Document RJzN4J8x4oj9gG8o3yGkyMBn
U.S. Department of Transportation Federal Highway Administration
Bridge Investment Program (BIP) Bridge Grant Awards 2022
wunv.fhwa.dot.novibridge/bin
OST-2025-1200 Page 02892
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028602
U.S. Department of Transportation
I r' ( 111) Administration Federal Highway
Table of Contents
Project Name
Bridge Rehab, Safety, and Mobility Project at Palm Avenue/I-805
1-395 Northbound Bridge Over the Potomac River Rehabilitation Project
One Bridge, Many Connections: Reinventing the Lafayette Bascule Bridge
Restoring the Castleton-on-Hudson Bridge
Improving Rural Bridges in Northwest Oklahoma
Burgard Bridge Resiliency and Multimodal Enhancements Project
Investing in South Carolina's Rural Bridges
Goliad County US 59 San Antonio River Bridge Replacement Project
Replacement of John Nolen Drive Bridges in Madison, Wisconsin
State
California
District of Columbia
Award Amount $24,000,000
$72,000,000
Michigan
$73,000,000
New York
Oklahoma
Oregon South Carolina Texas
Wisconsin
$21,000,000 $11,505,044 $13,895,277 $51,185,909 $14,037,887 $15,124,596
Rural
or
Urban
Urban
Urban
Urban
Rural Rural Urban Rural Rural Urban
Page 1 2
3 4 5 6 7 8 9
www.fhwa.dot.gov/bridge/bip
OST-2025-1200 Page 02893
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
ii SC_EVERSPLIT0028603
U.S. Department of Transportation
Federal Highway Administration
BIP Bridge Project, Rural
Improving Rural Bridges in Northwest Oklahoma
Garfield, Grant, Kingfisher, Major, Noble, and Woods Counties, Oklahoma, for combined seven bridges 2,894 vehicles per day, estimated 15% truck traffic (combined 434 trucks per day)
Grant Funding: $11,505,044
Estimated Total Project Cost: $14,381,305
Project Description
This project is to replace seven bridges in northwest Oklahoma that were constructed between 1915 and 1981. All bridges are on rural roadways connecting agricultural areas with local towns and larger roadway facilities. All bridges are in fair or poor condition, have deficient horizontal clearances, and are loadposted. These postings affect oversize agricultural and oilfield vehicles, which are important to the region's economy. Energy sector and agricultural equipment, such as oil rig materials, combines, and large wind turbine towers must move on these narrow roadways and bridges.
Project Benefits
The project would eliminate these deficient bridges and restore safe crossings that meet regional traffic requirements for safety and weight. Load restrictions force commercial trucks, emergency vehicles, and school buses to detour to other routes. If no major rehabilitation or replacement occurs, the existing bridges will likely have to be closed in the next 15 years, which would have significant negative impacts to transportation network efficiency, accessibility and mobility of people and goods, and economic growth. The project will improve reliability and capacity of the bridges for the region's farmers, ranchers, and energy workers.
Image Source: Circuit Engineering District 8, Oklahoma. Existing bridge decks on two of the seven bridges.
www.fhwa.dot.gov/bridge/bip
OST-2025-1200 Page 02894
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
5
SC_EVERSPLIT0028604
September 8, 2022
The Honorable Pete Buttigieg Secretary UNITED STATES DEPARTMENT OF TRANSPORTATION 1200 New Jersey Avenue SE Washington, DC 20590
Phone: 202-366-4000 Email: DOTExecSec@dot.gov
Subject: Improving Rural Bridges in Northwest Oklahoma
Dear Secretary Buttigieg,
Circuit Engineering District #8 (CED #8) is requesting $12,943,175 in federal funds from the Bridge Investment Program to replace a bundle of seven bridges in northwestern Oklahoma. The proposed breakdown for the Improving Rural Bridges in Northwest Oklahoma Project is as follows:
BIP Share (90%) Other Federal Share (0%) Non-Federal Funds (10%) Total Eligible Project Cost
$12,943,175 $0 $1,438,130 $14,381,305
The funding for the local match will come from the Oklahoma Department of Transportation's (ODOT's) County Improvements for Roads and Bridges (CIRB) fund. The CIRB fund consists of state dollars specifically set aside for road and bridge improvements on Oklahoma's county system. The CIRB fund is allocated equally to ODOT's eight districts. CED #8 covers fourteen counties in northwestern Oklahoma. CED #8 has committed $1,438,130 of its CIRB allocation as match for this BIP grant request. These funds are committed and available for this Project. In addition to the 10% match, CED #8 has also committed close to $800,000 for design and environmental activities (pre-incurred costs).
If you have any questions, please call me at (580) 327-2278.
Sincerely,
Circuit Engineering District #8
cl)w(g, Max Hess
ile4a.
President
Marc Bolz Vice Presiders
son Kienholz Secretary-Tres
OST-2025-1200 Page 02895
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
SC_EVERSPLIT0028605
SC_EVERSPLIT0028606
OST-2025-1200 Page 02896
Sierra Club v. Dept. of Transp. - 3:25-cv-06221
PROJECT ki NE -
Design
Environmental Right-of-Way and Utilities Construction & Inspection
TOTAL % OF FUTURE ELIGIBLE COSTS
OTHER FEDERAL
$0 $0 $0 $0
0.0%
SIP
$0 $0 $264,600
SOURCES of FUNDS
NON-FEDERAL FUNDS
FUTURE PROJECT COSTS
ODOT ,
$0
$0
,.., PREVIOUSLY INCURRED COSTS
$549,000
. TOTAL PROJECT COSTS
$549,000
$0
$0
$162,830
$162,830
$29,400
$294,000
$84,000
$378,000
$12,678,575 $1,408,730
$14,087,305
$0
$14,087,305
12,943,175 90.0%
$1,438,13,e ..
10.0%
$14,381,305 100%
$795 830
$15 177 135