Document RJzo1kDBxRg5a77znDMwZrpoz
- Mr, J. a. Hoitaway
AMERICAN BRAKE SHOE COMPANY AMERICAN BRAKS3L0K DIVISION
WINCHESTER, VIRGINIA
September 10, 1959
&? D0 & Rennie Tsoy Office
Deer Dons
AMERICAN BRAKE SHOE CO. medical dept.
With regard to your letter of August 18, 1959, on the matter
of liberty Mutual *s Industrial Hygiene Survey, conducted June 25 and 26, 1959, ve wish to offer the following.
Upon receipt of the report, Messers. C.B. Mallory, J.W. Riley, C.L. Curtis and the writer, made a complete analysis of same. Although ve felt that ve were aware of exact locations as described In the report, there were some areas ve questioned and ve elected to withhold any comments until after such a time as Mr. Charles Cole, Liberty representative, visited us again. Mr. Cole was here on Friday, September 4, 1959*
Airborne,itaa& (?se 3)
Conclusions
Compounding
1.) Hie weighing of certain powders at the south end of the dry mix powder bins indicated high lead concentration (4.33 Milligrams per cubic meter). Observation of this operation
indicated the followings
(a) Operation Is being performed several feet away from the exhaust system. This exhaust was installed after our Medical Department survey of November 58, 1957*
(b) Certain new materials are being weighed and there are not sufficient storage bins In regular line to accomodate them.
Ag&gft.Iftltta
(a) Move weighing operation bach under hood in order that proper advantage may be taken of exhaust system.
(b) Relocate exhaust hood in order to use to better advantage. On this item Shop Requisition #22015 has been issued.
SPNY 007417
The dumping of mix lilt:;- buggy % : m bo
of toe ribbou
Eiders on the dry line results in !jr;in.*3*' not being ecu Sained
by the dust control system..
inoo rio iaibitn #22016 has been issued bo; (a) enclose 5-he Eapid sderdii Conveyor (b) to provide n back on tbs nood cn #2 11 ,e (<5) to rework the hood on s i line*
Borderline health hazard during dumping from blender to ^1 iismmermiil nay exist*
Shop requisition #22017 has been issued to cover a velocity check on the exhaust system here* It Is possibls we may have to throttle back the blast gates mentioned in para* #2 to provide more air here*
^0} #0 comments - based on their comments*
Rolling
5) Minimal concentrations of airborne lead exist at rolling machines except backing machine #6*
(a) It is apparent that several conditions exist In the fume hood system, due to "poor* maintenance* This is not entirely the fault of poor workmanship but more from the absence of work performed on the equipment*
Ac.ttPR,aa
Shop requisition #22020 has been issued to:
(a) (b) (c) (d)
Check the fan for RPM*s and speed up if. necessary* Relocate several hoods and "fasten with a purpose"* Secure "compressed air" signs properly Repair machine hopper before a complete new one is
required*
stripFiniafaing
6c) So comments Everything seems to be In order*
7*) Close surveillance of exhaust system where higher lead con centrations existed (0*1 milligrams) - Automatic Chamfer #2 ** back grinder #3 and exhaust of Torlt Collector on automatic strip grinder.
SPNY 007418
3.
Action-Sakai
Shop requlstion #20221 has been issued be; (a} Rebalance dust collector system #1* b) Pipe Torit Collector to the outside*
It oust be noted that when dust collector #13 is instell an additional '*-,000 CFM*s will be released for use in : j*j iepaX'tn.szvto
Eraksiflak (Blok Department)
9*) No comments Everything apparently in order-,
2C) No comments - Everything apparently in order.
NOTE: By taking action as indicated above, it is felt we will reduce and in some Instances eliminate those excessive counts as shown on pages 8 & 9 & 10 of the survey.
Airborne .Asbestos Conclusions
(Page #11}
1.) Borderline health hazard exists at weigh and dumping stations in the wet line.
Shop requisition #22019 has been issued fori (a) New rubber gaskets on flanges of hopper. (b) New dust "box skirts'* be installed in place of battered and crushed ones now in use.
2. ) Weighing and blender charging - excessive airborne asbestos.
AffStoq.
Shop requisition #22023 has been Issued to cover. Improve design of hoods, rebalance system and relocation, if necessary.
3. ) Covered above.
NOSE: The above action should reduce and/or eliminate high counts shown on page & of report.
Metfarl, Ethyl Ketone Vapor, in Air PC Department 1.) No comment.
(Page #1?)
SPNY 007419
action Taken
%s>) Shop requisition #22024- has been issuea to set la~ge roo;' fan to bring air into room instead of pulling out - the latter being operator*s desire*
glolL_aeo^it__Compounding
3<J No comments.
4-0) No comments.
NOTSi High counts as noted on page 17 should be relieved and/or eliminated as result of above action.
No comments.
,jammer
Ventilation Study
This report indicates that our present system could stand some repairs and revaluing. Certain cases exist where the original hood vas taken off and never remodeled or replaced.
Mr0 Wagner's report indicates that we should redesign our entrance fittings on the majority of our equipment. To do so will be very costly and time consuming and will not in the end solve many problems. We have to assume that the individual workman will still ^doctor" or batter the ductwork as they have dene in the past. Our control over this will have to be improved upon by going to disciplinary action, if necessary.
Ar, Cole vas advised that after we have completed all action
of the discussed items we would like him to recheck the areas
concerned and again offer their comments.
,
Any comments you may have as to our action on any of these items will be appreciated.
WoS.Baker/pr
cct F.B.Tayler J.Soviak J.T< Gresh G. A.c Riley L.E.Hamlln
J.S.Holtavay
Safety Director. SPNY 007420