been established. (See attachment.) Coveralls will be used for this demolition. 17. Do you have or foresee the need for special change rooms and double lockering? If so, discuss. NO. 18. Do you have or foresee the need for special laundering practices? If so, discuss. NO. LOCATION MASSENA OPERATIONS DATE APRIL 11. 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE II. Medical, Page 1 1. Have you identified the areas where respirable asbestos fibers do or may, exceed the OSHA limits? Early in 1972 we surveyed our possible hazard areas, reviewed our stores items and started the program of eliminating the use of non locked-in asbestos products. 2. How many individuals have you found to be subject to the medical and monitoring provisions of the regulations? Should examine past exposures. Li-st now being completed. Routine examinations have not indicated a problem with present or retired employees. 3. Have you conducted the first round of medical examinations, including chest X-rays, pulmonary function tests and clinical data including smoking habits? NO. a. Number of employees examined in first round: None -startir. in Mav 1973 will examine some Dast exposure employees. 0. Scheduled dace of ncxu annual. cAamniQLj.ui,. Would repeat some in November 1973. 4. Are you conducting the preplacement examinations on indivi duals who will be exposed to asbestos fibers? YES. How many such preplacement examinations have been made since the regulations became effective? NONE. 5. How many subject examinations have been made upon termination of employment? NONE. LOCATION MASSENA OPERATIONS DATE APRTT, 11. 197^ ASBESTOS COMPLIANCE QUESTIONNAIRE II. Medical, Page 2 6. Have the results of examinations been evaluated? Assume this applies to No. 5. Answer "no*!. 7. Have you encountered any problems in getting individuals to undergo the examinations? NO. This applies to regular or special medical examinations. 8. Have arrangements been made for keeping the medical examina tion records for 20 years? YES. 9. Have you had requests for examination of the records by any of those persons who are given legal access? NO. LOCATION MASSENA OPERATIONS DATE APRIL 11, 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE III. Compliance, Page 1 1. List here a summary of the areas at your location which are now of concern because of asbestos. Estimate the date of compliance with Section 1910.93a, paragraph (b). If costs can be estimated, note them. No extensive cost study is required. Estimated Estimated Work Area Compliance Date Cost (We are listing the areas where we may have had an exposure problem so that a record is available). Machine Shop- Discontinued Cutting and machining All done by outside shop. marinite Discontinued from our shop about 5 years ago. Carpenter Shop- All not purchased to size Cutting asbestos paper stocks will be used by and board. June 1,1973. Now pur chasing board & paper cut to size. Masons - Instructions on proper Use of asbestos products use were issued in May in furnaces & troughs. 1972,followed by Safety Memo in August 1972. All non locked-in asbestos insulation & lining material to be eliminated by 7/1/73. Old troughlinings containing asbestos to be wet down before removing. Superex 2000, asbestos free, as of 1/1/73. Now using Kaowool as replace ment for asbestos shorts in trough lining. Use of asbestos products in potlining & removal. - Early in 1973 started using Monoblock non asbestos for solid insulation-considerable less solid insulation in pots for over a year. - Late in 1972 substituted Penseal for sealing around the collector bars. LOCATION l^ASCZNA OPERATIONS DATE APRIL 11, 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE III. Compliance, Page 1 a 1. List here a summary of the areas at your location which are now of concern because of asbestos. Estimate the date of compliance with Section 1910.93a, paragraph (b). If costs can be estimated, note them. No extensive cost study is required. Estimated Estimated Work Area Compliance Date Cost Use of asbestos products in potlining & removal. Laborers Removal of Ingot Plant furnace linings. Employees handling and cutting asbestos board, paper 5c cloth. (Mainly ingot plant and pot lining) Employees removing old pipe insulation. - For approx.past 10 years have been wetting down pots before lining removal. Eliminate use of asbestos hard block around 1954. Have one known furnace with old Superex (about ?,% asbestos).Special procedure for removal has been established. Fairbanks letter to TMalker 3/7/73. Material is broken, or cut with knife or hand saw blade. See that employees are prooerly instructed to cut without creating a dust and personal exposure. If asbestos - respirators of approved type must be used. The major cost has been the time and effort expended in finding substi tutes . LOCATION MASSENA OPERATIONS DATE APRIL 11, 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE III. Compliance, Page 2 2. List here (or attach sheets) the asbestos-bearing materials in use at your location. List briefly the uses for each. If such information has been prepared previously, simply attach copies. Material Uses (Detailed uses are available if you so desire). a. Gasketing,gaskets & packing. In ingot plant, potrooras and maintenance (Gaskets bought cut to size) b. Asbestos cloth. In ingot plant,potrooms,maintenance and fabricating heat-treatment. (J-M states,"cloth we furnish will be lint free and the material as we furnish it will not become airborne under reasonable, foreseeable conditions of use".) (Letter 9/18/72). c. Superex 2000. In ingot plant furnaces. Now asbestos free. d. Garments In ingot plant, potrooms, maintenance. (Our supplier states, "Meet Federal regulations and so constructed that the asbestos fibers will not become airborne under reasonable, foreseeable conditions of use".) (Letter 9/1/72). e. Asbestos board. In ingot plant, potrooms and maintenance f. Asbestos paper. In ingot plant, potrooms and maintenance 14 lb.-various widths. (Buying to cut widths) LOCATION MASSENA OPERATIONS . DAT APRIL 11, 1973 ASBESTOS COMPLIANCE QUESTIONNAIRE III. Compliance, Page 3 3. On succeeding forms entitled "Asbestos Compliance Status Sheet", discuss each work area of concern. Group identical areas. The form is intended to provide a history of progress as more information is added in the future. Our main program is to continue with the elimination of non locked-in asbestos products and prevent the use of them creeping back in. Also where.non locked-in asbestos products are used, to use them properly and prevent exposure by proper instruction and monitoring. We are going to medically review those that have had considerable exposure in the past. By copy of this report to the Purchasing Department Storeskeeper, we request that any new item of non lockedin asbestos be cleared with the Manager of Environmental Services and Safety before purchase. About January 1, 1974, we should re-review our asbestos situation plantwide and list what is being done and has been done since this report. About every nine months to one year thereafter the situation should be reviewed again. MR. W. BARR--30 FROM: G. 17. FAIRBANKS TO: KR. J. B. TALKER ,March 7 1973 RE: P-EPT/.CEHENT OF ASBESTOS CONTAINING INSULATING BLOCK Recently c letter v?as received fren A. J. Ssrtechev and R. P. Carter advising of problems with block type insulation containing asbestos. The letter covered two c.aiu points---the first is to discontinue the use of block insulation containing asbestos. This has been done in all areas of the plant. The second i3 how to deal v:itii the removal of asbestos containing block insulation during refractory x-epairs or relining. The letter requests that we describe cur plans to handle the required control of asbestos. The arrangement of our organization indicates that this problem can beet be handled by dividing it along Fabricating and Smelting lines. I will develop our program for the Fabricating Division, including the Ingot riant. I suggest that the Smelting program BV rcn.l^CU!S m LtlGC Fabr.fcotin? Pivigion including the Ingot Plant Approximately 1964 we discontinued the use of '*hard" block type insulation v;itb air cut S% asbestos such as J. 11. Sup ere:: and Carey 19 in the Ingot Plant. Vie standardized on honoblock because it is softer sue causes less distortion c furnace shells. In the years since the change, the hard insulation has been worked out c the system. Hcnoblock does net contain asbestos. Pittsburgh designed, and specified furnaces, however, have used J. II. Supcrex ware recently. T.-e hove one remaining furnace, 14S, in which all the block in Superex. 7hi3 furnace is scheduled for rebuild in the second or third quarter of this year. Removal of the old lining will i.nr.'ive c-xposure to asbestos curb from the block insulation. Our 1'l^.v-, to control asbestos dust exposure are to retire the use of approved respirators: and supply coveralls for the urn involved in m; eying the old refractory lining. Clean up will be by the use c.i: a vacuum clearer:, rather than sweeping. The remainder of the Fabricating Division furnaces involve heat f* <? . ._ . hhj block insulation r;ny or r.cy not contain Vkerc the purchase orders are available, we probably can determine the specific brand, and from the brand, the asbestos content. In cost cases, however, the purchase orders have been destroyed so we cannot determine in advance the asbestos content of the insulation. In general, the asbestos containing blocks can be identified by inspection cf the relative hardness end color The white, hard material contains asbestos (Carey 19 and Supercx) and the dark brown, soft material (Konoblcck) does not. We have- no plans to remove, relocate, or taodify any of these fur naces so we are not facing an immediate problem. In the future, we will have to remain alert to the dangers of asbestos, and rake a da termination in each instance whether or*'asbestos is present. Where asbestos is present, respirators, coveralls, and vacuum cleaning dust control v?ill be required. CC: . Kessrc. W. Farr H. Bssio, W. llolnar B. P. Wilrrsca, R. H. Encdgra.sc File